Professional Documents
Culture Documents
Sr.
complete.
Dewatering:
3a Pumping out water caused by springs, tides or river Per Kl 73.20 51.00 3613.20
seepage broken water mains or drain or well or the like
area timbered).
a A) Lift 0 to 1.5 m (for non-water logged area) Sq.m 196.00 99.00 19404.00
b Additional per Sqm. For further lifts of 1.5 m each Sq.m 98.00 104.00 10192.00
400 mm
Providing MS/CI foot rests and fixing in manhole with KG 435.00 66.00 28710.00
CC blocks of Cement Concrete grade M-10 (Nominal
Mix) with stone aggregate 20 mm nominal size of size
8 Property Connection
of soils
Total 546338.45