(WATER RESOURCES
DEPARTMENT WORK ITEMS)
MASTER INDEX
3 Binding wire Kg 46
6 Chequered plate Kg 36
16 D – cord Rm 8
1
18 Detonating fuse coil Rm 6
2
40 Hariyala turfing sods sqm 19
42 Hemp yarn kg 52
3
59 PVC sealing strip Rm 29
4
Through stones 30 x 30 x 65 to 75 cm long (including
77 Each 45
loading charges and Seigniorage charges)
5
8 Cast steel pinions Kg 133
26 Zinc Kg 112
6
Capital cost of Machinery/Equipment
Sl DESCRIPTION OF MACHINERY / EQUIPMENT UNIT
No S.Rate for
2011-12
7
24 Diesel generating set 50 KVA Each 470000
25 Diesel Loco 45 hp Each 1350000
26 Dewatering pump 5 hp diesel Each 33000
27 Dewatering pump 5 hp electric Each 18000
28 Dewatering pump 10 hp diesel Each 48000
29 Dewatering pump 10 hp electric Each 27000
30 Dewatering pump 20 hp diesel Each
150000
31 Dewatering pump 20 hp electric Each
50000
32 Drifter Each 700000
33 Drilling jumbo ( excluding tyres ) Each 1000000
tyres and tubes 6 sets 72000
34 Dumper 4.5 cum ( excluding tyres ) Each
950000
tyres and tubes 6 sets 72000
35 Geophysical Ele.resistivity meter Each 300000
36 Grouting pump Each 80000
37 Guniting / sand blasting equipment Each
220000
38 Ice plant with accessories 30 t / day Each
1850000
39 Jack hammer Each 44000
40 Needle vibrator 40 mm petrol Each 15500
41 Needle vibrator 40 mm electric Each 17500
42 Needle vibrator 60 mm petrol Each 16200
43 Needle vibrator 60 mm electric Each 20000
44 Planing machine 4 m stroke Each
600000
8
52 Shovel 0.85 cum 110 hp Each
4400000
53 Stationery derrick crane 5 t Each
500000
54 Tipper 5 cum ( excluding tyres ) Each 1250000
tyres and tubes 6 sets 72000
55 Tipping tub 1.5 cum Each 125000
56 Tower crane 5 tonne Each 6000000
57 Transformer 250 KVA Each 330000
58 Truck 10 t ( excluding tyres ) Each 950000
tyres and tubes 6 sets 72000
59 Truck mounted derrick crane 5 t ( excluding tyres ) Each
1575000
tyres and tubes 6 sets 72000
60 Upright drilling machine Each 45000
61 Ventilation fan 20 hp Each 140000
62 Vibratory pad foot roller 8 t Each 2000000
63 Wagon drill Each 500000
64 Water tanker 8000 ltr (excluding tyres) Each
950000
tyres and tubes 6 sets 72000
65 Welding set Each 38500
66 Winch 35 hp electric Each 285000
ACCESSORIES TO MACHINERY / EQUIPMENT
9
10 Rails 30R ( 30 kg / m ) tonne
36538
11 Reamer shell Each 3846
12 T.C. Cross bit 50 mm dia Each 4519
13 T.C. Cross bit 75 mm dia Each
7692
14 T.C. Cross bit 100 mm dia Each 9615
15 Tyres and Tubes for truck Set 9863
16 Wire rope 16 mm dia Rm
159
17 Excavation of drain with Excavator cum 23
OTHER COSTS ON MATERIAL / MACHINERY / EQUIPMENT
4 Diesel Ltr 45
5 Electric power (HT-VIII Category) including tax ( 1.5 Kwhr
times of the Tariff of HT-I(A):General-11 KVA Category) 4.50
(as per APEPDCL tariff)
6 Excise duty on Gates / Hoist supplies %
0%
18 Steel wedges LS 10
19 Elbows / Nipple / Plugs etc., LS 11
20 Soldering materials LS 10
21 Steam circulation arrangement LS 10
22 Fuel charges ( gas for heating ) LS 12
10
23 Vulcanizing materials LS 12
24 Other accessories / controls / junctions LS
12
25 Miscellaneous fittings / switches etc LS
12
26 Anchors / supports for cables / lights LS 12
27 Civil works for foundations / pedestals / duct etc LS 12
28 Gas cutting set ( 2 No’s 15 m hose and nozzle unit ) Each 9118
29 Grease Kg 145
30 Welding holder set ( cable / holder / gloves / mask etc ) Each 4145
M-003 Boulder with minimum size of 300 mm for Pitching Cum 152
11
M-004 Coarse sand for filling (including Seigniorage Cum 238
charges)
M-005 Coarse sand for mortar(including Seigniorage Cum 310
charges)
M-006 Fine Sand (including Seigniorage charges) Cum 405
M-009 Granular Material or hard Murrum for GSB works Cum Deleted
M-012 Filter media/Filter Material as per Table 300-3 (MoRT&H Cum 290
Specification)
M-021 Stone crusher dust finer than 3mm with not more Cum 243
than10% passing 0.075 sieve.
M-022 Coarse graded Granular sub-base Material 2.36 mm & Cum 395
below
12
M-023 Coarse graded Granular sub-base Material 4.75mm to cum 424
75 micron mm
13
M-043 Aggregates 13.2 mm to 5.6 mm Cum 767
M-061 Aluminum sheeting fixed with encapsulated lens type Sqm 657
reflective sheeting including 2% towards lettering, cost
of angle iron, cost of drilling holes, nuts, bolts etc. and
signs as applicable
M-062 Aluminum studs 100 x 100 mm fitted with lens No’s As per local
market rate
14
M-063 Barbed wire Kg 54
M-065 Bearing (Cast steel rocker bearing assembly of 250 No’s 558
tonne )
M-066 Bearing (Elastomeric bearing assembly consisting of 7 Cm3
internal layers of elastomer bonded to 6 nos. internal
reinforcing steel laminates by the process of
vulcanization,)
M-071 Bentonite Kg 5
15
M-084 Compressible Fibre Board(20mm thick) Sqm 400
M-091 Delineators from ISI certified firm as per the standard Each As per local
drawing given in IRC - 79 compettitive
quotations
M-092 Earth Cost or compensation for earth taken from Cum 27
private land(Excluding Seigniorage Charges)
M-093 Elastomeric slab seal expansion joint assembly Metre As per local
manufactured by using chloroprene, elastomer for compettitive
elastomeric slab unit conforming to clause 915.1 of quotations
IRC: 83 (part II),
M-094 Electric Detonators @ 1 detonator for 1/2 gelatin stick 100 843
of 125 gms each no’s
M-095 Epoxy compound with accessories for preparing epoxy Kg 230
mortar
M-096 Epoxy mortar Kg 73
16
M-105 Geo grids Sqm As per local
compettitive
quotations
Rate as per
M-118 Hot applied thermoplastic compound Litre local
competitive
quotations
M-119 HTS strand Tonne
M-121 Jute netting, open weave, 2.5 cm square opening for Sqm 61
seeding and Mulching
17
M-124 M.S. Clamps Kg Rate as per
local
competitive
quotations
18
M-142 Pre-coated stone chips of 13.2 mm nominal size Cum competitive
quotatiions
M-143 Preformed continuous chloroprene elastomer or closed Meter Rate as per
cell foam sealing element with high tear strength, local
vulcanized in a single operation for the full length of a competitive
joint to ensure water tightness. quotatiions
M-144 Pre-moulded asphalt filler board Sqm
M-149 RCC Pipe NP 4 heavy duty non pressure pipe 1000mm Metre
dia
M-150 RCC Pipe NP 4 heavy duty non pressure pipe 1200 mm Metre
dia
Rate as per
M-151 RCC Pipe NP 4 heavy duty non pressure pipe 300 mm Metre PH items
dia
19
M-159 Sand bags (Cost of sand and Empty cement bag) Per bag 16
M-162 Seeds(Grass) Kg 14
M-163 Cost of Selected earth Cum 72
M-167 Sludge / Farm yard manure @ 0.18 cum per 100 sqm Cum Rate as per
at site of work for turfing local
competitive
quotations
M-168 Sodium vapour lamp Each As per
Building SSR
21
Item Painting angle iron post Two Coats Sqm
8.9
Miscellaneous Items
2 Laying Sand Bags in the stipulated places including cost per bag 19
of empty cement bag, sand, thread, stiching charges
and labour charges with 13.615 % overhead charges
and contractors profits.
3 Rough stone for revetment 225mm thick ( including Cum 140
Seigniorage charges)
5 Thinner ltr 88
22
ROAD & BRIDGE WORKS
MATERIAL & WORK ITEM RATES
RATES OF MATERIALS & WORK ITEMS
Basic Rate
for SoR
2011-12
S.S. excluding
Sl. Item Unit subsumed
No. No. Description (per) taxes in Rs.
1 2 3 4 5
(A) STONE AND ROAD MATERIALS
ROUGH STONE QUARRIED INCLUDING
WEDGING, BREAKING, BURNING, SPLITING
AND STACKING
1 22.a For R.R Masonary Work (other than Granite, 1 cum 127.90
Dolomite and Trap)
2 b.I For SS Revetment work 225 mm 1 cum 86.50
3 b.ii For SS Revetment work 300 mm 1 cum 105.80
4 b.iii For SS Revetment work450 mm 1 cum 109.60
5 C Jeddy Stone above 450 mm to 600 mm 1 cum 150.00
6 d I. Laterite for revetment 225 mm 1 cum 94.20
7 d II. Laterite for revetment 300 mm 1 cum 109.60
8 d.iii Granite for SS revetment 225 mm 1 cum 112.50
9 d.iv Granite for SS revetment 300 mm 1 cum 130.80
Note:- Only when other granite is not available
10 E Laterite for masonry 1 cum 109.60
11 F Cyclopean stones above 0.2 cum 1 cum 201.90
12 G For R.R.Masonry works ( granite, dolamite and 1 cum 168.30
trap variety)
13 NOTE:- For items 22(a) to 22© and 22(g) add 1 cum 67.00
extra Rs /cum, wherever quarrying is done
by blasting
COURSED RUBBLE STONE QUARRYING
WEDGING, BREAKING, BURNING AND
SPLITTING INCLUDING STACKING FOR SS
FIRST SORT WORKS
14 23.a Granite, Dolamite and trap 1 cum 209.60
15 B For other varieties 1 cum 146.20
16 27 Granite stone slabs for culverts, lintels and 1 cum 1354.80
copings (3 faces dressed coarsed rubble
masonry)
17 NOTE: - For items 23(a), 23(b) and 27 add 1 cum 69.00
extra Rs. Per Cum, wherever quarrying is
done by blasting
18 28 Bond stones ( 600 x 200 x 200 mm ) each 24.00
19 B Chainage stones and Centre line stones each 28.90
(750x150x150xmm)
20 31 Demarcation Stones ( 900 x 150 x 150 mm) each 55.30
21 32.a Guard Stones ( 1200 x 200 x 200 mm ) each 82.70
1
22 B Guide Stones ( 800 x 150 x150 mm ) each 55.30
23 C Carving letters and figures in stone up to 100 each 5.10
mm size
24 D Carving letters and figures in stone above 100 each 6.70
mm size
HARD BROKEN STONE OF GRANITE, TRAP
AND DOLERITE FREE FROM DUST
OBTAINED BY QUARRYING, WEDGING,
BREAKING, BURNING AND SPLITTING
INCLUDING STACKING.
25 33.a - do - 6mm size (SS 5) 1 cum 411.50
26 b - do - 10mm size (SS 5) 1 cum 538.50
27 c - do - 12mm size (SS 5) 1 cum 661.50
28 d - do - 20mm size (SS 5) 1 cum 811.50
29 e - do - 25mm size (SS 5) 1 cum 796.20
30 f - do - 40mm size (SS 5) 1 cum 480.80
31 g - do - 50mm size (SS 5) 1 cum 375.00
32 h - do - 60mm size (SS 5) 1 cum 346.20
33 I - do - 65mm size (SS 5) 1 cum 312.50
34 j - do - 75mm size (SS 5) 1 cum 250.00
35 k - do - 75 to 100mm size (SS 5) 1 cum 201.90
36 NOTE:- (1) Add extra Rs. /- per cum for items 70.00
33 (a) to 33 (k) if the metal is obtained by
blasting
37 (2) Add 25% extra per cum if the metal is 25%
obtained by machine crushing excluding cost of
blasting.
38 (3) Deduct Rs. /- per cum if the metal or 9.00
rubble is obtained from surface stone and
boulders.
39 (4) Add Rs. /- per cum for selection of stones 15.00
and boulders from excavated spoil dumps for 9.00
items 33 a to 33 k, when this addition of Rs. /-
per Cum is allowed, deduction of Rs. /- per
Cum mentioned under Note (3) above should
invariably be made.
SOFT BROKEN STONE SCREENED AND FREE
FROM DUST INCLUDING STACKING
40 33.l - do - 40 mm size ( SS 5 ) 1 Cum 101.00
41 33.m - do - 50 mm size ( SS 5 ) 1 Cum 91.40
42 33.n - do - 60 mm size ( SS 5 ) 1 Cum 72.10
43 33.o - do - 65 mm size ( SS 5 ) 1 Cum 64.40
44 33.p - do - 75 mm size ( SS 5 ) 1 Cum 60.60
2
HARD BROKEN STONE OF GRANITE TRAP
DOLERITE AND DOLAMITE FREE FROM
DUST OBTAINED BY QUARRYING
WEDGING, BREAKING, BURNING AND
SPLITTING INCLUDING STACKING
(QUARTZITE AND BASALT WITH
AGGREGATE IMPACT OF LESS THAN 20)
45 33a -do- 2.36 to 5 mm size (IRC&MORTH) 1 cum 250.00
46 b -do- 5 to 7mm size (IRC&MORTH) 1 cum 413.50
47 c -do- 9.5 to 11.2mm size (IRC&MORTH) 1 cum 538.50
48 d -do- 12mm to 14 mm size ( IRC and MORTH ) 1 cum 663.50
49 e -do- 19 mm to 22 mm size ( IRC and MORTH ) 1 cum 913.50
50 f -do- 25 mm to 27 mm size ( IRC and MORTH ) 1 cum 798.10
51 g -do- 40 mm to 45 mm size ( IRC and MORTH ) 1 cum 480.80
52 h -do- 50 mm to 55 mm size ( IRC and MORTH ) 1 cum 375.00
53 i -do- 60 mm to 63 mm size ( IRC and MORTH ) 1 cum 346.20
54 j -do- 65 mm size ( IRC and MORTH ) 1 cum 312.50
55 k -do- 75 mm size ( IRC and MORTH ) 1 cum 250.00
56 1 NOTE:- Add extra Rs. /- per cum for items 33 1 cum 70.00
(a) to 33 (j) if the metal is obtained by blasting
57 2 Add 25% extra per cum if the metal is obtained 1 cum 25%
by machine crushing excluding cost of blasting.
58 3 Deduct Rs. /- per cum if the metal or rubble is 1 cum 9.00
obtained from surface stones and boulders
59 4 Add Rs. /- per cum for selection of stones and 1 cum 15.00
boulders from excavated soil dumps for items 9.00
33 (a) to 33 (k), when this addition of Rs. /-
per cum allowed deduction of Rs. /- per cum
mentioned under note (3) above should
invariably be made
HARD BROKEN STONE OTHER THAN
GRANITE SUCH AS QUARTZ, QUARTZ-NAPA
AND BASALT SCREENED AND FREE FROM
DUST INCLUDING STACKING
60 33.q - do - 10 mm size (SS 5) 1 Cum 318.30
61 -do- 9.5 mm to 11.2 mm size ( IRC and MORTH 1 Cum 318.30
)
62 r - do - 12 mm size (SS 5) 1 Cum 298.10
63 -do- 12mm to 14 mm size ( IRC and MORTH ) 1 Cum 298.10
64 S - do - 20 mm size (SS 5) 1 Cum 241.40
65 -do- 19 mm to 22 mm size ( IRC and MORTH ) 1 Cum 241.40
66 T - do - 25 mm size (SS 5) 1 Cum 237.50
67 U - do - 40 mm size (SS 5) 1 Cum 140.40
68 -do- 40 mm to 45 mm size ( IRC and MORTH ) 1 Cum 140.40
69 V - do - 50 mm size (SS 5) 1 Cum 124.00
70 -do- 50 mm to 55 mm size ( IRC and MORTH ) 1 Cum 124.00
71 33.w - do - 65 mm size (SS 5) 1 Cum 117.30
3
72 -do- 60 mm to 65 mm size ( IRC and MORTH ) 1 Cum 117.30
73 X - do - 75 mm size (SS 5) 1 Cum 97.10
74 - do - 75 mm size ( IRC &MORTH) 1 Cum 97.10
75 Y - do - 75 to 100 mm size (SS 5) 1 Cum 76.90
76 - do - 75 to 100 mm ( IRC& MORTH) 1 Cum 76.90
OTHER ITEMS INCLUDING STACKING
77 33.z1 Laterite 40 to 75 mm ( ring) 1 Cum 84.10
78 z2 kankar, hard broken kankar 40 to 75 mm ( ring 1 Cum 63.00
)
79 z3 Soling stone of 150 mm size of granite, trap and 1 Cum 78.90
Dolamite varieties.
80 NOTE:- (1) Add extra for items to 33(z3) Rs /- 1 Cum 70.00
Per cum, wherever quarrying is done by
blasting. (2) Wherever controlled blasting is
resorted to the Chief Engineer concerned shall
approve the observed data in support of SS item
No. 22 a to 22 c , 22g, 23
81 z4 Soling stone of 150 mm size other than granite 1 Cum 55.30
variety
82 z5 Soling Stone laterite, Kankar 150mm, surface 1 Cum 33.70
stone
83 z6 Field picked metal unbroken 20 mm size 1 Cum 45.70
84 z7 - do - 25 mm size 1 Cum 36.10
85 z8 - do - 40 mm size 1 Cum 40.40
86 z9 - do - 50 mm size 1 Cum 36.10
87 z10 - do - 60 mm size 1 Cum 29.80
88 z11 - do - 80 mm size 1 Cum 21.60
89 NOTE:- Add Rs. /- Per Cum for selection of stone and 15.00
boulders from excavated spoil dumps for items 33 (Q) TO 9.00
33 Z , when this addition of Rs. /- per Cum is allowed,
deduction of Rs. /- per Cum should invariably be made
towards the metal or rubble if it is obtained from surface
stone and boulders.
90 34 Gravel including stacking 1 Cum 58.00
91 35 a Quarry rubbish 1 Cum 48.60
92 B HBG Stone Chips 2.36mm and below 1 Cum 226.90
93 36.a Sand for mortar, ceiling coat including washing 1 Cum 274.00
screening etc.,
94 B Sand for filling and blindage 1 Cum 201.90
95 37 Clay for puddle and masonry Items 38 (a) to 39 1 Cum 28.00
(h) As per local prevailing rates based on
competitive quotations.
(C) LIME AND CEMENT
96 40 to As per Local
41(c ) prevailing
rates based
on
competitive
4
rates
97 42 Cement excluding cost of empty cement bags 1 MT The monthly
rates will be
communicated
by Govt.
NOTE: (1) The rates are inclusive of sales tax. 2)As per the rates applicable
to the District. 3) Least of the (1) and (2 ) above may be allowed 4) The
price of cement will be reviewed and fixed on monthly basis and rates will be
communicated separately.
98 C Grinding lime mortar or Surkhi mortar 1 Cum 75.00
99 D Shell lime slaked and screened 1 Cum 750.00
100 E White cement 1 Kg. 18.80
101 (D) MORTARS
102 43 to Items 43 to 45 Rates have to be
45 worked out based on
MORT&H data.
(E) METAL AND IRON WORKS
103 Mild steel rods 6mm dia. 1 MT
104 Mild steel flats 1 MT
105 Mild Steel, Structural Steel, I.e., Angles, 1 MT
The monthly
Channels and I sections.
rates will be
106 High Yield Strength Deformed Bars/TMT bars 1 MT communicated
107 Mild steel plates 1 MT by Govt.
NOTE: (1) The rates are inclusive of sales tax. 2)As per the rates
applicable to the District. 3) Least of the (1) and (2 ) above may
allowed 4) The prices of steel will be reviewed and fixed on
monthly basis and rates will be communicated separately.
III RATES OF WORKS
(A) CLEARING SITE
108 1.a Clearing heavy Jungle 1 Sqm 2.20
109 B Clearing light Jungle 1 Sqm 2.00
110 C Clearing Scrub Jungle 1 Sqm 2.00
111 D Clearing Juliflora (Prosafis) jungle including up- 1 Sqm 3.30
rooting and removing of Juliflora stumps.
112 2.a.I Cutting and removing Palmyrah trees including Each 27.00
stacking of girth 30 to 100 cm.
113 Ii - do - 100 to 200 cm. Each 42.50
114 2.b.I Uprooting and removing Palmyrah stumps Each 30.00
including stacking of girth 30 to 100 cm.
115 Ii - do - 100 to 200 cm. Each 46.00
116 2.c.I Cutting and removing date trees including Each 18.00
stacking of girth 30 to 100 cm
117 Ii - do - 100 to 200 cm Each 28.00
118 d.I Uprooting and removing stumps of date trees Each 18.00
including stacking of girth 30 to 100 cm.
119 Ii - do - 100 to 200 cm Each 24.00
5
120 eI Cutting and removing other kind of trees Each 24.00
including stacking of girth 30 to 100 cm
121 Ii - do - 100 to 200 cm Each 38.00
122 iii - do - above 200 cm Each 62.00
123 f.I Uprooting and removing stumps of other kind of Each 18.00
trees including stacking of girth 30 to 100 cm.
124 Ii - do - 100 to 200 cm Each 26.00
125 iii - do - above 200 cm Each 35.50
126 3.a Uprooting and clearing prickly pear jungle 1 Sqm 1.90
127 B - do - under 2.5 meters height including burning 1 Sqm 2.40
and burrying as directed.
128 C - do - over 2.5 meters height including burning 1 Sqm 2.90
and burrying with an initital lead of conveyance
129 4.a Removing of natchu, goobi, thooti etc., from 1 Sqm 1.50
drains, channels including clearance if not more
than 1 metre depth of water with an initial lead
of 10 metresand lift of 2 metres.
130 b.I Clearing alchi, tilla 1 Sq.m 2.90
131 b.ii Removal of Jammu 1 Sq.m 2.50
132 c.I Removal of imponea, cornea 1 Sq.m 2.90
133 c.ii Removal of water hyacinth upto 30 cm thick. 1 Sqm 3.00
134 c.iii - do - more than 30 cm thick 1 Sq.m 4.10
135 D Removal of natchu, goobi, thooti etc., for every 1 Sqm 1.00
extra lead or lift over the initial lead or lift.
(B) DISMANTLING
5 DISMANTLING, CLEARING AWAY AND
CAREFULLY STACKING MATERIALS USEFUL
FOR REUSE.
136 n.(i) Dry rough stone revetment for aprons and 1 cum 50.00
stacking within 40 metres
7 Drilling holes in hard granite or sheet rock
a) Manually ( Hand)
137 I) 20 mm dia meter 1 RM 97.00
138 ii) 25 mm dia meter 1 RM 105.00
139 iii) 36 mm dia meter 1 RM 120.00
140 b) Pneumatic Compressor
141 I) 20 mm dia meter 1 RM 110.00
142 ii) 25 mm dia meter 1 RM 121.00
143 iii) 36 mm dia meter 1 RM 133.00
8 Grouting the holes with neat cement slurry
excluding cost of steel
144 I) 20 mm dia meter 1 RM 71.00
145 ii) 25 mm dia meter 1 RM 89.00
146 iii) 36 mm dia meter 1 RM 109.50
White Washing and Painting works
6
147 AI White washing and colour banding for guard and each 6.50
guide stones including cost of materials
148 BI Screening sand and gravel 1 cum 6.30
149 B2 Screening chips and metal 1 cum 13.00
150 C1 Removing and refixing Hectometre or each 9.50
Demarcation stones
(S ) ROAD WORK ITEMS
PICKING OLD METALLED SURFACE TO
DEPTH OF 40 TO 100 mm SPREADING OLD
METAL AND NEW METAL SECTIONING
INCLUDING EDGEBUNDS AND SUBGRADE
ROLLING, SPREADING METAL INCLUDING
BLINDAGE OFGRAVEL WATERING WITH AN
INITIAL LEAD OF 2 HECTOMETERS AND
HAND ROLLER ( 1.5 TO 2 TONNES)
ROLLING ETC., INCLUDING BARRICADING,
DIVERSION OF TRAFFIC AND WETTING THE
NEW CONSOLIDATION FOR A FORTNIGHT
COMPLETE
( For a compact thickness )
1 (I ) HARD METAL
151 A 40 mm thickness 10 57.20
sqm
152 B 50 mm thickness 10 60.50
sqm
153 C 75 mm thickness 10 66.00
sqm
154 D 100 mm thickness 10 71.50
sqm
155 1 (ii ) (For compact thickness of soft metal)
156 A 50 mm thickness 10 44.00
sqm
157 B 75 mm thickness 10 52.80
sqm
158 C 100 mm thickness 10 57.20
sqm
5 Picking old metalled surface to a depth of
40 to 100 mm and spreading metal
including watering with an initial lead of 2
Hectometers and rolling with power rollers
watering and spreading gravel for blindage
and power roller rolling including hire
charges of power roller( 8 to 10 T )
barricading and diversion of traffic and
wetting the new consolidation for a
fortnight(for compacted thickness of )
HARD METAL
159 5 (a) 40 mm thick ness 10 150.70
sqm
160 (b) 50 mm thick ness 10 170.50
7
sqm
161 (c ) 75 mm thick ness 10 187.00
sqm
162 (d ) 100 mm thick ness 10 203.50
sqm
163 (e) 150 mm thick excluding hire charges 10 363.00
sqm
164 Gelatin(For MORTH data, for works of state & Per Kg 45.20
national high ways only)
165 Electric Detonators(For MORTH data, for works each 2.30
of state & national high ways only)
166 Hot applied thermoplastic compound(For MORTH Per 150.60
data, for works of state & national high ways Litre
only)
167 Reflectionising glass beads of 2 mm thick(For Per Kg 48.90
MORTH data, for works of state & national high
ways only)
168 Road marking paint confirming to IS 164(For Per Kg 120.50
MORTH data, for works of state & national high
ways only)
169 n Labour charges for laying filters with coarse 1 cum 45.00
aggregate.
170 o Labour charges for laying filter with sand. 1 cum 25.00
New Items.
171 Fly Ash 1 cum Deleted
172 Binding wire 1 Kg. 45.60
8
PUBLIC HEALTH ITEMS
1. S o R FOR R.C.C. PLAIN ENDED PIPES
Sl.
Description
No.
1 2
Manufacture, Supply and Delivery of R.C.C. Plain ended pipes conforming to
1 B.I.S 458/2003 , Ex-factory, Excluding transportation, taxes & duties
The above rates of RCC Plain ended pipes are based on the following raw materials
Cost Cement. Rs.4141/- per MT (excluding all taxes and freight).
Steel (M.S. Rods) - Rs.32020/- per MT. (excluding all taxes and freight).
1
2. S o R FOR R.C.C. COLLARS
Sl.No. Description
1 2
Manufacture, Supply and Delivery of R.C.C. Collars conforming to B.I.S.
1 458/2003 (rate per each collar) suitable for R.C.C. Plain ended pipes
including transportation but excluding taxes & duties
Size Unit Revised SoR For 2011-12
NP - 2 Class NP - 3 Class NP - 4 Class
80 mm dia Each 35.00
100 mm dia Each 36.00
150 mm dia Each 38.00
200 mm dia Each 51.00
225 mm dia Each 54.00
250 mm dia Each 60.00
300 mm dia Each 78.00 112.00 112.00
350 mm dia Each 98.00 140.00 140.00
400 mm dia Each 107.00 159.00 159.00
450 mm dia Each 169.00 213.00 213.00
500 mm dia Each 192.00 254.00 254.00
600 mm dia Each 261.00 332.00 332.00
700 mm dia Each 338.00 443.00 443.00
800 mm dia Each 474.00 565.00 565.00
900 mm dia Each 569.00 660.00 660.00
1000 mm dia Each 666.00 824.00 824.00
1100 mm dia Each 812.00 1041.00 1041.00
1200 mm dia Each 983.00 1304.00 1304.00
1400 mm dia Each 1270.00 1650.00 1650.00
1600 mm dia Each 1620.00 2111.00 2111.00
1800 mm dia Each 1655.00 2712.00 2712.00
The above rates of RCC Collars suitable to plain ended pipes are based on the following raw
materials cost.
Cost Cement. Rs.4141/- per MT (excluding all taxes and freight).
Steel (M.S. Rods) - Rs.32020/- per MT. (excluding all taxes and freight).
2
3. S o R FOR R.C.C. S/S PIPES (Non - Pressure)
Sl.
Description
No.
1 2
Manufacture, Supply and Delivery of R.C.C. Socket and Spigot pipes
1 conforming to B.I.S. 458/2003 at ex-factory (rate per meter of
effective length) Excluding transportation, taxes & duties.
Size Unit Revised SoR For 2011-12
NP - 2 Class NP - 3 Class NP - 4 Class
80 mm dia Meter 141
100 mm dia Meter 161
150 mm dia Meter 189
200 mm dia Meter 233
225 mm dia Meter 254
250 mm dia Meter 271
300 mm dia Meter 382 929 979
350 mm dia Meter 490 1181 1201
400 mm dia Meter 540 1309 1331
450 mm dia Meter 673 1444 1455
500 mm dia Meter 774 1648 1783
600 mm dia Meter 1092 2307 2335
700 mm dia Meter 1413 2934 3014
800 mm dia Meter 1808 3878 3921
900 mm dia Meter 2278 4861 4932
1000 mm dia Meter 2769 5492 5828
1100 mm dia Meter 3250 6459 6713
1200 mm dia Meter 3676 7611 7847
1400 mm dia Meter 5245 10073 11094
1600 mm dia Meter 6485 13030 13213
1800 mm dia Meter 7252 17224 17663
The above rates of RCC S/S Non-Pressure pipes are based on the following raw
materials cost.
Cost Cement. Rs.4141/- per MT (excluding all taxes and freight).
Steel (M.S. Rods) - Rs.32020/- per MT. (excluding all taxes and freight).
3
4. S o R FOR R.C.C. S/S PIPES (Pressure)
Sl.No. Description
1 2
Manufacture, Supply and Delivery of R.C.C. Socket and Spigot
1 pipes conforming to B.I.S. 458/2003 Ex-factory (rate per meter of
effective length) Excluding transportation, taxes & duties.
4
Public Health Items
11. S o R FOR PRE-STRESSED (NON-CYLINDER) CONCRETE PIPES FOR THE YEAR 2011-12
Sl.No. Description
1 2
Manufacture, Supply, Delivery of Pre-stressed (Non-cylinder) concrete pipes conforming to IS 784/2001 ex-factory excluding
1 transportation, taxes & duties., for the following Field/Site Test Pressures.(The manufacture shall design the pipes as per the IS
Code 784-2001)
Size Unit Revised SoR For 2011-12
Rs. Rs. Rs. Rs. Rs. Rs.
6 Kg/cm2 8 Kg/cm2 10 Kg/cm2 12 Kg/cm2 14 Kg/cm2 16 Kg/cm2
350 MM DIA Metre 2333 2342 2349 2352 2396 2478
400 MM DIA Metre 2507 2524 2549 2570 2612 2646
450 MM DIA Metre 2644 2650 2674 2715 2779 2832
500 MM DIA Metre 2861 2865 2878 2926 2979 3061
600 MM DIA Metre 3277 3288 3308 3392 3491 3590
700 MM DIA Metre 4035 4032 4079 4149 4285 4363
800 MM DIA Metre 4738 4761 4864 4949 5130 5259
900 MM DIA Metre 5485 5493 5591 5789 5994 6355
1000 MM DIA Metre 6430 6443 6596 6821 7120 7433
1100 MM DIA Metre 7282 7339 7506 7888 8151 8514
1200 MM DIA Metre 8040 8120 8510 8870 9959 10052
1300 MM DIA Metre 9085 9559 10042 10534 11367 12343
1400 MM DIA Metre 10384 10930 11505 12410 13231 13906
1500 MM DIA Metre 12118 12766 13413 14455 15323 16089
1600 MM DIA Metre 13624 14363 15101 16956 17338 18204
1700 MM DIA Metre 14317 14817 15538 17324 19302 20131
1800 MM DIA Metre 15372 16303 17037 18641 20774 21692
1900 MM DIA Metre 16436 17280 18606 19629 21268 23683
7
Public Health Items
2000 MM DIA Metre 18021 19092 19917 21788 24681 26561
Note: a) The above rate of PSC pipes are based on the HT wire cost of Rs.42282/-MT (Excluding taxes).
and cement price of Rs.4141/- per MT (Excluding all taxes and freight)
12. S o R FOR PRE-STRESSED (CYLINDER) CONCRETE PIPES FOR THE YEAR 2011-12
Sl
Description
No.
1 2
Pre-stressed (Cylinder type ) concrete pipes conforming to IS 784/2001 @ ex-factory cost of pipes, excluding transportation, laying, jointing,
1 testing, bends, tees, specials, taxes & duties for the following Field/Site Test Pressures.(The manufacture shall design the pipes as per the IS
Code 784-2001)
Size Unit Revised SoR For 2011-12
8 10 12 14 16 18 20
4 Kg/cm2 6 Kg/cm2
Kg/cm2 Kg/cm2 Kg/cm2 Kg/cm2 Kg/cm2 Kg/cm2 Kg/cm2
400 MM DIA Meter 4,179 4,179 4,179 4,179 4,198 4,237 4,304 4,372 4,420
450 MM DIA Meter 4,535 4,535 4,535 4,553 4,602 4,660 4,747 4,805 4,873
500 MM DIA Meter 4,956 4,956 4,966 5,024 5,082 5,159 5,227 5,333 5,410
600 MM DIA Meter 5,884 5,923 5,991 6,088 6,174 6,261 6,396 6,521 6,647
700 MM DIA Meter 6,787 6,884 7,000 7,125 7,241 7,357 7,501 7,684 7,819
800 MM DIA Meter 7,964 8,099 8,264 8,428 8,573 8,727 8,910 9,106 9,328
900 MM DIA Meter 9,437 9,611 9,813 10,016 10,219 10,402 10,644 10,882 11,122
1000 MM DIA Meter 10,914 11,145 11,387 11,638 11,887 12,091 12,375 12,666 12,968
1100 MM DIA Meter 12,080 12,355 12,644 12,898 13,173 13,420 13,729 14,055 14,769
1200 MM DIA Meter 13,680 13,999 14,317 14,634 14,962 15,253 15,615 16,328 16,841
1300 MM DIA Meter 15,214 15,579 15,950 16,320 16,699 17,033 17,890 18,355 18,927
1400 MM DIA Meter 16,662 17,077 17,509 17,941 18,372 19,230 19,758 20,312 21,531
1500 MM DIA Meter 17,981 18,435 18,888 19,331 20,277 20,791 21,572 22,746 24,324
1600 MM DIA Meter 20,282 20,788 21,302 22,260 22,843 23,427 24,881 25,526 26,153
8
Public Health Items
1700 MM DIA Meter 21,807 22,391 23,009 24,106 24,768 26,006 27,120 27,816 28,478
1800 MM DIA Meter 23,880 24,485 25,673 26,408 27,127 28,480 29,658 30,490 31,322
1900 MM DIA Meter 27,877 28,571 29,897 30,740 32,151 33,340 34,372 35,305 36,184
2000 MM DIA
Meter 29,723 31,048 31,944 32,868 34,479 35,455 36,961 38,033 38,982
Note: The rates of PCCP pipes which were incorporated in the SSR are based on the following raw materials cost.
HT Wire: - Rs.42282/- (Excluding all taxes & freight)
HR Coil (Hot Rolled): - Rs.35714/- (Excluding all taxes & freight)
Cement Cost Rs. 4141/-.per MT (Excluding all duties, taxes & freight)
9
Public Health Items
13. S o R FOR BAR WRAPPED STEEL CYLINDRICAL (BWSC) PIPES FOR THE YEAR 2011-12
Sl.
Description
No
1 2
Bar Wrapped Steel Cylindrical (BWSC) pipes conforming to IS 15155 - 2002, ex-factory excluding transportation, taxes and duties etc., for bar
1
wrapped steel cylindrical pipes for the following Field/Site Test Pressures.(The manufacture shall design the pipes as per the IS Code 784-2001)
Size Unit Rs. Rs. Rs. Rs. Rs. Rs. Rs. Rs. Rs. Rs.
4 -12 14 16 18 20 22 24 26 28 30
2 2 2 2 2 2 2 2 2
Kg/cm Kg/cm Kg/cm Kg/cm Kg/cm Kg/cm Kg/cm Kg/cm Kg/cm Kg/cm2
250 MM DIA Meter 2,450 2,450 2,450 2,450 2,450 2,450 2,450 2,473 2,487 2,629
300 MM DIA Meter 2,748 2,748 2,748 2,748 2,748 2,772 2,835 2,934 2977 3148
3,662
350 MM DIA Meter 3,342 3,342 3,342 3,354 3,369 3,386 3,459 3,570 3,843
400 MM DIA Meter 3,659 3,659 3,672 3,698 3,718 3,878 4,020 4,162 4,333 4909
450 MM DIA Meter 4,026 4,036 4,067 4,087 4,270 4,428 4,604 4,780 4,961 5436
500 MM DIA Meter 4,505 4,527 4,559 4,753 4,982 5,188 5,422 5,615 5,992 6417
600 MM DIA Meter 5,928 5972 6009 6,332 6,646 6,910 7,234 7552 8010 8476
700 MM DIA Meter 7,160 7,236 7,690 8,128 8534 9,019 9,653 9943 10433 11193
800 MM DIA Meter 8126 8620 9177 9721 10267 11073 11666 12495 13137 14077
900 MM DIA Meter 9998 10,251 10974 11684 12,367 12881 14285 15,153 15873 17098
1000 MM DIA Meter 11270 12,181 12920 13702 14596 16039 17411 18653 19475 21062
1100 MM DIA Meter 16080 16,359 16,352 17,897 19,670 20,952 23,069 24,403 25,874 28,420
10
Public Health Items
1200 MM DIA Meter 17791 18,232 18739 20,600 22,612 24,532 26,529 27,334 30,605 34,072
Note: The above rates of BWSC pipes are based on the following raw materials' cost.
HR Plates - Rs.35714/- per MT (Excluding all taxes)
Wire rods - Rs.34483/- per MT (Excluding all taxes)
Cement Cost Rs. 4141/-.per MT (Excluding all duties, taxes & freight)
.
11
14. S o R FOR M.S. PIPES FOR THE YEAR 2011-12
Thicknes
Sl.No. Description Unit Rate (Rs.)
s in mm
1 2 3 4 5
1 Manufacture, supply and delivery of M.S
Pipes conforming to is 3589/2001 including
in lining with cement mortar (1:2) 15mm
thick using 4 numbers of 6mm dia
M.S.Rings at each end of the pipe and out
coating with cement mortar (1:3) 30mm
thick by shortcreting or gunetting duly
providing wire mesh of size 50x50x3mm
including cost of all materials, labour
charges, transportation to anywhere in AP,
but excluding taxes & duties, etc.
500 mm dia Meter 8.00 6725.00
12
1200 mm dia Meter 12.00 23030.00
1200 mm dia Meter 14.00 25427.00
1200 mm dia Meter 16.00 28901.00
1200 mm dia Meter 18.00 32385.00
13
1700 MM DIA Meter 10.00 28782.00
1700 MM DIA Meter 12.00 32144.00
1700 MM DIA Meter 14.00 35514.00
1700 MM DIA Meter 16.00 38891.00
1700 MM DIA Meter 18.00 42278.00
1700 MM DIA Meter 20.00 46804.00
1700 MM DIA Meter 22.00 51340.00
1700 MM DIA Meter 24.00 55886.00
1700 MM DIA Meter 26.00 60444.00
1700 MM DIA Meter 28.00 65011.00
14
2000 MM DIA Meter 20.00 53160.00
2000 MM DIA Meter 22.00 57109.00
2000 MM DIA Meter 24.00 62145.00
2000 MM DIA Meter 26.00 67189.00
2000 MM DIA Meter 28.00 72245.00
2000 MM DIA Meter 30.00 77309.00
2000 MM DIA Meter 32.00 82384.00
2000 MM DIA Meter 34.00 87467.00
15
2300 MM DIA Meter 18.00 56335.00
2300 MM DIA Meter 20.00 60900.00
2300 MM DIA Meter 22.00 65471.00
2300 MM DIA Meter 26.00 77008.00
2300 MM DIA Meter 28.00 82791.00
2300 MM DIA Meter 30.00 88585.00
2300 MM DIA Meter 32.00 94387.00
2300 MM DIA Meter 34.00 100198.00
2300 MM DIA Meter 36.00 106021.00
2300 MM DIA Meter 38.00 111852.00
2300 MM DIA Meter 40.00 117693.00
16
2600 MM DIA Meter 12.00 47836.00
2600 MM DIA Meter 14.00 52966.00
2600 MM DIA Meter 16.00 58102.00
2600 MM DIA Meter 18.00 63243.00
2600 MM DIA Meter 20.00 68393.00
2600 MM DIA Meter 22.00 73550.00
2600 MM DIA Meter 32.00 105974.00
2600 MM DIA Meter 34.00 112487.00
2600 MM DIA Meter 36.00 119011.00
2600 MM DIA Meter 38.00 125544.00
2600 MM DIA Meter 40.00 132086.00
2600 MM DIA Meter 42.00 138638.00
2600 MM DIA Meter 44.00 145202.00
2600 MM DIA Meter 46.00 151773.00
2600 MM DIA Meter 48.00 158355.00
The above rates of MS Spiral pipes are based on the following raw materials cost.
MS Plates = Rs 35304/- Per MT.
17