Floor dimensions:
Length: 130m; Width: 4x15m; Height: 15m; 4 cranes between 20-40 t
Note: 70 t cranes are required when manufacturing the 2.5MW class.
If a country has the economic opportunity and the potential not only to see
today's business, but also to think long term, then the production and use of
wind turbines is a step in the right direction.
It enables the generation of energy while conserving fossil fuel reserves. At
the same time it will strengthen the industrial development of the country.
The purchase of finished products from abroad only contributes little to this.
The work in the factory for the 1.5MW wind-turbine: Foundry for cast-iron GJS-
400; machining of rotor-hub, mainframe; generator, shaft and axle for the
bearings.
Assembling of generator, hub, nacelle; test of the complete wind-turbine.
outsourced: coil for generator stator; tower; rotor-blades.
3.8m
Procedure of selection.
a. For a type of plant matching products are selected on the market, al-
ways trying to get the rotor surface in relation to the allowable wind strength
and power as large as possible.
b. In parallel with the selection, it is analysed where appropriate facto-
ries are available for the selected rotor-blades and what is the effort for
transport.
c. In addition, it is also considered whether licenses for the products are
to be obtained, because already with a planned production of about 30-50 WT,
a license may have paid off through a local production.