Contract: SN:
Short-Circuit Analysis
Line/Cable/
XFMR2 XFMR3 Reactor Busway Impedance Tie PD Total
Number of Machines: 2 0 0 37 0 39
Contract: SN:
Adjustments
Apply Individual
Tolerance Adjustments /Global Percent
Apply Individual
Temperature Correction Adjustments /Global Degree C
Contract: SN:
Contract: SN:
Contract: SN:
Contract: SN:
Contract: SN:
ohms or siemens per 1000 m per Conductor (Cable) or per Phase (Line/Busway)
Line/Cable/Busway Length
P-20-TX-140 1.0NCUN3 185 160.0 0.0 2 20 0.1003883 0.073 0.0001442 0.1596174 0.18542
P-28-PA-204A 1.0NCUN3 4.0 90.0 0.0 1 20 4.603744 0.093 0.0000575 7.319953 0.23622
P-28-PA-209A 1.0NCUN3 6.0 50.0 0.0 1 20 3.074391 0.089 0.0000663 4.888282 0.22606
P-53-PA-442A 1.0NCUN3 4.0 120.0 0.0 1 20 4.603744 0.093 0.0000575 7.319953 0.23622
P-62-PA-924A 1.0NCUN3 4.0 100.0 0.0 1 20 4.603744 0.093 0.0000575 7.319953 0.23622
P-B1-28-PA-145A 1.0NCUN3 6.0 140.0 0.0 1 20 3.074391 0.089 0.0000663 4.888282 0.22606
P-B1-29-PA-211A 1.0NCUN3 6.0 60.0 0.0 1 20 3.074391 0.089 0.0000663 4.888282 0.22606
P-B1-63-CX-928A 1.0NCUN3 300 90.0 0.0 1 20 0.0627427 0.071 0.0001643 0.0997609 0.18034
P-B1-63-CX-928B 1.0NCUN3 300 75.0 0.0 1 20 0.0627427 0.071 0.0001643 0.0997609 0.18034
P-B1-CX-63-928C 1.0NCUN3 400 90.0 0.0 1 20 0.0501941 0.071 0.0001687 0.0798087 0.18034
P-B1-CX-64-929 1.0NCUN3 4.0 50.0 0.0 1 20 4.603744 0.093 0.0000575 7.319953 0.23622
P-B1-EL-82-004 1.0NCUN4 6.0 10.0 0.0 1 20 3.074391 0.089 0.0000663 4.888282 0.22606
P-B1-EL-82-005 1.0NCUN4 150 10.0 0.0 1 20 0.1247011 0.073 0.0001442 0.1982747 0.18542
P-B1-EL-83-002 1.0NCUN4 6.0 30.0 0.0 1 20 3.074391 0.089 0.0000663 4.888282 0.22606
P-B1-ET-82-00X 1.0NCUN3 240 165.0 0.0 1 20 0.0760755 0.072 0.0001565 0.12096 0.18288
P-B1-ET-82-003 1.0NCUN3 240 160.0 0.0 1 20 0.0760755 0.072 0.0001565 0.12096 0.18288
P-B1-ET-82-005 1.0NCUN3 240 160.0 0.0 2 20 0.0760755 0.072 0.0001565 0.12096 0.18288
P-B1-HOT OIL PAC FAN A 1.0NCUN3 25 100.0 0.0 1 20 0.7270308 0.082 0.0000889 1.155955 0.20828
P-B1-HOT OIL PAC FAN B 1.0NCUN3 25 90.0 0.0 1 20 0.7270308 0.082 0.0000889 1.155955 0.20828
Project: ETAP Page: 8
Contract: SN:
ohms or siemens per 1000 m per Conductor (Cable) or per Phase (Line/Busway)
Line/Cable/Busway Length
P-B1-HOT OIL TRANSFER B 1.0NCUN3 35 100.0 0.0 1 20 0.5246857 0.08 0.0001015 0.8342423 0.2032
P-B1-PX-25-306A 1.0NCUN3 4.0 175.0 0.0 1 20 4.603744 0.093 0.0000575 7.319953 0.23622
P-B1-PX-25-309A 1.0NCUN3 4.0 175.0 0.0 1 20 4.603744 0.093 0.0000575 7.319953 0.23622
P-B1-TX-20-139 1.0NCUN3 240 140.0 0.0 1 20 0.0760755 0.072 0.0001565 0.12096 0.18288
P-B1-XX-AMINE REFLUX 1.0NCUN3 25 175.0 0.0 1 20 0.7270308 0.082 0.0000889 1.155955 0.20828
COND
P-B1-XX-AMINE-PACKAGE 1.0NCUN3 4.0 175.0 0.0 1 20 4.603744 0.093 0.0000575 7.319953 0.23622
HEA
P-B1-XX-ANCILLERIES 1.0NCUN4 10 175.0 0.0 1 20 1.827381 0.084 0.0000807 2.905535 0.21336
P-B1-XX-XX-UPS BYPASS B 1.0NCUN4 4.0 30.0 0.0 1 20 4.603744 0.093 0.0000575 7.319953 0.23622
1
P-B1-XX-XX-XXX AMINE 1.0NCUN3 25 175.0 0.0 1 20 0.7270308 0.082 0.0000889 1.155955 0.20828
P-B1-XX-XX-XXX 1.0NCUN3 4.0 175.0 0.0 1 20 4.603744 0.093 0.0000575 7.319953 0.23622
ANITFOAM
P-B1-XX-XX-XXX HEAT 1.0NCUN3 150 200.0 0.0 1 20 0.1247011 0.073 0.0001442 0.1982747 0.18542
P-B1-XX-XX-XXX HOT OIL 1.0NCUN3 10 100.0 0.0 1 20 1.827381 0.084 0.0000807 2.905535 0.21336
P-B1-XX-XX-XXX OFFICES 1.0NCUN4 35 175.0 0.0 1 20 0.5246857 0.08 0.0001015 0.8342423 0.2032
P-B1-XX-XX-XXX UPS B1 1.0NCUN3 4.0 30.0 0.0 1 20 4.603744 0.093 0.0000575 7.319953 0.23622
P-B2-EC-13-001 1.0NCUN3 4.0 80.0 0.0 1 20 4.603744 0.093 0.0000575 7.319953 0.23622
P-B2-EC-13-002 1.0NCUN3 4.0 80.0 0.0 1 20 4.603744 0.093 0.0000575 7.319953 0.23622
P-B2-EC-13-003 1.0NCUN3 4.0 80.0 0.0 1 20 4.603744 0.093 0.0000575 7.319953 0.23622
P-B2-EC-13-004 1.0NCUN3 4.0 80.0 0.0 1 20 4.603744 0.093 0.0000575 7.319953 0.23622
P-B2-EC-13-006 1.0NCUN3 4.0 80.0 0.0 1 20 4.603744 0.093 0.0000575 7.319953 0.23622
P-B2-EL-82-007 1.0NCUN4 6.0 10.0 0.0 1 20 3.074391 0.089 0.0000663 4.888282 0.22606
P-B2-ER-83-001 1.0NCUN3 4.0 30.0 0.0 1 20 4.603744 0.093 0.0000575 7.319953 0.23622
P-B2-ET-82-001 1.0NCUN3 300 850.0 0.0 8 20 0.0627427 0.071 0.0001643 0.0997609 0.18034
P-B2-PD-42-951A 1.0NCUN3 4.0 65.0 0.0 1 20 4.603744 0.093 0.0000575 7.319953 0.23622
P-B2-PD-42-953A 1.0NCUN3 4.0 65.0 0.0 1 20 4.603744 0.093 0.0000575 7.319953 0.23622
P-B2-XX- HEAT TRACE 1.0NCUN3 4.0 50.0 0.0 1 20 4.603744 0.093 0.0000575 7.319953 0.23622
P-B3-63-KF-001 1.0NCUN3 4.0 85.0 0.0 1 20 4.603744 0.093 0.0000575 7.319953 0.23622
Project: ETAP Page: 9
Contract: SN:
ohms or siemens per 1000 m per Conductor (Cable) or per Phase (Line/Busway)
Line/Cable/Busway Length
P-B3-EL-82-001 1.0NCUN4 300 50.0 0.0 3 20 0.0627427 0.071 0.0001643 0.0997609 0.18034
P-B3-EL-82-008 1.0NCUN4 240 10.0 0.0 1 20 0.0760755 0.072 0.0001565 0.12096 0.18288
P-B3-EL-83-006 1.0NCUN4 6.0 50.0 0.0 1 20 3.074391 0.089 0.0000663 4.888282 0.22606
P-B3-ER-83-001 1.0NCUN3 4.0 20.0 0.0 1 20 4.603744 0.093 0.0000575 7.319953 0.23622
P-B3-ER-83-002 1.0NCUN4 6.0 50.0 0.0 1 20 3.074391 0.089 0.0000663 4.888282 0.22606
P-B3-ET-82-001 1.0NCUN3 300 10.0 0.0 3 20 0.0627427 0.071 0.0001643 0.0997609 0.18034
P-B3-ET-82-008 1.0NCUN3 400 290.0 0.0 5 20 0.0501941 0.071 0.0001687 0.0798087 0.18034
P-B3-PA-21-135 1.0NCUN3 4.0 50.0 0.0 1 20 4.603744 0.093 0.0000575 7.319953 0.23622
P-B3-PA-39-119A 1.0NCUN3 150 400.0 0.0 2 20 0.1247011 0.073 0.0001442 0.1982747 0.18542
P-B3-PA-39-119B 1.0NCUN3 150 400.0 0.0 2 20 0.1247011 0.073 0.0001442 0.1982747 0.18542
P-B3-PH-57-101A 1.0NCUN3 4.0 60.0 0.0 1 20 4.603744 0.093 0.0000575 7.319953 0.23622
P-B3-XX-OTHERS2 1.0NCUN4 4.0 10.0 0.0 1 20 4.603744 0.093 0.0000575 7.319953 0.23622
P-B3-XX-XX-OFFICES 1.0NCUN4 4.0 50.0 0.0 1 20 4.603744 0.093 0.0000575 7.319953 0.23622
P-MCC-B1-1 1.0NCUN3 400 90.0 0.0 5 20 0.0501941 0.071 0.0001687 0.0798087 0.18034
P-MCC-B1-2 1.0NCUN3 400 80.0 0.0 5 20 0.0501941 0.071 0.0001687 0.0798087 0.18034
P-MCC-B1-3 1.0NCUN1 630 80.0 0.0 4 20 0.0329399 0.086 0.0002023 0.0523745 0.21844
P-MCC-B1-4 1.0NCUN1 630 80.0 0.0 4 20 0.0329399 0.086 0.0002023 0.0523745 0.21844
P-Oil Serve Supply 1.0NCUN3 400 260.0 0.0 4 20 0.0501941 0.071 0.0001687 0.0798087 0.18034
Contract: SN:
20-TX-140 0.150 0.400 0.400 4.00 1.50 0 0 0 0 2.500 4.00 Dyn 30.00
B1-ET-82-00X 0.080 0.400 0.400 4.00 1.50 0 0 0 0 2.500 4.00 Dyn 30.00
B1-ET-82-004 0.050 0.400 0.400 4.00 1.50 0 0 0 0 2.500 4.00 Dyn 30.00
B1-ET-82-005 0.300 0.400 0.400 4.00 1.50 0 0 0 0 2.500 4.00 Dyn 30.00
B2-ET-82-001 0.150 0.400 0.400 4.00 1.50 0 0 0 0 2.500 4.00 Dyn 30.00
B3-ET-82-002 1.000 6.600 0.400 5.00 3.50 0 0 0 0 5.000 5.00 Dyn 30.00
B3-ET-82-010 0.100 0.400 0.400 4.00 1.50 0 0 0 0 2.500 4.00 Dyn 30.00
Grounding
Transformer Rating Conn. Primary Secondary
ID MVA Prim. kV Sec. kV Type Type kV Amp ohm Type kV Amp ohm
Contract: SN:
Grounding
Transformer Rating Conn. Primary Secondary
ID MVA Prim. kV Sec. kV Type Type kV Amp ohm Type kV Amp ohm
Contract: SN:
Branch Connections
Contract: SN:
P-B1-HOT OIL PAC FAN A Cable MCC-B1 BUS A P-B1-HOT OIL PAC FAN A~ 4543.94 512.50 4572.75 0.0000014
P-B1-HOT OIL PAC FAN B Cable MCC-B1 BUS A P-B1-HOT OIL PAC FAN B~ 4089.55 461.25 4115.48 0.0000013
P-B1-HOT OIL TRANSFER B Cable MCC-B1 BUS A Bus14 3279.29 500.00 3317.19 0.0000016
P-B1-XX-AMINE REFLUX Cable MCC-B1 BUS A Bus104 7951.90 896.88 8002.32 0.0000025
COND
P-B1-XX-AMINE-PACKAGE Cable MCC-B1 BUS A Bus117 50353.45 1017.19 50363.72 0.0000016
HEA
P-B1-XX-ANCILLERIES Cable LSPDB-B1 Bus78 19023.89 874.48 19043.98 0.0000024
P-B1-XX-XX-XXX AMINE Cable MCC-B1 BUS A Bus133 7951.90 896.88 8002.32 0.0000025
P-B1-XX-XX-XXX ANITFOAM Cable MCC-B1 BUS A Bus132 50353.45 1017.19 50363.72 0.0000016
P-B1-XX-XX-XXX HEAT Cable MCC-B1 BUS A Bus59 1558.76 912.50 1806.21 0.0000046
P-B1-XX-XX-XXX HOT OIL Cable MCC-B1 BUS A Bus115 11421.13 525.00 11433.19 0.0000013
P-B1-XX-XX-XXX UPS B1 Cable MCC-B1 BUS A Bus131 8632.02 174.38 8633.78 0.0000003
Contract: SN:
P-B2-XX- HEAT TRACE Cable MCC-B2 Bus94 13693.47 276.62 13696.26 0.0000005
P-Oil Serve Supply Cable MCC-B1 BUS A Bus169 203.91 288.44 353.24 0.0000281
Project: ETAP Page: 15
Contract: SN:
GG-001 Steam Turbo 2.790 0.400 1500 80.00 0.774 14.70 0.0 0.05 155.00 Wye Solid 0.00 Turbine 130%
GG-002 Steam Turbo 2.790 0.400 1500 80.00 0.774 14.70 0.0 0.05 155.00 Wye Solid 0.00 Turbine 130%
Contract: SN:
ID Type Qty ID HP/kW kVA kV Amp PF %R % X" R/X" Conn. Type Amp MW/PP
B1-20-PA-117A Motor 1 Bus3 18.50 25.69 0.400 37.09 80.00 7.42 14.92 0.50 Wye Open 0.01
62-PA-924A Motor 1 Bus5 2.20 3.44 0.400 4.96 80.00 11.11 12.42 0.89 Wye Open 0.00
B1-CX-63-928A Motor 1 Bus7 290.00 358.02 0.400 516.76 90.00 3.37 16.32 0.21 Wye Open 0.15
B1-HC-21-107C Motor 1 Bus8 30.00 41.67 0.400 60.14 80.00 6.59 15.31 0.43 Wye Open 0.02
HOT OIL TRANSFER PUMP Motor 1 Bus9 55.00 67.90 0.400 98.01 90.00 5.54 15.72 0.35 Wye Open 0.03
A
B1-28-PA-209A Motor 1 Bus11 15.00 20.83 0.400 30.07 80.00 7.79 14.74 0.53 Wye Open 0.01
B1-29-PA-211A Motor 1 Bus13 11.00 15.28 0.400 22.05 80.00 8.32 14.44 0.58 Wye Open 0.01
B1-HOT OIL TRANSFER B Motor 1 Bus14 55.00 67.90 0.400 98.01 90.00 5.54 15.72 0.35 Wye Open 0.03
B1-28-PA-204A Motor 1 Bus15 2.20 3.44 0.400 4.96 80.00 11.11 12.42 0.89 Wye Open 0.00
B1-53-PA-442A Motor 1 Bus19 4.00 4.94 0.400 7.13 90.00 10.07 13.28 0.76 Wye Open 0.00
B1-PX-25-306A Motor 1 Bus20 0.37 0.58 0.400 0.83 80.00 14.11 8.87 1.59 Wye Open 0.00
B3-PA-21-135 Motor 1 Bus31 5.00 6.17 0.400 8.91 90.00 9.69 13.56 0.71 Wye Open 0.00
B1-PA-25-315A Motor 1 Bus32 15.00 20.83 0.400 30.07 80.00 7.79 14.74 0.53 Wye Open 0.01
B1-28-PA-137A Motor 1 Bus34 45.00 62.50 0.400 90.21 80.00 5.89 15.59 0.38 Wye Open 0.02
B1-21-PA-120A Motor 1 Bus36 55.00 67.90 0.400 98.01 90.00 5.54 15.72 0.35 Wye Open 0.03
B1-HC-21-107A Motor 1 Bus38 30.00 41.67 0.400 60.14 80.00 6.59 15.31 0.43 Wye Open 0.02
B1-20-PA-138A Motor 1 Bus40 55.00 67.90 0.400 98.01 90.00 5.54 15.72 0.35 Wye Open 0.03
B3-PH-57-101A Motor 1 Bus45 7.50 10.42 0.400 15.04 80.00 8.99 14.04 0.64 Wye Open 0.00
B1-28-PA-145A Motor 1 Bus53 7.50 9.26 0.400 13.36 90.00 8.99 14.04 0.64 Wye Open 0.00
B1-HC-21-107B Motor 1 Bus56 30.00 41.67 0.400 60.14 80.00 6.59 15.31 0.43 Wye Open 0.02
B1-PX-25-309A Motor 1 Bus57 1.50 2.34 0.400 3.38 80.00 11.77 11.80 1.00 Wye Open 0.00
B2-PD-42-951A Motor 1 Bus69 0.37 0.58 0.400 0.83 80.00 14.11 8.87 1.59 Wye Open 0.00
B2-PD-42-953A Motor 1 Bus75 0.37 0.58 0.400 0.83 80.00 14.11 8.87 1.59 Wye Open 0.00
B1-CX-63-928C Motor 1 Bus84 290.00 402.78 0.400 581.36 80.00 3.37 16.32 0.21 Wye Open 0.15
B1-HOT OIL PAC FAN A Motor 1 Bus88 37.00 51.39 0.400 74.17 80.00 6.23 15.46 0.40 Wye Open 0.02
B1-CX-63-928B Motor 1 Bus99 290.00 358.02 0.400 516.76 90.00 3.37 16.32 0.21 Wye Open 0.15
B1-XX-COMBUSTION Motor 1 Bus100 30.00 41.67 0.400 60.14 80.00 6.59 15.31 0.43 Wye Open 0.02
B1-XX-AMINE REFLUX Motor 1 Bus104 18.50 25.69 0.400 37.09 80.00 7.42 14.92 0.50 Wye Open 0.01
COND
B1-CX-64-929 Motor 1 Bus105 4.00 5.56 0.400 8.02 80.00 10.07 13.28 0.76 Wye Open 0.00
B1-HOT OIL PAC FAN B Motor 1 Bus106 37.00 51.39 0.400 74.17 80.00 6.23 15.46 0.40 Wye Open 0.02
HOT OIL FILL DRAIN PUMP Motor 1 Bus116 0.60 0.94 0.400 1.35 80.00 13.42 9.88 1.36 Wye Open 0.00
B1-XX-XX-XXX ANTIFOAM Motor 1 Bus132 2.20 3.44 0.400 4.96 80.00 11.11 12.42 0.89 Wye Open 0.00
B1-HE-25-310 Motor 1 Bus144 18.50 25.69 0.400 37.09 80.00 7.42 14.92 0.50 Wye Open 0.01
B3-KF-39-902 Motor 1 Bus151 18.50 25.69 0.400 37.09 80.00 7.42 14.92 0.50 Wye Open 0.01
B3-PA-39-119A Motor 1 Bus152 112.00 138.27 0.400 199.58 90.00 4.39 16.08 0.27 Wye Open 0.06
B3-PA-39-119B Motor 1 Bus153 112.00 138.27 0.400 199.58 90.00 4.39 16.08 0.27 Wye Open 0.06
Project: ETAP Page: 17
Contract: SN:
ID Type Qty ID HP/kW kVA kV Amp PF %R % X" R/X" Conn. Type Amp MW/PP
B3-KA-63-001 Motor 1 Bus157 22.00 30.56 0.400 44.10 80.00 7.12 15.07 0.47 Wye Open 0.01
Contract: SN:
AC Rating
% Impedance
kVA kV FLA Input Output Bypass Equipment Base
ID Output Input Output Input Output % EFF % PF Hz % Imax Switch R X
VFD107A 30.00 0.400 0.400 43.30 43.30 100.00 100.00 60.00 150.0 No 66.67 0.00
VFD117A 18.50 0.400 0.400 26.70 26.70 100.00 100.00 60.00 150.0 No 66.67 0.00
VFD_119A 112.00 0.400 0.400 161.66 161.66 100.00 100.00 60.00 150.0 No 66.67 0.00
VFD_119B 112.00 0.400 0.400 161.66 161.66 100.00 100.00 60.00 150.0 No 66.67 0.00
VFD120A 55.00 0.400 0.400 79.39 79.39 100.00 100.00 60.00 150.0 No 66.67 0.00
VFD138A 55.00 0.400 0.400 79.39 79.39 100.00 100.00 60.00 150.0 No 66.67 0.00
VFD_928A 290.00 0.400 0.400 418.58 418.58 100.00 100.00 60.00 150.0 No 66.67 0.00
VFD_928B 290.00 0.400 0.400 418.58 418.58 100.00 100.00 60.00 150.0 No 66.67 0.00
VFD_928C 290.00 0.400 0.400 418.58 418.58 100.00 100.00 60.00 150.0 No 66.67 0.00
VFD_FANA 37.00 0.400 0.400 53.40 53.40 100.00 100.00 60.00 150.0 No 66.67 0.00
VFD_FANB 37.00 0.400 0.400 53.40 53.40 100.00 100.00 60.00 150.0 No 66.67 0.00
Project: ETAP Page: 19
Contract: SN:
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0
Bus1 Total 0.00 4.155 0.00 100.75 101.79 4.483 4.483 1.91E+003 2.90E+003 1.45E+003 2.17E+003
MCC-B2 Bus1 0.02 0.010 0.01 100.75 101.79 0.006 0.000 1.17E+006 7.30E+005
Bus71 Bus1 76.77 4.145 87.95 103.50 89.08 4.477 4.483 * 1.91E+003 2.91E+003 1.45E+003 2.17E+003
Contract: SN:
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0
Bus2 Total 0.00 52.541 0.00 103.30 112.02 52.016 52.016 5.83E+001 2.83E+002 6.97E+001 1.80E+002
MCC-B1 BUS A Bus2 7.10 51.935 9.79 102.62 110.91 51.638 52.016 5.77E+001 2.86E+002 6.97E+001 1.80E+002
Bus27 Bus2 2.18 0.648 24.41 101.38 104.18 0.391 0.000 1.26E+004 1.97E+004
Contract: SN:
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0
Bus3 Total 0.00 0.255 0.00 126.32 180.01 0.098 0.098 3.40E+004 4.87E+004 3.60E+005 5.41E-005
B1-20-PA-117A Bus3 105.00 0.234 105.00 105.00 105.00 0.059 0.000 2.89E+004 5.81E+004
VFD117A Bus3 105.00 0.042 105.00 105.00 105.00 0.042 0.098 3.60E+005 5.41E-005 3.60E+005 5.41E-005
Contract: SN:
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0
Bus4 Total 0.00 2.285 0.00 101.09 104.47 2.387 2.387 4.23E+003 5.11E+003 3.85E+003 4.20E+003
Bus64 Bus4 11.36 2.285 14.22 101.59 102.31 2.387 2.387 4.23E+003 5.11E+003 3.85E+003 4.20E+003
Contract: SN:
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0
Bus5 Total 0.00 0.548 0.00 114.94 116.66 0.446 0.446 2.76E+004 1.96E+003 4.58E+004 1.62E+003
MCC-B1 BUS A Bus5 104.81 0.526 104.82 104.82 105.22 0.438 0.446 2.88E+004 8.50E+002 4.58E+004 1.62E+003
62-PA-924A Bus5 105.00 0.031 105.00 105.00 105.00 0.013 0.000 3.23E+005 3.61E+005
Contract: SN:
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0
Bus6 Total 0.00 10.904 0.00 98.61 96.75 13.171 13.171 4.28E+002 1.19E+003 1.33E+002 4.66E+002
MCC-B3 Bus6 0.42 0.615 0.28 98.66 96.88 0.409 0.000 1.22E+004 1.88E+004
Bus29 Bus6 36.34 10.306 66.04 103.76 63.74 12.766 13.171 * 4.36E+002 1.26E+003 1.33E+002 4.66E+002
Contract: SN:
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0
Bus7 Total 0.00 3.450 0.00 130.55 182.39 1.614 1.614 1.68E+003 4.06E+003 2.30E+004 3.45E-006
B1-CX-63-928A Bus7 105.00 3.256 105.00 105.00 105.00 1.011 0.000 9.43E+002 4.56E+003
VFD_928A Bus7 105.00 0.659 105.00 105.00 105.00 0.659 1.614 2.30E+004 3.45E-006 2.30E+004 3.45E-006
Contract: SN:
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0
Bus8 Total 0.00 3.222 0.00 115.99 117.97 2.558 2.558 4.49E+003 1.39E+003 7.87E+003 2.05E+003
MCC-B1 BUS A Bus8 103.10 2.991 103.25 104.05 106.27 2.466 2.558 4.96E+003 1.02E+003 7.87E+003 2.05E+003
B1-HC-21-107C Bus8 105.00 0.379 105.00 105.00 105.00 0.161 0.000 1.58E+004 3.67E+004
Contract: SN:
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0
Bus9 Total 0.00 4.801 0.00 114.13 119.48 3.835 3.835 2.98E+003 1.04E+003 5.26E+003 1.41E+003
MCC-B1 BUS A Bus9 102.07 4.441 102.38 103.58 106.84 3.661 3.835 3.32E+003 7.71E+002 5.26E+003 1.41E+003
HOT OIL Bus9 105.00 0.617 105.00 105.00 105.00 0.301 0.000 8.16E+003 2.32E+004
TRANSFER PUMP
A
Contract: SN:
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0
Bus10 Total 0.00 2.998 0.00 101.73 101.13 3.220 3.220 2.88E+003 4.15E+003 2.17E+003 3.25E+003
Bus24 Bus10 81.26 2.998 92.57 105.73 91.91 3.220 3.220 * 2.88E+003 4.15E+003 2.17E+003 3.25E+003
Contract: SN:
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0
Bus11 Total 0.00 1.673 0.00 114.12 118.86 1.344 1.344 8.95E+003 1.39E+003 1.53E+004 8.49E+002
MCC-B1 BUS A Bus11 104.39 1.568 104.45 104.48 105.69 1.304 1.344 9.65E+003 5.47E+002 1.53E+004 8.49E+002
B1-28-PA-209A Bus11 105.00 0.189 105.00 105.00 105.00 0.081 0.000 3.74E+004 7.07E+004
Contract: SN:
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0
Bus12 Total 0.00 4.193 0.00 101.89 100.85 4.515 4.515 1.99E+003 2.80E+003 1.45E+003 2.17E+003
Bus26 Bus12 77.66 4.193 89.56 103.49 88.44 4.515 4.515 * 1.99E+003 2.80E+003 1.45E+003 2.17E+003
Contract: SN:
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0
Bus13 Total 0.00 1.388 0.00 114.37 118.30 1.118 1.118 1.08E+004 1.48E+003 1.84E+004 9.90E+002
MCC-B1 BUS A Bus13 104.49 1.308 104.54 104.56 105.57 1.088 1.118 1.16E+004 6.03E+002 1.84E+004 9.90E+002
B1-29-PA-211A Bus13 105.00 0.139 105.00 105.00 105.00 0.059 0.000 5.45E+004 9.45E+004
Contract: SN:
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0
Bus15 Total 0.00 0.606 0.00 114.88 116.48 0.495 0.495 2.50E+004 1.70E+003 4.12E+004 1.47E+003
MCC-B1 BUS A Bus15 104.79 0.584 104.80 104.80 105.25 0.487 0.495 2.59E+004 7.91E+002 4.12E+004 1.47E+003
B1-28-PA-204A Bus15 105.00 0.031 105.00 105.00 105.00 0.013 0.000 3.23E+005 3.61E+005
Contract: SN:
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0
Bus19 Total 0.00 0.468 0.00 114.99 118.01 0.375 0.375 3.22E+004 3.33E+003 5.49E+004 1.91E+003
MCC-B1 BUS A Bus19 104.84 0.438 104.86 104.85 105.19 0.364 0.375 3.46E+004 9.66E+002 5.49E+004 1.91E+003
B1-53-PA-442A Bus19 105.00 0.045 105.00 105.00 105.00 0.019 0.000 2.04E+005 2.69E+005
Contract: SN:
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0
Bus20 Total 0.00 0.305 0.00 115.00 115.10 0.253 0.253 4.96E+004 1.70E+003 8.01E+004 2.73E+003
MCC-B1 BUS A Bus20 104.89 0.301 104.89 104.89 105.12 0.251 0.253 5.04E+004 1.29E+003 8.01E+004 2.73E+003
B1-PX-25-306A Bus20 105.00 0.005 105.00 105.00 105.00 0.002 0.000 2.44E+006 1.53E+006
Contract: SN:
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0
Bus24 Total 0.00 13.230 0.00 120.28 116.18 10.223 10.223 7.11E+002 8.98E+002 1.11E+003 1.74E+003
MCC-B1 BUS A Bus24 84.01 13.230 88.00 102.64 107.44 10.223 10.223 7.11E+002 8.98E+002 1.11E+003 1.74E+003
Contract: SN:
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0
Bus25 Total 0.00 1.573 0.00 111.20 113.88 1.365 1.365 8.79E+003 2.61E+003 1.29E+004 3.36E+003
LSPDB-B1 Bus25 87.20 1.573 90.92 102.71 105.76 1.365 1.365 8.79E+003 2.61E+003 1.29E+004 3.36E+003
Contract: SN:
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0
Bus26 Total 0.00 18.109 0.00 115.74 116.52 14.518 14.518 5.47E+002 6.33E+002 8.47E+002 1.07E+003
MCC-B1 BUS A Bus26 77.86 18.109 82.08 101.34 108.92 14.518 14.518 5.47E+002 6.33E+002 8.47E+002 1.07E+003
Contract: SN:
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0
Bus27 Total 0.00 1.280 0.00 190.53 190.53 0.000 0.000 1.93E+002 7.27E+002
Bus29 Bus27 0.57 0.042 0.00 190.53 190.53 0.000 0.000 1.24E+004 1.93E+004
Bus2 Bus27 68.72 1.240 110.00 110.00 110.00 0.000 0.000 1.91E+002 7.52E+002
Contract: SN:
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0
Bus29 Total 0.00 1.173 0.00 190.53 190.53 0.000 0.000 2.98E+002 7.64E+002
Bus27 Bus29 15.49 1.132 0.00 190.53 190.53 0.000 0.000 3.03E+002 7.94E+002
Bus6 Bus29 2.45 0.042 115.50 115.50 115.50 0.000 0.000 1.23E+004 1.92E+004
Contract: SN:
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0
Bus31 Total 0.00 1.048 0.00 112.31 117.70 0.867 0.867 1.30E+004 1.98E+003 2.10E+004 1.31E+003
MCC-B3 Bus31 100.64 1.010 102.03 103.42 106.14 0.853 0.867 1.35E+004 1.51E+003 2.10E+004 1.31E+003
B3-PA-21-135 Bus31 105.00 0.056 105.00 105.00 105.00 0.024 0.000 1.42E+005 1.99E+005
Contract: SN:
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0
Bus32 Total 0.00 1.314 0.00 115.29 119.22 1.038 1.038 1.13E+004 2.43E+003 2.00E+004 2.36E+003
MCC-B1 BUS A Bus32 104.45 1.201 104.50 104.62 105.53 0.995 1.038 1.26E+004 1.14E+003 2.00E+004 2.36E+003
B1-PA-25-315A Bus32 105.00 0.189 105.00 105.00 105.00 0.080 0.000 3.74E+004 7.07E+004
Contract: SN:
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0
Bus34 Total 0.00 4.924 0.00 115.51 118.51 3.915 3.915 2.87E+003 1.12E+003 5.05E+003 1.77E+003
MCC-B1 BUS A Bus34 101.58 4.564 101.91 103.57 106.82 3.743 3.915 3.19E+003 9.13E+002 5.05E+003 1.77E+003
B1-28-PA-137A Bus34 105.00 0.568 105.00 105.00 105.00 0.275 0.000 9.42E+003 2.49E+004
Contract: SN:
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0
Bus35 Total 0.00 1.048 0.00 113.87 114.18 0.885 0.885 1.28E+004 2.64E+003 1.99E+004 4.18E+003
MCC-B3 Bus35 99.62 1.048 101.05 103.32 105.94 0.885 0.885 1.28E+004 2.64E+003 1.99E+004 4.18E+003
Contract: SN:
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0
Bus36 Total 0.00 0.669 0.00 130.44 178.19 0.299 0.299 1.12E+004 1.97E+004 1.21E+005 1.82E-005
B1-21-PA-120A Bus36 105.00 0.617 105.00 105.00 105.00 0.183 0.000 8.16E+003 2.32E+004
VFD120A Bus36 105.00 0.125 105.00 105.00 105.00 0.125 0.299 1.21E+005 1.82E-005 1.21E+005 1.82E-005
Contract: SN:
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0
Bus38 Total 0.00 0.411 0.00 126.22 181.32 0.160 0.160 1.96E+004 3.13E+004 2.22E+005 3.33E-005
B1-HC-21-107A Bus38 105.00 0.379 105.00 105.00 105.00 0.097 0.000 1.58E+004 3.67E+004
VFD107A Bus38 105.00 0.068 105.00 105.00 105.00 0.068 0.160 2.22E+005 3.33E-005 2.22E+005 3.33E-005
Contract: SN:
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0
Bus40 Total 0.00 0.669 0.00 130.44 178.19 0.299 0.299 1.12E+004 1.97E+004 1.21E+005 1.82E-005
B1-20-PA-138A Bus40 105.00 0.617 105.00 105.00 105.00 0.183 0.000 8.16E+003 2.32E+004
VFD138A Bus40 105.00 0.125 105.00 105.00 105.00 0.125 0.299 1.21E+005 1.82E-005 1.21E+005 1.82E-005
Contract: SN:
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0
Bus42 Total 0.00 1.268 0.00 103.29 102.24 1.325 1.325 8.56E+003 7.49E+003 7.25E+003 6.64E+003
Bus60 Bus42 16.89 1.268 21.12 103.96 99.09 1.325 1.325 8.56E+003 7.49E+003 7.25E+003 6.64E+003
Contract: SN:
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0
Bus43 Total 0.00 0.605 0.00 113.29 115.16 0.509 0.509 2.27E+004 1.69E+003 3.55E+004 1.77E+003
MCC-B3 Bus43 102.50 0.605 103.25 104.02 105.63 0.509 0.509 2.27E+004 1.69E+003 3.55E+004 1.77E+003
Contract: SN:
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0
Bus44 Total 0.00 2.172 0.00 101.06 104.25 2.274 2.274 4.22E+003 5.13E+003 3.80E+003 4.19E+003
Bus41 Bus44 10.79 2.172 13.55 101.56 102.18 2.274 2.274 4.22E+003 5.13E+003 3.80E+003 4.19E+003
Contract: SN:
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0
Bus47 Total 0.00 2.012 0.00 116.27 112.57 1.687 1.687 5.97E+003 3.31E+003 8.96E+003 5.89E+003
MCC-B3 Bus47 90.20 2.012 93.79 102.21 105.90 1.687 1.687 5.97E+003 3.31E+003 8.96E+003 5.89E+003
Contract: SN:
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0
Bus48 Total 0.00 8.523 0.00 103.83 103.18 8.819 8.819 6.48E+002 1.48E+003 4.90E+002 1.23E+003
MCC-B3 Bus48 18.61 8.523 27.27 99.59 100.83 8.819 8.819 6.48E+002 1.48E+003 4.90E+002 1.23E+003
Contract: SN:
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0
Bus49 Total 0.00 2.346 0.00 108.13 117.34 2.032 2.032 5.70E+003 1.35E+003 8.53E+003 9.04E+002
MCC-B3 Bus49 93.55 2.346 96.99 101.13 107.24 2.032 2.032 5.70E+003 1.35E+003 8.53E+003 9.04E+002
Contract: SN:
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0
Bus50 Total 0.00 1.296 0.00 104.11 94.55 1.456 1.456 7.39E+003 7.60E+003 3.94E+003 5.90E+003
Bus33 Bus50 70.27 1.296 91.64 105.40 80.62 1.456 1.456 * 7.39E+003 7.60E+003 3.94E+003 5.90E+003
Contract: SN:
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0
Bus52 Total 0.00 1.071 0.00 105.09 114.99 0.977 0.977 1.13E+004 4.57E+003 1.54E+004 3.66E+003
LSP-DB-B3 Bus52 71.33 1.071 77.84 101.13 105.96 0.977 0.977 1.13E+004 4.57E+003 1.54E+004 3.66E+003
Contract: SN:
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0
Bus53 Total 0.00 0.614 0.00 114.98 119.40 0.486 0.486 2.44E+004 3.73E+003 4.28E+004 2.12E+003
MCC-B1 BUS A Bus53 104.79 0.562 104.81 104.82 105.25 0.466 0.486 2.69E+004 1.05E+003 4.28E+004 2.12E+003
B1-28-PA-145A Bus53 105.00 0.084 105.00 105.00 105.00 0.035 0.000 9.71E+004 1.52E+005
Contract: SN:
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0
Bus54 Total 0.00 1.930 0.00 115.72 113.84 1.607 1.607 7.77E+003 1.14E+003 1.23E+004 2.36E+003
MCC-B1 BUS A Bus54 103.94 1.930 103.96 104.32 105.76 1.607 1.607 7.77E+003 1.14E+003 1.23E+004 2.36E+003
Contract: SN:
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0
Bus56 Total 0.00 3.222 0.00 115.99 117.97 2.558 2.558 4.49E+003 1.39E+003 7.87E+003 2.05E+003
MCC-B1 BUS A Bus56 103.10 2.991 103.25 104.05 106.27 2.466 2.558 4.96E+003 1.02E+003 7.87E+003 2.05E+003
B1-HC-21-107B Bus56 105.00 0.379 105.00 105.00 105.00 0.161 0.000 1.58E+004 3.67E+004
Contract: SN:
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0
Bus57 Total 0.00 0.316 0.00 115.21 116.99 0.256 0.256 4.78E+004 3.44E+003 8.01E+004 2.73E+003
MCC-B1 BUS A Bus57 104.89 0.301 104.90 104.90 105.13 0.250 0.256 5.04E+004 1.29E+003 8.01E+004 2.73E+003
B1-PX-25-309A Bus57 105.00 0.021 105.00 105.00 105.00 0.009 0.000 5.02E+005 5.03E+005
Contract: SN:
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0
Bus59 Total 0.00 7.609 0.00 120.75 114.36 6.001 6.001 1.60E+003 1.18E+003 2.53E+003 2.46E+003
MCC-B1 BUS A Bus59 95.22 7.609 96.49 103.10 107.01 6.001 6.001 1.60E+003 1.18E+003 2.53E+003 2.46E+003
Contract: SN:
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0
Bus61 Total 0.00 1.937 0.00 99.73 109.01 1.963 1.963 5.00E+003 4.55E+003 5.32E+003 3.62E+003
LSP-DB-B3 Bus61 30.68 1.937 37.35 99.21 104.14 1.963 1.963 5.00E+003 4.55E+003 5.32E+003 3.62E+003
Contract: SN:
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0
Bus62 Total 0.00 19.972 0.00 116.21 116.53 15.903 15.903 4.26E+002 6.28E+002 6.54E+002 1.06E+003
MCC-B1 BUS A Bus62 72.47 19.972 78.22 101.67 108.55 15.903 15.903 4.26E+002 6.28E+002 6.54E+002 1.06E+003
Contract: SN:
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0
Bus63 Total 0.00 11.884 0.00 121.11 116.08 9.133 9.133 8.06E+002 9.88E+002 1.26E+003 1.97E+003
MCC-B1 BUS A Bus63 86.24 11.884 89.84 102.85 107.21 9.133 9.133 8.06E+002 9.88E+002 1.26E+003 1.97E+003
Contract: SN:
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0
Bus64 Total 0.00 2.460 0.00 102.08 101.32 2.627 2.627 3.52E+003 5.06E+003 2.71E+003 4.07E+003
Bus63 Bus64 83.34 2.460 93.84 105.60 93.00 2.627 2.627 * 3.52E+003 5.06E+003 2.71E+003 4.07E+003
Contract: SN:
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0
Bus65 Total 0.00 6.993 0.00 99.33 100.15 7.828 7.828 1.15E+003 1.71E+003 7.23E+002 1.08E+003
Bus62 Bus65 64.76 6.993 81.12 104.27 82.08 7.828 7.828 * 1.15E+003 1.71E+003 7.23E+002 1.08E+003
Contract: SN:
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0
Bus67 Total 0.00 2.012 0.00 110.40 113.35 1.768 1.768 6.69E+003 2.59E+003 9.53E+003 3.31E+003
LSPDB-B1 Bus67 80.92 2.012 85.67 102.16 105.76 1.768 1.768 6.69E+003 2.59E+003 9.53E+003 3.31E+003
Contract: SN:
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0
Bus68 Total 0.00 0.812 0.00 107.40 115.42 0.721 0.721 1.55E+004 4.58E+003 2.19E+004 3.69E+003
LSP-DB-B3 Bus68 80.93 0.812 86.03 102.04 105.94 0.721 0.721 1.55E+004 4.58E+003 2.19E+004 3.69E+003
Contract: SN:
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0
Bus70 Total 0.00 1.716 0.00 100.35 111.49 1.690 1.690 6.12E+003 4.54E+003 7.11E+003 3.60E+003
LSP-DB-B3 Bus70 42.65 1.716 50.32 99.40 105.00 1.690 1.690 6.12E+003 4.54E+003 7.11E+003 3.60E+003
Contract: SN:
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0
Bus71 Total 0.00 17.388 0.00 118.66 116.57 13.534 13.534 4.62E+002 7.39E+002 7.11E+002 1.34E+003
MCC-B1 BUS A Bus71 75.76 17.378 81.60 102.40 107.71 13.529 13.534 4.62E+002 7.40E+002 7.11E+002 1.34E+003
Bus1 Bus71 0.20 0.011 69.03 70.27 110.90 0.004 0.000 1.17E+006 7.33E+005
Contract: SN:
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0
Bus72 Total 0.00 2.067 0.00 107.67 115.51 1.829 1.829 6.71E+003 1.92E+003 9.57E+003 1.60E+003
LSPDB-B1 Bus72 82.60 2.067 87.46 101.87 106.15 1.829 1.829 6.71E+003 1.92E+003 9.57E+003 1.60E+003
Contract: SN:
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0
Bus73 Total 0.00 1.573 0.00 111.20 113.88 1.365 1.365 8.79E+003 2.61E+003 1.29E+004 3.36E+003
LSPDB-B1 Bus73 87.20 1.573 90.92 102.71 105.76 1.365 1.365 8.79E+003 2.61E+003 1.29E+004 3.36E+003
Contract: SN:
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0
Bus75 Total 0.00 0.718 0.00 111.41 115.47 0.613 0.613 1.98E+004 3.38E+003 3.01E+004 3.30E+003
MCC-B2 Bus75 92.46 0.713 94.89 103.91 105.59 0.611 0.613 1.99E+004 3.35E+003 3.01E+004 3.30E+003
B2-PD-42-953A Bus75 105.00 0.005 105.00 105.00 105.00 0.002 0.000 2.32E+006 1.46E+006
Contract: SN:
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0
Bus78 Total 0.00 0.707 0.00 112.98 114.51 0.600 0.600 2.02E+004 2.63E+003 3.11E+004 3.42E+003
LSPDB-B1 Bus78 97.94 0.707 99.57 103.93 105.47 0.600 0.600 2.02E+004 2.63E+003 3.11E+004 3.42E+003
Contract: SN:
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0
Bus79 Total 0.00 1.800 0.00 109.00 115.13 1.578 1.578 7.75E+003 2.06E+003 1.12E+004 1.96E+003
LSPDB-B1 Bus79 85.55 1.800 89.79 102.29 106.01 1.578 1.578 7.75E+003 2.06E+003 1.12E+004 1.96E+003
Contract: SN:
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0
Bus80 Total 0.00 1.800 0.00 109.00 115.13 1.578 1.578 7.75E+003 2.06E+003 1.12E+004 1.96E+003
LSPDB-B1 Bus80 85.55 1.800 89.79 102.29 106.01 1.578 1.578 7.75E+003 2.06E+003 1.12E+004 1.96E+003
Contract: SN:
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0
Bus86 Total 0.00 1.497 0.00 109.60 115.52 1.301 1.301 9.44E+003 1.92E+003 1.39E+004 1.62E+003
LSPDB-B1 Bus86 89.57 1.497 93.11 102.71 105.95 1.301 1.301 9.44E+003 1.92E+003 1.39E+004 1.62E+003
Contract: SN:
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0
Bus91 Total 0.00 0.594 0.00 111.94 115.06 0.507 0.507 2.40E+004 3.43E+003 3.66E+004 3.51E+003
MCC-B2 Bus91 94.73 0.594 96.73 104.08 105.48 0.507 0.507 2.40E+004 3.43E+003 3.66E+004 3.51E+003
Contract: SN:
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0
Bus93 Total 0.00 0.594 0.00 111.94 115.06 0.507 0.507 2.40E+004 3.43E+003 3.66E+004 3.51E+003
MCC-B2 Bus93 94.73 0.594 96.73 104.08 105.48 0.507 0.507 2.40E+004 3.43E+003 3.66E+004 3.51E+003
Contract: SN:
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0
Bus95 Total 0.00 0.970 0.00 97.96 104.73 1.043 1.043 1.11E+004 9.94E+003 9.55E+003 6.80E+003
Bus97 Bus95 24.11 0.970 31.06 98.37 100.54 1.043 1.043 1.11E+004 9.94E+003 9.55E+003 6.80E+003
Contract: SN:
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0
Bus96 Total 0.00 2.903 0.00 105.50 108.54 2.793 2.793 3.52E+003 3.51E+003 4.01E+003 3.71E+003
MCC-B2 Bus96 31.23 2.903 37.27 101.64 104.77 2.793 2.793 3.52E+003 3.51E+003 4.01E+003 3.71E+003
Contract: SN:
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0
Bus97 Total 0.00 1.167 0.00 100.14 96.22 1.342 1.342 7.65E+003 9.70E+003 4.13E+003 6.20E+003
Bus96 Bus97 63.28 1.167 84.43 105.32 79.74 1.342 1.342 * 7.65E+003 9.70E+003 4.13E+003 6.20E+003
Contract: SN:
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0
Bus99 Total 0.00 3.450 0.00 130.55 182.39 1.614 1.614 1.68E+003 4.06E+003 2.30E+004 3.45E-006
B1-CX-63-928B Bus99 105.00 3.256 105.00 105.00 105.00 1.011 0.000 9.43E+002 4.56E+003
VFD_928B Bus99 105.00 0.659 105.00 105.00 105.00 0.659 1.614 2.30E+004 3.45E-006 2.30E+004 3.45E-006
Contract: SN:
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0
Bus100 Total 0.00 3.476 0.00 114.87 118.27 2.785 2.785 4.21E+003 1.12E+003 7.27E+003 1.44E+003
MCC-B1 BUS A Bus100 103.14 3.256 103.29 103.95 106.39 2.697 2.785 4.59E+003 7.82E+002 7.27E+003 1.44E+003
B1-XX-COMBUSTIO Bus100 105.00 0.379 105.00 105.00 105.00 0.162 0.000 1.58E+004 3.67E+004
N
Contract: SN:
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0
Bus104 Total 0.00 2.018 0.00 115.82 117.87 1.607 1.607 7.30E+003 1.79E+003 1.27E+004 2.42E+003
MCC-B1 BUS A Bus104 103.97 1.875 104.05 104.39 105.81 1.551 1.607 8.00E+003 1.17E+003 1.27E+004 2.42E+003
B1-XX-AMINE Bus104 105.00 0.234 105.00 105.00 105.00 0.099 0.000 2.89E+004 5.81E+004
REFLUX COND
Contract: SN:
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0
Bus105 Total 0.00 1.082 0.00 114.49 116.49 0.887 0.887 1.40E+004 1.05E+003 2.29E+004 8.80E+002
MCC-B1 BUS A Bus105 104.61 1.049 104.63 104.64 105.44 0.875 0.887 1.44E+004 5.59E+002 2.29E+004 8.80E+002
B1-CX-64-929 Bus105 105.00 0.051 105.00 105.00 105.00 0.022 0.000 1.81E+005 2.39E+005
Contract: SN:
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0
Bus107 Total 0.00 0.594 0.00 111.94 115.06 0.507 0.507 2.40E+004 3.43E+003 3.66E+004 3.51E+003
MCC-B2 Bus107 94.73 0.594 96.73 104.08 105.48 0.507 0.507 2.40E+004 3.43E+003 3.66E+004 3.51E+003
Contract: SN:
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0
Bus109 Total 0.00 0.594 0.00 111.94 115.06 0.507 0.507 2.40E+004 3.43E+003 3.66E+004 3.51E+003
MCC-B2 Bus109 94.73 0.594 96.73 104.08 105.48 0.507 0.507 2.40E+004 3.43E+003 3.66E+004 3.51E+003
Contract: SN:
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0
Bus111 Total 0.00 1.738 0.00 106.87 114.27 1.567 1.567 7.59E+003 3.37E+003 1.05E+004 3.36E+003
MCC-B2 Bus111 69.11 1.738 74.65 102.39 105.89 1.567 1.567 7.59E+003 3.37E+003 1.05E+004 3.36E+003
Contract: SN:
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0
Bus114 Total 0.00 4.249 0.00 116.27 113.96 3.514 3.514 3.44E+003 9.59E+002 5.44E+003 1.90E+003
MCC-B1 BUS A Bus114 101.85 4.249 101.98 103.57 106.57 3.514 3.514 3.44E+003 9.59E+002 5.44E+003 1.90E+003
Contract: SN:
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0
Bus115 Total 0.00 1.319 0.00 114.71 114.53 1.101 1.101 1.15E+004 7.93E+002 1.82E+004 1.48E+003
MCC-B1 BUS A Bus115 104.45 1.319 104.46 104.53 105.53 1.101 1.101 1.15E+004 7.93E+002 1.82E+004 1.48E+003
Contract: SN:
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0
Bus116 Total 0.00 0.533 0.00 114.83 115.16 0.441 0.441 2.84E+004 1.10E+003 4.58E+004 1.62E+003
MCC-B1 BUS A Bus116 104.81 0.526 104.81 104.81 105.22 0.439 0.441 2.88E+004 8.49E+002 4.58E+004 1.62E+003
HOT OIL FILL Bus116 105.00 0.009 105.00 105.00 105.00 0.004 0.000 1.43E+006 1.05E+006
DRAIN PUMP
Contract: SN:
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0
Bus117 Total 0.00 0.301 0.00 114.81 114.41 0.251 0.251 5.04E+004 1.29E+003 8.01E+004 2.73E+003
MCC-B1 BUS A Bus117 104.89 0.301 104.89 104.89 105.12 0.251 0.251 5.04E+004 1.29E+003 8.01E+004 2.73E+003
Contract: SN:
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0
Bus131 Total 0.00 1.744 0.00 113.96 115.21 1.458 1.458 8.68E+003 4.43E+002 1.38E+004 5.85E+002
MCC-B1 BUS A Bus131 104.34 1.744 104.36 104.37 105.71 1.458 1.458 8.68E+003 4.43E+002 1.38E+004 5.85E+002
Contract: SN:
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0
Bus132 Total 0.00 0.323 0.00 115.27 118.10 0.258 0.258 4.67E+004 4.50E+003 8.01E+004 2.73E+003
MCC-B1 BUS A Bus132 104.89 0.301 104.90 104.90 105.13 0.250 0.258 5.04E+004 1.29E+003 8.01E+004 2.73E+003
B1-XX-XX-XXX Bus132 105.00 0.031 105.00 105.00 105.00 0.013 0.000 3.23E+005 3.61E+005
ANTIFOAM
Contract: SN:
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0
Bus133 Total 0.00 1.875 0.00 115.76 113.81 1.562 1.562 8.00E+003 1.17E+003 1.27E+004 2.42E+003
MCC-B1 BUS A Bus133 103.97 1.875 103.99 104.34 105.74 1.562 1.562 8.00E+003 1.17E+003 1.27E+004 2.42E+003
Contract: SN:
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0
Bus144 Total 0.00 2.018 0.00 115.82 117.87 1.607 1.607 7.30E+003 1.79E+003 1.27E+004 2.42E+003
MCC-B1 BUS A Bus144 103.97 1.875 104.05 104.39 105.81 1.551 1.607 8.00E+003 1.17E+003 1.27E+004 2.42E+003
B1-HE-25-310 Bus144 105.00 0.234 105.00 105.00 105.00 0.099 0.000 2.89E+004 5.81E+004
Contract: SN:
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0
Bus151 Total 0.00 1.581 0.00 115.49 119.00 1.247 1.247 7.92E+003 3.58E+003 1.42E+004 5.19E+003
MCC-B3 Bus151 96.41 1.408 98.88 103.09 106.44 1.177 1.247 9.27E+003 3.06E+003 1.42E+004 5.19E+003
B3-KF-39-902 Bus151 105.00 0.234 105.00 105.00 105.00 0.099 0.000 2.62E+004 5.27E+004
Contract: SN:
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0
Bus152 Total 0.00 1.347 0.00 130.49 180.34 0.616 0.616 4.89E+003 1.01E+004 5.95E+004 8.93E-006
B3-PA-39-119A Bus152 105.00 1.257 105.00 105.00 105.00 0.382 0.000 3.18E+003 1.16E+004
VFD_119A Bus152 105.00 0.255 105.00 105.00 105.00 0.255 0.616 5.95E+004 8.93E-006 5.95E+004 8.93E-006
Contract: SN:
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0
Bus153 Total 0.00 1.347 0.00 130.49 180.34 0.616 0.616 4.89E+003 1.01E+004 5.95E+004 8.93E-006
B3-PA-39-119B Bus153 105.00 1.257 105.00 105.00 105.00 0.382 0.000 3.18E+003 1.16E+004
VFD_119B Bus153 105.00 0.255 105.00 105.00 105.00 0.255 0.616 5.95E+004 8.93E-006 5.95E+004 8.93E-006
Contract: SN:
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0
Bus157 Total 0.00 2.396 0.00 109.76 120.55 1.978 1.978 5.37E+003 2.01E+003 9.00E+003 1.62E+003
MCC-B3 Bus157 93.17 2.205 96.89 101.69 107.48 1.899 1.978 6.01E+003 1.66E+003 9.00E+003 1.62E+003
B3-KA-63-001 Bus157 105.00 0.278 105.00 105.00 105.00 0.123 0.000 2.11E+004 4.47E+004
Contract: SN:
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0
Bus162 Total 0.00 8.481 0.00 95.30 109.76 8.964 8.964 9.22E+002 1.33E+003 9.26E+002 8.64E+002
MCC-B3 Bus162 29.04 8.481 37.17 95.42 104.85 8.964 8.964 9.22E+002 1.33E+003 9.26E+002 8.64E+002
Contract: SN:
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0
Bus163 Total 0.00 2.531 0.00 99.83 100.18 2.803 2.803 2.89E+003 4.29E+003 1.97E+003 2.95E+003
Bus162 Bus163 70.32 2.531 84.75 103.30 85.14 2.803 2.803 * 2.89E+003 4.29E+003 1.97E+003 2.95E+003
Contract: SN:
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0
Bus165 Total 0.00 55.088 0.00 105.46 105.57 61.704 61.704 4.05E+001 2.72E+002 1.40E+001 7.86E+001
MCC-B1 BUS A Bus165 17.36 25.610 18.01 103.49 107.70 22.724 9.655 1.51E+002 5.72E+002 1.83E+002 4.77E+002
GG-001 Bus165 105.00 29.770 105.00 105.00 105.00 39.169 52.254 2.68E+001 5.08E+002 1.33E+001 9.34E+001
Contract: SN:
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0
Bus166 Total 0.00 55.222 0.00 105.48 105.60 61.817 61.817 4.05E+001 2.71E+002 1.40E+001 7.86E+001
MCC-B1 BUS A Bus166 15.51 25.745 16.07 103.72 107.51 22.811 9.673 1.50E+002 5.69E+002 1.83E+002 4.77E+002
GG-002 Bus166 105.00 29.770 105.00 105.00 105.00 39.195 52.350 2.68E+001 5.08E+002 1.33E+001 9.34E+001
Contract: SN:
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0
Bus167 Total 0.00 39.314 0.00 109.68 112.63 34.767 34.767 8.65E+001 3.76E+002 1.14E+002 4.15E+002
MCC-B1 BUS A Bus167 31.35 39.314 40.94 102.90 108.27 34.767 34.767 8.65E+001 3.76E+002 1.14E+002 4.15E+002
Contract: SN:
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0
Bus168 Total 0.00 39.314 0.00 109.68 112.63 34.767 34.767 8.65E+001 3.76E+002 1.14E+002 4.15E+002
MCC-B1 BUS A Bus168 31.35 39.314 40.94 102.90 108.27 34.767 34.767 8.65E+001 3.76E+002 1.14E+002 4.15E+002
Contract: SN:
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0
Bus169 Total 0.00 24.850 0.00 115.24 116.11 19.986 19.986 2.49E+002 5.57E+002 3.73E+002 8.75E+002
MCC-B1 BUS A Bus169 60.82 24.850 69.24 102.15 108.11 19.986 19.986 2.49E+002 5.57E+002 3.73E+002 8.75E+002
Contract: SN:
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0
LSP-DB-B3 Total 0.00 2.476 0.00 99.77 101.09 2.717 2.717 3.03E+003 4.33E+003 2.20E+003 3.06E+003
Bus163 LSP-DB-B3 2.99 2.476 4.00 99.70 100.57 2.717 2.717 3.03E+003 4.33E+003 2.20E+003 3.06E+003
Contract: SN:
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0
LSPDB-B1 Total 0.00 6.739 0.00 99.87 101.15 7.409 7.409 1.22E+003 1.76E+003 8.41E+002 1.20E+003
Bus65 LSPDB-B1 4.22 6.739 5.96 99.29 100.62 7.409 7.409 1.22E+003 1.76E+003 8.41E+002 1.20E+003
Contract: SN:
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0
MCC-B1 BUS A Total 0.00 55.725 0.00 103.54 110.76 56.899 56.899 4.54E+001 2.68E+002 4.89E+001 1.42E+002
P-20-PA-138A~ MCC-B1 BUS A 0.00 0.000 0.00 103.54 110.76 0.000 0.000
Bus26 MCC-B1 BUS A 0.00 0.000 0.00 103.54 110.76 0.000 0.000
Bus15 MCC-B1 BUS A 5.41 0.030 3.24 103.17 112.87 0.018 0.000 3.49E+005 3.62E+005
Bus11 MCC-B1 BUS A 11.85 0.178 7.34 102.05 115.25 0.110 0.000 4.70E+004 7.10E+004
Bus9 MCC-B1 BUS A 13.26 0.577 9.64 100.33 115.57 0.420 0.000 1.14E+004 2.37E+004
Bus19 MCC-B1 BUS A 10.07 0.042 6.14 102.67 114.67 0.026 0.000 2.39E+005 2.70E+005
Bus5 MCC-B1 BUS A 5.99 0.030 3.59 103.14 113.09 0.018 0.000 3.52E+005 3.62E+005
Bus54 MCC-B1 BUS A 0.00 0.000 0.00 103.54 110.76 0.000 0.000
P-B1-21-PA-120A~ MCC-B1 BUS A 0.00 0.000 0.00 103.54 110.76 0.000 0.000
Bus34 MCC-B1 BUS A 11.83 0.532 8.58 100.86 114.95 0.386 0.000 1.26E+004 2.56E+004
Bus53 MCC-B1 BUS A 14.39 0.077 8.90 102.08 116.29 0.048 0.000 1.24E+005 1.52E+005
Bus13 MCC-B1 BUS A 10.48 0.131 6.46 102.31 114.74 0.081 0.000 6.60E+004 9.48E+004
P-B1-63-CX-928A~ MCC-B1 BUS A 0.00 0.000 0.00 103.54 110.76 0.000 0.000
P-B1-63-CX-928B~ MCC-B1 BUS A 0.00 0.000 0.00 103.54 110.76 0.000 0.000
Bus114 MCC-B1 BUS A 0.00 0.000 0.00 103.54 110.76 0.000 0.000
P-B1-CX-63-928C~ MCC-B1 BUS A 0.00 0.000 0.00 103.54 110.76 0.000 0.000
Bus105 MCC-B1 BUS A 4.89 0.049 2.95 103.10 112.64 0.030 0.000 1.96E+005 2.39E+005
Bus66 MCC-B1 BUS A 0.00 0.000 0.00 103.54 110.76 0.000 0.000
Bus63 MCC-B1 BUS A 0.00 0.000 0.00 103.54 110.76 0.000 0.000
Bus76 MCC-B1 BUS A 0.00 0.000 0.00 103.54 110.76 0.000 0.000
Bus62 MCC-B1 BUS A 0.00 0.000 0.00 103.54 110.76 0.000 0.000
P-B1-HC-21-107A~ MCC-B1 BUS A 0.00 0.000 0.00 103.54 110.76 0.000 0.000
Bus56 MCC-B1 BUS A 12.20 0.354 7.60 102.05 115.23 0.221 0.000 2.07E+004 3.75E+004
Bus8 MCC-B1 BUS A 12.20 0.354 7.60 102.05 115.23 0.221 0.000 2.07E+004 3.75E+004
Bus144 MCC-B1 BUS A 12.08 0.218 7.51 102.14 115.25 0.135 0.000 3.68E+004 5.90E+004
P-B1-HOT OIL PAC MCC-B1 BUS A 0.00 0.000 0.00 103.54 110.76 0.000 0.000
FAN A~
P-B1-HOT OIL PAC MCC-B1 BUS A 0.00 0.000 0.00 103.54 110.76 0.000 0.000
FAN B~
Bus14 MCC-B1 BUS A 13.26 0.577 9.64 100.33 115.57 0.420 0.000 1.14E+004 2.37E+004
Bus32 MCC-B1 BUS A 15.10 0.174 9.41 101.82 116.46 0.108 0.000 4.99E+004 7.16E+004
Bus20 MCC-B1 BUS A 1.81 0.005 1.04 103.55 111.48 0.003 0.000 2.49E+006 1.54E+006
Project: ETAP Page: 110
Contract: SN:
(Cont.)
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0
Bus57 MCC-B1 BUS A 7.07 0.020 4.23 103.17 113.54 0.012 0.000 5.53E+005 5.04E+005
Bus24 MCC-B1 BUS A 0.00 0.000 0.00 103.54 110.76 0.000 0.000
Bus104 MCC-B1 BUS A 12.08 0.218 7.51 102.14 115.25 0.135 0.000 3.68E+004 5.90E+004
Bus117 MCC-B1 BUS A 0.00 0.000 0.00 103.54 110.76 0.000 0.000
Bus100 MCC-B1 BUS A 11.31 0.357 7.04 102.05 114.93 0.222 0.000 2.04E+004 3.73E+004
Bus133 MCC-B1 BUS A 0.00 0.000 0.00 103.54 110.76 0.000 0.000
Bus132 MCC-B1 BUS A 10.16 0.029 6.15 102.88 114.73 0.018 0.000 3.74E+005 3.62E+005
Bus59 MCC-B1 BUS A 0.00 0.000 0.00 103.54 110.76 0.000 0.000
Bus115 MCC-B1 BUS A 0.00 0.000 0.00 103.54 110.76 0.000 0.000
Bus131 MCC-B1 BUS A 0.00 0.000 0.00 103.54 110.76 0.000 0.000
Bus116 MCC-B1 BUS A 1.68 0.008 0.97 103.51 111.43 0.005 0.000 1.46E+006 1.05E+006
Bus71 MCC-B1 BUS A 0.05 0.011 0.03 103.54 110.77 0.006 0.000 1.17E+006 7.33E+005
Bus2 MCC-B1 BUS A 0.09 0.648 0.06 103.54 110.78 0.405 0.000 1.26E+004 1.97E+004
Bus165 MCC-B1 BUS A 17.29 25.509 25.60 101.89 108.36 26.474 27.291 8.32E+001 5.88E+002 1.03E+002 2.96E+002
Bus166 MCC-B1 BUS A 15.62 25.930 23.96 102.09 108.17 27.494 29.609 7.70E+001 5.79E+002 9.31E+001 2.74E+002
Bus167 MCC-B1 BUS A 0.00 0.000 0.00 103.54 110.76 0.000 0.000
Bus168 MCC-B1 BUS A 0.00 0.000 0.00 103.54 110.76 0.000 0.000
Bus169 MCC-B1 BUS A 0.00 0.000 0.00 103.54 110.76 0.000 0.000
Contract: SN:
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0
MCC-B2 Total 0.00 3.928 0.00 101.17 103.52 4.143 4.143 2.14E+003 2.99E+003 1.81E+003 2.39E+003
Bus1 MCC-B2 7.02 3.918 9.20 100.64 102.40 4.138 4.143 2.14E+003 3.00E+003 1.81E+003 2.39E+003
Bus69 MCC-B2 0.68 0.005 0.36 101.24 103.79 0.003 0.000 2.34E+006 1.46E+006
Bus75 MCC-B2 0.68 0.005 0.36 101.24 103.79 0.003 0.000 2.34E+006 1.46E+006
Contract: SN:
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0
MCC-B3 Total 0.00 10.305 0.00 99.25 99.09 11.876 11.876 4.83E+002 1.24E+003 2.27E+002 6.37E+002
Bus6 MCC-B3 6.63 9.701 10.97 98.17 98.06 11.487 11.876 4.95E+002 1.33E+003 2.27E+002 6.37E+002
Bus157 MCC-B3 11.08 0.262 7.03 98.20 103.35 0.166 0.000 2.67E+004 4.51E+004
Bus151 MCC-B3 14.54 0.212 9.28 98.53 104.77 0.135 0.000 3.50E+004 5.45E+004
Bus31 MCC-B3 5.42 0.054 3.37 98.93 101.26 0.034 0.000 1.55E+005 2.00E+005
Bus45 MCC-B3 10.65 0.089 6.70 98.53 103.35 0.056 0.000 9.39E+004 1.23E+005
Contract: SN:
Bus1 0.400 4.155 6.803 4.125 4.483 7.339 4.483 4.483 3.546 5.806 3.546 3.546 4.385 7.180 4.385 4.385
Bus2 0.400 52.541 116.974 45.652 52.016 115.806 52.016 52.016 38.419 85.534 38.419 38.419 57.726 128.518 57.726 57.726
Bus3 0.400 0.255 0.470 0.042 0.098 0.180 0.098 0.098 0.165 0.304 0.165 0.165 0.199 0.366 0.199 0.199
Bus4 0.400 2.285 3.560 2.279 2.387 3.719 2.387 2.387 1.965 3.061 1.965 1.965 2.380 3.709 2.380 2.380
Bus5 0.400 0.548 0.790 0.526 0.446 0.643 0.446 0.446 0.468 0.674 0.468 0.468 0.511 0.737 0.511 0.511
Bus6 0.400 10.904 20.991 10.168 13.171 25.356 13.171 13.171 8.995 17.317 8.995 8.995 13.342 25.685 13.342 13.342
Bus7 0.400 3.450 8.074 0.659 1.614 3.777 1.614 1.614 2.708 6.338 2.708 2.708 3.186 7.457 3.186 3.186
Bus8 0.400 3.222 4.661 2.991 2.558 3.701 2.558 2.558 2.722 3.938 2.722 2.722 2.978 4.307 2.978 2.978
Bus9 0.400 4.801 6.982 4.441 3.835 5.577 3.835 3.835 4.091 5.950 4.091 4.091 4.521 6.575 4.521 4.521
Bus10 0.400 2.998 4.847 2.989 3.220 5.205 3.220 3.220 2.572 4.157 2.572 2.572 3.143 5.080 3.143 3.143
Bus11 0.400 1.673 2.414 1.568 1.344 1.939 1.344 1.344 1.418 2.046 1.418 1.418 1.571 2.266 1.571 1.571
Bus12 0.400 4.193 6.743 4.174 4.515 7.260 4.515 4.515 3.581 5.758 3.581 3.581 4.419 7.105 4.419 4.419
Bus13 0.400 1.388 2.002 1.308 1.118 1.613 1.118 1.118 1.178 1.700 1.178 1.178 1.300 1.876 1.300 1.300
Bus15 0.400 0.606 0.874 0.584 0.495 0.714 0.495 0.495 0.518 0.747 0.518 0.518 0.566 0.816 0.566 0.566
Bus19 0.400 0.468 0.675 0.438 0.375 0.541 0.375 0.375 0.396 0.572 0.396 0.396 0.436 0.628 0.436 0.436
Bus20 0.400 0.305 0.440 0.301 0.253 0.364 0.253 0.253 0.263 0.379 0.263 0.263 0.285 0.411 0.285 0.285
Bus24 0.400 13.230 20.838 13.054 10.223 16.102 10.223 10.223 10.998 17.323 10.998 10.998 12.168 19.165 12.168 12.168
Bus25 0.400 1.573 2.269 1.573 1.365 1.970 1.365 1.365 1.358 1.960 1.358 1.358 1.506 2.172 1.506 1.506
Bus26 0.400 18.109 28.078 17.735 14.518 22.510 14.518 14.518 14.850 23.026 14.850 14.850 16.507 25.594 16.507 16.507
Bus27 6.600 1.280 2.674 1.203 0.000 0.000 0.000 0.000 1.032 2.157 1.032 1.032 1.032 2.157 1.032 1.032
Bus29 6.600 1.173 2.211 1.104 0.000 0.000 0.000 0.000 0.951 1.792 0.951 0.951 0.951 1.792 0.951 0.951
Bus31 0.400 1.048 1.512 1.008 0.867 1.251 0.867 0.867 0.896 1.292 0.896 0.896 0.997 1.439 0.997 0.997
Bus32 0.400 1.314 1.896 1.201 1.038 1.498 1.038 1.038 1.106 1.596 1.106 1.106 1.220 1.762 1.220 1.220
Bus34 0.400 4.924 7.155 4.562 3.915 5.689 3.915 3.915 4.193 6.094 4.193 4.193 4.586 6.664 4.586 4.586
Bus35 0.400 1.048 1.512 1.046 0.885 1.277 0.885 0.885 0.906 1.307 0.906 0.906 0.986 1.422 0.986 0.986
Bus36 0.400 0.669 1.368 0.125 0.299 0.611 0.299 0.299 0.519 1.061 0.519 0.519 0.606 1.239 0.606 0.606
Bus38 0.400 0.411 0.789 0.068 0.160 0.307 0.160 0.160 0.266 0.512 0.266 0.266 0.322 0.619 0.322 0.322
Bus40 0.400 0.669 1.368 0.125 0.299 0.611 0.299 0.299 0.519 1.061 0.519 0.519 0.606 1.239 0.606 0.606
Bus42 0.400 1.268 1.887 1.267 1.325 1.971 1.325 1.325 1.094 1.628 1.094 1.094 1.306 1.943 1.306 1.306
Bus43 0.400 0.605 0.872 0.604 0.509 0.734 0.509 0.509 0.523 0.755 0.523 0.523 0.572 0.826 0.572 0.572
Bus44 0.400 2.172 3.388 2.167 2.274 3.548 2.274 2.274 1.867 2.914 1.867 1.867 2.264 3.533 2.264 2.264
Bus47 0.400 2.012 2.916 1.995 1.687 2.444 1.687 1.687 1.733 2.511 1.733 1.733 1.914 2.773 1.914 1.914
Bus48 0.400 8.523 15.541 8.028 8.819 16.081 8.819 8.819 7.101 12.949 7.101 7.101 8.775 16.001 8.775 8.775
Bus49 0.400 2.346 3.384 2.333 2.032 2.932 2.032 2.032 2.024 2.919 2.024 2.024 2.305 3.325 2.305 2.305
Bus50 0.400 1.296 1.968 1.287 1.456 2.210 1.456 1.456 1.117 1.696 1.117 1.117 1.464 2.222 1.464 1.464
Bus52 0.400 1.071 1.546 1.067 0.977 1.409 0.977 0.977 0.925 1.335 0.925 0.925 1.074 1.551 1.074 1.074
Bus53 0.400 0.614 0.886 0.562 0.486 0.701 0.486 0.486 0.517 0.745 0.517 0.517 0.572 0.825 0.572 0.572
Project: ETAP Page: 114
Contract: SN:
Bus54 0.400 1.930 2.784 1.930 1.607 2.318 1.607 1.607 1.667 2.405 1.667 1.667 1.821 2.626 1.821 1.821
Bus56 0.400 3.222 4.661 2.991 2.558 3.701 2.558 2.558 2.722 3.938 2.722 2.722 2.978 4.307 2.978 2.978
Bus57 0.400 0.316 0.456 0.301 0.256 0.369 0.256 0.256 0.269 0.388 0.269 0.269 0.294 0.425 0.294 0.294
Bus59 0.400 7.609 11.160 7.571 6.001 8.801 6.001 6.001 6.460 9.475 6.460 6.460 7.163 10.506 7.163 7.163
Bus61 0.400 1.937 2.894 1.915 1.963 2.934 1.963 1.963 1.665 2.488 1.665 1.665 2.034 3.040 2.034 2.034
Bus62 0.400 19.972 32.567 19.429 15.903 25.931 15.903 15.903 16.238 26.478 16.238 16.238 18.080 29.482 18.080 18.080
Bus63 0.400 11.884 18.605 11.745 9.133 14.298 9.133 9.133 9.923 15.534 9.923 9.923 10.976 17.184 10.976 10.976
Bus64 0.400 2.460 3.973 2.454 2.627 4.243 2.627 2.627 2.114 3.414 2.114 2.114 2.569 4.149 2.569 2.569
Bus65 0.400 6.993 11.401 6.936 7.828 12.762 7.828 7.828 5.915 9.642 5.915 5.915 7.631 12.441 7.631 7.631
Bus67 0.400 2.012 2.904 2.011 1.768 2.551 1.768 1.768 1.735 2.504 1.735 1.735 1.935 2.792 1.935 1.935
Bus68 0.400 0.812 1.171 0.810 0.721 1.040 0.721 0.721 0.702 1.012 0.702 0.702 0.801 1.155 0.801 0.801
Bus70 0.400 1.716 2.518 1.701 1.690 2.479 1.690 1.690 1.477 2.168 1.477 1.477 1.788 2.623 1.788 1.788
Bus71 0.400 17.388 28.891 16.986 13.534 22.487 13.534 13.534 14.239 23.658 14.239 14.239 15.793 26.241 15.793 15.793
Bus72 0.400 2.067 2.982 2.067 1.829 2.638 1.829 1.829 1.784 2.573 1.784 1.784 2.034 2.934 2.034 2.034
Bus73 0.400 1.573 2.269 1.573 1.365 1.970 1.365 1.365 1.358 1.960 1.358 1.358 1.506 2.172 1.506 1.506
Bus75 0.400 0.718 1.036 0.713 0.613 0.885 0.613 0.613 0.620 0.894 0.620 0.620 0.688 0.993 0.688 0.688
Bus78 0.400 0.707 1.019 0.707 0.600 0.865 0.600 0.600 0.611 0.882 0.611 0.611 0.669 0.965 0.669 0.669
Bus79 0.400 1.800 2.597 1.800 1.578 2.276 1.578 1.578 1.554 2.242 1.554 1.554 1.754 2.530 1.754 1.754
Bus80 0.400 1.800 2.597 1.800 1.578 2.276 1.578 1.578 1.554 2.242 1.554 1.554 1.754 2.530 1.754 1.754
Bus86 0.400 1.497 2.160 1.498 1.301 1.876 1.301 1.301 1.294 1.867 1.294 1.294 1.454 2.097 1.454 1.454
Bus91 0.400 0.594 0.857 0.594 0.507 0.731 0.507 0.507 0.514 0.741 0.514 0.514 0.567 0.818 0.567 0.567
Bus93 0.400 0.594 0.857 0.594 0.507 0.731 0.507 0.507 0.514 0.741 0.514 0.514 0.567 0.818 0.567 0.567
Bus95 0.400 0.970 1.447 0.969 1.043 1.556 1.043 1.043 0.838 1.250 0.838 0.838 1.045 1.560 1.045 1.045
Bus96 0.400 2.903 4.388 2.890 2.793 4.222 2.793 2.793 2.491 3.765 2.491 2.491 2.889 4.367 2.889 2.889
Bus97 0.400 1.167 1.836 1.165 1.342 2.111 1.342 1.342 1.007 1.584 1.007 1.007 1.311 2.062 1.311 1.311
Bus99 0.400 3.450 8.074 0.659 1.614 3.777 1.614 1.614 2.708 6.338 2.708 2.708 3.186 7.457 3.186 3.186
Bus100 0.400 3.476 5.022 3.256 2.785 4.023 2.785 2.785 2.943 4.252 2.943 2.943 3.241 4.682 3.241 3.241
Bus104 0.400 2.018 2.912 1.876 1.607 2.319 1.607 1.607 1.707 2.463 1.707 1.707 1.867 2.695 1.867 1.867
Bus105 0.400 1.082 1.561 1.050 0.887 1.280 0.887 0.887 0.927 1.337 0.927 0.927 1.014 1.462 1.014 1.014
Bus107 0.400 0.594 0.857 0.594 0.507 0.731 0.507 0.507 0.514 0.741 0.514 0.514 0.567 0.818 0.567 0.567
Bus109 0.400 0.594 0.857 0.594 0.507 0.731 0.507 0.507 0.514 0.741 0.514 0.514 0.567 0.818 0.567 0.567
Bus111 0.400 1.738 2.510 1.736 1.567 2.262 1.567 1.567 1.499 2.165 1.499 1.499 1.718 2.481 1.718 1.718
Bus114 0.400 4.249 6.129 4.247 3.514 5.068 3.514 3.514 3.654 5.271 3.654 3.654 4.001 5.772 4.001 4.001
Bus115 0.400 1.319 1.902 1.319 1.101 1.589 1.101 1.101 1.140 1.645 1.140 1.140 1.236 1.783 1.236 1.236
Bus116 0.400 0.533 0.768 0.526 0.441 0.637 0.441 0.441 0.459 0.662 0.459 0.459 0.498 0.718 0.498 0.498
Bus117 0.400 0.301 0.434 0.301 0.251 0.362 0.251 0.251 0.260 0.375 0.260 0.260 0.282 0.407 0.282 0.282
Bus131 0.400 1.744 2.516 1.745 1.458 2.103 1.458 1.458 1.508 2.176 1.508 1.508 1.643 2.370 1.643 1.643
Bus132 0.400 0.323 0.466 0.301 0.258 0.372 0.258 0.258 0.273 0.394 0.273 0.273 0.300 0.433 0.300 0.300
Bus133 0.400 1.875 2.705 1.876 1.562 2.253 1.562 1.562 1.620 2.337 1.620 1.620 1.770 2.553 1.770 1.770
Bus144 0.400 2.018 2.912 1.876 1.607 2.319 1.607 1.607 1.707 2.463 1.707 1.707 1.867 2.695 1.867 1.867
Project: ETAP Page: 115
Contract: SN:
Bus151 0.400 1.581 2.299 1.404 1.247 1.813 1.247 1.247 1.324 1.925 1.324 1.324 1.462 2.127 1.462 1.462
Bus152 0.400 1.347 2.949 0.255 0.616 1.348 0.616 0.616 1.052 2.303 1.052 1.052 1.233 2.699 1.233 1.233
Bus153 0.400 1.347 2.949 0.255 0.616 1.348 0.616 0.616 1.052 2.303 1.052 1.052 1.233 2.699 1.233 1.233
Bus157 0.400 2.396 3.470 2.198 1.978 2.865 1.978 1.978 2.021 2.927 2.021 2.021 2.317 3.355 2.317 2.317
Bus162 0.400 8.481 13.759 8.028 8.964 14.543 8.964 8.964 7.088 11.499 7.088 7.088 9.408 15.264 9.408 9.408
Bus163 0.400 2.531 4.120 2.487 2.803 4.562 2.803 2.803 2.167 3.528 2.167 2.167 2.713 4.417 2.713 2.713
Bus165 0.400 55.088 131.994 15.223 61.704 147.846 61.704 61.704 39.956 95.737 39.956 39.956 71.266 170.757 71.266 71.266
Bus166 0.400 55.222 132.276 15.223 61.817 148.073 61.817 61.817 40.038 95.905 40.038 40.038 71.406 171.042 71.406 71.406
Bus167 0.400 39.314 85.083 35.805 34.767 75.242 34.767 34.767 29.924 64.760 29.924 29.924 37.473 81.097 37.473 37.473
Bus168 0.400 39.314 85.083 35.805 34.767 75.242 34.767 34.767 29.924 64.760 29.924 29.924 37.473 81.097 37.473 37.473
Bus169 0.400 24.850 45.137 23.780 19.986 36.301 19.986 19.986 19.829 36.017 19.829 19.829 22.498 40.865 22.498 22.498
LSP-DB-B3 0.400 2.476 3.994 2.434 2.717 4.382 2.717 2.717 2.121 3.421 2.121 2.121 2.647 4.270 2.647 2.647
LSPDB-B1 0.400 6.739 10.893 6.688 7.409 11.976 7.409 7.409 5.706 9.222 5.706 5.706 7.252 11.721 7.252 7.252
MCC-B1 BUS A 0.400 55.725 129.237 15.266 56.899 131.959 56.899 56.899 40.377 93.642 40.377 40.377 63.863 148.108 63.863 63.863
MCC-B2 0.400 3.928 6.309 3.901 4.143 6.654 4.143 4.143 3.355 5.389 3.355 3.355 4.104 6.592 4.104 4.104
MCC-B3 0.400 10.305 19.444 9.581 11.876 22.409 11.876 11.876 8.513 16.064 8.513 8.513 11.745 22.163 11.745 11.745
All fault currents are in rms kA. Current ip is calculated using Method C.
* LLG fault current is the larger of the two faulted line currents.
Project: ETAP Page: 116
Contract: SN:
Bus Positive Seq. Imp. (ohm) Negative Seq. Imp. (ohm) Zero Seq. Imp. (ohm) Fault Zf (ohm)
ID kV Resistance Reactance Impedance Resistance Reactance Impedance Resistance Reactance Impedance Resistance Reactance Impedance
Bus1 0.400 0.03206 0.04876 0.05836 0.03240 0.05059 0.06008 0.02432 0.03648 0.04384 0.00000 0.00000 0.00000
Bus2 0.400 0.00093 0.00452 0.00462 0.00128 0.00619 0.00632 0.00112 0.00288 0.00309 0.00000 0.00000 0.00000
Bus3 0.400 0.54422 0.77901 0.95028 0.81165 1.37867 1.59985 5.76594 0.00000 5.76594 0.00000 0.00000 0.00000
Bus4 0.400 0.06775 0.08171 0.10614 0.06810 0.08337 0.10765 0.06160 0.06713 0.09111 0.00000 0.00000 0.00000
Bus5 0.400 0.44167 0.03136 0.44278 0.45455 0.02866 0.45545 0.73278 0.02590 0.73324 0.00000 0.00000 0.00000
Bus6 0.400 0.00756 0.02092 0.02224 0.00780 0.02318 0.02446 0.00235 0.00822 0.00855 0.00000 0.00000 0.00000
Bus7 0.400 0.02686 0.06495 0.07029 0.03274 0.07822 0.08479 0.36783 0.00000 0.36783 0.00000 0.00000 0.00000
Bus8 0.400 0.07191 0.02218 0.07525 0.07581 0.02233 0.07903 0.12592 0.03276 0.13011 0.00000 0.00000 0.00000
Bus9 0.400 0.04767 0.01668 0.05051 0.04902 0.01781 0.05215 0.08421 0.02260 0.08719 0.00000 0.00000 0.00000
Bus10 0.400 0.04610 0.06645 0.08087 0.04645 0.06811 0.08244 0.03472 0.05208 0.06259 0.00000 0.00000 0.00000
Bus11 0.400 0.14321 0.02219 0.14492 0.14999 0.01984 0.15130 0.24520 0.01358 0.24557 0.00000 0.00000 0.00000
Bus12 0.400 0.03352 0.04712 0.05782 0.03389 0.04887 0.05947 0.02432 0.03648 0.04384 0.00000 0.00000 0.00000
Bus13 0.400 0.17307 0.02370 0.17469 0.18053 0.02121 0.18177 0.29408 0.01584 0.29451 0.00000 0.00000 0.00000
Bus15 0.400 0.39928 0.02715 0.40021 0.40981 0.02520 0.41059 0.65958 0.02354 0.66000 0.00000 0.00000 0.00000
Bus19 0.400 0.51581 0.05324 0.51855 0.53960 0.04511 0.54148 0.87918 0.03062 0.87971 0.00000 0.00000 0.00000
Bus20 0.400 0.79419 0.02724 0.79466 0.80292 0.02870 0.80343 1.28178 0.04361 1.28252 0.00000 0.00000 0.00000
Bus24 0.400 0.01138 0.01437 0.01833 0.01173 0.01603 0.01987 0.01772 0.02788 0.03303 0.00000 0.00000 0.00000
Bus25 0.400 0.14779 0.04388 0.15417 0.14816 0.04562 0.15503 0.21643 0.05654 0.22370 0.00000 0.00000 0.00000
Bus26 0.400 0.00876 0.01013 0.01339 0.00911 0.01179 0.01490 0.01355 0.01711 0.02183 0.00000 0.00000 0.00000
Bus27 6.600 0.83862 3.16578 3.27498 0.91729 3.64511 3.75876 0.00000 0.00000 0.00000
Bus29 6.600 1.29751 3.32913 3.57304 1.38251 3.81949 4.06200 0.00000 0.00000 0.00000
Bus31 0.400 0.22877 0.03488 0.23141 0.23473 0.03516 0.23735 0.37001 0.02304 0.37073 0.00000 0.00000 0.00000
Bus32 0.400 0.18045 0.03882 0.18457 0.19211 0.03513 0.19530 0.31939 0.03784 0.32163 0.00000 0.00000 0.00000
Bus34 0.400 0.04589 0.01786 0.04925 0.04717 0.01916 0.05092 0.08087 0.02836 0.08570 0.00000 0.00000 0.00000
Bus35 0.400 0.22662 0.04654 0.23135 0.22688 0.04887 0.23208 0.35080 0.07371 0.35846 0.00000 0.00000 0.00000
Bus36 0.400 0.17867 0.31508 0.36221 0.21184 0.39333 0.44675 1.93945 0.00000 1.93945 0.00000 0.00000 0.00000
Bus38 0.400 0.31342 0.50045 0.59050 0.47850 0.86353 0.98724 3.55566 0.00000 3.55566 0.00000 0.00000 0.00000
Bus40 0.400 0.17867 0.31508 0.36221 0.21184 0.39333 0.44675 1.93945 0.00000 1.93945 0.00000 0.00000 0.00000
Bus42 0.400 0.14391 0.12586 0.19118 0.14428 0.12761 0.19262 0.12184 0.11169 0.16528 0.00000 0.00000 0.00000
Bus43 0.400 0.39983 0.02984 0.40094 0.40008 0.03218 0.40138 0.62621 0.03131 0.62699 0.00000 0.00000 0.00000
Bus44 0.400 0.07100 0.08618 0.11166 0.07137 0.08793 0.11325 0.06380 0.07043 0.09503 0.00000 0.00000 0.00000
Bus47 0.400 0.10537 0.05844 0.12049 0.10563 0.06077 0.12186 0.15802 0.10394 0.18914 0.00000 0.00000 0.00000
Bus48 0.400 0.01142 0.02606 0.02845 0.01168 0.02839 0.03070 0.00864 0.02169 0.02335 0.00000 0.00000 0.00000
Bus49 0.400 0.10059 0.02380 0.10336 0.10084 0.02613 0.10417 0.15041 0.01595 0.15125 0.00000 0.00000 0.00000
Project: ETAP Page: 117
Contract: SN:
Bus Positive Seq. Imp. (ohm) Negative Seq. Imp. (ohm) Zero Seq. Imp. (ohm) Fault Zf (ohm)
ID kV Resistance Reactance Impedance Resistance Reactance Impedance Resistance Reactance Impedance Resistance Reactance Impedance
Bus50 0.400 0.13042 0.13409 0.18706 0.13067 0.13643 0.18891 0.06944 0.10416 0.12518 0.00000 0.00000 0.00000
Bus52 0.400 0.20996 0.08462 0.22637 0.21023 0.08707 0.22755 0.28516 0.06792 0.29313 0.00000 0.00000 0.00000
Bus53 0.400 0.39038 0.05964 0.39491 0.41514 0.05019 0.41816 0.68514 0.03392 0.68598 0.00000 0.00000 0.00000
Bus54 0.400 0.12432 0.01823 0.12565 0.12467 0.01989 0.12625 0.19730 0.03768 0.20086 0.00000 0.00000 0.00000
Bus56 0.400 0.07191 0.02218 0.07525 0.07581 0.02233 0.07903 0.12592 0.03276 0.13011 0.00000 0.00000 0.00000
Bus57 0.400 0.76444 0.05512 0.76643 0.79212 0.04962 0.79367 1.28178 0.04361 1.28252 0.00000 0.00000 0.00000
Bus59 0.400 0.02567 0.01889 0.03187 0.02602 0.02055 0.03316 0.04044 0.03936 0.05643 0.00000 0.00000 0.00000
Bus61 0.400 0.09259 0.08427 0.12520 0.09286 0.08672 0.12706 0.09854 0.06703 0.11918 0.00000 0.00000 0.00000
Bus62 0.400 0.00681 0.01005 0.01214 0.00716 0.01171 0.01373 0.01046 0.01691 0.01988 0.00000 0.00000 0.00000
Bus63 0.400 0.01290 0.01581 0.02040 0.01325 0.01747 0.02193 0.02014 0.03154 0.03742 0.00000 0.00000 0.00000
Bus64 0.400 0.05630 0.08091 0.09857 0.05665 0.08257 0.10014 0.04340 0.06510 0.07824 0.00000 0.00000 0.00000
Bus65 0.400 0.01932 0.02880 0.03468 0.01969 0.03054 0.03634 0.01216 0.01824 0.02192 0.00000 0.00000 0.00000
Bus67 0.400 0.11238 0.04353 0.12052 0.11275 0.04527 0.12150 0.16013 0.05565 0.16953 0.00000 0.00000 0.00000
Bus68 0.400 0.28643 0.08482 0.29873 0.28670 0.08727 0.29969 0.40674 0.06843 0.41246 0.00000 0.00000 0.00000
Bus70 0.400 0.11350 0.08417 0.14130 0.11376 0.08662 0.14299 0.13177 0.06678 0.14773 0.00000 0.00000 0.00000
Bus71 0.400 0.00739 0.01183 0.01395 0.00774 0.01349 0.01556 0.01138 0.02144 0.02427 0.00000 0.00000 0.00000
Bus72 0.400 0.11279 0.03220 0.11730 0.11316 0.03394 0.11815 0.16079 0.02687 0.16302 0.00000 0.00000 0.00000
Bus73 0.400 0.14779 0.04388 0.15417 0.14816 0.04562 0.15503 0.21643 0.05654 0.22370 0.00000 0.00000 0.00000
Bus75 0.400 0.33276 0.05689 0.33759 0.33457 0.05905 0.33974 0.50627 0.05554 0.50931 0.00000 0.00000 0.00000
Bus78 0.400 0.34035 0.04423 0.34322 0.34072 0.04597 0.34381 0.52261 0.05743 0.52576 0.00000 0.00000 0.00000
Bus79 0.400 0.13021 0.03457 0.13472 0.13058 0.03631 0.13553 0.18847 0.03289 0.19132 0.00000 0.00000 0.00000
Bus80 0.400 0.13021 0.03457 0.13472 0.13058 0.03631 0.13553 0.18847 0.03289 0.19132 0.00000 0.00000 0.00000
Bus86 0.400 0.15867 0.03232 0.16193 0.15905 0.03406 0.16265 0.23374 0.02718 0.23532 0.00000 0.00000 0.00000
Bus91 0.400 0.40422 0.05765 0.40831 0.40456 0.05949 0.40892 0.61607 0.05908 0.61890 0.00000 0.00000 0.00000
Bus93 0.400 0.40422 0.05765 0.40831 0.40456 0.05949 0.40892 0.61607 0.05908 0.61890 0.00000 0.00000 0.00000
Bus95 0.400 0.18586 0.16713 0.24995 0.18620 0.16897 0.25144 0.16047 0.11432 0.19702 0.00000 0.00000 0.00000
Bus96 0.400 0.05917 0.05897 0.08354 0.05951 0.06081 0.08508 0.06744 0.06244 0.09190 0.00000 0.00000 0.00000
Bus97 0.400 0.12860 0.16313 0.20772 0.12895 0.16497 0.20938 0.06944 0.10416 0.12518 0.00000 0.00000 0.00000
Bus99 0.400 0.02686 0.06495 0.07029 0.03274 0.07822 0.08479 0.36783 0.00000 0.36783 0.00000 0.00000 0.00000
Bus100 0.400 0.06740 0.01796 0.06976 0.07067 0.01809 0.07295 0.11638 0.02310 0.11865 0.00000 0.00000 0.00000
Bus104 0.400 0.11674 0.02858 0.12018 0.12287 0.02764 0.12594 0.20308 0.03873 0.20673 0.00000 0.00000 0.00000
Bus105 0.400 0.22346 0.01674 0.22409 0.22848 0.01617 0.22905 0.36678 0.01409 0.36705 0.00000 0.00000 0.00000
Bus107 0.400 0.40422 0.05765 0.40831 0.40456 0.05949 0.40892 0.61607 0.05908 0.61890 0.00000 0.00000 0.00000
Bus109 0.400 0.40422 0.05765 0.40831 0.40456 0.05949 0.40892 0.61607 0.05908 0.61890 0.00000 0.00000 0.00000
Bus111 0.400 0.12752 0.05661 0.13953 0.12787 0.05845 0.14060 0.17613 0.05644 0.18495 0.00000 0.00000 0.00000
Bus114 0.400 0.05497 0.01535 0.05707 0.05532 0.01701 0.05788 0.08703 0.03037 0.09217 0.00000 0.00000 0.00000
Bus115 0.400 0.18346 0.01269 0.18390 0.18382 0.01435 0.18438 0.29134 0.02361 0.29229 0.00000 0.00000 0.00000
Project: ETAP Page: 118
Contract: SN:
Bus Positive Seq. Imp. (ohm) Negative Seq. Imp. (ohm) Zero Seq. Imp. (ohm) Fault Zf (ohm)
ID kV Resistance Reactance Impedance Resistance Reactance Impedance Resistance Reactance Impedance Resistance Reactance Impedance
Bus116 0.400 0.45487 0.01756 0.45521 0.45944 0.01874 0.45982 0.73278 0.02590 0.73324 0.00000 0.00000 0.00000
Bus117 0.400 0.80638 0.02057 0.80664 0.80673 0.02223 0.80704 1.28178 0.04361 1.28252 0.00000 0.00000 0.00000
Bus131 0.400 0.13884 0.00708 0.13902 0.13919 0.00874 0.13947 0.22038 0.00936 0.22058 0.00000 0.00000 0.00000
Bus132 0.400 0.74765 0.07205 0.75111 0.78541 0.06252 0.78790 1.28178 0.04361 1.28252 0.00000 0.00000 0.00000
Bus133 0.400 0.12796 0.01864 0.12931 0.12831 0.02030 0.12991 0.20308 0.03873 0.20673 0.00000 0.00000 0.00000
Bus144 0.400 0.11674 0.02858 0.12018 0.12287 0.02764 0.12594 0.20308 0.03873 0.20673 0.00000 0.00000 0.00000
Bus151 0.400 0.13979 0.06314 0.15339 0.15057 0.06480 0.16392 0.25042 0.09149 0.26661 0.00000 0.00000 0.00000
Bus152 0.400 0.07831 0.16209 0.18002 0.09394 0.19803 0.21918 0.95241 0.00000 0.95241 0.00000 0.00000 0.00000
Bus153 0.400 0.07831 0.16209 0.18002 0.09394 0.19803 0.21918 0.95241 0.00000 0.95241 0.00000 0.00000 0.00000
Bus157 0.400 0.09478 0.03546 0.10120 0.10017 0.03644 0.10659 0.15877 0.02850 0.16130 0.00000 0.00000 0.00000
Bus162 0.400 0.01626 0.02352 0.02859 0.01652 0.02585 0.03068 0.01633 0.01524 0.02234 0.00000 0.00000 0.00000
Bus163 0.400 0.05356 0.07942 0.09580 0.05383 0.08187 0.09798 0.03648 0.05471 0.06576 0.00000 0.00000 0.00000
Bus165 0.400 0.00065 0.00435 0.00440 0.00105 0.00602 0.00611 0.00022 0.00126 0.00128 0.00000 0.00000 0.00000
Bus166 0.400 0.00065 0.00434 0.00439 0.00105 0.00601 0.00610 0.00022 0.00126 0.00128 0.00000 0.00000 0.00000
Bus167 0.400 0.00138 0.00601 0.00617 0.00174 0.00767 0.00787 0.00183 0.00665 0.00689 0.00000 0.00000 0.00000
Bus168 0.400 0.00138 0.00601 0.00617 0.00174 0.00767 0.00787 0.00183 0.00665 0.00689 0.00000 0.00000 0.00000
Bus169 0.400 0.00399 0.00891 0.00976 0.00434 0.01057 0.01143 0.00597 0.01400 0.01522 0.00000 0.00000 0.00000
LSP-DB-B3 0.400 0.05624 0.08017 0.09793 0.05651 0.08262 0.10010 0.04074 0.05662 0.06975 0.00000 0.00000 0.00000
LSPDB-B1 0.400 0.02056 0.02953 0.03598 0.02093 0.03127 0.03763 0.01414 0.02009 0.02457 0.00000 0.00000 0.00000
MCC-B1 BUS A 0.400 0.00073 0.00429 0.00435 0.00108 0.00595 0.00605 0.00078 0.00228 0.00241 0.00000 0.00000 0.00000
MCC-B2 0.400 0.03592 0.05021 0.06174 0.03627 0.05205 0.06344 0.03048 0.04018 0.05044 0.00000 0.00000 0.00000
MCC-B3 0.400 0.00851 0.02194 0.02353 0.00877 0.02427 0.02581 0.00401 0.01123 0.01192 0.00000 0.00000 0.00000