You are on page 1of 3

Berdasarkan buku Timmerhaus dan Kusnarjo

TOTAL CAPITAL INVESTMENT TOTAL PRODUCTION COST


No Jenis Biaya Persen Jumlah No
DIRECT COST DIRECT PRODUCTION COST
1 Pengadaan Alat 100 28709982 1
2 Instrumentasi 36 10335594 2
3 Isolasi 8 2296798.6 3
4 Piping 68 19522788 4
5 Electrical 11 3158098
6 Harga FOB 100 64023260
7 Ongkos Kapal 10 6402326
8 Harga CF 100 70425586 5
9 Asuransi 1 704255.86 6
10 Harga CIF 100 71129842 7
11 Biaya angkut ke plant site 15 10669476 8
12 Pemasangan alat 47 13493692 FIXED CHARGE
13 Bangunan pabrik 18 5167796.8 9
14 Service 70 20096987 10
15 Yard 6 1722598.9 11
Total 364 122280392 12
INDIRECT COST PLANT OVERHEAD COST
16 Engineering & Supervision 33 9474294.1 13
17 Construction expenses 41 4237593.3 Manufacturing cost
18 Legal expenses 4 91871.942 GENERAL EXPENSES
19 Ongkos kontraktor 22 4295013.3 14
20 Biaya tidak terduga 44 1389563.1 15
Total 144 19488336 16
FIXED CAPITAL INVESTMENT Total
FCI=DC+IC 141768728 TPC=MC+GE
WORKING CAPITAL
Asumsi pabrik mendapatkan piutang 11582808
setelah 4 bulan (basis per 4 bulan)
TOTAL CAPITAL INVESTMENT
TCI=FCI + WC 153351537
sarkan buku Timmerhaus dan Kusnarjo
TOTAL PRODUCTION COST
Jenis Biaya Persen Jumlah
DIRECT PRODUCTION COST
Raw material (FOB atau CIF, kalau FOB perlu invest transpo 40 1814576.445 TPC
Operating labor (bisa dari grafik) 15 54215.01181 TPC
Operating supervision (bisa dari grafik) 15 0.556679452 Operating labor
Utility (persen / perhitungan manual)
Steam 108874.5867
Listrik 1360932.334
Air 907288.2226
Maintenance 7% 9923810.976 FCI
Operating supplies 15% 1488571.646 Maintenance & repair
Laboratory 15% 8132.251771 Operating labor
Patent and royalties 1 45364.41113 TPC
FIXED CHARGE
Depresiasi 10% 14176872.82 FCI
Taxes 1.50% 2126530.923 FCI
Asuransi 1% 1417687.282 FCI
Biaya sewa 0 0 Yard
PLANT OVERHEAD COST
Plant overhead cost 12 544372.9336 TPC
Manufacturing cost 33977230.4
GENERAL EXPENSES
Administrasi 4 181457.6445 TPC
Distribusi dan penjualan 8 362915.289 TPC
Research and development 5 226822.0557 TPC
Total 771194.9892
TPC=MC+GE 34748425.39 (dalam satu tahun)
2895702.116 (per bulan)
22084601.52
6625380.455
28709981.97
100

nce & repair