Professional Documents
Culture Documents
(WATER RESOURCES
DEPARTMENT WORK ITEMS)
MASTER INDEX
3 Binding wire Kg 43
16 D – cord Rm 8
1
19 Detonating shock tube / Cord relays Rm 38
24 Explosive ANFO kg 21
2
41 Hectometer stone one line dressed Each 159
42 Hemp yarn kg 48
3
60 PVC water stopper 310 mm wide Rm 365
4
Through stones 30 x 30 x 65 to 75 cm long (including
77 Each 38
loading charges and Seigniorage charges)
5
8 Cast steel pinions Kg 128
15 MS pipe 25 mm dia Rm 95
26 Zinc Kg 99
6
Capital cost of Machinery/Equipment
Sl DESCRIPTION OF MACHINERY / EQUIPMENT UNIT S.Rate for
No 2010-11
1 Agitator car / Transit mixer 2 cum ( excluding tyres ) Each 17,00,000
tyres and tubes 6 sets Each 63,000
2 Air compressor 5 cmm electric Each
4,40,000
3 Air compressor 7 cmm diesel Each
6,50,000
4 Air compressor 7 cmm electric Each
6,30,000
5 Air compressor 8.5 cmm diesel Each
7,50,000
6 Air compressor 8.5 cmm electric Each
7,14,000
7 Air compressor 15 cmm electric Each
9,00,000
8 Angle Dozer 90 hp Each
38,00,000
9 Batching plant 0.5 cum with accessories(6 Cum/hr) Each
950000
10 Batching plant 2 x 1.00 cum with accessories( 15 Each
25,00,000
Cum/hr)
11 Batching plant 2 x 1.50 cum with accessories( 50 Each
32,00,000
Cum/hr)
12 Bending machine Each
1,80,000
8
52 Shovel 0.85 cum 110 hp Each
40,90,000
53 Stationery derrick crane 5 t Each
4,70,000
54 Tipper 5 cum ( excluding tyres ) Each 11,95,000
tyres and tubes 6 sets 63,000
55 Tipping tub 1.5 cum Each 1,15,000
56 Tower crane 5 tonne Each 57,00,000
57 Transformer 250 KVA Each 3,00,000
58 Truck 10 t ( excluding tyres ) Each 8,80,000
tyres and tubes 6 sets 63,000
59 Truck mounted derrick crane 5 t ( excluding tyres ) Each
15,00,000
tyres and tubes 6 sets 63,000
60 Upright drilling machine Each 42,000
61 Ventilation fan 20 hp Each
1,31,000
9
8 Nozzle for Guniting / sand blasting gun Each 435
10
15 Structural steel fabrication Kg 15
16 Sundries ( Lump sum for un quantified inputs ) LS
30
28 Gas cutting set ( 2 No’s 15 m hose and nozzle unit ) Each 8289
29 Grease Kg 120
11
12 Electric cable / switch / control panel etc LS 22795
12
M-014 Close graded Granular sub-base Material 37.5 mm to Cum
9.5 mm 595
M-021 Stone crusher dust finer than 3mm with not more Cum
than10% passing 0.075 sieve 243
13
M-033 Aggregates 45 mm to 2.8 mm Cum
600
14
M-049 Aggregates 37.5 mm to 25 mm Cum
900
15
M-065 Bearing (Cast steel rocker bearing assembly of 250 No’s
tonne ) 517
M-071 Bentonite Kg
5
M-072 Binding wire Kg Rate as per item
no.3 of Material
rates of WRD.
M-073 Bitumen ( Cationic Emulsion ) Tonne
As per rates fixed
by R&B Dept
based on refinery
rates
M-074 Bitumen (60-70 grade)(Excluding taxes) Tonne
M-089 Credit for excavated rock found suitable for use Cum
105
M-094 Electric Detonators @ 1 detonator for 1/2 gelatin stick 100 no’s
of 125 gms each
805
M-095 Epoxy compound with accessories for preparing epoxy Kg
mortar
211
M-096 Epoxy mortar Kg
65
M-097 Epoxy primer Kg
368
M-098 Epoxy resin-hardener mix for prime coat Kg
383
M-099 Flag of red color cloth 600 x 600 mm Each
20
M-100 Flowering Plants Each
26
17
M-101 Galvanized MS flat clamp No’s
131
M-102 Galvanized steel wire crates of mesh size 100 mm x Sqm
100 mm woven with 4mm dia. GI wire in rolls of
required size. 111
M-103 Galvanized structural steel plate 200 mm wide, 6 mm Kg
thick, 24 m long 603
M-104 Gelatin 80% Kg
402
M-105 Geo grids Sqm As per local
competitive
quotations
M-106 (a)Geo membrane 500 micron thick Sqm Rate as per item
No. 52 of WRD
(b) Geo membrane 750 micron thick Sqm Rate as per item
No. 53 of WRD
(c) Geo membrane 1000 micron thick Sqm
Rate as per item
No. 54 of WRD
M-107 Geo nets Sqm As per local
competitive
quotations
M-108 (a)Geo textile 160 gsm Sqm
Rate as per item
No. 29 of WRD
(b) Geo textile 200 gsm Sqm
Rate as per item
No. 30 of WRD
(c) Geo textile 250 gsm Sqm
Rate as per item
No. 31 of WRD
M-109 Geo textile filter fabric Sqm
As per local
competitive
quotations
M-110 GI bolt 10 mm Dia No’s
14
M-111 Grouting pump with agitator Hour
Rate covered in
item no. 36 in
hire charges of
machinery of
Water Resources
work items
M-112 Grass (Doob) Kg 3
M-113 Grass (Fine) Kg 5
M-114 HDPE pipes 75mm dia Metre
Rate as per PH
M-115 HDPE pipes 90mm dia Metre items
18
M-116 Hedge plants Each
Rate as per PH
item
M-138 Plastic sheath, 1.25 mm thick for dowel bars Sqm
Rate as per local
competitive
M-139 Plastic tubes 50 cm dia , 1.2 m high No’s quotations
As per local
market rate
M-148 Random Rubble Stone Cum
195
M-149 RCC Pipe NP 4 heavy duty non pressure pipe 1000mm Metre
dia
M-150 RCC Pipe NP 4 heavy duty non pressure pipe 1200 Metre
mm dia
M-151 RCC Pipe NP 4 heavy duty non pressure pipe 300 mm Metre Rate as per PH
dia items
M-152 Reflectorising glass beads Kg
Rate as per local
competitive
20
M-153 Reinforcement strips 60 mm wide 5 mm thick as per Metre quotations
clause 3102. (Copper Strips)
45
M-162 Seeds(Grass) Kg 13
M-163 Cost of Selected earth Cum
65
M-164 Separation Membrane of impermeable plastic sheeting Sqm
125 micron thick
Rate as per local
competitive
quotations
M-165 Sheathing duct Metre
1680
21
M-170 Steel circular hollow pole of standard specification for Each
street lighting to mount light at 5 m height above
deck level
Rate to be
obtained from
Electricity/Municip
al Departments
M-171 Steel circular hollow pole of standard specification for Each
Rate to be
street lighting to mount light at 9 m height above road
obtained from
level
Electricity/Municip
al Departments
M-172 Steel drum 300 mm dia 1.2 m high/empty bitumen No’s
drum As per local
competitive
market rate
M-173 Steel helmet and cushion block on top of pile head Kg As per local
during driving. competitive
market rate
M-174 Steel pipe 25 mm external dia as per Metre
IS:1239
172
M-175 Steel pipe 50 mm external dia as per Metre
IS:1239
345
M-176 Steel wire rope 20 mm Kg
111
M-177 Steel wire rope 40 mm Kg
127
M-178 Strip seal expansion joint Metre Rate as per local
competitive
quotations
M-179 Structural Steel(HYSD/TMT bars) Tonne
27915
M-180 Super plasticizer admixture IS marked as per 9103- Kg Rate as per item
1999 no.70 of Material
rates of WRD
M-181 Synthetic Geo grids as per clause 3102.8 and Sqm Rate as per local
approved design and specifications. competitive
quotations
M-182 Through and bond stone Each
Rate as per item
no.75 of Material
(a) 20X20x30 to 45 cm long Each rates of WRD.
22
M-183 Tie rods 20mm diameter No’s
27
M-184 Tiles size 300 x 300 mm and 25 mm thick Each
As per Building
M-185 Timber Cum SSR
Rate as per
local
M-187 Tube anchorage set complete with bearing plate, No’s competitive
permanent wedges etc quotations
M-188 Un slaked lime Tonne
1810
M-189 Water KiloLitre
67
M-190 Water based cement paint Litre
As per Building
SSR
M-191 Welded steel wire fabric Kg
90
M-192 Wire mesh 50mm x 50mm size of 3mm wire Kg
152
M-193 Wooden ballies 2" Dia for bracing Each As per Building
SSR
M-194 Wooden ballies 8" Dia and 9 m long Each As per Building
SSR
M-195 Wooden packing Cum
780
M-196 Wooden staff for fastening of flag 25 mm dia, one m Each
long 47
Item Printing new letter and figures of any shade (ii) per cm
8.3 English Roman height per
letter 1
Item Painting Two Coats on New Concrete Surfaces Sqm
8.8 As per Building
SSR
Item Painting angle iron post Two Coats Sqm
8.9 As per Building
SSR
Miscellaneous Items
1 Benching old embankment slopes 0.45 X 0.45 M RM
2.40
2 Laying Sand Bags in the stipulated places including per bag
cost of empty cement bag, sand, thread, stiching
charges and labour charges with 13.615 % overhead 17.10
charges and contractors profits.
23
ROAD & BRIDGE WORKS
MATERIAL & WORK ITEM RATES
RATES OF MATERIALS & WORK ITEMS
Sl. S.S. Description Unit Basic Rate
No. Item (per) for SoR
No. 2010-11
excluding
subsumed
taxes in Rs.
1 2 3 4 5
(A) STONE AND ROAD MATERIALS
ROUGH STONE QUARRIED INCLUDING
WEDGING, BREAKING, BURNING, SPLITING
AND STACKING
1 22.a For R.R Masonary Work (other than Granite, 1 cum 127.90
Dolomite and Trap)
2 b.I For SS Revetment work 225 mm 1 cum 68.30
3 b.ii For SS Revetment work 300 mm 1 cum 91.40
4 b.iii For SS Revetment work450 mm 1 cum 109.60
5 C Jeddy Stone above 450 mm to 600 mm 1 cum 150.00
6 d I. Laterite for revetment 225 mm 1 cum 94.20
7 d II. Laterite for revetment 300 mm 1 cum 109.60
8 d.iii Granite for SS revetment 225 mm 1 cum 112.50
9 d.iv Granite for SS revetment 300 mm 1 cum 130.80
Note:- Only when other granite is not available
10 E Laterite for masonry 1 cum 109.60
11 F Cyclopean stones above 0.2 cum 1 cum 201.90
12 G For R.R.Masonry works ( granite, dolamite and 1 cum 149.00
trap variety)
13 NOTE:- For items 22(a) to 22© and 22(g) add 1 cum 67.00
extra Rs /cum, wherever quarrying is done by
blasting
COURSED RUBBLE STONE QUARRYING
WEDGING, BREAKING, BURNING AND
SPLITTING INCLUDING STACKING FOR SS
FIRST SORT WORKS
14 23.a Granite, Dolamite and trap 1 cum 209.60
15 B For other varieties 1 cum 146.20
16 27 Granite stone slabs for culverts, lintels and 1 cum 1354.80
copings (3 faces dressed coarsed rubble
masonry)
17 NOTE: - For items 23(a), 23(b) and 27 add extra 1 cum 69.00
Rs. Per Cum, wherever quarrying is done by
blasting
18 28 Bond stones ( 600 x 200 x 200 mm ) each 24.00
19 B Chainage stones and Centre line stones each 28.90
(750x150x150xmm)
20 31 Demarcation Stones ( 900 x 150 x 150 mm) each 55.30
21 32.a Guard Stones ( 1200 x 200 x 200 mm ) each 82.70
1
22 B Guide Stones ( 800 x 150 x150 mm ) each 55.30
23 C Carving letters and figures in stone up to 100 each 5.10
mm size
24 D Carving letters and figures in stone above 100 each 6.70
mm size
HARD BROKEN STONE OF GRANITE, TRAP
AND DOLERITE FREE FROM DUST
OBTAINED BY QUARRYING, WEDGING,
BREAKING, BURNING AND SPLITTING
INCLUDING STACKING.
25 33.a - do - 6mm size (SS 5) 1 cum 411.50
26 b - do - 10mm size (SS 5) 1 cum 538.50
27 c - do - 12mm size (SS 5) 1 cum 661.50
28 d - do - 20mm size (SS 5) 1 cum 811.50
29 e - do - 25mm size (SS 5) 1 cum 796.20
30 f - do - 40mm size (SS 5) 1 cum 480.80
31 g - do - 50mm size (SS 5) 1 cum 375.00
32 h - do - 60mm size (SS 5) 1 cum 346.20
33 I - do - 65mm size (SS 5) 1 cum 312.50
34 j - do - 75mm size (SS 5) 1 cum 250.00
35 k - do - 75 to 100mm size (SS 5) 1 cum 201.90
36 NOTE:- (1) Add extra Rs. /- per cum for items 70.00
33 (a) to 33 (k) if the metal is obtained by
blasting
37 (2) Add 25% extra per cum if the metal is 25%
obtained by machine crushing excluding cost of
blasting.
38 (3) Deduct Rs. /- per cum if the metal or rubble 9.00
is obtained from surface stone and boulders.
39 (4) Add Rs. /- per cum for selection of stones 15.00
and boulders from excavated spoil dumps for 9.00
items 33 a to 33 k, when this addition of Rs. /-
per Cum is allowed, deduction of Rs. /- per
Cum mentioned under Note (3) above should
invariably be made.
SOFT BROKEN STONE SCREENED AND FREE
FROM DUST INCLUDING STACKING
40 33.l - do - 40 mm size ( SS 5 ) 1 Cum 101.00
41 33.m - do - 50 mm size ( SS 5 ) 1 Cum 91.40
42 33.n - do - 60 mm size ( SS 5 ) 1 Cum 72.10
43 33.o - do - 65 mm size ( SS 5 ) 1 Cum 64.40
44 33.p - do - 75 mm size ( SS 5 ) 1 Cum 60.60
HARD BROKEN STONE OF GRANITE TRAP
DOLERITE AND DOLAMITE FREE FROM DUST
OBTAINED BY QUARRYING WEDGING,
BREAKING, BURNING AND SPLITTING
INCLUDING STACKING (QUARTZITE AND
BASALT WITH AGGREGATE IMPACT OF LESS
THAN 20)
2
45 33a -do- 2.36 to 5 mm size (IRC&MORTH) 1 cum 250.00
46 b -do- 5 to 7mm size (IRC&MORTH) 1 cum 413.50
47 c -do- 9.5 to 11.2mm size (IRC&MORTH) 1 cum 538.50
48 d -do- 12mm to 14 mm size ( IRC and MORTH ) 1 cum 663.50
49 e -do- 19 mm to 22 mm size ( IRC and MORTH ) 1 cum 913.50
50 f -do- 25 mm to 27 mm size ( IRC and MORTH ) 1 cum 798.10
51 g -do- 40 mm to 45 mm size ( IRC and MORTH ) 1 cum 480.80
52 h -do- 50 mm to 55 mm size ( IRC and MORTH ) 1 cum 375.00
53 i -do- 60 mm to 63 mm size ( IRC and MORTH ) 1 cum 346.20
54 j -do- 65 mm size ( IRC and MORTH ) 1 cum 312.50
55 k -do- 75 mm size ( IRC and MORTH ) 1 cum 250.00
56 1 NOTE:- Add extra Rs. /- per cum for items 33 1 cum 70.00
(a) to 33 (j) if the metal is obtained by blasting
57 2 Add 25% extra per cum if the metal is obtained 1 cum 25%
by machine crushing excluding cost of blasting.
58 3 Deduct Rs. /- per cum if the metal or rubble is 1 cum 9.00
obtained from surface stones and boulders
59 4 Add Rs. /- per cum for selection of stones and 1 cum 15.00
boulders from excavated soil dumps for items 33 9.00
(a) to 33 (k), when this addition of Rs. /- per
cum allowed deduction of Rs. /- per cum
mentioned under note (3) above should
invariably be made
HARD BROKEN STONE OTHER THAN
GRANITE SUCH AS QUARTZ, QUARTZ-NAPA
AND BASALT SCREENED AND FREE FROM
DUST INCLUDING STACKING
60 33.q - do - 10 mm size (SS 5) 1 Cum 318.30
61 -do- 9.5 mm to 11.2 mm size ( IRC and MORTH 1 Cum 318.30
)
62 r - do - 12 mm size (SS 5) 1 Cum 298.10
63 -do- 12mm to 14 mm size ( IRC and MORTH ) 1 Cum 298.10
64 S - do - 20 mm size (SS 5) 1 Cum 241.40
65 -do- 19 mm to 22 mm size ( IRC and MORTH ) 1 Cum 241.40
66 T - do - 25 mm size (SS 5) 1 Cum 237.50
67 U - do - 40 mm size (SS 5) 1 Cum 140.40
68 -do- 40 mm to 45 mm size ( IRC and MORTH ) 1 Cum 140.40
69 V - do - 50 mm size (SS 5) 1 Cum 124.00
70 -do- 50 mm to 55 mm size ( IRC and MORTH ) 1 Cum 124.00
71 33.w - do - 65 mm size (SS 5) 1 Cum 117.30
72 -do- 60 mm to 65 mm size ( IRC and MORTH ) 1 Cum 117.30
73 X - do - 75 mm size (SS 5) 1 Cum 97.10
74 - do - 75 mm size ( IRC &MORTH) 1 Cum 97.10
75 Y - do - 75 to 100 mm size (SS 5) 1 Cum 76.90
76 - do - 75 to 100 mm ( IRC& MORTH) 1 Cum 76.90
OTHER ITEMS INCLUDING STACKING
3
77 33.z1 Laterite 40 to 75 mm ( ring) 1 Cum 84.10
78 z2 kankar, hard broken kankar 40 to 75 mm ( ring 1 Cum 63.00
)
79 z3 Soling stone of 150 mm size of granite, trap and 1 Cum 78.90
Dolamite varieties.
80 NOTE:- (1) Add extra for items to 33(z3) Rs /- 1 Cum 70.00
Per cum, wherever quarrying is done by blasting.
(2) Wherever controlled blasting is resorted to
the Chief Engineer concerned shall approve the
observed data in support of SS item No. 22 a to
22 c , 22g, 23
81 z4 Soling stone of 150 mm size other than granite 1 Cum 55.30
variety
82 z5 Soling Stone laterite, Kankar 150mm, surface 1 Cum 33.70
stone
83 z6 Field picked metal unbroken 20 mm size 1 Cum 45.70
84 z7 - do - 25 mm size 1 Cum 36.10
85 z8 - do - 40 mm size 1 Cum 40.40
86 z9 - do - 50 mm size 1 Cum 36.10
87 z10 - do - 60 mm size 1 Cum 29.80
88 z11 - do - 80 mm size 1 Cum 21.60
89 NOTE:- Add Rs. /- Per Cum for selection of stone and 15.00
boulders from excavated spoil dumps for items 33 (Q) TO 9.00
33 Z , when this addition of Rs. /- per Cum is allowed,
deduction of Rs. /- per Cum should invariably be made
towards the metal or rubble if it is obtained from surface
stone and boulders.
90 34 Gravel including stacking 1 Cum 50.50
91 35 a Quarry rubbish 1 Cum 48.60
92 B HBG Stone Chips 2.36mm and below 1 Cum 226.90
93 36.a Sand for mortar, ceiling coat including washing 1 Cum 211.50
screening etc.,
94 B Sand for filling and blindage 1 Cum 67.30
95 37 Clay for puddle and masonry Items 38 (a) to 39 1 Cum 28.00
(h) As per local prevailing rates based on
competitive quotations.
(C) LIME AND CEMENT
96 40 to
41(c )
97 42 Cement excluding cost of empty cement bags 1 MT The monthly
rates will be
communicated
by Govt.
NOTE: (1) The rates are inclusive of sales tax. 2)As per the rates applicable
to the District. 3) Least of the (1) and (2 ) above may be allowed 4) The
price of cement will be reviewed and fixed on monthly basis and rates will be
communicated separately.
98 C Grinding lime mortar or Surkhi mortar 1 Cum 75.00
99 D Shell lime slaked and screened 1 Cum 750.00
4
100 E White cement 1 Kg. 19.20
101 (D) MORTARS
102 43 to Items 43 to 45 Rates have to be
45 worked out based on
MORT&H data.
(E) METAL AND IRON WORKS
103 Mild steel rods 6mm dia. 1 MT The monthly
104 Mild steel flats 1 MT rates will be
communicated
105 Mild Steel, Structural Steel, I.e., Angles, 1 MT
by Govt.
Channels and I sections.
106 High Yield Strength Deformed Bars/TMT bars 1 MT
107 Mild steel plates 1 MT
NOTE: (1) The rates are inclusive of sales tax. 2)As per the rates
applicable to the District. 3) Least of the (1) and (2 ) above may
allowed 4) The prices of steel will be reviewed and fixed on
monthly basis and rates will be communicated separately.
III RATES OF WORKS
(A) CLEARING SITE
108 1.a Clearing heavy Jungle 1 Sqm 2.20
109 B Clearing light Jungle 1 Sqm 2.00
110 C Clearing Scrub Jungle 1 Sqm 2.00
111 D Clearing Juliflora (Prosafis) jungle including up- 1 Sqm 3.30
rooting and removing of Juliflora stumps.
112 2.a.I Cutting and removing Palmyrah trees including Each 27.00
stacking of girth 30 to 100 cm.
113 Ii - do - 100 to 200 cm. Each 42.50
114 2.b.I Uprooting and removing Palmyrah stumps Each 30.00
including stacking of girth 30 to 100 cm.
115 Ii - do - 100 to 200 cm. Each 46.00
116 2.c.I Cutting and removing date trees including Each 18.00
stacking of girth 30 to 100 cm
117 Ii - do - 100 to 200 cm Each 28.00
118 d.I Uprooting and removing stumps of date trees Each 18.00
including stacking of girth 30 to 100 cm.
119 Ii - do - 100 to 200 cm Each 24.00
120 eI Cutting and removing other kind of trees Each 24.00
including stacking of girth 30 to 100 cm
121 Ii - do - 100 to 200 cm Each 38.00
122 iii - do - above 200 cm Each 62.00
123 f.I Uprooting and removing stumps of other kind of Each 18.00
trees including stacking of girth 30 to 100 cm.
124 Ii - do - 100 to 200 cm Each 26.00
125 iii - do - above 200 cm Each 35.50
126 3.a Uprooting and clearing prickly pear jungle 1 Sqm 1.90
127 B - do - under 2.5 meters height including burning 1 Sqm 2.40
and burrying as directed.
5
128 C - do - over 2.5 meters height including burning 1 Sqm 2.90
and burrying with an initital lead of conveyance
129 4.a Removing of natchu, goobi, thooti etc., from 1 Sqm 1.50
drains, channels including clearance if not more
than 1 metre depth of water with an initial lead
of 10 metresand lift of 2 metres.
130 b.I Clearing alchi, tilla 1 Sq.m 2.90
131 b.ii Removal of Jammu 1 Sq.m 2.50
132 c.I Removal of imponea, cornea 1 Sq.m 2.90
133 c.ii Removal of water hyacinth upto 30 cm thick. 1 Sqm 3.00
134 c.iii - do - more than 30 cm thick 1 Sq.m 4.10
135 D Removal of natchu, goobi, thooti etc., for every 1 Sqm 1.00
extra lead or lift over the initial lead or lift.
(B) DISMANTLING
5 DISMANTLING, CLEARING AWAY AND
CAREFULLY STACKING MATERIALS USEFUL
FOR REUSE.
136 n.(i) Dry rough stone revetment for aprons and 1 cum 50.00
stacking within 40 metres
7 Drilling holes in hard granite or sheet rock
a) Manually ( Hand)
137 I) 20 mm dia meter 1 RM 97.00
138 ii) 25 mm dia meter 1 RM 105.00
139 iii) 36 mm dia meter 1 RM 120.00
140 b) Pneumatic Compressor
141 I) 20 mm dia meter 1 RM 110.00
142 ii) 25 mm dia meter 1 RM 121.00
143 iii) 36 mm dia meter 1 RM 133.00
8 Grouting the holes with neat cement slurry
excluding cost of steel
144 I) 20 mm dia meter 1 RM 71.00
145 ii) 25 mm dia meter 1 RM 89.00
146 iii) 36 mm dia meter 1 RM 109.50
White Washing and Painting works
147 AI White washing and colour banding for guard and each 6.50
guide stones including cost of materials
148 BI Screening sand and gravel 1 cum 6.30
149 B2 Screening chips and metal 1 cum 13.00
150 C1 Removing and refixing Hectometre or each 9.50
Demarcation stones
(S ) ROAD WORK ITEMS
6
PICKING OLD METALLED SURFACE TO
DEPTH OF 40 TO 100 mm SPREADING OLD
METAL AND NEW METAL SECTIONING
INCLUDING EDGEBUNDS AND SUBGRADE
ROLLING, SPREADING METAL INCLUDING
BLINDAGE OFGRAVEL WATERING WITH AN
INITIAL LEAD OF 2 HECTOMETERS AND
HAND ROLLER ( 1.5 TO 2 TONNES) ROLLING
ETC., INCLUDING BARRICADING,
DIVERSION OF TRAFFIC AND WETTING THE
NEW CONSOLIDATION FOR A FORTNIGHT
COMPLETE
( For a compact thickness )
1 (I ) HARD METAL
151 A 40 mm thickness 10 57.20
sqm
152 B 50 mm thickness 10 60.50
sqm
153 C 75 mm thickness 10 66.00
sqm
154 D 100 mm thickness 10 71.50
sqm
155 1 (ii ) (For compact thickness of soft metal)
156 A 50 mm thickness 10 44.00
sqm
157 B 75 mm thickness 10 52.80
sqm
158 C 100 mm thickness 10 57.20
sqm
5 Picking old metalled surface to a depth of
40 to 100 mm and spreading metal
including watering with an initial lead of 2
Hectometers and rolling with power rollers
watering and spreading gravel for blindage
and power roller rolling including hire
charges of power roller( 8 to 10 T )
barricading and diversion of traffic and
wetting the new consolidation for a
fortnight(for compacted thickness of )
HARD METAL
159 5 (a) 40 mm thick ness 10 150.70
sqm
160 (b) 50 mm thick ness 10 170.50
sqm
161 (c ) 75 mm thick ness 10 187.00
sqm
162 (d ) 100 mm thick ness 10 203.50
sqm
163 (e) 150 mm thick excluding hire charges 10 363.00
sqm
7
164 Gelatin(For MORTH data, for works of state & Per Kg 46.00
national high ways only)
165 Electric Detonators(For MORTH data, for works of each 2.30
state & national high ways only)
166 Hot applied thermoplastic compound(For MORTH Per 153.30
data, for works of state & national high ways Litre
only)
167 Reflectionising glass beads of 2 mm thick(For Per Kg 49.80
MORTH data, for works of state & national high
ways only)
168 Road marking paint confirming to IS 164(For Per Kg 122.60
MORTH data, for works of state & national high
ways only)
169 n Labour charges for laying filters with coarse 1 cum 45.00
aggregate.
170 o Labour charges for laying filter with sand. 1 cum 25.00
New Items.
171 Fly Ash 1 cum Deleted
172 Binding wire 1 Kg. 43.10
8
PUBLIC HEALTH ITEMS
1. S o R FOR R.C.C. PLAIN ENDED PIPES
Sl.
Description
No.
1 2
Manufacture, Supply and Delivery of R.C.C. Plain ended pipes conforming to
1 B.I.S 458/2003 , Ex-factory, Excluding transportation, taxes & duties
The above rates of RCC Plain ended pipes are based on the following raw materials
Cost Cement. Rs.2835/- per MT (excluding all taxes and freight).
Steel (M.S. Rods) - Rs.27094/- per MT. (excluding all taxes and freight).
1
2. S o R FOR R.C.C. COLLARS
Sl.No. Description
1 2
Manufacture, Supply and Delivery of R.C.C. Collars conforming to B.I.S.
1 458/2003 (rate per each collar) suitable for R.C.C. Plain ended pipes
including transportation but excluding taxes & duties
Size Unit Revised SoR For 2010-11
NP - 2 Class NP - 3 Class NP - 4 Class
80 mm dia Each 34.00
100 mm dia Each 37.00
150 mm dia Each 38.00
200 mm dia Each 52.00
225 mm dia Each 55.00
250 mm dia Each 61.00
110.00
300 mm dia Each 79.00 110.00
350 mm dia Each 98.00 140.00 140.00
400 mm dia Each 108.00 159.00 159.00
450 mm dia Each 171.00 213.00 213.00
500 mm dia Each 195.00 255.00 255.00
600 mm dia Each 261.00 334.00 334.00
700 mm dia Each 339.00 443.00 443.00
800 mm dia Each 475.00 568.00 568.00
900 mm dia Each 572.00 662.00 662.00
1000 mm dia Each 668.00 827.00 827.00
814.00
1100 mm dia Each 1046.00 1046.00
1200 mm dia Each 985.00 1310.00 1310.00
1400 mm dia Each 1273.00 1659.00 1659.00
1600 mm dia Each 1625.00 2120.00 2120.00
1800 mm dia Each 1637.00 2723.00 2723.00
The above rates of RCC Collars suitable to plain ended pipes are based on the following raw
materials cost.
Cost Cement. Rs.2835/- per MT (excluding all taxes and freight).
Steel (M.S. Rods) - Rs.27094/- per MT. (excluding all taxes and freight).
2
3. S o R FOR R.C.C. S/S PIPES (Non - Pressure)
Sl.
Description
No.
1 2
Manufacture, Supply and Delivery of R.C.C. Socket and Spigot pipes
1 conforming to B.I.S. 458/2003 at ex-factory (rate per meter of
effective length) Excluding transportation, taxes & duties.
Size Unit Revised SoR For 2010-11
NP - 2 Class NP - 3 Class NP - 4 Class
Meter 141
80 mm dia
100 mm dia Meter 160
150 mm dia Meter 188
200 mm dia Meter 232
225 mm dia Meter 252
250 mm dia Meter 269
Meter 378 944 991
300 mm dia
350 mm dia Meter 487 1173 1193
400 mm dia Meter 535 1299 1322
450 mm dia Meter 667 1434 1445
500 mm dia Meter 769 1637 1773
600 mm dia Meter 1082 2293 2305
700 mm dia Meter 1398 2924 2977
800 mm dia Meter 1795 3866 3867
900 mm dia Meter 2269 4851 4877
1000 mm dia Meter 2768 5453 5720
1100 mm dia Meter 3226 6420 6591
1200 mm dia Meter 3640 7569 7707
Meter 5226 10018 10906
1400 mm dia
1600 mm dia Meter 6465 12973 12918
1800 mm dia Meter 7177 17172 17287
The above rates of RCC S/S Non-Pressure pipes are based on the following raw materials
cost.
Cost Cement. Rs.2835/- per MT (excluding all taxes and freight).
Steel (M.S. Rods) - Rs.27094/- per MT. (excluding all taxes and freight).
3
4. S o R FOR R.C.C. S/S PIPES (Pressure)
Sl.No. Description
1 2
Manufacture, Supply and Delivery of R.C.C. Socket and Spigot
1 pipes conforming to B.I.S. 458/2003 Ex-factory (rate per meter of
effective length) Excluding transportation, taxes & duties.
800 mm dia
2715 4626
900 mm dia Meter 3269 5413
1000 mm dia Meter 4143 6182
1100 mm dia Meter 4975
1200 mm dia Meter
5821
The above rates of RCC S/S Pressure pipes are based on the following raw materials
cost.
Cost Cement. Rs.2835/- per MT (excluding all taxes and freight).
Steel (M.S. Rods) - Rs.27094/- per MT. (excluding all taxes and freight).
4
Public Health Items
11. S o R FOR PRE-STRESSED (NON-CYLINDER) CONCRETE PIPES FOR THE YEAR 2010-11
Sl.No. Description
1 2
Manufacture, Supply, Delivery of Pre-stressed (Non-cylinder) concrete pipes conforming to IS 784/2001 ex-factory excluding
1 transportation, taxes & duties., for the following Field/Site Test Pressures.(The manufacture shall design the pipes as per the IS
Code 784-2001)
Size Unit Revised SoR For 2010-11
Rs. Rs. Rs. Rs. Rs. Rs.
6 Kg/cm2 8 Kg/cm2 10 Kg/cm2 12 Kg/cm2 14 Kg/cm2 16 Kg/cm2
350 MM DIA Metre 2378 2388 2396 2400 2446 2531
400 MM DIA Metre 2551 2570 2596 2618 2662 2697
450 MM DIA Metre 2688 2694 2718 2759 2822 2876
500 MM DIA Metre 2908 2912 2925 2973 3026 3108
600 MM DIA Metre 3332 3344 3364 3447 3547 3646
700 MM DIA Metre 4097 4095 4142 4212 4348 4426
800 MM DIA Metre 4812 4835 4938 5024 5204 5334
900 MM DIA Metre 5571 5579 5678 5876 6081 6443
1000 MM DIA Metre 6531 6544 6697 6922 7221 7535
1100 MM DIA Metre 7396 7454 7621 8004 8267 8630
1200 MM DIA Metre 8173 8254 8644 9004 10091 10187
1300 MM DIA Metre 9237 9712 10195 10688 11522 12499
1400 MM DIA Metre 10547 11094 11669 12575 13430 14106
1500 MM DIA Metre 12303 12951 13598 14642 15560 16326
1600 MM DIA Metre 13831 14570 15308 17166 17598 18465
1700 MM DIA Metre 15248 15873 16637 18529 20614 21552
1800 MM DIA Metre 16496 17482 18263 19961 22211 23241
1900 MM DIA Metre 17633 18527 19938 21021 22756 25363
2000 MM DIA Metre 19338 20472 21352 23334 26401 28432
Note: a) The above rate of PSC pipes are based on the HT wire cost of Rs.41872/-MT (Excluding taxes).
and cement price of Rs.2835/- per MT (Excluding all taxes and freight)
7
Public Health Items
12. S o R FOR PRE-STRESSED (CYLINDER) CONCRETE PIPES FOR THE YEAR 2010-11
Sl
Description
No.
1 2
Pre-stressed (Cylinder type ) concrete pipes conforming to IS 784/2001 @ ex-factory cost of pipes, excluding transportation, laying, jointing,
1 testing, bends, tees, specials, taxes & duties for the following Field/Site Test Pressures.(The manufacture shall design the pipes as per the IS
Code 784-2001)
Size Unit Revised SoR For 2010-11
8 10 12 14 16 18 20
4 Kg/cm2 6 Kg/cm2
Kg/cm2 Kg/cm2 Kg/cm2 Kg/cm2 Kg/cm2 Kg/cm2 Kg/cm2
400 MM DIA Meter 4,281 4,281 4,281 4,281 4,299 4,333 4,396 4,459 4,502
450 MM DIA Meter 4,642 4,642 4,642 4,660 4,704 4,757 4,838 4,889 4,952
500 MM DIA Meter 5,074 5,074 5,082 5,233 5,188 5,260 5,321 5,419 5,489
600 MM DIA Meter 6,017 6,052 6,113 6,202 6,281 6,361 6,486 6,601 6,716
700 MM DIA Meter 6,928 7,017 7,123 7,239 7,345 7,452 7,585 7,754 7,877
800 MM DIA Meter 8,116 8,240 8,392 8,543 8,674 8,817 8,985 9,172 9,394
900 MM DIA Meter 9,600 9,760 9,947 10,133 10,319 10,487 10,727 10,965 11,205
1000 MM DIA Meter 11,088 11,302 11,522 11,753 11,984 12,187 12,472 12,763 13,066
1100 MM DIA Meter 12,239 12,490 12,761 13,022 13,293 13,534 13,844 14,172 14,887
1200 MM DIA Meter 13,841 14,131 14,450 14,769 15,098 15,388 15,745 16,461 16,973
1300 MM DIA Meter 15,369 15,727 16,094 16,471 16,849 17,187 18,038 18,503 19,083
1400 MM DIA Meter 16,821 17,235 17,671 18,105 18,541 19,392 19,923 20,476 21,697
1500 MM DIA Meter 18,185 18,638 19,091 19,543 20,489 20,999 21,780 22,958 20,808
1600 MM DIA Meter 20,514 21,015 21,525 22,488 23,077 23,664 25,119 25,764 26,389
1700 MM DIA Meter 22,058 22,636 23,262 24,360 25,025 26,258 27,374 28,078 28,743
1800 MM DIA Meter 24,149 24,754 25,948 26,688 27,409 28,755 29,939 30,776 31,603
1900 MM DIA Meter 28,183 28,876 30,203 31,040 32,457 33,343 34,682 35,616 36,493
8
Public Health Items
2000 MM DIA
Meter 30,063 31,383 32,278 33,202 34,821 35,794 37,306 38,375 39,329
Note: The rates of PCCP pipes which were incorporated in the SSR are based on the following raw materials cost.
HT Wire: - Rs.41872/- (Excluding all taxes & freight)
HR Coil (Hot Rolled): - Rs.34893/- (Excluding all taxes & freight)
Cement Cost Rs. 2835/-.per MT (Excluding all duties, taxes & freight)
9
Public Health Items
13. S o R FOR BAR WRAPPED STEEL CYLINDRICAL (BWSC) PIPES FOR THE YEAR 2010-11
Sl.
Description
No
1 2
Bar Wrapped Steel Cylindrical (BWSC) pipes conforming to IS 15155 - 2002, ex-factory excluding transportation, taxes and duties etc., for bar
1
wrapped steel cylindrical pipes for the following Field/Site Test Pressures.(The manufacture shall design the pipes as per the IS Code 784-2001)
Size Unit Rs. Rs. Rs. Rs. Rs. Rs. Rs. Rs. Rs. Rs.
4 -12 14 16 18 20 22 24 26 28 30
Kg/cm2 Kg/cm2 Kg/cm2 Kg/cm2 Kg/cm2 Kg/cm2 Kg/cm2 Kg/cm2 Kg/cm2 Kg/cm2
250 MM DIA Meter 2,534 2,534 2,534 2,534 2,534 2,534 2,534 2,556 2,569 2,719
300 MM DIA Meter 2,841 2,841 2,841 2,841 2,841 2,863 2926 3,029 3,072 3252
350 MM DIA Meter 3,458 3,458 3,458 3,470 3,482 3,497 3,571 3,685 3,778 3,968
400 MM DIA Meter 3,785 3,785 3,797 3,820 3837 4,001 4,146 4,291 4454 5063
450 MM DIA Meter 4,156 4,166 4,193 4,208 4,395 4,559 4,740 4,921 5,106 5,606
6614
500 MM DIA Meter 4,652 4,669 4,696 4,894 5129 5,342 5,583 5783 6,166
600 MM DIA Meter 6,127 6,166 6,196 6,527 6847 7,115 7,449 7775 8,244 8734
700 MM DIA Meter 7,396 7,467 7932 8,381 8806 9,297 9954 10,244 10751 11551
800 MM DIA Meter 8,378 8891 9464 10,028 10594 11425 12,022 12905 13558 14548
900 MM DIA Meter 10,330 10583 11325 12,052 12761 13267 14727 15623 16366 17656
1000 MM DIA Meter 11,625 12537 13317 14134 15041 16529 17953 19260 20100 21770
1100 MM DIA Meter 16,671 16,958 16921 18510 20338 21663 23862 25247 26800 29480
19370
1200 MM DIA Meter 18,443 18884 21302 23375 25386 27457 28283 31694 35344
Note: The above rates of BWSC pipes are based on the following raw materials' cost.
HR Plates - Rs.34893/- per MT (Excluding all taxes)
10
Public Health Items
Wire rods - Rs.33251/- per MT (Excluding all taxes)
Cement Cost Rs. 2835/-.per MT (Excluding all duties, taxes & freight)
11
14. S o R FOR M.S. PIPES FOR THE YEAR 2010-11
Thicknes
Sl.No. Description Unit Rate (Rs.)
s in mm
1 2 3 4 5
1 Manufacture, supply and delivery of M.S
Pipes conforming to is 3589/2001 including
in lining with cement mortar (1:2) 15mm
thick using 4 numbers of 6mm dia
M.S.Rings at each end of the pipe and out
coating with cement mortar (1:3) 30mm
thick by shortcreting or gunetting duly
providing wire mesh of size 50x50x3mm
including cost of all materials, labour
charges, transportation to anywhere in AP,
but excluding taxes & duties, etc.
500 mm dia Meter 8.00 6296.00
The above rates of MS Spiral pipes are based on the following raw materials cost.
MS Plates = Rs 32841/- Per MT.
17