Name Of The Work : Replacement of 4'/2'/40W PL/TL/BC Fittings with LED fittings at Press and Transport, Schools
& Colleges and Quarters area, Tirupati (Part-B).
Name Of The Contractor : M.KASINADHA RAO M-Book No : 06C/DE(E)-II/TPT/2018-19
Wok Location : Tirupati Amount of Estimate : 209458
Authority : 115/DE-ELEC.II/TPT/2018-19 Agreement No : 116/DE(E)-II/TPT/2018-19
Invoice Batch Name : How Executed : % Tender
Bill Details:
S. Agr Quantity Item Detailed Specification Rate Per Amount
No S.No Executed
1 1 982 Dismantling of existing fixture's such as 2' /4' tube 11.43 Nos 11,224.26
light fitting / PL fitting with out causing any damage
to the fittings etc., (Note: The dismantled above
material are to be returned to concerned section
officer by the contractor at his cost)
2 2 16090 Screen painting on the new existing tube light 1.31 Nos 21,077.90
fittings, ceiling fans, Heaters, AC units etc.
indicating TTDs area, location, No.. The size of the
letter should be minimum 25 mm. The work will
have to be done at site.
3 3 1916 Fixing of given LED Tube light luminaire on wall / 60 Nos 1,14,960.00
ceiling / Trusses / channels includes labour charges
and giving necessary connections.
Page 1 of 2
Deduction Details:
Deduct:-
Fines and other deductions upto date (to be specified in remarks column)
Amount of Previous payments as per last Certificate Voucher No……………
Payments now made Rs. (In Words)One Lakh Twenty One Thousand One Hundred Thirty Six only
Please pay the amount to the Contractor M.KASINADHA RAO
by the way of EFT in State Bank of India,Tirupati.
Signature of Contractor…………………………………………………Dated………………….2019
Certified that the Proceedings Claim is correct, that the necessary measurements have been made by me on
…………………………………………………………………………………
………………….. and that the work has been satisfactorily performed……..……vide page……8….of measurements
Received Rupees
(…………………………)…………………………………………………………………………………………………………………
…………………………
………...………………………….…………..only, as a final payment in settlements of all demands (In vernacular).
………………………………………………………………………………………………………………………………………………
…………………………………………………………………