You are on page 1of 6

PROJECT PROPOSAL

Everyday steel storage


Pvt ltd,
H 45, UPSIDC site 4
Greater Noida (UP)

Works:
Plot No. 12 Ecotech-6,
Greater Noida GB Nagar
(UP) 201308

Everyday Steel Storage Pvt.Ltd. Page 1


27th May 2019

Dear Sir

Thank you for considering our proprietary Equipment. It is our pleasure to forward you
our budgetary proposal based on the details you have provided.

We present our proposal offer based on the details provided by you and trust the same
meets your requirement adequately.

Our Proposal Consists of:


1. Product Details
2. Model & Price Details
3. Commercial Details
4. Scope Matrix
5. Site Work Details
6. Description of Components
7. Additional Data

Should you require any further information, please feel free to contact the undersigned.
Thanking you and assuring you of our best attention at all times, we remain,

Yours truly,
For Everyday Steel Storage Pvt. Ltd.
Pankaj Upadhyay
Director- Operations
(HP: - +91-9810381538)

Everyday Steel Storage Pvt.Ltd. Page 2


1 : - PRODUCT DETAILS (Scope of Supply)
MANUFACTURER Everyday Steel storage Pvt. Ltd.

MOC MS PAINTED

PROJECT TYPE MATERIAL HANDLING EQUIPMENT’S

MODEL Multiple

TYPE

EFFECTIVE CAPACITY Depends on Requirement


(to be specified by client)

Everyday Steel Storage Pvt.Ltd. Page 3


2 : - MODEL & PRICE DETAILS

Sr. Application Model CASING DIMENSIONS ROLLERS Qty. Price Net Amount
No MOC (mm) MOC (No.) INR
.

1. BELT BC-200 SS-304 BODY 3600 X 200 X 1100 SS-304 PIPE 1 NOS 1,05,000 1,05,000
CONVEYOR WITH
PANEL
2. ROLLER RC-600 SS-304 BODY 3000 X 600 X 680 SS-304 PIPE 1 NOS 80,000 80,000
CONVEYOR
3. ROLLER RC-500 SS-304 BODY 1400 X 500 X 640 SS-304 PIPE 1 NOS 40,000 40,000
CONVEYOR

PANEL PROVIDED WITH BELT CONVEYOR INCLUDED


TRANSPORTATION CHARGES AS PER
ACTUAL
ERECTION AND COMMISSIONING 25,000

TOTAL COST 2,50,000

Note-
These Prices are Final Prices and exclusive of taxes.
These Prices includes supply and scope of work as mentioned in the
Scope matrix.
ESSPL- Everyday Steel Storage Private Limited.
 Transportation will be client scope.

Everyday Steel Storage Pvt.Ltd. Page 4


: COMMERCIAL DETAILS

Price Basis

 Prices: Exclude taxes


 P&F charges: included.
 Transportation charges: As per Annexure
 Taxes: 18% GST

Payment Terms

 50% Advance with Purchase Order.


 50% Against PI prior to dispatch.
 Billing Address: PLOT NO 12, ECOTECH-VI, KASNA, GREATER NOIDA, GAUTAM
BUDDHA NAGAR, U.P. STATE – 201308, INDIA.
 GSTIN- 09AAFCE1464L1ZE

Supervision Charges for Installation:

 Air fare from Delhi, train Charges: ESSPL Scope


 Lodging, Boarding & Local conveyance: ESSPL Scope
 Civil Foundation: Client Scope, Indicative / Tentative Drawing shall be provided by
ESSPL. However, detailed engineering, Soil testing and construction of civil
foundation in Client Scope.
 Local Labour: ESSPL Scope.
 Unloading and storage of Material at Site: Client Scope
 Electricity for installation: Client Scope
 O & M: Client Scope

Delivery

 Dispatch from Greater Noida Within 15 days from the date of receipt of Advance
Payment and Drawing approval whichever is Later.
 Production Initiates only after the receipt of Advance Payment.
 Drawings to be approved by client within 2 days of Submission by ESSPL Design
Team

Everyday Steel Storage Pvt.Ltd. Page 5


Estimated Installation Time

Model No. Multiple

INSTALLATION TIME 2-3 DAYS


COMMISSIONING TIME 1 DAY

Everyday Steel Storage Pvt.Ltd. Page 6