B. REAJUSTES(R)
Reajuste Recalculado a este mes (R) 0.00
Reajuste pagado al mes anterior (Ra) 0.00
Total Reajuste R-Ra = (R) 0.00
C. DEDUCCIONES (D)
Deducciones de Reajustes que no Correponde por Adel. Efectivo 0.00
Deducciones de Reajustes que no Correponde por Adel. Materiales 0.00
Total Deduccion (D) 0.00
D. AMORTIZACIONES (A)
Amort. Adel. Directo 40,147.29
Amort. Adel. Materiales 183,181.59
En Efectivo(VN) 178,144.01
En I.G.V. 18.00% 32,065.92
MONTO TOTAL A PAGAR (CONTRATISTA) S/. 210,209.93
Expediente Tecnico
ESTRUCTURAS DE CONCRETO
ZAPATAS
Z-1 med. 1.00x1.00 m (9 und)
longitudinal: 6 Ø 1/2" (long=0.86 m) 0.86 6 9 1/2 " - - 43.37 - - - 46.44 43.37
longitudinal: 6 Ø 1/2" (long=0.86 m) 0.86 6 9 1/2 " - - 43.37 - - - 46.44 43.37
Z-2 med. 1.60x1.20 m (6 und)
longitudinal: 7 Ø 1/2" (long=1.46 m) 1.46 7 6 1/2 " - - 57.27 - - - 61.32 57.27
longitudinal: 9 Ø 1/2" (long=1.06 m) 1.06 9 6 1/2 " - - 53.46 - - - 57.24 53.46
Z-3 med. 0.90x0.90 m (15 und)
longitudinal: 5 Ø 1/2" (long=0.76 m) 0.76 5 15 1/2 " - - 53.24 - - - 57.00 53.24
longitudinal: 5 Ø 1/2" (long=0.76 m) 0.76 5 15 1/2 " - - 53.24 - - - 57.00 53.24
COLUMNAS
Primer nivel
C-1 0.30x0.30 (9und)
longitudinal: 4 Ø 5/8" (long=4.50 m) 4.50 4 9 5/8 " - - - 236.36 - - 162.00 236.36
longitudinal: 4 Ø 1/2" (long=4.50 m) 4.50 4 9 1/2 " - - 151.31 - - - 162.00 151.31
estribos Ø 3/8" (long=1.20 m) 1.20 25 9 3/8 " - 142.02 - - - - 270.00 142.02
C-2 1.00x0.275 (6 und)
longitudinal: 10 Ø 5/8" (long=4.50 m) 4.50 10 6 5/8 " - - - 393.93 - - 270.00 393.93
longitudinal: 7 Ø 1/2" (long=4.50 m) 4.50 7 6 1/2 " - - 176.53 - - - 189.00 176.53
MUROS DE CONTENCION
Cerco perimetrico
MC-1 0.50x1.20 m
long. horizontal: 106 Ø 1/2" (long=0.75 m 0.75 106 1 1/2 " - - 74.25 - - - 79.50 74.25
long. horizontal: 2 Ø 1/2" (long=26.20 m) 26.20 2 1 1/2 " - - 48.94 - - - 52.40 48.94
long. horizontal: 13 Ø 3/8" (long=26.20 m 26.20 13 1 3/8 " - 179.16 - - - - 340.60 179.16
long. vertical: 131 Ø 3/8" (long=2.78 m) 2.78 131 1 3/8 " - 191.56 - - - - 364.18 191.56
MC-2 0.50x1.20 m
long. horizontal: 131 Ø 1/2" (long=0.50 m 0.50 131 1 1/2 " - - 61.18 - - - 65.50 61.18
long. horizontal: 2 Ø 1/2" (long=32.65 m) 32.65 2 1 1/2 " - - 60.99 - - - 65.30 60.99
long. horizontal: 12 Ø 3/8" (long=32.65 m 32.65 12 1 3/8 " - 206.09 - - - - 391.80 206.09
long. vertical: 163 Ø 3/8" (long=2.73 m) 2.73 163 1 3/8 " - 234.06 - - - - 444.99 234.06
LOZAS ALIGERADAS
Primer Nivel Aulas
Aulas 01 y 02 (12 viguetas)
long. (+): 1 Ø 1/2" (long=3.65 m) 3.65 5 12 1/2 " - - 204.55 - - - 219.00 204.55
bastón 1 (-): 1 Ø 1/2" (long=1.20 m) 1.20 5 24 1/2 " - - 134.50 - - - 144.00 134.50
Temperatura Ø1/4"@ 0.25 ancho=3.05 m
1 Ø 1/4" @ 0.25 (long=6.50 m) 6.50 5 13 1/4 " 87.46 - - - - - 422.50 87.46
Primer Nivel Administrativo
METRADO
FINAL
(kg)
UCTURAS DE CONCRETO
303.96
2,031.77
METRADO
FINAL
(kg)
1,056.23
1,658.82
METRADO
FINAL
(kg)
METRADO
FINAL
(kg)
METRADO
FINAL
(kg)
582.00
METRADO
FINAL
(kg)
1,238.04
METRADO
FINAL
(kg)
METRADO
FINAL
(kg)
01 OBRAS PROVISIONALES
01.01 MOVIMIENTO DE TIERRAS
01.01.01 CERCO PRIMETRICO PROVISIONAL m
01.01.02 CASETA DE GUARDIAN Y ALMACEN m2
01.01.03 ENERGIA ELECTRICA PARA LA OBRA glb
01.01.04 CARTEL DE IDENTIFICACION DE LA OBRA DE 3.60X2.40M INCL. und
COLOCACION
01.02 TRABAJOS PRELIMINARES
01.02.01 TRAZO Y REPLANTEO PRELIMINAR m2
01.02.02 LIMPIEZA DEL TERRENO CON MAQUINARIA m2
01.03 MOVIMIENTO DE TIERRAS
01.03.01 CORTE EN TERRENO NATURAL CON EQUIPO m3
01.03.02 RELLENO MANUAL CON MATERIAL PROPIO COMPENSADO M3
01.04 VOLADURA CONTROLADA EN ROCA
01.04.01 VOLADURA CONTROLADA DE ROCA D:2.5MTS und
01.05 VARIOS
01.05.01 MITIGACION AMBIENTAL glb 0.30
02 ENROCADO DE DEFENSA TORRENTERA
02.01 EXCAVACION PARA UÑA ANTISOCAVANTE m3
02.02 REFINE Y PERFILADO DE TALUD PARA ENROCADO m2
02.03 SELECCION Y ACOPIO DE ROCA EN CANTERA m3
02.04 CARGUIO DE ROCA EN CANTERA m3
02.05 TRANSPORTE DE ROCA m3
02.06 COLOCACION Y ACOMODO DE ROCA EN DIQUE m3
PORTADA DE ACCESO-CERCO PERIMETRICO Y VEREDAS
EXTERIORES_x000D_
03 PORTADA DE ACCESO
03.01 TRABAJOS PRELIMINARES
03.01.01 TRAZO Y REPLANTEO PRELIMINAR m2
03.02 MOVIMIENTO DE TIERRAS
03.02.01 RELLENO COMP. CON EQUIPO MAT. PROPIO HASTA H:1.20 MTS. m3 metrado de expediente es inferior
2.00 3.50 1.50 0.90
03.02.02 EXCAVACION DE ZANJAS H:1.20 m3 metrado de expediente es inferior
2.00 3.50 1.50 1.50
03.03 OBRAS DE CONCRETO SIMPLE
Item DESCRIPCION Und Cantidad Largo ( m ) Ancho ( m ) Altura ( m )
03.03.01 SOLADO PARA ZAPATAS E= 2" MEZCLA 1:12 CEMENTO:HORMIGON m2 2.00 3.50 1.50 metrado de exp. es inferior
03.04 OBRAS DE CONCRETO ARMADO
03.04.01 ZAPATAS -ACERO F'y:4200kg/cm2 kg
2.00 23.80 0.99
2.00 25.20 0.99
partida ejecutada completa.
03.04.02 ZAPATAS-CONCRETO F'C=210 KG/CM2 m3 2.00 3.50 1.50 0.60
03.04.03 PORTALES-ACERO F'y:4200kg/cm2 kg
03.04.04 PORTALES, ENCOFRADO Y DESENCOFRADO m2 metrado exp. Es infer
4.00 autocad
4.00 autocad
04.06 PINTURA
04.06.01 PINTURA OLEO MATE EN MURO EXTERIOR m2
04.07 CARPINTERIA METALICA Y HERRERIA
04.07.01 MALLA GALV. 2"X2" (PANEL 3.00X2.00 TIPO A) INC. INST. und 25.00
04.08 VARIOS
04.08.01 JUNTAS DE SEPARACION SISMICA TECKNOPOR E: 1" m 50.00
04.08.02 MITIGACION AMBIENTAL glb 0.20
05 VEREDAS
05.01 TRABAJOS PRELIMINARES
05.01.01 LIMPIEZA DEL TERRENO MANUAL m2
05.01.02 TRAZO Y REPLANTEO PRELIMINAR m2
05.02 MOVIMIENTO DE TIERRAS
05.02.01 NIVELACION Y COMPACTADO C/EQUIPO m2
05.03 OBRAS DE CONCRETO SIMPLE
05.03.01 SARDINELES SUMERG. E/VEREDAS C° F'C=140 KG/CM2 (15X25) ACAB. m 161.60 Ver. E-3
FROTACH.
05.03.02 SARDINELES TIPO BURBUJA. C° F'C=140 KG/CM2 ACAB. FROTACH. m
05.03.03 VEREDAS DE CONCRETO F'C=140 KG/CM2, E=4" (ACAB. FROTACH. Y m2 1.00 AutoCad
BRUÑADO)
AREA RECREATIVA, JUEGOS INFANTILES, ESTARES Y
CAMINERIAS_x000D_
06 AREA RECREATIVA Y JUEGOS INFANTILES
06.01 TRABAJOS PRELIMINARES
06.01.01 TRAZO Y REPLANTEO PRELIMINAR m2 1.00 ref de plat 3 a la Plat 6
06.01.02 LIMPIEZA DEL TERRENO MANUAL m2
06.01.03 NIVELACION Y COMPACTADO C/EQUIPO m2 1.00 ref de plat 3 a la Plat 6
06.02 MOVIMIENTO DE TIERRAS
06.02.01 EXCAVACION DE ZANJAS H:1.20 m3
1.00 11.71 0.50 1.20
1.00 13.94 0.50 1.20
1.00 16.07 0.50 1.20
06.02.02 RELLENO COMP. CON EQUIPO MAT. PROPIO HASTA H:1.20 MTS. m3
1.00 11.71 0.25 0.40
1.00 13.94 0.25 0.40
1.00 16.07 0.25 0.40
06.03 OBRAS DE CONCRETO SIMPLE
06.03.01 CIMIENTOS CORRIDOS MEZCLA 1:10 CEMENTO-HORMIGON+30% P.G. f'c m3
1.00 11.71 0.50 0.60
1.00 13.94 0.50 0.60
1.00 16.07 0.50 0.60
06.03.02 CONCRETO F'C=140 KG/CM2 EN MUROS + 50% DE PM m3
1.00 11.71 0.15 0.90
1.00 13.94 0.15 0.90
1.00 16.07 0.15 0.90
06.03.03 CONCRETO F'C=140 KG/CM2 EN JARDINERAS m3
06.04 PISOS Y VEREDAS
06.04.01 CESPED ARTIFICIAL MONOFILAMENTO CONCAVO C/ARENA INCLUYE TR m2
06.05 SISTEMA ELECTRICO
06.05.01 POSTES METALICOS PARA ILUMINACION 3MTS DE ALTURA INC/INSTA und
06.06 REVOQUES Y ENLUCIDOS
Item DESCRIPCION Und Cantidad Largo ( m ) Ancho ( m ) Altura ( m )
07.06 PINTURA
07.06.01 PINTURA OLEO MATE EN MURO EXTERIOR m2
07.07 CARPINTERIA METALICA
07.07.01 BARANDA DE TUBO ACERO. PASAMANO 2" m
08 ESTARES Y PERGOLAS
08.01 TRABAJOS PRELIMINARES
08.01.01 TRAZO Y REPLANTEO PRELIMINAR m2 200.00
08.01.02 LIMPIEZA DEL TERRENO MANUAL m2 200.00
08.01.03 NIVELACION Y COMPACTADO C/EQUIPO m2 200.00
08.02 MOVIMIENTO DE TIERRAS
08.02.01 EXCAVACION DE ZANJAS H:1.20 m3
08.02.02 RELLENO COMP. CON EQUIPO MAT. PROPIO HASTA H:1.20 MTS. m3
08.03 OBRAS DE CONCRETO SIMPLE
08.03.01 CONCRETO F'C=140 KG/CM2 EN PERGOLAS m3
08.04 OBRAS DE CONCRETO ARMADO
08.04.01 COLUMNAS CIRCULARES CONCRETO F'C=210 KG/CM2 m3
08.04.02 COLUMNAS CIRCULARES, ENCOFRADO Y DESENCOFRADO m2
08.04.03 COLUMNAS CIRCULARES-ACERO F'y:4200kg/cm2 kg
08.05 ZOCALOS
08.05.01 ENCHAPE DE SILLAR COLUMNA CIRCULAR m2
08.06 CARPINTERIA METALICA
08.06.01 PERGOLAS DE METAL RECTANGULAR INC/INSTALACION und -
08.06.02 PERGOLAS DE METAL CURVA INC/INSTALACION und 0.80
08.07 VARIOS
08.07.01 BANCA DE METAL C/LISTONES DE MADERA und
08.07.02 SEMBRADO DE ARBOLES Y PLANTAS ORNAMENTALES und
08.07.03 SEMBRADO DE CACTARIO und
08.07.04 MITIGACION AMBIENTAL glb 0.40
09 CAMINERIAS
09.01 TRABAJOS PRELIMINARES m2 A. R.
09.01.01 TRAZO Y REPLANTEO PRELIMINAR m2 autoCad 2,275.50 628.45
09.01.02 LIMPIEZA DEL TERRENO MANUAL m2 4,700.00
09.01.03 NIVELACION Y COMPACTADO C/EQUIPO m2 autoCad 2,275.50 628.45
09.02 OBRAS DE CONCRETO SIMPLE
09.02.01 SARDINELES SUMERG. E/VEREDAS C° F'C=140 KG/CM2 (15X25) ACAB. m 410.00
09.03 PISOS Y VEREDAS V.L. V.SENIDAL V. CIR
09.03.01 VEREDAS DE CONCRETO F'C=140 KG/CM2, E=4" (ACAB. FROTACH. Y m2 239.00 239.60 249.29
09.03.02 VEREDAS DE PIEDRA PORFIDO IRREGULAR Y CONCRETO F'C=140 KG/C m2 Corresponde a P.C. y P6 358.23
09.04 VARIOS
09.04.01 ASTA DE BANDERA TIPICO pza
09.04.02 BASUREROS BASCULANTES DE LAMINA DE FIBRA DE VIDRIO und
LOSAS MULTIDEPORTIVA Y DE FULBITO
10 LOSA MULTIDEPORTIVA
10.01 TRABAJOS PRELIMINARES
10.01.01 TRAZO Y REPLANTEO GRADERIAS Y LOSA m2
10.01.02 LIMPIEZA DEL TERRENO CON MAQUINARIA PESADA m3
10.02 MOVIMIENTO DE TIERRAS
Item DESCRIPCION Und Cantidad Largo ( m ) Ancho ( m ) Altura ( m )
15.16 PINTURA
15.16.01 PINTURA LATEX EN CIELO RASO 2 MANOS m2
15.16.02 PINTURA OLEO MATE EN MUROS m2
15.17 APARATOS SANITARIOS
15.17.01 INODORO TIPO S-1 pza
15.17.02 LAVATORIO TIPO S-2 und
15.17.03 URINARIO TIPO S-3 pza
15.17.04 MEZCLADORA 8" EMPOTRADA PARA DUCHA S-4 pza
15.17.05 PAPELERA DE CERAMICA BLANCA DE 12 X 10 X 10 CM. S-5 pza
15.17.06 JABONERA DE CERAMICA BLANCA S-6 pza
15.17.07 TOALLERA CERAMICA BLANCA P/SOBREPONER BUENA CALIDAD pza
16.04 RIEGO
16.04.01 CAJA DE REGISTRO DE 60 X 60 CMS C/TAPA DE CONCRETO und
16.04.02 PROGRAMADOR 6 ESTACIONES und
16.04.03 DERIVACION ELECTRICA A CAÑONES DE RIEGO m
16.04.04 CAÑON DE RIEGO und
16.04.05 ELECTROVALVULA 1 1/2" C/REGISTRO und
16.04.06 CONEXION A RED GENERAL und
16.04.07 TUBO DE POLIETILENO PN 10 D 110MM m
16.04.08 TUBO DE POLIETILENO PN 10 D 90MM m
16.04.09 FILTRO DE ENTRADA Y VALVULA DE LLENADO ELECTRICA und
16.04.10 POZO-CONEXION A TIERRA und
16.04.11 GRUPO IMPULSION /DISTRIBUCION SIST. ELECTRICO und
16.04.12 TABLERO DE DISTRIBUCION ELECTRICA ANIOBRA BOMBAS, und
GABINETE METALICO CON INTERRUPTORES TERMOMAGNETICOS
16.05.04.01 TARRAJEO C:A 1:5 E=1.5 CM. CON ADITIVO INPERMEABILIZANTE m2 58.08
Volumen
Area ( m2 ) Parcial Total
( m3 )
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.30 0.30
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
146.65 146.65
47.31
50.10
97.41
6.30 6.30
0.00 0.00
metrado exp. Es inferior a ejecutado 40.00 40.00
9.50 38.00
9.50 38.00
76.00
3.27 13.08 13.08 13.08
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
14.10 14.10
0.00 0.00
1.35 1.35
0.67 0.67
11.28 11.28
5.64 5.64
3.25 3.25
0.49 0.49
27.35 10.00 10.00
466.75 466.75
177.14
207.90
15.77
65.94 466.75
Volumen
Area ( m2 ) Parcial Total
( m3 )
0.00 0.00
25.00 25.00
50.00 50.00
0.20 0.20
0.00 0.00
0.00 0.00
0.00 0.00
161.60 161.60
0.00 0.00
165.90 165.90 165.90
25.03 25.03
7.03
8.36
9.64
4.17 4.17
1.17
1.39
1.61
12.52 12.52
3.51
4.18
4.82
5.63 5.63
1.58
1.88
2.17
0.00 0.00
0.00 0.00
0.00 0.00
Volumen
Area ( m2 ) Parcial Total
( m3 )
91.78 91.78
25.76
30.67
35.35
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.35 0.35
50.00 50.00
200.00 200.00
sup 1/2"
inf 1/2"
sup 3/8" met. Infer. A ejecutar
inf 3/8" 463.30
met. Sup. A ejecutar
21.26 22.27 22.27
25.30
Volumen
Area ( m2 ) Parcial Total
( m3 )
0.00 0.00
0.00 0.00
200.00 200.00
200.00 200.00
200.00 200.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.80 0.80
0.00 0.00
0.00 0.00
0.00 0.00
0.40 0.40
2,903.95 2,903.95
4,700.00 4,700.00
2,903.95 2,903.95
410.00 410.00
727.89 727.89
358.23 358.23
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
Volumen
Area ( m2 ) Parcial Total
( m3 )
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
270.00 270.00
0.00 0.00
met sup. Al Exp 79.12 79.12
90.72
31.52
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
12.00 12.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
270.00 270.00
0.00 0.00
181.44 150.00 150.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
12.00 12.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
99.30 99.30
Volumen
Area ( m2 ) Parcial Total
( m3 )
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
125.00 125.00
125.00 125.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
50.00 50.00
100.00 100.00
100.00 100.00
8.00 8.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
120.00 120.00
100.00 100.00
0.00 0.00
0.00 0.00
Volumen
Area ( m2 ) Parcial Total
( m3 )
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
14.50 14.50
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
7.00 7.00
0.00 0.00
Volumen
Area ( m2 ) Parcial Total
( m3 )
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
25.00 25.00
50.00 50.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
Volumen
Area ( m2 ) Parcial Total
( m3 )
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
150.00 150.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
7.00 7.00
39.00 39.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
Volumen
Area ( m2 ) Parcial Total
( m3 )
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00
0.00 0.00
0.00
0.00 0.00
0.00
0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
Volumen
Area ( m2 ) Parcial Total
( m3 )
0.00 0.00
0.00
0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00 0.00
0.00 0.00
0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00
0.00 0.00
0.00 0.00
0.00 0.00
Volumen
Area ( m2 ) Parcial Total
( m3 )
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
270.00 270.00
194.40
27.54
221.94
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
Volumen
Area ( m2 ) Parcial Total
( m3 )
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
1.00 1.00
8.43 8.43
10.96 10.96
0.32 0.32
5.76 5.76
306.43 306.43
58.08 58.08
4.65 4.65
248.98 248.98
11.64 11.64
3.81 3.81
Volumen
Area ( m2 ) Parcial Total
( m3 )
58.08 58.08
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
248.49 248.49
248.49 248.49
150.00 150.00
120.00 120.00
150.00 150.00
248.49 248.49
0.00 0.00
RESUMEN DE METRADOS
VALORIZACIÓN N° 07 - MARZO 2019
: CREACION DE LOS SERVICIOS RECREATIVOS Y DEPORTIVOS EN EL CAMPO Nº 1 DE LA ASOCIACION PARQUE INDUSTRIAL PORVENIR AREQUIPA - API
OBRA
COLORADO, AREQUIPA-AREQUIPA.
ENTIDAD : MUNICIPALIDAD DISTRITAL DE CERRO COLORADO
CONTRATISTA : CONSORCIO MAFER
RESIDENTE : ING. FERNANDO EDUARDO PAREDES CAIHUACAS C.I.P. 108347 FINALIZACION DE PLAZO
SUPERVISOR : ING. ANTONY ADAN RONCAL CAÑI C.I.P. 100173
PLAZO : 179 DÍAS CALENDARIO
AVANCE
AVANCE
Item DESCRIPCION Und Metrado del Expediente
ANTERIOR
Metrado
MOVIMIENTO DE TIERRAS GENERAL Y ENROCADO DE DEFENSA
TORRENTERA CERRADA
01 OBRAS PROVISIONALES
01.01 MOVIMIENTO DE TIERRAS
01.01.01 CERCO PRIMETRICO PROVISIONAL m 524.00 524.00
01.01.02 CASETA DE GUARDIAN Y ALMACEN m2 50.00 50.00
01.01.03 ENERGIA ELECTRICA PARA LA OBRA glb 1.00 1.00
01.01.04 CARTEL DE IDENTIFICACION DE LA OBRA DE 3.60X2.40M INCL. und 1.00 1.00
COLOCACION
01.02 TRABAJOS PRELIMINARES
01.02.01 TRAZO Y REPLANTEO PRELIMINAR m2 16,450.00 16,450.00
01.02.02 LIMPIEZA DEL TERRENO CON MAQUINARIA m2 16,450.00 16,450.00
01.03 MOVIMIENTO DE TIERRAS
01.03.01 CORTE EN TERRENO NATURAL CON EQUIPO m3 10,113.00 10,113.00
01.03.02 RELLENO MANUAL CON MATERIAL PROPIO COMPENSADO M3 12,135.00 12,135.00
01.04 VOLADURA CONTROLADA EN ROCA
01.04.01 VOLADURA CONTROLADA DE ROCA D:2.5MTS und 10.00 10.00
01.05 VARIOS
01.05.01 MITIGACION AMBIENTAL glb 1.00 0.50
02 ENROCADO DE DEFENSA TORRENTERA
02.01 EXCAVACION PARA UÑA ANTISOCAVANTE m3 592.00 592.00
02.02 REFINE Y PERFILADO DE TALUD PARA ENROCADO m2 892.00 892.00
02.03 SELECCION Y ACOPIO DE ROCA EN CANTERA m3 1,000.00 1,000.00
02.04 CARGUIO DE ROCA EN CANTERA m3 1,000.00 1,000.00
02.05 TRANSPORTE DE ROCA m3 1,000.00 1,000.00
02.06 COLOCACION Y ACOMODO DE ROCA EN DIQUE m3 1,000.00 1,000.00
PORTADA DE ACCESO-CERCO PERIMETRICO Y VEREDAS
EXTERIORES_x000D_
03 PORTADA DE ACCESO
03.01 TRABAJOS PRELIMINARES
03.01.01 TRAZO Y REPLANTEO PRELIMINAR m2 60.00 60.00
03.02 MOVIMIENTO DE TIERRAS
03.02.01 RELLENO COMP. CON EQUIPO MAT. PROPIO HASTA H:1.20 MTS. m3 6.00 4.20
03.02.02 EXCAVACION DE ZANJAS H:1.20 m3 20.00 13.44
03.03 OBRAS DE CONCRETO SIMPLE
AVANCE
AVANCE
Item DESCRIPCION Und Metrado del Expediente
ANTERIOR
Metrado
03.03.01 SOLADO PARA ZAPATAS E= 2" MEZCLA 1:12 CEMENTO:HORMIGON m2 24.00 16.00
03.04 OBRAS DE CONCRETO ARMADO
03.04.01 ZAPATAS -ACERO F'y:4200kg/cm2 kg 318.11 171.46
03.04.02 ZAPATAS-CONCRETO F'C=210 KG/CM2 m3 18.90 12.60
03.04.03 PORTALES-ACERO F'y:4200kg/cm2 kg 1,680.00 790.83
03.04.04 PORTALES, ENCOFRADO Y DESENCOFRADO m2 50.00 0.00
03.04.05 PORTALES CONCRETO F'C=210 KG/CM2 m3 21.80 0.00
03.05 REVOQUES Y ENLUCIDOS
03.05.01 TARRAJEO EN MUROS EXTERIORES C:A 1:5 E=1.5 CM. m2 78.00 0.00
03.06 ZOCALOS
03.06.01 ZOCALO DE SILLAR 0.30X0.20 M m2 62.10 0.00
03.06.02 ZOCALO DE PIEDRA PORFIDO IRREGULAR m2 15.90 0.00
03.07 PINTURA
03.07.01 PINTURA OLEO MATE EN MURO EXTERIOR m2 78.00 0.00
03.08 CARPINTERIA METALICA Y HERRERIA
03.08.01 PUERTA METALICA (3.50 X 3.00) INCLUYE INSTALACION und 3.00 0.00
03.08.02 VENTANA METALICA C/S PERF. 1 1/4"X1 1/4" X 1/8" und 6.00 0.00
03.09 VARIOS
03.09.01 FAROLA MODELO PHILLIPS (PARED) LAMPARA V.M. 80 W und 6.00 0.00
03.09.02 SALIDA DE ALUMBRADO EN PARED FAROLA (CABLE 2-1X4MM2, C/TUB. pto 6.00 0.00
DE 20 mm)
03.09.03 ARTEFACTO SPOT LIHGTH ALUMINIO (INCANDESCENTE 50W) und 12.00 0.00
04 CERCO PERIMETRICO
04.01 TRABAJOS PRELIMINARES
04.01.01 TRAZO Y REPLANTEO PRELIMINAR m2 500.00 480.00
04.01.02 LIMPIEZA DEL TERRENO MANUAL m2 500.00 500.00
04.02 MOVIMIENTO DE TIERRAS
04.02.01 EXCAVACION DE ZANJAS H:1.20 m3 120.00 117.30
04.02.02 RELLENO COMP. CON EQUIPO MAT. PROPIO HASTA H:1.20 MTS. m3 20.00 18.66
04.03 OBRAS DE CONCRETO SIMPLE
04.03.01 CIMIENTOS CORRIDOS MEZCLA 1:10 CEMENTO-HORMIGON+30% P.G. m3 100.00 68.31
f'c:100kg/cm2
04.03.02 SOBRECIMIENTOS CONCRETO F´C=210 KG/CM2 m3 81.00 54.65
04.04 OBRAS DE CONCRETO ARMADO
04.04.01 COLUMNETAS, ENCOFRADO Y DESENCOFRADO m2 50.00 44.80
04.04.02 COLUMNETAS CONCRETO F'C=210 KG/CM2 m3 7.50 6.85
04.04.03 COLUMNETAS F'y:4200kg/cm2 kg 632.00 612.03
04.05 REVOQUES Y ENLUCIDOS
04.05.01 TARRAJEO EN MUROS EXTERIORES C:A 1:5 E=1.5 CM. m2 1,000.00 0.00
04.06 PINTURA
04.06.01 PINTURA OLEO MATE EN MURO EXTERIOR m2 1,000.00 0.00
04.07 CARPINTERIA METALICA Y HERRERIA
04.07.01 MALLA GALV. 2"X2" (PANEL 3.00X2.00 TIPO A) INC. INST. und 115.00 30.00
04.08 VARIOS
04.08.01 JUNTAS DE SEPARACION SISMICA TECKNOPOR E: 1" m 145.00 0.00
04.08.02 MITIGACION AMBIENTAL glb 1.00 0.00
05 VEREDAS
05.01 TRABAJOS PRELIMINARES
AVANCE
AVANCE
Item DESCRIPCION Und Metrado del Expediente
ANTERIOR
Metrado
05.01.01 LIMPIEZA DEL TERRENO MANUAL m2 1,000.00 1,000.00
05.01.02 TRAZO Y REPLANTEO PRELIMINAR m2 1,000.00 1,000.00
05.02 MOVIMIENTO DE TIERRAS
05.02.01 NIVELACION Y COMPACTADO C/EQUIPO m2 930.00 839.00
05.03 OBRAS DE CONCRETO SIMPLE
05.03.01 SARDINELES SUMERG. E/VEREDAS C° F'C=140 KG/CM2 (15X25) ACAB. m 500.00 159.67
FROTACH.
05.03.02 SARDINELES TIPO BURBUJA. C° F'C=140 KG/CM2 ACAB. FROTACH. m 123.78 79.96
05.03.03 VEREDAS DE CONCRETO F'C=140 KG/CM2, E=4" (ACAB. FROTACH. Y m2 1,600.00 439.56
BRUÑADO)
AREA RECREATIVA, JUEGOS INFANTILES, ESTARES Y
CAMINERIAS_x000D_
06.02.02 RELLENO COMP. CON EQUIPO MAT. PROPIO HASTA m3 5.00 0.00
06.07 PINTURA
06.07.01 PINTURA OLEO MATE EN MURO EXTERIOR m2 190.00 0.00
06.08 VARIOS
06.08.01 JUNTAS DE SEPARACION SISMICA TECKNOPOR E: m 50.00 0.00
06.09 CARPINTERIA METALICA
06.09.01 BARANDA DE TUBO ACERO. PASAMANO 2" m 148.00 0.00
07 PUENTE DECORATIVO
07.01 TRABAJOS PRELIMINARES
07.01.01 TRAZO Y REPLANTEO PRELIMINAR m2 50.00 0.00
07.02.02 RELLENO COMP. CON EQUIPO MAT. PROPIO HASTA m3 1.00 0.00
08 ESTARES Y PERGOLAS
08.01 TRABAJOS PRELIMINARES
08.01.01 TRAZO Y REPLANTEO PRELIMINAR m2 250.00 0.00
08.02.02 RELLENO COMP. CON EQUIPO MAT. PROPIO HASTA m3 6.86 0.00
08.05 ZOCALOS
08.05.01 ENCHAPE DE SILLAR COLUMNA CIRCULAR m2 100.00 0.00
08.07 VARIOS
08.07.01 BANCA DE METAL C/LISTONES DE MADERA und 26.00 0.00
08.07.02 SEMBRADO DE ARBOLES Y PLANTAS ORNAMENTA und 20.00 0.00
AVANCE
AVANCE
Item DESCRIPCION Und Metrado del Expediente
ANTERIOR
Metrado
08.07.03 SEMBRADO DE CACTARIO und 10.00 0.00
09.04 VARIOS
09.04.01 ASTA DE BANDERA TIPICO pza 3.00 0.00
10 LOSA MULTIDEPORTIVA
10.01 TRABAJOS PRELIMINARES
10.01.01 TRAZO Y REPLANTEO GRADERIAS Y LOSA m2 887.00 887.00
10.02.02 RELLENO COMP. CON EQUIPO MAT. PROPIO HASTA m3 2.50 2.50
10.06 PINTURA
10.06.01 PINTURA ESMALTE EN GRADERIAS m2 150.00 0.00
10.07 VARIOS
10.07.01 JUNTAS DE SEPARACION SISMICA TECKNOPOR E: m 50.00 0.00
11 LOSA DE FULBITO
11.01 TRABAJOS PRELIMINARES
11.01.01 TRAZO Y REPLANTEO GRADERIAS Y LOSA m2 887.00 0.00
11.02.02 RELLENO COMP. CON EQUIPO MAT. PROPIO HASTA m3 2.50 0.00
11.02.03 ACARREO INTERNO DE MATERIAL EXCEDENTE CON m3 30.00 0.00
11.02.04 NIVELACION Y COMPACTADO C/EQUIPO m2 887.00 0.00
11.06 PINTURA
11.06.01 PINTURA ESMALTE EN GRADERIAS m2 150.00 0.00
11.07 PAVIMENTOS
11.07.01 CESPED ARTIFICIAL MONOFILAMENTO CONCAVO m2 725.76 0.00
11.08 VARIOS
11.08.01 JUNTAS DE SEPARACION SISMICA TECKNOPOR E: m 50.00 0.00
12.02.02 RELLENO COMP. CON EQUIPO MAT. PROPIO HASTA m3 5.00 5.00
12.02.03 ACARREO INTERNO DE MATERIAL EXCEDENTE CON m3 45.00 45.00
12.02.04 NIVELACION Y COMPACTADO C/EQUIPO m2 125.00 125.00
12.03 OBRAS DE CONCRETO SIMPLE
12.03.01 CIMIENTOS CORRIDOS MEZCLA 1:10 CEMENTO-HORM m3 50.00 40.83
12.03.02 SOBRECIMIENTOS CONCRETO F´C=210 KG/CM2 m3 10.00 10.00
12.03.03 SOBRECIMIENTOS - ENCOFRADO Y DESENCOFRA m2 25.00 25.00
12.03.04 FALSO PISO DE 4" DE CONCRETO 1:8 m2 125.00 0.00
12.03.05 SARDINELES SUMERG. E/VEREDAS C° F'C=140 KG/ m 64.00 0.00
12.10 CONTRAZOCALOS
12.10.01 CONTRAZÓCALO CERÁMICO, h=20cm m 50.00 0.00
12.11 ZOCALOS
AVANCE
AVANCE
Item DESCRIPCION Und Metrado del Expediente
ANTERIOR
Metrado
12.11.01 ZOCALO DE CERAMICA 30 X 30 cm DE 1ERA m2 100.00 0.00
12.12.02 VENTANA DE MARCO DE CEDRO TIPO-1 (0.60 X 0.6 und 18.00 0.00
12.13 VARIOS
12.13.01 DIVISIONES DE MELAMINE INCLUYE PUERTA PARA und 6.00 0.00
12.13.03 SEÑAL TIPO PARED (0.25x 0.40) SS.HH. Y VESTIDO und 4.00 0.00
12.14 CERRAJERIA
12.14.01 CERRADURA PARA PUERTA PRINCIPAL PESADA pza 4.00 0.00
12.15.02 ESPEJO DE PARED 3.16 X 0.90 M MARCO DE ALU und 4.00 0.00
12.16 PINTURA
12.16.01 PINTURA LATEX EN CIELO RASO 2 MANOS m2 120.00 0.00
12.16.02 PINTURA OLEO MATE EN MUROS m2 100.00 0.00
12.17.04 MEZCLADORA 8" EMPOTRADA PARA DUCHA S-4 pza 16.00 0.00
12.17.05 PAPELERA DE CERAMICA BLANCA DE 12 X 10 X 10 pza 10.00 0.00
12.17.06 JABONERA DE CERAMICA BLANCA S-6 pza 8.00 0.00
12.19.03 VALVULAS
12.19.03.01 VALVULAS DE COMPUERTA DE BRONCE DE pza 5.00 0.00
13 GRADERIAS
13.01 TRABAJOS PRELIMINARES
13.01.01 TRAZO Y REPLANTEO GRADERIAS Y LOSA m2 700.00 700.00
13.01.02 LIMPIEZA DEL TERRENO MANUAL m2 700.00 700.00
13.02 MOVIMIENTO DE TIERRAS
13.02.01 EXCAVACION DE ZANJAS H:1.20 m3 216.00 216.00
13.02.02 RELLENO COMP. CON EQUIPO MAT. PROPIO HASTA H:1.20 MTS. m3 66.00 66.00
13.02.03 ACARREO INTERNO DE MATERIAL EXCEDENTE CON CARRETILLA m3 150.00 150.00
D=30 M.
13.03 OBRAS DE CONCRETO SIMPLE
13.03.01 SOLADO PARA ZAPATAS E= 2" MEZCLA 1:12 CEMENTO:HORMIGON m2 135.00 135.00
13.03.02 CONCRETO F'C=140 KG/CM2 EN GRADERIAS + 50% DE PM m3 270.00 270.00
13.03.03 CIMIENTOS CORRIDOS MEZCLA 1:10 CEMENTO-HORMIGON+30% P.G. m3 86.70 86.70
f'c:100kg/cm2
13.03.04 SOBRECIMIENTOS CONCRETO F´C=175 KG/CM2 m3 19.86 1.24
13.03.05 SOBRECIMIENTOS - ENCOFRADO Y DESENCOFRADO m2 10.00 3.10
13.04 OBRAS DE CONCRETO ARMADO
13.04.01 ZAPATAS -ACERO F'y:4200kg/cm2 kg 2,672.42 2,672.42
13.04.02 ZAPATAS-CONCRETO F'C=210 KG/CM2 m3 81.00 81.00
13.04.03 MURO DE CONTENCION -ACERO F'y:4200kg/cm2 kg 7,358.70 7,358.70
13.04.04 MURO DE CONTENCION- CONCRETO F'C=210 KG/CM2 m3 93.42 93.42
13.04.05 MURO DE CONTENCION- ENCOFRADO Y DESENCOFRADO m2 50.00 50.00
13.04.06 COLUMNAS Y PLACAS CONCRETO F'C=210 KG/CM2 m3 13.20 13.20
13.04.07 COLUMNAS Y PLACAS, ENCOFRADO Y DESENCOFRADO m2 10.00 10.00
13.04.08 COLUMNAS Y PLACAS-ACERO F'y:4200kg/cm2 kg 3,395.30 3,395.30
13.05 REVOQUES Y ENLUCIDOS
13.05.01 TARRAJEO FROTACHADO DE COLUMNAS CON MORTERO C:A 1:5 m2 150.00 150.00
E=1.5 CM.
13.05.02 TARRAJEO EN GRADERIAS C:A 1:5 E=1.5 CM. m2 1,113.00 1,113.00
13.06 ZOCALOS
13.06.01 ZOCALO DE SILLAR EN FACHADA PRINCIPAL 0.30X0.20 M m2 150.00 0.00
13.07 PINTURA
13.07.01 PINTURA ESMALTE EN GRADERIAS m2 1,113.00 0.00
13.07.02 PINTURA ESMALTE EN COLUMNAS m2 150.00 0.00
13.08 VARIOS
13.08.01 JUNTAS DE SEPARACION SISMICA TECKNOPOR E: 1" m 50.00 50.00
14 CARPINTERIA METALICA
14.01 TIJERALES
14.01.01 TIJERAL TIPO 01 L=5.20 M und 44.00 44.00
14.01.02 CORREA TUBO RECTANGULAR 80X40X1.5MM L=6.00M m 900.00 900.00
14.01.03 COBERTURA PLANCHA DE ETERNIT OPACA COLOR VERDE E=2MM m2 900.00 900.00
14.02 CERCO METALICO
14.02.01 MALLA GALV. 2"X2" (PANEL 3.00 X1.50 MTS.) INC. INST. und 92.00 85.00
AVANCE
AVANCE
Item DESCRIPCION Und Metrado del Expediente
ANTERIOR
Metrado
14.02.02 MALLA GALV. 2"X2" (PANEL 2.00X2.00 TIPO A) INC. INST. und 78.00 0.00
14.02.03 PUERTA METALICA (3.50 X 2.40) INCLUYE INSTALACION und 1.00 0.00
14.02.04 PUERTA METALICA (1.20X2.40) INCLUYE INSTALACION und 4.00 0.00
14.03 POSTE METALICOS ILUMINACION
14.03.01 POSTES METALICOS PARA ILUMINACION 6" Y 9MTS DE ALTURA und 6.00 0.00
INC/INSTALACION
15 SS.HH. Y VESTIDORES DAMAS Y VARONES
15.01 TRABAJOS PRELIMINARES
15.01.01 LIMPIEZA DEL TERRENO MANUAL m2 200.00 200.00
15.01.02 TRAZO Y REPLANTEO PRELIMINAR m2 200.00 200.00
15.01.03 TRASLADO DE MATERIALES HERRAMIENTAS Y EQUIPO glb 1.00 1.00
15.02 MOVIMIENTO DE TIERRAS
15.02.01 EXCAVACION DE ZANJAS H:1.20 m3 60.00 60.00
15.02.02 RELLENO COMP. CON EQUIPO MAT. PROPIO HASTA H:1.20 MTS. m3 5.00 5.00
15.02.03 ACARREO INTERNO DE MATERIAL EXCEDENTE CON CARRETILLA m3 55.00 55.00
D=30 M.
15.03 OBRAS DE CONCRETO SIMPLE
15.03.01 SOLADO PARA ZAPATAS E= 2" MEZCLA 1:12 CEMENTO:HORMIGON m2 58.00 58.00
15.03.02 CIMIENTOS CORRIDOS MEZCLA 1:10 CEMENTO-HORMIGON+30% P.G. m3 57.42 57.42
f'c:100kg/cm2
15.03.03 SOBRECIMIENTOS CONCRETO F´C=210 KG/CM2 m3 10.20 10.20
15.03.04 SOBRECIMIENTOS - ENCOFRADO Y DESENCOFRADO m2 50.00 50.00
15.03.05 FALSO PISO E:10 CMS CONCRETO 1:8 m2 188.00 188.00
15.03.06 SARDINELES SUMERG. E/VEREDAS C° F'C=140 KG/CM2 (15X25) ACAB. 100.00 100.00
FROTACH. m
AVANCE
SALDO
AVANCE ACTUAL ACUMULADO
AVANCE
SALDO
Item DESCRIPCION AVANCE ANTERIOR AVANCE ACTUAL ACUMULADO %
Und Metrado Precio S/. Metrado Valoriz. S/. Metrado Valoriz. S/. Metrado Valoriz. S/. Metrado Valoriz. S/.
MOVIMIENTO DE TIERRAS GENERAL Y ENROCADO DE DEFENSA
TORRENTERA CERRADA
01 ESTRUCTURAS
1.01 TRABAJOS PRELIMINARES
01.01.01 OBRAS PROVISIONALES, TRABAJOS PRELIMINARES,
SEGURIDAD Y SALUD
01.01.01.01 TRANSPORTE DE PERSONAL Y EQUIPOS A OBRA glb 1.00 764.03 764.03 524.00 400,351.72 0.00 0.00 524.00 400,351.72 52400.00% -523.00 -399,587.69
01.01.01.02 TRAZO, NIVELES Y REPLANTEO m2 258.68 2.37 613.84 50.00 118.65 0.00 0.00 50.00 118.65 19.33% 208.68 495.19
01.01.01.03 TRAZO, NIVELES Y REPLANTEO DURANTES EL PROCESO m2 258.68 2.37 613.84 1.00 2.37 0.00 0.00 1.00 2.37 0.39% 257.68 611.47
01.01.01.04 LIMPIEZA GENERAL DE OBRA glb 1.00 237.98 237.98 1.00 237.98 0.00 0.00 1.00 237.98 100.00% 0.00 0.00
01.01.01.05 EQUIPOS DE PROTECCION INDIVIDUAL glb 1.00 761.76 761.76
01.01.01.06 EQUIPOS DE PROTECCION COLECTIVA glb 1.00 332.58 332.58
01.01.01.07 CAPACITACION EN SEGURIDAD Y SALUD glb 1.00 449.43 449.43
1.1.2 OBRAS PRELIMINARES
1.1.2.1 ALMACEN, OFICINA Y CASETA DE GUARDIANIA glb 1.00 449.43 449.43 0.00 0.00 0.00 0.00 0.00 0.00% 1.00 449.43
1.1.2.2 INSTALACIONES PROVISIONALES DURANTE LA OBRA glb 1.00 408.14 408.14 0.00 0.00 0.00 0.00 0.00 0.00% 1.00 408.14
1.1.2.3 DEMOLICION DE PISO Y CONTRAPISO m2 29.72 4.38 130.10
1.1.2.4 DEMOLICION DE PISO CERAMICO Y CONTRAPISO m2 196.52 4.38 860.25
1.1.2.5 DEMOLICION DE FALSO PISO DE CONCRETO m2 17.18 9.49 163.07
1.1.2.6 DEMOLICION DE LOSA ALIGERADA H=20CM m2 13.09 15.36 201.08
1.1.2.7 DEOMLICION DE LOSA MACIZA e=0.15m m2 7.52 2.80 21.02
1.1.2.8 DEMOLICION DE VIGA DE CONCRETO m3 0.53 39.31 20.83
1.1.2.9 DEMOLICION DE MUROS DE ALBAÑILERIA (incl vanos) m2 187.01 8.78 1,642.29
1.1.2.10 DESMONTAJE DE APARATOS SANITARIOS und 2.00 38.41 76.82
1.1.2.11 DESMONTAJE DE ACCESORIOS SANITARIOS und 8.00 11.52 92.19
1.1.2.12 DESMONTAJES ARTEFACTOS ELECTRICOS Und 23.00 22.16 509.61
1.1.2.13 DESMONTAJE DE ARTEFACTOS ILUMINACION Und 26.00 5.80 150.74
1.1.2.14 DESONTAJE DE TABLERO ELECTRICO Und 5.00 16.34 81.71
1.1.2.15 DESMONTAJE DE PUERTA ENRROLLABLE Und 3.00 52.75 158.26
1.1.2.16 DESMONTAJE DE PUERTAS METALICAS Und 7.00 43.95 307.68
1.1.2.17 DESMONTAJE DE BARANDA METALICA Und 1.00 30.64 30.64
1.1.2.18 DESMONTAJE DE ESPEJO Und 5.00 8.78 43.91
1.1.2.19 DESONTAJE DE TUBERIAS Und 2.00 32.97 65.94
1.1.2.20 DESMONTAJE DE ZOCALOS DE CERAMICO m2 28.70 15.37 441.13
1.1.2.21 DESMONTAJE DE CONTRAZOCALO DE CERAMICO m 5.70 1.89 10.76
1.1.2.22 ACARREO INTERNO, MAT PROCEDENTE DE DEMOLICION m3 62.76 16.49 1,034.60
1.1.2.23 ELIMINACION DE MATERIAL, EXCEDENTE Y DEMOLICIONES m3 62.76 27.41 1,720.01
1.1.2.24 ELIMINACION DE ELEMENTOS DESMONTADOS. glb 1.00 509.43 509.43
AVANCE
SALDO
Item DESCRIPCION AVANCE ANTERIOR AVANCE ACTUAL ACUMULADO %
Und Metrado Precio S/. Metrado Valoriz. S/. Metrado Valoriz. S/. Metrado Valoriz. S/. Metrado Valoriz. S/.
1.2 MOVIMIENTO DE TIERRAS
1.2.1 NIVELACION INTERIOR Y APISONADO m2 5.55 4.19 23.25
01.03.01 EXCAVACION MANUAL EN MATERIAL NATURAL m3 1.07 43.95 47.03 10,113.00 444,466.35 0.00 0.00 10,113.00 444,466.35 945069.85% -10,111.93 -444,419.32
01.03.02 ELIMINACION DE MATERIAL EXEDENTE M3 1.28 54.74 70.07 12,135.00 664,269.90 0.00 0.00 12,135.00 664,269.90 948008.99% -12,133.72 -664,199.83
1.3 OBRAS DE CONCRETO SIMPLE
1.3.1 FALSO PISO MEZCLA 1:8 e=4" m2 8.77 31.42 275.51 10.00 314.15 0.00 0.00 10.00 314.15 114.02% -1.23 -38.64
1.3.2 SOBRECIMIENTO, CONCRETO 1:8 + 25% P.M f'c>=100kg/cm2 m3 0.40 298.56 119.43
1.3.3 SOBRECIMIENTO, ENCOFRADO Y DESENCOFRADO m2 5.34 30.79 164.44
1.4 OBRAS DE CONCRETO ARMADO
1.4.1 CIMIENTOS REFORZADOS
1.4.1.1 CIMIENTOS REFORZ. CONCRETO F'c=175 kg/cm2 m3 0.66 312.59 206.31 0.50 156.30 0.30 93.78 0.80 250.07 121.21% -0.14 -43.76
1.4.1.2 CIMIENTOS REFORZ. ACERO F'y=4200 kg/cm2 kg 18.26 4.29 78.29
1.4.2 COLUMNAS 0.00
1.4.2.1 COLUMNAS - CONCRETO 210 kg/cm2 m3 1.53 491.14 751.45 592.00 290,755.35 0.00 0.00 592.00 290,755.35 38692.57% -590.47 -290,003.91
1.4.2.2 COLUMNAS - ENCOFRADO Y DESENCOFRADO m2 25.58 60.72 1,553.16 892.00 54,160.10 0.00 0.00 892.00 54,160.10 3487.09% -866.42 -52,606.94
1.4.2.3 COLUMNAS - ACERO F'y=4200kg/cm2 kg 193.38 4.29 829.13 1,000.00 4,287.55 0.00 0.00 1,000.00 4,287.55 517.11% -806.62 -3,458.42
1.4.3 VIGAS 0.00
1.4.3.1 VIGAS DE CIMIENT. CONC 210 kg/cm2 m3 1.74 357.29 621.68 1,000.00 357,290.00 0.00 0.00 1,000.00 357,290.00 57471.69% -998.26 -356,668.32
1.4.3.2 VIGAS. ENCOFRADOS Y DESENCOFRADO m2 30.83 58.39 1,800.16 1,000.00 58,390.00 0.00 0.00 1,000.00 58,390.00 3243.60% -969.17 -56,589.84
1.4.3.3 VIGAS ACERO F'y=4200 kg/cm2 kg 261.22 4.29 1,119.99 1,000.00 4,287.55 0.00 0.00 1,000.00 4,287.55 382.82% -738.78 -3,167.56
1.4.4 LOSAS MACIZA 0.00
1.4.4.1 LOSAS MACIZAS CONC 210 kg/cm2 m3 3.01 391.71 1,179.03 1,000.00 391,705.00 0.00 0.00 1,000.00 391,705.00 33222.65% -996.99 -390,525.97
1.4.4.2 LOSAS MACIZAS - ENCOFRADO Y DESENCOFRADO m2 16.33 49.35 805.84 1,000.00 49,347.00 0.00 0.00 1,000.00 49,347.00 6123.67% -983.67 -48,541.16
1.4.4.3 LOSAS MACIZAS - ACERO F'y=4200kg/cm2 kg 263.35 4.29 1,129.13 1,000.00 4,287.55 0.00 0.00 1,000.00 4,287.55 379.72% -736.65 -3,158.42
1.4.5 CAJERO ATM 0.00
1.4.4.1 CAJERO CONC 210 kg/cm2 m3 1.19 456.11 542.77 1,000.00 456,110.00 1.80 821.00 1,001.80 456,931.00 84185.01% -1,000.61 -456,388.23
1.4.4.2 CAJERO - ENCOFRADO Y DESENCOFRADO m2 12.01 64.52 774.89 1,000.00 64,520.00 6.56 423.25 1,006.56 64,943.25 8380.96% -994.55 -64,168.37
1.4.4.3 CAJERO - ACERO F'y=4200kg/cm2 kg 77.75 4.29 333.36 1,000.00 4,287.55 0.00 0.00 1,000.00 4,287.55 1286.16% -922.25 -3,954.19
1.4.6 RAMPA 0.00
1.4.6.1 RAMPA CONCRETO F'C=210 kg/cm2, bruñado 1/2", CADA 0.10m m3 1.08 387.69 418.70 1,000.00 387,689.00 0.00 0.00 1,000.00 387,689.00 92593.50% -998.92 -387,270.30
1.4.6.2 RAMPAS - ENCOFRADO Y DESENCOFRADO m2 5.42 64.20 347.94 1,000.00 64,196.00 146.65 9,414.34 1,146.65 73,610.34 21156.04% -1,141.23 -73,262.40
1.4.6.3 RAMPAS - ACERO F'y=4200kg/cm2 kg 181.06 4.29 776.30 1,000.00 4,287.55 6.30 27.01 1,006.30 4,314.56 555.79% -825.24 -3,538.26
1.5 CARPINTERIA METALICA
1.5.1 ESCALERAS
1.5.1.1
AVANCE
SALDO
Item DESCRIPCION AVANCE ANTERIOR AVANCE ACTUAL ACUMULADO %
Und Metrado Precio S/. Metrado Valoriz. S/. Metrado Valoriz. S/. Metrado Valoriz. S/. Metrado Valoriz. S/.
03 PORTADA DE ACCESO
03.01 TRABAJOS PRELIMINARES
03.01.01 TRAZO Y REPLANTEO PRELIMINAR m2 60.00 0.56 33.60 60.00 33.60 0.00 0.00 60.00 33.60 100.00% 0.00 0.00
03.02 MOVIMIENTO DE TIERRAS
03.02.01 RELLENO COMP. CON EQUIPO MAT. PROPIO HASTA H:1.20 MTS. m3 6.00 49.48 296.88 4.20 207.82 1.80 89.06 6.00 296.88 100.00% 0.00 0.00
03.02.02 EXCAVACION DE ZANJAS H:1.20 m3 20.00 41.29 825.80 13.44 554.94 6.56 270.86 20.00 825.80 100.00% 0.00 0.00
03.03 OBRAS DE CONCRETO SIMPLE
03.03.01 SOLADO PARA ZAPATAS E= 2" MEZCLA 1:12 CEMENTO:HORMIGON m2 24.00 23.57 565.68 16.00 377.12 8.00 188.56 24.00 565.68 100.00% 0.00 0.00
03.04 OBRAS DE CONCRETO ARMADO
03.04.01 ZAPATAS -ACERO F'y:4200kg/cm2 kg 318.11 5.05 1,606.46 171.46 865.87 146.65 740.58 318.11 1,606.46 100.00% 0.00 0.00
03.04.02 ZAPATAS-CONCRETO F'C=210 KG/CM2 m3 18.90 454.29 8,586.08 12.60 5,724.05 6.30 2,862.03 18.90 8,586.08 100.00% 0.00 0.00
03.04.03 PORTALES-ACERO F'y:4200kg/cm2 kg 1,680.00 5.05 8,484.00 1,680.00 8,484.00 0.00 0.00 1,680.00 8,484.00 100.00% 0.00 0.00
03.04.04 PORTALES, ENCOFRADO Y DESENCOFRADO m2 50.00 57.89 2,894.50 0.00 0.00 40.00 2,315.60 40.00 2,315.60 80.00% 10.00 578.90
03.04.05 PORTALES CONCRETO F'C=210 KG/CM2 m3 21.80 582.29 12,693.92 0.00 0.00 13.08 7,616.35 13.08 7,616.35 60.00% 8.72 5,077.57
03.05 REVOQUES Y ENLUCIDOS
03.05.01 TARRAJEO EN MUROS EXTERIORES C:A 1:5 E=1.5 CM. m2 78.00 30.71 2,395.38 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 78.00 2,395.38
03.06 ZOCALOS
03.06.01 ZOCALO DE SILLAR 0.30X0.20 M m2 62.10 80.49 4,998.43 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 62.10 4,998.43
03.06.02 ZOCALO DE PIEDRA PORFIDO IRREGULAR m2 15.90 97.71 1,553.59 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 15.90 1,553.59
03.07 PINTURA
03.07.01 PINTURA OLEO MATE EN MURO EXTERIOR m2 78.00 14.24 1,110.72 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 78.00 1,110.72
03.08 CARPINTERIA METALICA Y HERRERIA
03.08.01 PUERTA METALICA (3.50 X 3.00) INCLUYE INSTALACION und 3.00 1,450.64 4,351.92 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 3.00 4,351.92
03.08.02 VENTANA METALICA C/S PERF. 1 1/4"X1 1/4" X 1/8" und 6.00 123.00 738.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 6.00 738.00
03.09 VARIOS
03.09.01 FAROLA MODELO PHILLIPS (PARED) LAMPARA V.M. 80 W und 6.00 70.95 425.70 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 6.00 425.70
03.09.02 SALIDA DE ALUMBRADO EN PARED FAROLA (CABLE 2-1X4MM2, C/TUB. pto 6.00 126.78 760.68 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 6.00 760.68
DE 20 mm)
03.09.03 ARTEFACTO SPOT LIHGTH ALUMINIO (INCANDESCENTE 50W) und 12.00 57.67 692.04 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 12.00 692.04
04 CERCO PERIMETRICO
04.01 TRABAJOS PRELIMINARES
04.01.01 TRAZO Y REPLANTEO PRELIMINAR m2 500.00 0.56 280.00 480.00 268.80 14.10 7.90 494.10 276.70 98.82% 5.90 3.30
04.01.02 LIMPIEZA DEL TERRENO MANUAL m2 500.00 0.37 185.00 500.00 185.00 0.00 0.00 500.00 185.00 100.00% 0.00 0.00
04.02 MOVIMIENTO DE TIERRAS
04.02.01 EXCAVACION DE ZANJAS H:1.20 m3 120.00 41.29 4,954.80 117.30 4,843.32 1.35 55.74 118.65 4,899.06 98.88% 1.35 55.74
04.02.02 RELLENO COMP. CON EQUIPO MAT. PROPIO HASTA H:1.20 MTS. m3 20.00 49.48 989.60 18.66 923.42 0.67 33.15 19.33 956.57 96.66% 0.67 33.03
04.03 OBRAS DE CONCRETO SIMPLE
04.03.01 CIMIENTOS CORRIDOS MEZCLA 1:10 CEMENTO-HORMIGON+30% P.G. m3 100.00 193.56 19,356.00 68.31 13,222.57 11.28 2,183.36 79.59 15,405.92 79.59% 20.41 3,950.08
f'c:100kg/cm2
04.03.02 SOBRECIMIENTOS CONCRETO F´C=210 KG/CM2 m3 81.00 393.13 31,843.53 54.65 21,484.55 5.64 2,217.25 60.29 23,701.81 74.43% 20.71 8,141.72
04.04 OBRAS DE CONCRETO ARMADO
04.04.01 COLUMNETAS, ENCOFRADO Y DESENCOFRADO m2 50.00 57.89 2,894.50 44.80 2,593.47 3.25 188.14 48.05 2,781.61 96.10% 1.95 112.89
04.04.02 COLUMNETAS CONCRETO F'C=210 KG/CM2 m3 7.50 582.29 4,367.18 6.85 3,988.69 0.49 283.87 7.34 4,272.55 97.83% 0.16 94.62
04.04.03 COLUMNETAS F'y:4200kg/cm2 kg 632.00 5.05 3,191.60 612.03 3,090.76 10.00 50.50 622.03 3,141.26 98.42% 9.97 50.34
04.05 REVOQUES Y ENLUCIDOS
04.05.01 TARRAJEO EN MUROS EXTERIORES C:A 1:5 E=1.5 CM. m2 1,000.00 30.71 30,710.00 293.58 9,015.84 466.75 14,333.95 760.33 23,349.80 76.03% 239.67 7,360.20
04.06 PINTURA
AVANCE
SALDO
Item DESCRIPCION AVANCE ANTERIOR AVANCE ACTUAL ACUMULADO %
Und Metrado Precio S/. Metrado Valoriz. S/. Metrado Valoriz. S/. Metrado Valoriz. S/. Metrado Valoriz. S/.
04.06.01 PINTURA OLEO MATE EN MURO EXTERIOR m2 1,000.00 14.24 14,240.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 1,000.00 14,240.00
04.07 CARPINTERIA METALICA Y HERRERIA
04.07.01 MALLA GALV. 2"X2" (PANEL 3.00X2.00 TIPO A) INC. INST. und 115.00 449.65 51,709.75 59.00 26,529.35 25.00 11,241.25 84.00 37,770.60 73.04% 31.00 13,939.15
04.08 VARIOS
04.08.01 JUNTAS DE SEPARACION SISMICA TECKNOPOR E: 1" m 145.00 5.80 841.00 59.65 345.97 50.00 290.00 109.65 635.97 75.62% 35.35 205.03
04.08.02 MITIGACION AMBIENTAL glb 1.00 2,460.00 2,460.00 0.60 1,476.00 0.20 492.00 0.80 1,968.00 80.00% 0.20 492.00
05 VEREDAS
05.01 TRABAJOS PRELIMINARES
05.01.01 LIMPIEZA DEL TERRENO MANUAL m2 1,000.00 0.37 370.00 1,000.00 370.00 0.00 0.00 1,000.00 370.00 100.00% 0.00 0.00
05.01.02 TRAZO Y REPLANTEO PRELIMINAR m2 1,000.00 0.56 560.00 1,000.00 560.00 0.00 0.00 1,000.00 560.00 100.00% 0.00 0.00
05.02 MOVIMIENTO DE TIERRAS
05.02.01 NIVELACION Y COMPACTADO C/EQUIPO m2 930.00 1.35 1,255.50 919.52 1,241.36 0.00 0.00 919.52 1,241.36 98.87% 10.48 14.14
OBRAS DE CONCRETO SIMPLE
05.03.01 SARDINELES SUMERG. E/VEREDAS C° F'C=140 KG/CM2 (15X25) ACAB. m 500.00 49.37 24,685.00 159.67 7,882.91 161.60 7,978.19 321.27 15,861.10 64.25% 178.73 8,823.90
FROTACH.
05.03.02 SARDINELES TIPO BURBUJA. C° F'C=140 KG/CM2 ACAB. FROTACH. m 123.78 49.89 6,175.38 79.96 3,989.20 0.00 0.00 79.96 3,989.20 64.60% 43.82 2,186.18
05.03.03 VEREDAS DE CONCRETO F'C=140 KG/CM2, E=4" (ACAB. FROTACH. Y m2 1,600.00 58.29 93,264.00 439.56 25,621.95 165.90 9,670.31 605.46 35,292.26 37.84% 994.54 57,971.74
BRUÑADO)
AREA RECREATIVA, JUEGOS INFANTILES, ESTARES Y
CAMINERIAS_x000D_
06.01.02 LIMPIEZA DEL TERRENO MANUAL m2 2,900.00 0.37 1,073.00 2,900.00 1,073.00 0.00 0.00 2,900.00 1,073.00 100.00% 0.00 0.00
06.01.03 NIVELACION Y COMPACTADO C/EQUIPO m2 1,000.00 1.35 1,350.00 328.00 442.80 474.50 640.58 802.50 1,083.38 80.25% 197.50 266.63
06.02.02 RELLENO COMP. CON EQUIPO MAT. PROPIO HASTA m3 5.00 49.48 247.40 0.00 0.00 4.17 206.43 4.17 206.43 83.44% 0.83 40.97
06.03.02 CONCRETO F'C=140 KG/CM2 EN MUROS + 50% DE m3 17.00 319.62 5,433.54 0.00 0.00 5.63 1,800.16 5.63 1,800.16 33.13% 11.37 3,633.38
06.03.03 CONCRETO F'C=140 KG/CM2 EN JARDINERAS m3 23.00 295.74 6,802.02 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 23.00 6,802.02
06.07 PINTURA
06.07.01 PINTURA OLEO MATE EN MURO EXTERIOR m2 190.00 14.24 2,705.60 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 190.00 2,705.60
06.08 VARIOS
06.08.01 JUNTAS DE SEPARACION SISMICA TECKNOPOR E: m 50.00 5.80 290.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 50.00 290.00
06.09 CARPINTERIA METALICA
06.09.01 BARANDA DE TUBO ACERO. PASAMANO 2" m 148.00 101.15 14,970.20 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 148.00 14,970.20
06.10.02 JUEGO TIPO 1 und 1.00 9,745.72 9,745.72 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 1.00 9,745.72
06.10.03 JUEGO TIPO 2 und 1.00 5,000.00 5,000.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 1.00 5,000.00
06.10.04 JUEGO DE TELEFONO und 1.00 5,338.98 5,338.98 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 1.00 5,338.98
06.10.05 TOBOGAN TIPO CASTILLO und 1.00 1,949.15 1,949.15 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 1.00 1,949.15
AVANCE
SALDO
Item DESCRIPCION AVANCE ANTERIOR AVANCE ACTUAL ACUMULADO %
Und Metrado Precio S/. Metrado Valoriz. S/. Metrado Valoriz. S/. Metrado Valoriz. S/. Metrado Valoriz. S/.
06.10.06 SUBE Y BAJA S/DISEÑO und 1.00 1,016.95 1,016.95 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 1.00 1,016.95
06.10.07 COLUMBIO S/DISEÑO und 1.00 1,525.42 1,525.42 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 1.00 1,525.42
06.10.08 POZO DE ARENA DE CULEBRA und 1.00 2,500.00 2,500.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 1.00 2,500.00
06.10.09 JUEGOS DE RESORTE und 2.00 423.73 847.46 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 2.00 847.46
06.10.10 CARRUSEL SEGUN DISEÑO und 1.00 1,355.93 1,355.93 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 1.00 1,355.93
07 PUENTE DECORATIVO
07.01 TRABAJOS PRELIMINARES
07.01.01 TRAZO Y REPLANTEO PRELIMINAR m2 50.00 0.56 28.00 0.00 0.00 50.00 28.00 50.00 28.00 100.00% 0.00 0.00
07.02.02 RELLENO COMP. CON EQUIPO MAT. PROPIO HASTA m3 1.00 49.48 49.48 0.00 0.00 1.00 49.48 1.00 49.48 100.00% 0.00 0.00
07.04.02 ZAPATAS-CONCRETO F'C=210 KG/CM2 m3 4.61 454.29 2,094.28 0.00 0.00 4.61 2,094.28 4.61 2,094.28 100.00% 0.00 0.00
07.04.03 VIGAS - ACERO F'Y:4200KG/CM2 kg 500.00 5.05 2,525.00 0.00 0.00 500.00 2,525.00 500.00 2,525.00 100.00% 0.00 0.00
07.04.04 VIGAS CONCRETO F'C=210 KG/CM2 m3 2.78 457.90 1,272.96 0.00 0.00 2.78 1,272.96 2.78 1,272.96 100.00% 0.00 0.00
07.04.05 VIGAS-ENCOFRADO Y DESENCOFRADO m2 10.00 62.73 627.30 0.00 0.00 10.00 627.30 10.00 627.30 100.00% 0.00 0.00
07.04.06 LOSA DE CONCRETO F'C=210 KG/CM2 E:20CMS m2 5.57 457.90 2,550.50 0.00 0.00 5.57 2,550.50 5.57 2,550.50 100.00% 0.00 0.00
07.04.07 LOSA-ENCOFRADO Y DESENCOFRADO m2 24.00 62.73 1,505.52 0.00 0.00 24.00 1,505.52 24.00 1,505.52 100.00% 0.00 0.00
07.04.08 LOSA-ACERO F'y:4200kg/cm2 kg 500.00 5.12 2,560.00 0.00 0.00 500.00 2,560.00 500.00 2,560.00 100.00% 0.00 0.00
08 ESTARES Y PERGOLAS
08.01 TRABAJOS PRELIMINARES
08.01.01 TRAZO Y REPLANTEO PRELIMINAR m2 250.00 0.56 140.00 0.00 0.00 200.00 112.00 200.00 112.00 80.00% 50.00 28.00
08.01.02 LIMPIEZA DEL TERRENO MANUAL m2 250.00 0.37 92.50 0.00 0.00 200.00 74.00 200.00 74.00 80.00% 50.00 18.50
08.01.03 NIVELACION Y COMPACTADO C/EQUIPO m2 250.00 1.35 337.50 0.00 0.00 200.00 270.00 200.00 270.00 80.00% 50.00 67.50
08.02.02 RELLENO COMP. CON EQUIPO MAT. PROPIO HASTA m3 6.86 49.48 339.43 6.86 339.44 0.00 0.00 6.86 339.44 100.00% 0.00 0.00
08.04.02 COLUMNAS CIRCULARES, ENCOFRADO Y DESEN m2 10.00 57.89 578.90 10.00 578.90 0.00 0.00 10.00 578.90 100.00% 0.00 0.00
08.04.03 COLUMNAS CIRCULARES-ACERO F'y:4200kg/cm2 kg 826.00 5.05 4,171.30 826.00 4,171.30 0.00 0.00 826.00 4,171.30 100.00% 0.00 0.00
08.05 ZOCALOS
08.05.01 ENCHAPE DE SILLAR COLUMNA CIRCULAR m2 100.00 80.49 8,049.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 100.00 8,049.00
08.06.02 PERGOLAS DE METAL CURVA INC/INSTALACION und 1.00 9,708.01 9,708.01 0.00 0.00 0.80 7,766.41 0.80 7,766.41 80.00% 0.20 1,941.60
08.07 VARIOS
08.07.01 BANCA DE METAL C/LISTONES DE MADERA und 26.00 205.08 5,332.08 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 26.00 5,332.08
08.07.02 SEMBRADO DE ARBOLES Y PLANTAS ORNAMENTA und 20.00 45.87 917.40 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 20.00 917.40
08.07.03 SEMBRADO DE CACTARIO und 10.00 45.86 458.60 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 10.00 458.60
08.07.04 MITIGACION AMBIENTAL glb 1.00 2,460.00 2,460.00 0.50 1,230.00 0.40 984.00 0.90 2,214.00 90.00% 0.10 246.00
09 CAMINERIAS
09.01 TRABAJOS PRELIMINARES
09.01.01 TRAZO Y REPLANTEO PRELIMINAR m2 4,700.00 0.56 2,632.00 0.00 0.00 2,903.95 1,626.21 2,903.95 1,626.21 61.79% 1,796.05 1,005.79
09.01.02 LIMPIEZA DEL TERRENO MANUAL m2 4,700.00 0.37 1,739.00 0.00 0.00 4,700.00 1,739.00 4,700.00 1,739.00 100.00% 0.00 0.00
09.01.03 NIVELACION Y COMPACTADO C/EQUIPO m2 4,700.00 1.35 6,345.00 0.00 0.00 2,903.95 3,920.33 2,903.95 3,920.33 61.79% 1,796.05 2,424.67
09.02 OBRAS DE CONCRETO SIMPLE
09.02.01 SARDINELES SUMERG. E/VEREDAS C° F'C=140 KG/ m 500.00 49.37 24,685.00 0.00 0.00 410.00 20,241.70 410.00 20,241.70 82.00% 90.00 4,443.30
09.03 PISOS Y VEREDAS
09.03.01 VEREDAS DE CONCRETO F'C=140 KG/CM2, E=4" ( m2 1,392.00 58.29 81,139.68 0.00 0.00 727.89 42,428.71 727.89 42,428.71 52.29% 664.11 38,710.97
09.03.02 VEREDAS DE PIEDRA PORFIDO IRREGULAR Y CON m2 652.82 96.85 63,225.62 0.00 0.00 358.23 34,694.58 358.23 34,694.58 54.87% 294.59 28,531.04
09.04 VARIOS
09.04.01 ASTA DE BANDERA TIPICO pza 3.00 1,241.57 3,724.71 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 3.00 3,724.71
09.04.02 BASUREROS BASCULANTES DE LAMINA DE FIBRA und 16.00 82.00 1,312.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 16.00 1,312.00
LOSAS MULTIDEPORTIVA Y DE FULBITO
10 LOSA MULTIDEPORTIVA
10.01 TRABAJOS PRELIMINARES
10.01.01 TRAZO Y REPLANTEO GRADERIAS Y LOSA m2 887.00 1.95 1,729.65 887.00 1,729.65 0.00 0.00 887.00 1,729.65 100.00% 0.00 0.00
10.01.02 LIMPIEZA DEL TERRENO CON MAQUINARIA PESAD m3 177.40 0.61 108.21 177.40 108.21 0.00 0.00 177.40 108.21 100.00% 0.00 0.00
10.02.02 RELLENO COMP. CON EQUIPO MAT. PROPIO HASTA m3 2.50 49.48 123.70 2.50 123.70 0.00 0.00 2.50 123.70 100.00% 0.00 0.00
10.02.03 ACARREO INTERNO DE MATERIAL EXCEDENTE CON m3 30.00 42.71 1,281.30 30.00 1,281.30 0.00 0.00 30.00 1,281.30 100.00% 0.00 0.00
10.02.04 NIVELACION Y COMPACTADO C/EQUIPO m2 887.00 1.35 1,197.45 887.00 1,197.45 0.00 0.00 887.00 1,197.45 100.00% 0.00 0.00
10.03.02 ZAPATAS-CONCRETO F'C=175 KG/CM2 m3 4.00 294.35 1,177.40 0.00 0.00 4.00 1,177.40 4.00 1,177.40 100.00% 0.00 0.00
10.03.03 CONCRETO F'C=140 KG/CM2 EN GRADERIAS + 50% m3 55.00 157.30 8,651.50 55.00 8,651.50 0.00 0.00 55.00 8,651.50 100.00% 0.00 0.00
10.03.04 PISO DE CONCRETO F'C=140KG/CM2 E=12 CMS E m2 725.00 56.83 41,201.75 600.00 34,098.00 0.00 0.00 600.00 34,098.00 82.76% 125.00 7,103.75
10.04.02 COLUMNAS Y PLACAS, ENCOFRADO Y DESENCOF m2 5.00 57.89 289.45 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 5.00 289.45
10.04.03 COLUMNAS Y PLACAS-ACERO F'y:4200kg/cm2 kg 270.00 5.05 1,363.50 0.00 0.00 270.00 1,363.50 270.00 1,363.50 100.00% 0.00 0.00
10.05 REVOQUES Y ENLUCIDOS
10.05.01 TARRAJEO FROTACHADO DE COLUMNAS CON MORTE
m2 25.00 37.95 948.75 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 25.00 948.75
10.05.02 TARRAJEO EN GRADERIAS C:A 1:5 E=1.5 CM. m2 150.00 28.45 4,267.50 70.88 2,016.54 79.12 2,250.96 150.00 4,267.50 100.00% 0.00 0.00
10.06 PINTURA
10.06.01 PINTURA ESMALTE EN GRADERIAS m2 150.00 7.46 1,119.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 150.00 1,119.00
10.06.02 PINTURA ESMALTE EN COLUMNAS m2 25.00 7.46 186.50 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 25.00 186.50
10.06.03 PINTURA ESMALTE PARA LOSA DEPORTIVA m2 450.00 7.48 3,366.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 450.00 3,366.00
10.07 VARIOS
AVANCE
SALDO
Item DESCRIPCION AVANCE ANTERIOR AVANCE ACTUAL ACUMULADO %
Und Metrado Precio S/. Metrado Valoriz. S/. Metrado Valoriz. S/. Metrado Valoriz. S/. Metrado Valoriz. S/.
10.07.01 JUNTAS DE SEPARACION SISMICA TECKNOPOR E: m 50.00 5.80 290.00 19.20 111.36 0.00 0.00 19.20 111.36 38.40% 30.80 178.64
10.07.02 JUNTAS ASFALTICAS E=2.5 CMS m 250.00 5.53 1,382.50 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 250.00 1,382.50
10.07.03 ARCOS DE METAL LOSA MULTIDEPORTIVA und 2.00 1,230.00 2,460.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 2.00 2,460.00
10.08.02 VIGA PERIMETRAL pza 2.00 2,118.64 4,237.28 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 2.00 4,237.28
10.08.03 COLUMNAS T-1 TIPICAS pza 12.00 1,129.94 13,559.28 0.00 0.00 12.00 13,559.28 12.00 13,559.28 100.00% 0.00 0.00
10.08.04 ESTRUCTURA DE SOPORTE DE MALLA RASCHEL pza 5.00 847.46 4,237.30 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 5.00 4,237.30
10.08.05 MALLA RASCHEL pza 673.00 12.30 8,277.90 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 673.00 8,277.90
11 LOSA DE FULBITO
11.01 TRABAJOS PRELIMINARES
11.01.01 TRAZO Y REPLANTEO GRADERIAS Y LOSA m2 887.00 1.95 1,729.65 163.35 318.53 0.00 0.00 163.35 318.53 18.42% 723.65 1,411.12
11.01.02 LIMPIEZA DEL TERRENO CON MAQUINARIA PESAD m3 177.40 0.61 108.21 177.40 108.21 0.00 0.00 177.40 108.21 100.00% 0.00 0.00
11.02.02 RELLENO COMP. CON EQUIPO MAT. PROPIO HASTA m3 2.50 49.48 123.70 0.00 0.00 2.50 123.70 2.50 123.70 100.00% 0.00 0.00
11.02.03 ACARREO INTERNO DE MATERIAL EXCEDENTE CON m3 30.00 42.71 1,281.30 0.00 0.00 30.00 1,281.30 30.00 1,281.30 100.00% 0.00 0.00
11.02.04 NIVELACION Y COMPACTADO C/EQUIPO m2 887.00 1.35 1,197.45 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 887.00 1,197.45
11.03.03 CONCRETO F'C=140 KG/CM2 EN GRADERIAS + 50% m3 55.00 157.30 8,651.50 55.00 8,651.50 0.00 0.00 55.00 8,651.50 100.00% 0.00 0.00
11.04.03 COLUMNAS Y PLACAS-ACERO F'y:4200kg/cm2 kg 270.00 5.05 1,363.50 0.00 0.00 270.00 1,363.50 270.00 1,363.50 100.00% 0.00 0.00
11.05.02 TARRAJEO EN GRADERIAS C:A 1:5 E=1.5 CM. m2 150.00 28.45 4,267.50 0.00 0.00 150.00 4,267.50 150.00 4,267.50 100.00% 0.00 0.00
11.06 PINTURA
11.06.01 PINTURA ESMALTE EN GRADERIAS m2 150.00 7.46 1,119.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 150.00 1,119.00
11.06.02 PINTURA ESMALTE EN COLUMNAS m2 25.00 7.46 186.50 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 25.00 186.50
11.07 PAVIMENTOS
11.07.01 CESPED ARTIFICIAL MONOFILAMENTO CONCAVO C m2 725.76 31.45 22,825.15 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 725.76 22,825.15
11.08 VARIOS
11.08.01 JUNTAS DE SEPARACION SISMICA TECKNOPOR E: m 50.00 5.80 290.00 50.00 290.00 0.00 0.00 50.00 290.00 100.00% 0.00 0.00
11.08.02 ARCOS DE METAL FULBITO und 2.00 820.00 1,640.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 2.00 1,640.00
11.09.02 VIGA PERIMETRAL pza 2.00 2,118.64 4,237.28 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 2.00 4,237.28
11.09.03 COLUMNAS T-1 TIPICAS pza 12.00 1,129.94 13,559.28 0.00 0.00 12.00 13,559.28 12.00 13,559.28 100.00% 0.00 0.00
11.09.04 ESTRUCTURA DE SOPORTE DE MALLA RASCHEL pza 5.00 847.46 4,237.30 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 5.00 4,237.30
11.09.05 MALLA RASCHEL pza 673.00 12.30 8,277.90 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 673.00 8,277.90
12.01.02 TRAZO Y REPLANTEO PRELIMINAR m2 126.00 0.56 70.56 126.00 70.56 0.00 0.00 126.00 70.56 100.00% 0.00 0.00
12.02 MOVIMIENTO DE TIERRAS
12.02.01 EXCAVACION DE ZANJAS H:1.20 m3 50.00 57.81 2,890.50 50.00 2,890.50 0.00 0.00 50.00 2,890.50 100.00% 0.00 0.00
12.02.02 RELLENO COMP. CON EQUIPO MAT. PROPIO HASTA m3 5.00 49.48 247.40 5.00 247.40 0.00 0.00 5.00 247.40 100.00% 0.00 0.00
12.02.03 ACARREO INTERNO DE MATERIAL EXCEDENTE CON m3 45.00 42.71 1,921.95 45.00 1,921.95 0.00 0.00 45.00 1,921.95 100.00% 0.00 0.00
12.02.04 NIVELACION Y COMPACTADO C/EQUIPO m2 125.00 1.35 168.75 125.00 168.75 0.00 0.00 125.00 168.75 100.00% 0.00 0.00
12.03 OBRAS DE CONCRETO SIMPLE
12.03.01 CIMIENTOS CORRIDOS MEZCLA 1:10 CEMENTO-HORM
m3 50.00 240.10 12,005.00 50.00 12,005.00 0.00 0.00 50.00 12,005.00 100.00% 0.00 0.00
12.03.02 SOBRECIMIENTOS CONCRETO F´C=210 KG/CM2 m3 10.00 393.13 3,931.30 10.00 3,931.30 0.00 0.00 10.00 3,931.30 100.00% 0.00 0.00
12.03.03 SOBRECIMIENTOS - ENCOFRADO Y DESENCOFRA m2 25.00 40.35 1,008.75 25.00 1,008.75 0.00 0.00 25.00 1,008.75 100.00% 0.00 0.00
12.03.04 FALSO PISO DE 4" DE CONCRETO 1:8 m2 125.00 76.15 9,518.75 125.00 9,518.75 0.00 0.00 125.00 9,518.75 100.00% 0.00 0.00
12.03.05 SARDINELES SUMERG. E/VEREDAS C° F'C=140 KG/ m 64.00 49.37 3,159.68 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 64.00 3,159.68
12.03.06 ENCOFRADO Y DESENCOFRADO NORMAL SARDIN m2 10.00 19.64 196.40 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 10.00 196.40
12.04.02 COLUMNAS Y PLACAS, ENCOFRADO Y DESENCOF m2 50.00 57.89 2,894.50 50.00 2,894.50 0.00 0.00 50.00 2,894.50 100.00% 0.00 0.00
12.04.03 COLUMNAS Y PLACAS- ACERO F'Y:4200KG/CM2 m3 2,070.00 5.05 10,453.50 2,070.00 10,453.50 0.00 0.00 2,070.00 10,453.50 100.00% 0.00 0.00
12.04.04 VIGAS - ACERO F'Y:4200KG/CM2 kg 647.80 5.05 3,271.39 647.80 3,271.39 0.00 0.00 647.80 3,271.39 100.00% 0.00 0.00
12.04.05 VIGAS CONCRETO F'C=210 KG/CM2 m3 10.00 457.90 4,579.00 10.00 4,579.00 0.00 0.00 10.00 4,579.00 100.00% 0.00 0.00
12.04.06 VIGAS-ENCOFRADO Y DESENCOFRADO m2 25.00 62.73 1,568.25 25.00 1,568.25 0.00 0.00 25.00 1,568.25 100.00% 0.00 0.00
12.04.07 LOSA ALIGERADA- LADRILLO HUECO 15x30x30 und 1,249.00 4.14 5,170.86 1,149.70 4,759.77 99.30 411.10 1,249.00 5,170.87 100.00% 0.00 -0.01
12.04.08 LOSAALIGERADA-ACERO F'y:4200kg/cm2 kg 464.71 5.12 2,379.32 464.71 2,379.32 0.00 0.00 464.71 2,379.32 100.00% 0.00 0.00
12.04.09 LOSAS ALIGERADAS CONCRETO F'C=210 KG/CM2 m3 20.00 383.31 7,666.20 20.00 7,666.20 0.00 0.00 20.00 7,666.20 100.00% 0.00 0.00
12.04.10 LOSA ALIGERADA-ENCOFRADO Y DESENCOFRAD m2 125.00 49.10 6,137.50 125.00 6,137.50 0.00 0.00 125.00 6,137.50 100.00% 0.00 0.00
12.06.02 TARRAJEO EN MUROS INTERIORES C:A 1:5 E=1.5 m2 50.00 28.45 1,422.50 50.00 1,422.50 0.00 0.00 50.00 1,422.50 100.00% 0.00 0.00
12.07.02 PISO CERAMICO ANTIDESLIZANTE COLOR CREMA m2 125.00 57.51 7,188.75 0.00 0.00 125.00 7,188.75 125.00 7,188.75 100.00% 0.00 0.00
12.09.02 JUNTAS DE DILATACION EN PATIOS Y VEREDAS C/M m 10.00 5.53 55.30 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 10.00 55.30
12.09.03 JUNTAS DE SEPARACION SISMICA TECKNOPOR E: m 10.00 5.80 58.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 10.00 58.00
12.10 CONTRAZOCALOS
12.10.01 CONTRAZÓCALO CERÁMICO, h=20cm m 50.00 18.00 900.00 0.00 0.00 50.00 900.00 50.00 900.00 100.00% 0.00 0.00
12.11 ZOCALOS
12.11.01 ZOCALO DE CERAMICA 30 X 30 cm DE 1ERA m2 100.00 83.61 8,361.00 0.00 0.00 100.00 8,361.00 100.00 8,361.00 100.00% 0.00 0.00
AVANCE
SALDO
Item DESCRIPCION AVANCE ANTERIOR AVANCE ACTUAL ACUMULADO %
Und Metrado Precio S/. Metrado Valoriz. S/. Metrado Valoriz. S/. Metrado Valoriz. S/. Metrado Valoriz. S/.
12.11.02 ZOCALO DE SILLAR 0.30X0.20 M m2 100.00 80.49 8,049.00 0.00 0.00 100.00 8,049.00 100.00 8,049.00 100.00% 0.00 0.00
12.11.03 SARDINEL EN DUCHA REVEST. CON CERAMICO VIT m 8.00 141.05 1,128.40 0.00 0.00 8.00 1,128.40 8.00 1,128.40 100.00% 0.00 0.00
12.12.02 VENTANA DE MARCO DE CEDRO TIPO-1 (0.60 X 0.6 und 18.00 260.46 4,688.28 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 18.00 4,688.28
12.12.03 BANCA DE MADERA L=1.50 M und 2.00 205.08 410.16 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 2.00 410.16
12.13 VARIOS
12.13.01 DIVISIONES DE MELAMINE INCLUYE PUERTA PARA und 6.00 490.12 2,940.72 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 6.00 2,940.72
12.13.02 CASILLEROS METALICOS und 2.00 205.00 410.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 2.00 410.00
12.13.03 SEÑAL TIPO PARED (0.25x 0.40) SS.HH. Y VESTIDO und 4.00 123.00 492.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 4.00 492.00
12.14 CERRAJERIA
12.14.01 CERRADURA PARA PUERTA PRINCIPAL PESADA pza 4.00 129.83 519.32 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 4.00 519.32
12.14.02 BISAGRA CAPUCHINA ALUMINIZADA 4"x4" pza 16.00 19.41 310.56 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 16.00 310.56
12.14.03 CERROJO DE 3" ALUMINIZADO PARA PUERTA pza 10.00 7.49 74.90 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 10.00 74.90
12.15.02 ESPEJO DE PARED 3.16 X 0.90 M MARCO DE ALUM und 4.00 82.00 328.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 4.00 328.00
12.16 PINTURA
12.16.01 PINTURA LATEX EN CIELO RASO 2 MANOS m2 120.00 14.25 1,710.00 0.00 0.00 120.00 1,710.00 120.00 1,710.00 100.00% 0.00 0.00
12.16.02 PINTURA OLEO MATE EN MUROS m2 100.00 20.70 2,070.00 0.00 0.00 100.00 2,070.00 100.00 2,070.00 100.00% 0.00 0.00
12.17.02 INODORO TIPO S-1 pza 10.00 309.39 3,093.90 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 10.00 3,093.90
12.17.03 URINARIO TIPO S-3 pza 7.00 329.84 2,308.88 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 7.00 2,308.88
12.17.04 MEZCLADORA 8" EMPOTRADA PARA DUCHA S-4 pza 16.00 272.22 4,355.52 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 16.00 4,355.52
12.17.05 PAPELERA DE CERAMICA BLANCA DE 12 X 10 X 10 C pza 10.00 28.77 287.70 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 10.00 287.70
12.17.06 JABONERA DE CERAMICA BLANCA S-6 pza 8.00 28.77 230.16 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 8.00 230.16
12.17.07 TOALLERA CERAMICA BLANCA P/SOBREPONER B pza 8.00 28.64 229.12 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 8.00 229.12
12.18.01.02 SALIDAS DE PVC SAL PARA DESAGUE DE 4 pto 10.00 261.22 2,612.20 10.00 2,612.20 0.00 0.00 10.00 2,612.20 100.00% 0.00 0.00
12.18.01.03 SALIDAS DE PVC SAL PARA VENTILACION D pto 2.00 97.46 194.92 2.00 194.92 0.00 0.00 2.00 194.92 100.00% 0.00 0.00
12.18.02.02 TUBERIA PVC SAP D=4" m 70.00 32.29 2,260.30 55.50 1,792.10 14.50 468.21 70.00 2,260.30 100.00% 0.00 0.00
12.18.02.03 MONTANTE DE VENTILACION DE PVC 2" m 6.00 21.90 131.40 6.00 131.40 0.00 0.00 6.00 131.40 100.00% 0.00 0.00
12.18.02.04 MONTANTE PVC-SAP 2" m 6.00 21.90 131.40 6.00 131.40 0.00 0.00 6.00 131.40 100.00% 0.00 0.00
12.18.02.05 MONTANTE PVC-SAP 4" m 6.00 32.29 193.74 6.00 193.74 0.00 0.00 6.00 193.74 100.00% 0.00 0.00
12.18.03 REDES COLECTORAS Y DE DESCARGA
12.18.03.01 TRAZO Y REPLANTEO DE RED DE DESAGU m 50.00 3.91 195.50 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 50.00 195.50
12.18.03.02 EXCAVACION DE ZANJAS PARA REDES SANI m 50.00 9.64 482.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 50.00 482.00
12.18.03.03 REFINE Y NIVELACION DE ZANJAS EN T m 50.00 2.10 105.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 50.00 105.00
12.18.03.04 CAMA DE ARENA h=0.10 m2 50.00 5.49 274.50 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 50.00 274.50
12.18.03.05 RELLENO COMPACTADO C/EQUIPO, MATERI m 50.00 23.90 1,195.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 50.00 1,195.00
12.18.03.06 TUBERIA COLECTORA DE DESAGUE PVC SA m 50.00 32.29 1,614.50 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 50.00 1,614.50
12.18.03.07 TUBERIA DE DRENAJE DE LLUVIAS DE PVC m 10.00 36.60 366.00 10.00 366.00 0.00 0.00 10.00 366.00 100.00% 0.00 0.00
12.18.04.02 REGISTRO DE BRONCE 4" PROVISION Y und 5.00 57.63 288.15 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 5.00 288.15
12.19.02.02 TUBERIA PVC CLASE 10 - 3/4" m 25.00 75.57 1,889.25 25.00 1,889.25 0.00 0.00 25.00 1,889.25 100.00% 0.00 0.00
12.19.03 VALVULAS
12.19.03.01 VALVULAS DE COMPUERTA DE BRONCE DE pza 5.00 85.90 429.50 5.00 429.50 0.00 0.00 5.00 429.50 100.00% 0.00 0.00
12.19.03.02 VALVULAS DE COMPUERTA DE BRONCE DE pza 2.00 109.22 218.44 2.00 218.44 0.00 0.00 2.00 218.44 100.00% 0.00 0.00
12.20.01.02 SALIDAS DE ALUMBRADO DE TECHO (CABLEpto 10.00 122.66 1,226.60 10.00 1,226.60 0.00 0.00 10.00 1,226.60 100.00% 0.00 0.00
12.20.06.02 CONDUCTOR THW 2-1X4MM2(2X20 A) m 25.00 5.87 146.75 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 25.00 146.75
12.20.09.02 ARTEFACTO WALL SOCKET DE PORCELANA und 8.00 104.18 833.44 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 8.00 833.44
12.20.09.03 ARTEFACTO SPOT LIHGTH ALUMINIO (INC und 4.00 57.67 230.68 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 4.00 230.68
AVANCE
SALDO
Item DESCRIPCION AVANCE ANTERIOR AVANCE ACTUAL ACUMULADO %
Und Metrado Precio S/. Metrado Valoriz. S/. Metrado Valoriz. S/. Metrado Valoriz. S/. Metrado Valoriz. S/.
CAMPO DEPORTIVO DE FUTBOL
13 GRADERIAS
13.01 TRABAJOS PRELIMINARES
13.01.01 TRAZO Y REPLANTEO GRADERIAS Y LOSA m2 700.00 1.95 1,365.00 700.00 1,365.00 0.00 0.00 700.00 1,365.00 100.00% 0.00 0.00
13.01.02 LIMPIEZA DEL TERRENO MANUAL m2 700.00 0.37 259.00 700.00 259.00 0.00 0.00 700.00 259.00 100.00% 0.00 0.00
13.02 MOVIMIENTO DE TIERRAS
13.02.01 EXCAVACION DE ZANJAS H:1.20 m3 216.00 57.81 12,486.96 216.00 12,486.96 0.00 0.00 216.00 12,486.96 100.00% 0.00 0.00
13.02.02 RELLENO COMP. CON EQUIPO MAT. PROPIO HASTA H:1.20 MTS. m3 66.00 49.48 3,265.68 66.00 3,265.68 0.00 0.00 66.00 3,265.68 100.00% 0.00 0.00
13.02.03 ACARREO INTERNO DE MATERIAL EXCEDENTE CON CARRETILLA m3 150.00 42.71 6,406.50 150.00 6,406.50 0.00 0.00 150.00 6,406.50 100.00% 0.00 0.00
D=30 M.
13.03 OBRAS DE CONCRETO SIMPLE
13.03.01 SOLADO PARA ZAPATAS E= 2" MEZCLA 1:12 CEMENTO:HORMIGON m2 135.00 23.57 3,181.95 135.00 3,181.95 0.00 0.00 135.00 3,181.95 100.00% 0.00 0.00
13.03.02 CONCRETO F'C=140 KG/CM2 EN GRADERIAS + 50% DE PM m3 270.00 157.30 42,471.00 270.00 42,471.00 0.00 0.00 270.00 42,471.00 100.00% 0.00 0.00
13.03.03 CIMIENTOS CORRIDOS MEZCLA 1:10 CEMENTO-HORMIGON+30% P.G. m3 86.70 240.10 20,816.67 86.70 20,816.67 0.00 0.00 86.70 20,816.67 100.00% 0.00 0.00
f'c:100kg/cm2
13.03.04 SOBRECIMIENTOS CONCRETO F´C=175 KG/CM2 m3 19.86 432.91 8,597.59 19.86 8,597.59 0.00 0.00 19.86 8,597.59 100.00% 0.00 0.00
13.03.05 SOBRECIMIENTOS - ENCOFRADO Y DESENCOFRADO m2 10.00 40.35 403.50 10.00 403.50 0.00 0.00 10.00 403.50 100.00% 0.00 0.00
13.04 OBRAS DE CONCRETO ARMADO
13.04.01 ZAPATAS -ACERO F'y:4200kg/cm2 kg 2,672.42 5.05 13,495.72 2,672.42 13,495.72 0.00 0.00 2,672.42 13,495.72 100.00% 0.00 0.00
13.04.02 ZAPATAS-CONCRETO F'C=210 KG/CM2 m3 81.00 454.29 36,797.49 81.00 36,797.49 0.00 0.00 81.00 36,797.49 100.00% 0.00 0.00
13.04.03 MURO DE CONTENCION -ACERO F'y:4200kg/cm2 kg 7,358.70 5.05 37,161.44 7,358.70 37,161.44 0.00 0.00 7,358.70 37,161.44 100.00% 0.00 0.00
13.04.04 MURO DE CONTENCION- CONCRETO F'C=210 KG/CM2 m3 93.42 462.99 43,252.53 93.42 43,252.53 0.00 0.00 93.42 43,252.53 100.00% 0.00 0.00
13.04.05 MURO DE CONTENCION- ENCOFRADO Y DESENCOFRADO m2 50.00 48.34 2,417.00 50.00 2,417.00 0.00 0.00 50.00 2,417.00 100.00% 0.00 0.00
13.04.06 COLUMNAS Y PLACAS CONCRETO F'C=210 KG/CM2 m3 13.20 582.29 7,686.23 13.20 7,686.23 0.00 0.00 13.20 7,686.23 100.00% 0.00 0.00
13.04.07 COLUMNAS Y PLACAS, ENCOFRADO Y DESENCOFRADO m2 10.00 57.89 578.90 10.00 578.90 0.00 0.00 10.00 578.90 100.00% 0.00 0.00
13.04.08 COLUMNAS Y PLACAS-ACERO F'y:4200kg/cm2 kg 3,395.30 5.05 17,146.27 3,395.30 17,146.27 0.00 0.00 3,395.30 17,146.27 100.00% 0.00 0.00
13.05 REVOQUES Y ENLUCIDOS
13.05.01 TARRAJEO FROTACHADO DE COLUMNAS CON MORTERO C:A 1:5 m2 150.00 37.95 5,692.50 150.00 5,692.50 0.00 0.00 150.00 5,692.50 100.00% 0.00 0.00
E=1.5 CM.
13.05.02 TARRAJEO EN GRADERIAS C:A 1:5 E=1.5 CM. m2 1,113.00 28.45 31,664.85 1,113.00 31,664.85 0.00 0.00 1,113.00 31,664.85 100.00% 0.00 0.00
13.06 ZOCALOS
13.06.01 ZOCALO DE SILLAR EN FACHADA PRINCIPAL 0.30X0.20 M m2 150.00 50.81 7,621.50 0.00 0.00 150.00 7,621.50 150.00 7,621.50 100.00% 0.00 0.00
13.07 PINTURA
13.07.01 PINTURA ESMALTE EN GRADERIAS m2 1,113.00 7.46 8,302.98 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 1,113.00 8,302.98
13.07.02 PINTURA ESMALTE EN COLUMNAS m2 150.00 7.46 1,119.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 150.00 1,119.00
13.08 VARIOS
13.08.01 JUNTAS DE SEPARACION SISMICA TECKNOPOR E: 1" m 50.00 5.80 290.00 50.00 290.00 0.00 0.00 50.00 290.00 100.00% 0.00 0.00
14 CARPINTERIA METALICA
14.01 TIJERALES
14.01.01 TIJERAL TIPO 01 L=5.20 M und 44.00 482.58 21,233.52 44.00 21,233.52 0.00 0.00 44.00 21,233.52 100.00% 0.00 0.00
14.01.02 CORREA TUBO RECTANGULAR 80X40X1.5MM L=6.00M m 900.00 34.49 31,041.00 900.00 31,041.00 0.00 0.00 900.00 31,041.00 100.00% 0.00 0.00
14.01.03 COBERTURA PLANCHA DE ETERNIT OPACA COLOR VERDE E=2MM m2 900.00 26.72 24,048.00 900.00 24,048.00 0.00 0.00 900.00 24,048.00 100.00% 0.00 0.00
14.02 CERCO METALICO
14.02.01 MALLA GALV. 2"X2" (PANEL 3.00 X1.50 MTS.) INC. INST. und 92.00 400.28 36,825.76 85.00 34,023.80 7.00 2,801.96 92.00 36,825.76 100.00% 0.00 0.00
14.02.02 MALLA GALV. 2"X2" (PANEL 2.00X2.00 TIPO A) INC. INST. und 78.00 441.38 34,427.64 39.00 17,213.82 39.00 17,213.82 78.00 34,427.64 100.00% 0.00 0.00
14.02.03 PUERTA METALICA (3.50 X 2.40) INCLUYE INSTALACION und 1.00 1,450.64 1,450.64 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 1.00 1,450.64
14.02.04 PUERTA METALICA (1.20X2.40) INCLUYE INSTALACION und 4.00 250.00 1,000.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 4.00 1,000.00
14.03 POSTE METALICOS ILUMINACION
14.03.01 POSTES METALICOS PARA ILUMINACION 6" Y 9MTS DE ALTURA und 6.00 2,065.73 12,394.38 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 6.00 12,394.38
INC/INSTALACION
15 SS.HH. Y VESTIDORES DAMAS Y VARONES
AVANCE
SALDO
Item DESCRIPCION AVANCE ANTERIOR AVANCE ACTUAL ACUMULADO %
Und Metrado Precio S/. Metrado Valoriz. S/. Metrado Valoriz. S/. Metrado Valoriz. S/. Metrado Valoriz. S/.
15.01 TRABAJOS PRELIMINARES
15.01.01 LIMPIEZA DEL TERRENO MANUAL m2 200.00 0.37 74.00 200.00 74.00 0.00 0.00 200.00 74.00 100.00% 0.00 0.00
15.01.02 TRAZO Y REPLANTEO PRELIMINAR m2 200.00 0.56 112.00 200.00 112.00 0.00 0.00 200.00 112.00 100.00% 0.00 0.00
15.01.03 TRASLADO DE MATERIALES HERRAMIENTAS Y EQUIPO glb 1.00 2,000.00 2,000.00 1.00 2,000.00 0.00 0.00 1.00 2,000.00 100.00% 0.00 0.00
15.02 MOVIMIENTO DE TIERRAS
15.02.01 EXCAVACION DE ZANJAS H:1.20 m3 60.00 57.81 3,468.60 60.00 3,468.60 0.00 0.00 60.00 3,468.60 100.00% 0.00 0.00
15.02.02 RELLENO COMP. CON EQUIPO MAT. PROPIO HASTA H:1.20 MTS. m3 5.00 49.48 247.40 5.00 247.40 0.00 0.00 5.00 247.40 100.00% 0.00 0.00
15.02.03 ACARREO INTERNO DE MATERIAL EXCEDENTE CON CARRETILLA m3 55.00 42.71 2,349.05 55.00 2,349.05 0.00 0.00 55.00 2,349.05 100.00% 0.00 0.00
D=30 M.
15.03 OBRAS DE CONCRETO SIMPLE
15.03.01 SOLADO PARA ZAPATAS E= 2" MEZCLA 1:12 CEMENTO:HORMIGON m2 58.00 23.57 1,367.06 58.00 1,367.06 0.00 0.00 58.00 1,367.06 100.00% 0.00 0.00
15.03.02 CIMIENTOS CORRIDOS MEZCLA 1:10 CEMENTO-HORMIGON+30% P.G. m3 57.42 240.10 13,786.54 57.42 13,786.54 0.00 0.00 57.42 13,786.54 100.00% 0.00 0.00
f'c:100kg/cm2
15.03.03 SOBRECIMIENTOS CONCRETO F´C=210 KG/CM2 m3 10.20 393.13 4,009.93 10.20 4,009.93 0.00 0.00 10.20 4,009.93 100.00% 0.00 0.00
15.03.04 SOBRECIMIENTOS - ENCOFRADO Y DESENCOFRADO m2 50.00 40.35 2,017.50 50.00 2,017.50 0.00 0.00 50.00 2,017.50 100.00% 0.00 0.00
15.03.05 FALSO PISO E:10 CMS CONCRETO 1:8 m2 188.00 76.15 14,316.20 188.00 14,316.20 0.00 0.00 188.00 14,316.20 100.00% 0.00 0.00
15.03.06 SARDINELES SUMERG. E/VEREDAS C° F'C=140 KG/CM2 (15X25) ACAB. m 100.00 49.37 4,937.00 100.00 4,937.00 0.00 0.00 100.00 4,937.00 100.00% 0.00 0.00
FROTACH.
15.03.07 ENCOFRADO Y DESENCOFRADO NORMAL SARDINELES m2 20.00 19.64 392.80 20.00 392.80 0.00 0.00 20.00 392.80 100.00% 0.00 0.00
15.04 OBRAS DE CONCRETO ARMADO
15.04.01 COLUMNAS Y PLACAS CONCRETO F'C=210 KG/CM2 m3 9.00 454.29 4,088.61 9.00 4,088.61 0.00 0.00 9.00 4,088.61 100.00% 0.00 0.00
15.04.02 COLUMNAS Y PLACAS, ENCOFRADO Y DESENCOFRADO m2 50.00 57.89 2,894.50 50.00 2,894.50 0.00 0.00 50.00 2,894.50 100.00% 0.00 0.00
15.04.03 COLUMNAS Y PLACAS-ACERO F'y:4200kg/cm2 kg 2,070.00 5.05 10,453.50 2,070.00 10,453.50 0.00 0.00 2,070.00 10,453.50 100.00% 0.00 0.00
15.04.04 VIGAS - ACERO F'Y:4200KG/CM2 m3 1,099.54 5.05 5,552.68 1,099.54 5,552.68 0.00 0.00 1,099.54 5,552.68 100.00% 0.00 0.00
15.04.05 VIGAS CONCRETO F'C=210 KG/CM2 m3 10.00 457.90 4,579.00 10.00 4,579.00 0.00 0.00 10.00 4,579.00 100.00% 0.00 0.00
15.04.06 VIGAS-ENCOFRADO Y DESENCOFRADO m2 25.00 62.73 1,568.25 25.00 1,568.25 0.00 0.00 25.00 1,568.25 100.00% 0.00 0.00
15.04.07 LOSA ALIGERADA- LADRILLO HUECO 15x30x30 und 1,249.50 4.14 5,172.93 1,249.50 5,172.93 0.00 0.00 1,249.50 5,172.93 100.00% 0.00 0.00
15.04.08 LOSAALIGERADA-ACERO F'y:4200kg/cm2 kg 711.35 5.12 3,642.11 711.35 3,642.11 0.00 0.00 711.35 3,642.11 100.00% 0.00 0.00
15.04.09 LOSAS ALIGERADAS CONCRETO F'C=210 KG/CM2 m3 20.00 383.31 7,666.20 20.00 7,666.20 0.00 0.00 20.00 7,666.20 100.00% 0.00 0.00
15.04.10 LOSA ALIGERADA-ENCOFRADO Y DESENCOFRADO m2 188.00 49.10 9,230.80 188.00 9,230.80 0.00 0.00 188.00 9,230.80 100.00% 0.00 0.00
15.05 MUROS Y TABIQUES DE ALBAÑILERIA
15.05.01 MUROS DE LADRILLO KK TIPO IV 8x14x24 DE SOGA C/M 1:1:4 X 1.5 CM. m2 260.00 113.34 29,468.40 260.00 29,468.40 0.00 0.00 260.00 29,468.40 100.00% 0.00 0.00
15.06 REVOQUES Y ENLUCIDOS
15.06.01 TARRAJEO EN MUROS EXTERIORES C:A 1:5 E=1.5 CM. m2 260.00 30.71 7,984.60 260.00 7,984.60 0.00 0.00 260.00 7,984.60 100.00% 0.00 0.00
15.06.02 TARRAJEO EN MUROS INTERIORES C:A 1:5 E=1.5 CM. m2 100.00 28.45 2,845.00 100.00 2,845.00 0.00 0.00 100.00 2,845.00 100.00% 0.00 0.00
15.06.03 TARRAJEO FROTACHADO DE COLUMNAS CON MORTERO C:A 1:5 m2 50.00 37.95 1,897.50 50.00 1,897.50 0.00 0.00 50.00 1,897.50 100.00% 0.00 0.00
E=1.5 CM.
15.06.04 TARRAJEO FROTACHADO DE VIGAS CON MORTERO C:A 1:5 E=1.5 CM. m2 50.00 45.89 2,294.50 50.00 2,294.50 0.00 0.00 50.00 2,294.50 100.00% 0.00 0.00
15.06.05 TARRAJEO PRIMARIO MORTERO C:A 1:5 m2 100.00 29.30 2,930.00 100.00 2,930.00 0.00 0.00 100.00 2,930.00 100.00% 0.00 0.00
15.07 PISOS Y PAVIMENTOS 0.00
15.07.01 CONTRAPISO DE 48 MM m2 188.00 39.65 7,454.20 188.00 7,454.20 0.00 0.00 188.00 7,454.20 100.00% 0.00 0.00
15.07.02 PISO CERAMICO ANTIDESLIZANTE COLOR CREMA 45 X45 m2 188.00 57.51 10,811.88 188.00 10,811.88 0.00 0.00 188.00 10,811.88 100.00% 0.00 0.00
15.08 CIELO RASOS
15.08.01 TARRAJEO EN CIELOS RASOS C:A 1:5 E=1.5 CM m2 188.00 35.27 6,630.76 188.00 6,630.76 0.00 0.00 188.00 6,630.76 100.00% 0.00 0.00
15.09 JUNTAS Y SELLOS
15.09.01 JUNTA DE DILATACION CON ESPUMA PLASTICA + JEBE MICROPOROSO m 10.00 15.29 152.90 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 10.00 152.90
15.09.02 JUNTAS DE DILATACION EN PATIOS Y VEREDAS C/MORTERO ASFAL. m 50.00 5.53 276.50 50.00 276.50 0.00 0.00 50.00 276.50 100.00% 0.00 0.00
3/4"x4"
15.09.03 JUNTAS DE SEPARACION SISMICA TECKNOPOR E: 1" m 50.00 5.80 290.00 50.00 290.00 0.00 0.00 50.00 290.00 100.00% 0.00 0.00
15.10 CONTRAZOCALOS
15.10.01 CONTRAZÓCALO CERÁMICO, h=20cm m 100.00 18.00 1,800.00 100.00 1,800.00 0.00 0.00 100.00 1,800.00 100.00% 0.00 0.00
15.11 ZOCALOS
AVANCE
SALDO
Item DESCRIPCION AVANCE ANTERIOR AVANCE ACTUAL ACUMULADO %
Und Metrado Precio S/. Metrado Valoriz. S/. Metrado Valoriz. S/. Metrado Valoriz. S/. Metrado Valoriz. S/.
15.11.01 ZOCALO DE CERAMICA 30 X 30 cm DE 1ERA m2 100.00 83.61 8,361.00 100.00 8,361.00 0.00 0.00 100.00 8,361.00 100.00% 0.00 0.00
15.11.02 ZOCALO DE SILLAR 0.30X0.20 M m2 113.00 80.49 9,095.37 113.00 9,095.37 0.00 0.00 113.00 9,095.37 100.00% 0.00 0.00
15.11.03 SARDINEL EN DUCHA REVEST. CON CERAMICO VITRIFICADO m 12.00 141.05 1,692.60 12.00 1,692.60 0.00 0.00 12.00 1,692.60 100.00% 0.00 0.00
15.12 CARPINTERIA DE MADERA
15.12.01 PUERTA DE CEDRO TABLERO REBAJADO TIPO-1 (1.00 X 2.40) und 6.00 1,237.19 7,423.14 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 6.00 7,423.14
15.12.02 VENTANA DE MARCO DE CEDRO TIPO-1 (0.60 X 0.60 CMS) und 34.00 260.46 8,855.64 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 34.00 8,855.64
15.12.03 BANCA DE MADERA L=1.50 M und 3.00 205.08 615.24 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 3.00 615.24
15.13 VARIOS
15.13.01 DIVISIONES DE MELAMINE INCLUYE PUERTA PARA SERVICIOS und 12.00 490.12 5,881.44 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 12.00 5,881.44
HIGIENICOS
15.13.02 CASILLEROS METALICOS und 2.00 205.00 410.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 2.00 410.00
15.13.03 SEÑAL TIPO PARED (0.25x 0.40) SS.HH. Y VESTIDORES und 4.00 123.00 492.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 4.00 492.00
15.14 CERRAJERIA
15.14.01 CERRADURA PARA PUERTA PRINCIPAL PESADA pza 6.00 129.83 778.98 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 6.00 778.98
15.14.02 BISAGRA CAPUCHINA ALUMINIZADA 4"x4" pza 24.00 19.41 465.84 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 24.00 465.84
15.14.03 CERROJO DE 3" ALUMINIZADO PARA PUERTA pza 16.00 7.49 119.84 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 16.00 119.84
15.15 VIDRIO, CRISTALES Y SIMILARES
15.15.01 VIDRIO INCOLORO SEMIDOBLE 6MM p2 50.00 5.16 258.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 50.00 258.00
15.15.02 ESPEJO DE PARED 3.16 X 0.90 M MARCO DE ALUMINIO 3CMS und 3.00 82.00 246.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 3.00 246.00
INC/INSTALACION
15.16 PINTURA
15.16.01 PINTURA LATEX EN CIELO RASO 2 MANOS m2 188.00 14.25 2,679.00 188.00 2,679.00 0.00 0.00 188.00 2,679.00 100.00% 0.00 0.00
15.16.02 PINTURA OLEO MATE EN MUROS m2 100.00 20.70 2,070.00 100.00 2,070.00 0.00 0.00 100.00 2,070.00 100.00% 0.00 0.00
15.17 APARATOS SANITARIOS
15.17.01 INODORO TIPO S-1 pza 16.00 309.39 4,950.24 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 16.00 4,950.24
15.17.02 LAVATORIO TIPO S-2 und 21.00 266.38 5,593.98 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 21.00 5,593.98
15.17.03 URINARIO TIPO S-3 pza 8.00 329.84 2,638.72 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 8.00 2,638.72
15.17.04 MEZCLADORA 8" EMPOTRADA PARA DUCHA S-4 pza 21.00 272.22 5,716.62 21.00 5,716.62 0.00 0.00 21.00 5,716.62 100.00% 0.00 0.00
15.17.05 PAPELERA DE CERAMICA BLANCA DE 12 X 10 X 10 CM. S-5 pza 16.00 28.77 460.32 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 16.00 460.32
15.17.06 JABONERA DE CERAMICA BLANCA S-6 pza 12.00 28.77 345.24 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 12.00 345.24
15.17.07 TOALLERA CERAMICA BLANCA P/SOBREPONER BUENA CALIDAD pza 12.00 28.64 343.68 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 12.00 343.68
15.18 SISTEMA DE DESAGUE
15.18.01 SALIDAS DE DESAGUE Y VENTILACION
15.18.01.01 SALIDAS DE PVC SAL PARA DESAGUE DE 2" pto 29.00 261.22 7,575.38 29.00 7,575.38 0.00 0.00 29.00 7,575.38 100.00% 0.00 0.00
15.18.01.02 SALIDAS DE PVC SAL PARA DESAGUE DE 4" pto 16.00 261.22 4,179.52 16.00 4,179.52 0.00 0.00 16.00 4,179.52 100.00% 0.00 0.00
15.18.01.03 SALIDAS DE PVC SAL PARA VENTILACION DE 2" pto 4.00 97.46 389.84 4.00 389.84 0.00 0.00 4.00 389.84 100.00% 0.00 0.00
15.18.02 TUBERIAS DE DISTRIBUCION - RAMALES Y MONTANTES
15.18.02.01 TUBERIA PVC SAP D=2" m 50.00 21.90 1,095.00 50.00 1,095.00 0.00 0.00 50.00 1,095.00 100.00% 0.00 0.00
15.18.02.02 TUBERIA PVC SAP D=4" m 70.00 32.29 2,260.30 70.00 2,260.30 0.00 0.00 70.00 2,260.30 100.00% 0.00 0.00
15.18.02.03 MONTANTE DE VENTILACION DE PVC 2" m 6.00 21.90 131.40 6.00 131.40 0.00 0.00 6.00 131.40 100.00% 0.00 0.00
15.18.02.04 MONTANTE PVC-SAP 2" m 6.00 21.90 131.40 6.00 131.40 0.00 0.00 6.00 131.40 100.00% 0.00 0.00
15.18.02.05 MONTANTE PVC-SAP 4" m 6.00 32.29 193.74 6.00 193.74 0.00 0.00 6.00 193.74 100.00% 0.00 0.00
15.18.03 REDES COLECTORAS Y DE DESCARGA
15.18.03.01 TRAZO Y REPLANTEO DE RED DE DESAGUE m 50.00 3.91 195.50 50.00 195.50 0.00 0.00 50.00 195.50 100.00% 0.00 0.00
15.18.03.02 EXCAVACION DE ZANJAS PARA REDES SANITARIAS (HASTA 1 M) m 50.00 9.64 482.00 50.00 482.00 0.00 0.00 50.00 482.00 100.00% 0.00 0.00
15.18.03.03 REFINE Y NIVELACION DE ZANJAS EN TERRENO NORMAL m 50.00 2.10 105.00 50.00 105.00 0.00 0.00 50.00 105.00 100.00% 0.00 0.00
15.18.03.04 CAMA DE ARENA h=0.10 m2 50.00 5.49 274.50 50.00 274.50 0.00 0.00 50.00 274.50 100.00% 0.00 0.00
15.18.03.05 RELLENO COMPACTADO C/EQUIPO, MATERIAL PROPIO Y AGUA m 50.00 23.90 1,195.00 50.00 1,195.00 0.00 0.00 50.00 1,195.00 100.00% 0.00 0.00
(HASTA 1 M)
15.18.03.06 TUBERIA COLECTORA DE DESAGUE PVC SAP 4" m 50.00 32.29 1,614.50 50.00 1,614.50 0.00 0.00 50.00 1,614.50 100.00% 0.00 0.00
AVANCE
SALDO
Item DESCRIPCION AVANCE ANTERIOR AVANCE ACTUAL ACUMULADO %
Und Metrado Precio S/. Metrado Valoriz. S/. Metrado Valoriz. S/. Metrado Valoriz. S/. Metrado Valoriz. S/.
15.18.03.07 TUBERIA DE DRENAJE DE LLUVIAS DE PVC C-25 DE 3" (P/BAJADA DE m 6.00 36.60 219.60 6.00 219.60 0.00 0.00 6.00 219.60 100.00% 0.00 0.00
LLUVIA)
15.18.04 ADITAMENTOS VARIOS
15.18.04.01 SUMIDERO DE BRONCE ROSCADO 2" und 12.00 39.92 479.04 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 12.00 479.04
15.18.04.02 REGISTRO DE BRONCE 4" PROVISION Y COLOCACION und 8.00 57.63 461.04 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 8.00 461.04
15.18.05 CAMARAS DE INSPECCION
15.18.05.01 CAJA DE REGISTRO DE 30 X 60 CMS C/TAPA DE CONCRETO und 2.00 237.27 474.54 2.00 474.54 0.00 0.00 2.00 474.54 100.00% 0.00 0.00
15.18.06 LIMPIEZA Y DESINFECCION
15.18.06.01 LIMPIEZA Y PRUEBAS HIDRAULICAS DE RED DE DESAGUE m 50.00 6.75 337.50 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 50.00 337.50
15.18.07 VARIOS
15.18.07.01 LIMPIEZA FINAL DE OBRA m2 16,450.00 0.22 3,619.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 16,450.00 3,619.00
15.18.07.02 BIODIGESTOR AUTOLIMPIABLE 1300 LTS und 1.00 1,062.00 1,062.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 1.00 1,062.00
15.18.07.03 MITIGACION AMBIENTAL glb 1.00 2,460.00 2,460.00 1.00 2,460.00 0.00 0.00 1.00 2,460.00 100.00% 0.00 0.00
15.19 SISTEMA DE AGUA FRIA
15.19.01 SALIDAS DE AGUA FRIA
15.19.01.01 SALIDA DE AGUA FRIA - PVC 1/2" (C-10) pto 45.00 126.07 5,673.15 45.00 5,673.15 0.00 0.00 45.00 5,673.15 100.00% 0.00 0.00
15.19.02 TUBERIA DE DISTRIBUCION AGUA FRIA
15.19.02.01 TUBERIA PVC CLASE 10 - 1/2" m 50.00 14.24 712.00 50.00 712.00 0.00 0.00 50.00 712.00 100.00% 0.00 0.00
15.19.02.02 TUBERIA PVC CLASE 10 - 3/4" m 50.00 75.57 3,778.50 50.00 3,778.50 0.00 0.00 50.00 3,778.50 100.00% 0.00 0.00
15.19.03 RED GENERAL DE DISTRIBUCION AGUA FRIA
15.19.03.01 TRAZO Y REPLANTEO DE RED DE AGUA m 50.00 3.98 199.00 50.00 199.00 0.00 0.00 50.00 199.00 100.00% 0.00 0.00
15.19.03.02 EXCAVACION DE ZANJAS PARA REDES SANITARIAS (HASTA 1 M) m 25.00 9.64 241.00 25.00 241.00 0.00 0.00 25.00 241.00 100.00% 0.00 0.00
15.19.03.03 REFINE Y NIVELACION DE ZANJAS EN TERRENO NORMAL m 25.00 2.10 52.50 25.00 52.50 0.00 0.00 25.00 52.50 100.00% 0.00 0.00
15.19.04 VALVULAS
15.19.04.01 VALVULAS DE COMPUERTA DE BRONCE DE 1/2" pza 10.00 85.90 859.00 10.00 859.00 0.00 0.00 10.00 859.00 100.00% 0.00 0.00
15.19.04.02 VALVULAS DE COMPUERTA DE BRONCE DE 3/4" pza 2.00 109.22 218.44 2.00 218.44 0.00 0.00 2.00 218.44 100.00% 0.00 0.00
15.19.05 ADITAMENTOS VARIOS
15.19.05.01 CAJA PARA VALVULAS (NICHO DE MAYOLICA) und 10.00 33.49 334.90 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 10.00 334.90
15.19.05.02 LLAVE DE RIEGO CON GRIFO DE 1/2" EN CAJUELA CONCRETO und 2.00 191.87 383.74 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 2.00 383.74
F'C:140KG/CM2
15.20 SISTEMA ELECTRICO
15.20.01 SALIDAS DE ALUMBRADO
15.20.01.01 SALIDA DE ALUMBRADO EN PARED (CABLE 2-1X4MM2, C/TUB. DE 20 pto 2.00 126.78 253.56 2.00 253.56 0.00 0.00 2.00 253.56 100.00% 0.00 0.00
mm)
15.20.01.02 SALIDAS DE ALUMBRADO DE TECHO (CABLE 2-1X4MM2, C/TUB. DE 20 pto 13.00 122.66 1,594.58 13.00 1,594.58 0.00 0.00 13.00 1,594.58 100.00% 0.00 0.00
mm)
15.20.02 SALIDA INTERRUPTORES
15.20.02.01 INTERRUPTOR UNIPOLAR DOBLE und 6.00 65.55 393.30 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 6.00 393.30
15.20.03 TOMACORRIENTES
15.20.03.01 TOMACORRIENTE DOBLE CON PLACA ACERO (CABLE LSOH DE 4 MM2) pto 12.00 127.92 1,535.04 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 12.00 1,535.04
15.20.04 CAJAS DE PASE
15.20.04.01 CAJA OCTOGONAL DE 100x55 mm pto 6.00 16.55 99.30 6.00 99.30 0.00 0.00 6.00 99.30 100.00% 0.00 0.00
15.20.05 CANALIZACIONES Y/O TUBERIAS
15.20.05.01 TUBERIA PVC SAP 20 MM m 50.00 6.28 314.00 50.00 314.00 0.00 0.00 50.00 314.00 100.00% 0.00 0.00
15.20.05.02 TUBERIA PVC SAP 40 MM m 50.00 7.92 396.00 50.00 396.00 0.00 0.00 50.00 396.00 100.00% 0.00 0.00
15.20.05.03 TUBERIA PVC SAP 50 MM m 50.00 7.92 396.00 50.00 396.00 0.00 0.00 50.00 396.00 100.00% 0.00 0.00
15.20.06 CONDUCTORES Y CABLES
15.20.06.01 CONDUCTOR THW 2-1X2.5MM2(2X20 A) m 50.00 5.46 273.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 50.00 273.00
15.20.06.02 CONDUCTOR THW 2-1X4MM2(2X20 A) m 50.00 5.87 293.50 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 50.00 293.50
15.20.06.03 CONDUCTOR THW 3-1X6MM2(3X30 A) m 25.00 6.69 167.25 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 25.00 167.25
15.20.06.04 CONDUCTOR THW 3-1X16MM2(3X60 A) m 25.00 9.97 249.25 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 25.00 249.25
AVANCE
SALDO
Item DESCRIPCION AVANCE ANTERIOR AVANCE ACTUAL ACUMULADO %
Und Metrado Precio S/. Metrado Valoriz. S/. Metrado Valoriz. S/. Metrado Valoriz. S/. Metrado Valoriz. S/.
15.20.07 TABLEROS E INTERRUPTORES TERMOMAGNETICOS
15.20.07.01 TABLERO DE DISTRIBUCION ELECTRICA (T-G), GABINETE METALICO pza 1.00 1,022.28 1,022.28 0.50 511.14 0.00 0.00 0.50 511.14 50.00% 0.50 511.14
CON INTERRUPTORES TERMOMAGNETICOS
15.20.07.02 TABLERO DE DISTRIBUCION ELECTRICA ST-101), GABINETE METALICO pza 1.00 587.23 587.23 0.50 293.62 0.00 0.00 0.50 293.62 50.00% 0.50 293.62
CON INTERRUPTORES TERMOMAGNETICOS
15.20.08 CONEXION A SUB-TABLERO
15.20.08.01 ALIM. CAB. TETRAPOLAR NYY FASE/NEUTRO 25/16MM2 m 50.00 31.39 1,569.50 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 50.00 1,569.50
15.20.09 ARTEFACTOS DE ALUMBRADO
15.20.09.01 ARTEFACTO WALL SOCKET DE PORCELANA (PARED) 40W und 2.00 104.18 208.36 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 2.00 208.36
15.20.09.02 ARTEFACTO WALL SOCKET DE PORCELANA (TECHO) 40W und 10.00 104.18 1,041.80 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 10.00 1,041.80
15.20.09.03 ARTEFACTO SPOT LIHGTH ALUMINIO (INCANDESCENTE 50W) und 6.00 57.67 346.02 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 6.00 346.02
16 CAMPO DEPORTIVO DE FUTBOL
16.01 MOVIMIENTO DE TIERRAS
16.01.01 EXCAVACION MANUAL EN DRENAJE m3 270.00 36.09 9,744.30 0.00 0.00 270.00 9,744.30 270.00 9,744.30 100.00% 0.00 0.00
16.01.02 RELLENO MANUAL CON MATERIAL PROPIO EN DRENAJE m3 226.00 60.17 13,598.42 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 226.00 13,598.42
16.01.03 EXCAVACION A NIVEL DE SUB-RASANTE CON EQUIPO m3 452.90 5.21 2,359.61 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 452.90 2,359.61
16.01.04 PERFILADO Y COMPACTADO EN ZONA DE CORTE m2 4,529.00 1.58 7,155.82 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 4,529.00 7,155.82
16.01.05 SUB-BASE GRANULAR e=0.20 m m2 905.80 19.06 17,264.55 905.80 17,264.55 0.00 0.00 905.80 17,264.55 100.00% 0.00 0.00
16.01.06 BASE GRANULAR E=0.05 m. m3 226.45 37.74 8,546.22 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 226.45 8,546.22
16.02 SANEAMIENTO Y DRENAJE
16.02.01 COLECTOR DRENAJE D160MM m 90.00 43.05 3,874.50 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 90.00 3,874.50
16.02.02 COLECTOR PVC D250/4.9MM m 48.00 43.05 2,066.40 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 48.00 2,066.40
16.02.03 COLECTOR PVC D315/6.2MM m 10.00 64.58 645.80 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 10.00 645.80
16.02.04 CANALETA DE HORMIGON POLIMERO m 180.00 107.88 19,418.40 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 180.00 19,418.40
16.02.05 CAJA DE REGISTRO DE 60 X 60 CMS C/TAPA DE CONCRETO und 8.00 237.27 1,898.16 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 8.00 1,898.16
16.02.06 CAJA DE REGISTRO DE 60 X 60CMS DESARENADOR und 16.00 237.27 3,796.32 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 16.00 3,796.32
16.03 PAVIMENTOS
16.03.01 SARDINEL DE CONCRETO PREFABRICADO m 280.00 76.74 21,487.20 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 280.00 21,487.20
16.03.02 GEOTEXTIL 120GR/M2 m2 4,529.00 3.31 14,990.99 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 4,529.00 14,990.99
16.03.03 TRATAMIENTO SUPERFICIAL DEL TERRENO m2 4,529.00 4.16 18,840.64 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 4,529.00 18,840.64
16.03.04 IMPRIMACION ASFALTICA MC-30 (SIN ASFALTO) m2 4,529.00 3.54 16,032.66 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 4,529.00 16,032.66
16.03.05 CESPED ARTIFICIAL MONOFILAMENTO CONCAVO C/ARENA INCLUYE m2 4,529.00 31.45 142,437.05 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 4,529.00 142,437.05
TRABAJOS DE INSTALACION
16.04 RIEGO
16.04.01 CAJA DE REGISTRO DE 60 X 60 CMS C/TAPA DE CONCRETO und 14.00 237.27 3,321.78 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 14.00 3,321.78
16.04.02 PROGRAMADOR 6 ESTACIONES und 1.00 871.32 871.32 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 1.00 871.32
16.04.03 DERIVACION ELECTRICA A CAÑONES DE RIEGO m 50.00 52.48 2,624.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 50.00 2,624.00
16.04.04 CAÑON DE RIEGO und 6.00 783.92 4,703.52 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 6.00 4,703.52
16.04.05 ELECTROVALVULA 1 1/2" C/REGISTRO und 6.00 378.59 2,271.54 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 6.00 2,271.54
16.04.06 CONEXION A RED GENERAL und 1.00 199.98 199.98 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 1.00 199.98
16.04.07 TUBO DE POLIETILENO PN 10 D 110MM m 25.00 21.86 546.50 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 25.00 546.50
16.04.08 TUBO DE POLIETILENO PN 10 D 90MM m 280.00 17.76 4,972.80 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 280.00 4,972.80
16.04.09 FILTRO DE ENTRADA Y VALVULA DE LLENADO ELECTRICA und 1.00 493.93 493.93 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 1.00 493.93
16.04.10 POZO-CONEXION A TIERRA und 1.00 1,122.70 1,122.70 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 1.00 1,122.70
16.04.11 GRUPO IMPULSION /DISTRIBUCION SIST. ELECTRICO und 1.00 7,583.49 7,583.49 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 1.00 7,583.49
16.04.12 TABLERO DE DISTRIBUCION ELECTRICA ANIOBRA BOMBAS, und 1.00 440.63 440.63 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 1.00 440.63
GABINETE METALICO CON INTERRUPTORES TERMOMAGNETICOS
16.04.13 ACOMETIDA TRIFASICA DE TABLERO GENERAL A CUADRO BOMBAS und 1.00 1,232.23 1,232.23 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 1.00 1,232.23
RIEGO
16.05 RESERVORIO DE CONCRETO ARMADO 13.5 M3
16.05.01 TRABAJOS PRELIMINARES
16.05.01.01 TRAZO REPLANTEO Y NIVELACION RESERVORIO glb 1.00 250.00 250.00 0.00 0.00 1.00 250.00 1.00 250.00 100.00% 0.00 0.00
AVANCE
SALDO
Item DESCRIPCION AVANCE ANTERIOR AVANCE ACTUAL ACUMULADO %
Und Metrado Precio S/. Metrado Valoriz. S/. Metrado Valoriz. S/. Metrado Valoriz. S/. Metrado Valoriz. S/.
16.05.02 MOVIMIENTO DE TIERRAS
16.05.02.01 EXCAVACION TERRENO NORMAL H:2.00 m3 8.43 41.29 348.07 0.00 0.00 8.43 348.07 8.43 348.07 100.00% 0.00 0.00
16.05.02.02 RELLENO COMPACTADO P/ESTRUCTURAS CON MATERIAL PROPIO m3 10.96 70.60 773.78 0.00 0.00 10.96 773.78 10.96 773.78 100.00% 0.00 0.00
16.05.03 CONCRETO ARMADO
16.05.03.01 CONCRETO CAMARA VALVULAS F'C=175 KG/CM2 m3 0.32 284.41 91.01 0.00 0.00 0.32 91.01 0.32 91.01 100.00% 0.00 0.00
16.05.03.02 ENCOFRADO Y DESENCOFRADO CAMARA VALVULAS m2 5.76 52.07 299.92 0.00 0.00 5.76 299.92 5.76 299.92 100.00% 0.00 0.00
16.05.03.03 ACERO DE REFUERZO GRADO 60 PARA MUROS kg 306.43 4.58 1,403.45 0.00 0.00 306.43 1,403.45 306.43 1,403.45 100.00% 0.00 0.00
16.05.03.04 ENCOFRADO Y DESENCOFRADO NORMAL EN MUROS m2 58.08 47.38 2,751.83 0.00 0.00 58.08 2,751.83 58.08 2,751.83 100.00% 0.00 0.00
16.05.03.05 CONCRETO EN MUROS REFORZADOS F'C=210 KG/CM2 m3 4.65 444.06 2,064.88 0.00 0.00 4.65 2,064.88 4.65 2,064.88 100.00% 0.00 0.00
16.05.03.06 ACERO DE REFUERZO GRADO 60 PARA LOSAS MACIZAS kg 248.98 4.58 1,140.33 0.00 0.00 248.98 1,140.33 248.98 1,140.33 100.00% 0.00 0.00
16.05.03.07 ENCOFRADO Y DESENCOFRADO LOZAS MACIZAS m2 11.64 50.05 582.58 0.00 0.00 11.64 582.58 11.64 582.58 100.00% 0.00 0.00
16.05.03.08 CONCRETO EN LOSAS MACIZAS F'C=210 KG/CM2 m3 3.81 444.06 1,691.87 0.00 0.00 3.81 1,691.87 3.81 1,691.87 100.00% 0.00 0.00
16.05.04 REVOQUES ENLUCIDOS Y MOLDURAS
16.05.04.01 TARRAJEO C:A 1:5 E=1.5 CM. CON ADITIVO INPERMEABILIZANTE m2 58.08 32.83 1,906.77 0.00 0.00 58.08 1,906.77 58.08 1,906.77 100.00% 0.00 0.00
16.05.05 INSTALACIONES SANITARIAS
16.05.05.01 CAMARA DE VALVULA RESERVORIO und 1.00 817.76 817.76 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 1.00 817.76
16.05.05.02 VENTILACION TUBERIA DE PVC A-10 SP DE 2" und 2.00 14.03 28.06 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 2.00 28.06
16.05.06 PINTURA
16.05.06.01 PINTURA EN EXTERIORES CON LATEX 02 MANOS m2 31.68 15.38 487.24 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 31.68 487.24
16.05.07 VARIOS
16.05.07.01 TAPA METALICA INC/FAB. Y MONTAJE (60 X 60 CMS) und 1.00 300.00 300.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 1.00 300.00
16.05.07.02 PRUEBA DE CALIDAD DE CONCRETO (PRUEBA A LA COMPRESION) und 6.00 25.00 150.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 6.00 150.00
16.05.08 INSTALACIONES DE REDES
16.05.08.01 SUMINISTRO E INSTALACION DE TUB. PVC SAP 1 1/2" C- m 253.00 7.97 2,016.41 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 253.00 2,016.41
10+2%DESPERDICIO
16.05.08.02 SUMINISTRO E INSTALACION DE ACCESORIOS PVC 1 1/2" C-10 m 1.00 207.46 207.46 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 1.00 207.46
16.05.08.03 SUMINISTRO E INSTALACION DE TUB. PVC SAP 1" C- m 100.00 2.29 229.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 100.00 229.00
10+2%DESPERDICIO
16.05.08.04 SUMINISTRO E INSTALACION DE ACCESORIOS PVC 1" C-10 jgo 1.00 103.38 103.38 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 1.00 103.38
17 EQUIPAMIENTO DEPORTIVO
17.01 PORTERIAS FUTBOL und 2.00 1,348.14 2,696.28 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 2.00 2,696.28
17.02 BANQUILLO JUGADORES 10 PLAZAS ANCLAJES und 1.00 410.00 410.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 1.00 410.00
17.03 ANCLAJES und 4.00 96.82 387.28 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 4.00 387.28
18 DRENAJE PLUVIAL
18.01 CAMA DE ARENA h=0.10 m2 549.41 5.49 3,016.26 0.00 0.00 248.49 1,364.21 248.49 1,364.21 45.23% 300.92 1,652.05
18.02 EXCAVACION DE ZANJAS PARA REDES SANITARIAS (HASTA 1 M) m 549.41 9.64 5,296.31 0.00 0.00 248.49 2,395.44 248.49 2,395.44 45.23% 300.92 2,900.87
18.03 SUMINISTRO E INSTALACION DE TUB. PVC DRENAJE 160 MM m 172.85 3.79 655.10 0.00 0.00 150.00 568.50 150.00 568.50 86.78% 22.85 86.60
18.04 SUMINISTRO E INSTALACION DE TUB. PVC DRENAJE 200 MM m 171.00 4.59 784.89 0.00 0.00 120.00 550.80 120.00 550.80 70.18% 51.00 234.09
18.05 SUMINISTRO E INSTALACION DE TUB. PVC DRENAJE 250 MM m 205.46 5.39 1,107.43 0.00 0.00 150.00 808.50 150.00 808.50 73.01% 55.46 298.93
18.06 RELLENO COMPACTADO C/EQUIPO, MATERIAL PROPIO Y AGUA m 549.41 11.95 6,565.45 0.00 0.00 248.49 2,969.46 248.49 2,969.46 45.23% 300.92 3,595.99
(HASTA 1 M).
18.07 REGISTRO DE CONCRETO Y REJILLA METALICA 0.30X1.20 und 30.00 21.19 635.70 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 30.00 635.70
INC/INSTALACION
OBRA : CREACION DE LOS SERVICIOS RECREATIVOS Y DEPORTIVOS EN EL CAMPO Nº 1 DE LA ASOCIACION PARQUE INDUSTRIAL PORVENIR AREQUIPA - APIPA SECTOR I, DISTRITO DE CERRO COLORADO, AREQUIPA-
AREQUIPA.
DATOS GENERALES
CONTRATO PRINCIPAL C / IGV 3,131,928.12 MONTO AMORTIZACION
VAL. Nº MES % AMORTIZ.
CONTRATO PRINCIPAL S / IGV VALORIZADO EN EL MES ACUMULADA SALDO
2,654,176.37
07 PUENTE DECORATIVO
07.04 OBRAS DE CONCRETO ARMADO
07.04.05 VIGAS-ENCOFRADO Y DESENCOFRADO m2 10.00 62.73 627.30 627.30
07.04.07 LOSA-ENCOFRADO Y DESENCOFRADO m2 24.00 62.73 1,505.52 1,505.52
08 ESTARES Y PERGOLAS 2,132.82 2,711.72 13,896.53 5.12 10,929.89
08.04 OBRAS DE CONCRETO ARMADO
08.04.02 COLUMNAS CIRCULARES, ENCOFRADO Y DESENCOFRADO m2 10.00 57.89 578.90
06.03.01 CIMIENTOS CORRIDOS MEZCLA 1:10 CEMENTO-HORMIGON+30% m3 23.39 240.10 5,615.94 3,005.09
P.G. f'c:100kg/cm2
06.03.02 CONCRETO F'C=140 KG/CM2 EN MUROS + 50% DE PM m3 17.00 319.62 5,433.54 1,800.16
07.03.01 SOLADO PARA ZAPATAS E= 2" MEZCLA 1:12 CEMENTO:HORMIGON m2 5.76 23.57 135.76 135.76
09.03.02 VEREDAS DE PIEDRA PORFIDO IRREGULAR Y CONCRETO m2 652.82 96.85 63,225.62 34,694.58
F'C=140 KG/CM2, E=4"
09.04 VARIOS
TOTAL
TOTAL ADELANTO RACTOR DE
PARTIDAS QUE UTILIZAN: TUBERIA DE ACERO NEGRO Y/O VALORIZACION VALORIZACION AMORTIZACION
PARTIDA UND METRADO P.U. PARCIAL PRESUPUESTO OTORGADO RELACION
GALVANIZADO FEBRERO (1) FEBRERO (6)=(5)*(2)
(3) (4) (5)=(4)/(3)
(2)
10.07 VARIOS
10.07.03 ARCOS DE METAL LOSA MULTIDEPORTIVA und 2.00 1,230.00 2,460.00 0.00
10 LOSA MULTIDEPORTIVA
10.08 COBERTURA METALICA CON MALLA RASCHEL
10.08.01 VIGA PRINCIPAL pza 6.00 1,412.43 8,474.58 8,474.58
10.08.02 VIGA PERIMETRAL pza 2.00 2,118.64 4,237.28 4,237.28
10.08.03 COLUMNAS T-1 TIPICAS pza 12.00 1,129.94 13,559.28 13,559.28
10.09 SISTEMA ELECTRICO
10.09.01 REFLECTOR PARA ILUMINACION LOSA DEPORTIVA und 12.00 498.09 5,977.08 0.00 38,700.48 55,884.58 81,344.36 1.46 56,331.56
11 LOSA DE FULBITO
11.08.02 ARCOS DE METAL FULBITO und 2.00 820.00 1,640.00 0.00
11.09 COBERTURA METALICA CON MALLA RASCHEL
11.09.03 COLUMNAS T-1 TIPICAS pza 12.00 1,129.94 13,559.28 12,429.34
11.10 SISTEMA ELECTRICO
11.10.01 REFLECTOR PARA ILUMINACION LOSA DEPORTIVA und 12.00 498.09 5,977.08 0.00
TOTAL
TOTAL ADELANTO RACTOR DE
VALORIZACION VALORIZACION AMORTIZACION
PARTIDA PARTIDAS QUE UTILIZAN CEMENTO PORTLAND UND METRADO P.U. PARCIAL PRESUPUESTO OTORGADO RELACION
FEBRERO (1) FEBRERO (6)=(5)*(2)
(3) (4) (5)=(4)/(3)
(2)
13.03.01 SOLADO PARA ZAPATAS E= 2" MEZCLA 1:12 CEMENTO:HORMIGON m2 135.00 23.57 3,181.95 0.00
13.03.02 CONCRETO F'C=140 KG/CM2 EN GRADERIAS + 50% DE PM m3 270.00 157.30 42,471.00 0.00
13.03.03 CIMIENTOS CORRIDOS MEZCLA 1:10 CEMENTO-HORMIGON+30% m3 86.70 240.10 20,816.67 0.00
P.G. f'c:100kg/cm2
13.04.04 MURO DE CONTENCION- CONCRETO F'C=210 KG/CM2 m3 93.42 462.99 43,252.53 0.00
13.04.06 COLUMNAS Y PLACAS CONCRETO F'C=210 KG/CM2 m3 13.20 582.29 7,686.23 0.00
13.05.01 TARRAJEO FROTACHADO DE COLUMNAS CON MORTERO C:A 1:5 m2 150.00 37.95 5,692.50 0.00
E=1.5 CM.
13.05.02 TARRAJEO EN GRADERIAS C:A 1:5 E=1.5 CM. m2 1,113.00 28.45 31,664.85 0.00
15.03.01 SOLADO PARA ZAPATAS E= 2" MEZCLA 1:12 CEMENTO:HORMIGON m2 58.00 23.57 1,367.06 0.00
15.03.02 CIMIENTOS CORRIDOS MEZCLA 1:10 CEMENTO-HORMIGON+30% m3 57.42 240.10 13,786.54 0.00
P.G. f'c:100kg/cm2
15.04.01 COLUMNAS Y PLACAS CONCRETO F'C=210 KG/CM2 m3 9.00 454.29 4,088.61 0.00
15.04.05 VIGAS CONCRETO F'C=210 KG/CM2 m3 10.00 457.90 4,579.00 0.00
15.04.09 LOSAS ALIGERADAS CONCRETO F'C=210 KG/CM2 m3 20.00 383.31 7,666.20 0.00
15.05.01 MUROS DE LADRILLO KK TIPO IV 8x14x24 DE SOGA C/M 1:1:4 X m2 260.00 113.34 29,468.40 0.00 11,932.64 328,732.69 94,912.07 0.29 3,445.21
1.5 CM.
15.06.01 TARRAJEO EN MUROS EXTERIORES C:A 1:5 E=1.5 CM. m2 260.00 30.71 7,984.60 0.00
15.06.02 TARRAJEO EN MUROS INTERIORES C:A 1:5 E=1.5 CM. m2 100.00 28.45 2,845.00 0.00
15.06.03 TARRAJEO FROTACHADO DE COLUMNAS CON MORTERO C:A 1:5 m2 50.00 37.95 1,897.50 0.00
E=1.5 CM.
15.06.04 TARRAJEO FROTACHADO DE VIGAS CON MORTERO C:A 1:5 E=1.5 m2 50.00 45.89 2,294.50 0.00
CM.
15.06.05 TARRAJEO PRIMARIO MORTERO C:A 1:5 m2 100.00 29.30 2,930.00 0.00
15.07.01 CONTRAPISO DE 48 MM m2 188.00 39.65 7,454.20 0.00
15.08.01 TARRAJEO EN CIELOS RASOS C:A 1:5 E=1.5 CM m2 188.00 35.27 6,630.76 0.00
15.19.05.02 LLAVE DE RIEGO CON GRIFO DE 1/2" EN CAJUELA CONCRETO und 2.00 191.87 383.74 0.00
F'C:140KG/CM2
16.05.03.01 CONCRETO CAMARA VALVULAS F'C=175 KG/CM2 m3 0.32 284.41 91.01 91.01
16.05.03.02 ENCOFRADO Y DESENCOFRADO CAMARA VALVULAS m2 5.76 52.07 299.92 299.92
16.05.03.03 ACERO DE REFUERZO GRADO 60 PARA MUROS kg 306.43 4.58 1,403.45 1,403.45
16.05.03.04 ENCOFRADO Y DESENCOFRADO NORMAL EN MUROS m2 58.08 47.38 2,751.83 2,751.83
16.05.03.05 CONCRETO EN MUROS REFORZADOS F'C=210 KG/CM2 m3 4.65 444.06 2,064.88 2,064.88
16.05.03.06 ACERO DE REFUERZO GRADO 60 PARA LOSAS MACIZAS kg 248.98 4.58 1,140.33 1,140.33
16.05.03.07 ENCOFRADO Y DESENCOFRADO LOZAS MACIZAS m2 11.64 50.05 582.58 582.58
16.05.03.08 CONCRETO EN LOSAS MACIZAS F'C=210 KG/CM2 m3 3.81 444.06 1,691.87 1,691.87
16.05.04.01 TARRAJEO C:A 1:5 E=1.5 CM. CON ADITIVO INPERMEABILIZANTE m2 58.08 32.83 1,906.77 1,906.77
TOTAL TOTAL ADELANTO RACTOR DE
VALORIZACION AMORTIZACION
PARTIDA PARTIDAS QUE UTILIZAN ACERO LISO UND METRADO P.U. PARCIAL VALORIZACION PRESUPUESTO OTORGADO RELACION
MARZO (1) (6)=(5)*(2)
MARZO (2) (3) (4) (5)=(4)/(3)
TOTAL
TOTAL ADELANTO RACTOR DE
VALORIZACION VALORIZACION AMORTIZACION
PARTIDA PARTIDAS QUE UTILIZAN ACERO DE CONSTRUCCION LISO UND METRADO P.U. PARCIAL PRESUPUESTO OTORGADO RELACION
FEBRERO (1) FEBRERO (6)=(5)*(2)
(3) (4) (5)=(4)/(3)
(2)
14 CARPINTERIA METALICA
14.02 CERCO METALICO
14.02.01 MALLA GALV. 2"X2" (PANEL 3.00 X1.50 MTS.) INC. INST. und 92.00 400.28 36,825.76 2,801.96
14.02.02 MALLA GALV. 2"X2" (PANEL 2.00X2.00 TIPO A) INC. INST. und 78.00 441.38 34,427.64 17,213.82
14.02.03 PUERTA METALICA (3.50 X 2.40) INCLUYE INSTALACION und 1.00 1,450.64 1,450.64 0.00
14.02.04 PUERTA METALICA (1.20X2.40) INCLUYE INSTALACION und 4.00 250.00 1,000.00 0.00
14.01 TIJERALES
14.01.01 TIJERAL TIPO 01 L=5.20 M und 44.00 482.58 21,233.52 0.00
14.01.02 CORREA TUBO RECTANGULAR 80X40X1.5MM L=6.00M m 900.00 34.49 31,041.00 0.00
14.03 POSTE METALICOS ILUMINACION
20,015.78 141,866.50 75,167.69 0.53 10,605.32
14.03.01 POSTES METALICOS PARA ILUMINACION 6" Y 9MTS DE ALTURA und 6.00 2,065.73 12,394.38
INC/INSTALACION
17 EQUIPAMIENTO DEPORTIVO
17.01 PORTERIAS FUTBOL und 2.00 1,348.14 2,696.28
17.02 BANQUILLO JUGADORES 10 PLAZAS ANCLAJES und 1.00 410.00 410.00
17.03 ANCLAJES und 4.00 96.82 387.28
AMORTIZACIÓN DE ADELANTO DE MATERIALES MARZO DEL 2019
OBRA : CREACION DE LOS SERVICIOS RECREATIVOS Y DEPORTIVOS EN EL CAMPO Nº 1 DE LA ASOCIACION PARQUE INDUSTRIAL PORVENIR AREQUIPA - APIPA SECTOR I, DISTRITO DE CERRO COLORADO, AREQUIPA-AREQUIPA.
Saldo por
MATERIAL Ima Imo Amortización Adelanto
P.U. a fecha V.R. F.R. Monto (a V.R.) amortizar
Val N° FECHA IU DESCRIPCIÓN DEL MATERIAL UTILIZADO agos-2018 May-2018 S/IGV otorgado S/IGV
S/IGV
39 ACEITE 0.00 0.00 1.00000 0.00 452.00 445.61 0.00 0.00 0.00
DOLAR (GENERAL PONDERADO) 0.00 0.00 1.00000 0.00
AGREGADO GRUESO 0.00 0.00 1.00000 0.00
FEBRERO 2019
Saldo por
MATERIAL Ima Imo Amortización Adelanto
P.U. a fecha V.R. F.R. Monto (a V.R.) amortizar
Val N° FECHA IU DESCRIPCIÓN DEL MATERIAL UTILIZADO agos-2018 May-2018 S/IGV otorgado S/IGV
S/IGV
Saldo por
MATERIAL Ima Imo Amortización Adelanto
P.U. a fecha V.R. F.R. Monto (a V.R.) amortizar
Val N° FECHA IU DESCRIPCIÓN DEL MATERIAL UTILIZADO Ene-2018 May-2018 S/IGV otorgado S/IGV
S/IGV
21 CEMENTO PORTLAND TIPO I 1.00 38,359.24 1.00000 38,359.24 438.28 431.73 38,941.21 60,163.37 21,222.16
39 INDICE GENERAL DE PRECIOS AL CONSUMIDOR 0.00 0.00 1.00000 0.00 449.40 445.61 0.00 0.00 0.00
47 MANO DE OBRA INC. LEYES SOCIALES 0.00 0.00 1.00000 0.00 602.11 582.52 0.00 0.00 0.00
Saldo por
MATERIAL Ima Imo Amortización Adelanto
P.U. a fecha V.R. F.R. Monto (a V.R.) amortizar
Val N° FECHA IU DESCRIPCIÓN DEL MATERIAL UTILIZADO agos-2018 May-2018 S/IGV otorgado S/IGV
S/IGV
39 INDICE GENERAL DE PRECIOS AL CONSUMIDOR 0.00 0.00 1.00000 0.00 452.00 445.61 0.00 0.00 0.00
47 MANO DE OBRA INC. LEYES SOCIALES 0.00 0.00 1.00000 0.00 602.11 582.52 0.00 0.00 0.00
TUBERIA DE ACERO NEGRO Y/O GALVANIZADO 1.00 56,331.56 1.00000 56,331.56
AGREGADO GRUESO 0.00 0.00 1.00000 0.00
AGREGADO FINO 0.00 0.00 1.00000 0.00
PLANCHA GALVANIZADA 0.00 0.00 1.00000 0.00
71 260.27 250.41 58,549.64 81,867.38 23,317.74
TUBERIA DE FIERRO FUNDIDO 0.00 0.00 1.00000 0.00
TUBERIA DE PVC PARA AGUA 0.00 0.00 1.00000 0.00
TUBERIA DE PVC PARA ELECTRICIDAD (SAP) 0.00 0.00 1.00000 0.00
TUBERIA DE PVC PARA ELECTRICIDAD (SEL) 0.00 0.00 1.00000 0.00
58,549.64 171,636.56 113,086.92
Saldo por
MATERIAL Ima Imo Amortización Adelanto
P.U. a fecha V.R. F.R. Monto (a V.R.) amortizar
Val N° FECHA IU DESCRIPCIÓN DEL MATERIAL UTILIZADO agos-2018 May-2018 S/IGV otorgado S/IGV
S/IGV
05 ARTEFACTO DE ALUMBRADO EXTERIOR 0.00 0.00 1.00000 0.00 604.07 608.03 0.00 19,119.03 19,119.03
17 CERAMICA ESMALTADA Y SIN ESMALTAR 0.00 0.00 1.00000 0.00 855.53 859.84 0.00 49,791.79 49,791.79
Saldo por
MATERIAL Ima Imo Amortización Adelanto
P.U. a fecha V.R. F.R. Monto (a V.R.) amortizar
Val N° FECHA IU DESCRIPCIÓN DEL MATERIAL UTILIZADO agos-2018 May-2018 S/IGV otorgado S/IGV
S/IGV
39 INDICE GENERAL DE PRECIOS AL CONSUMIDOR 0.00 0.00 1.00000 0.00 449.40 445.61 0.00 0.00 0.00
47 MANO DE OBRA INC. LEYES SOCIALES 0.00 0.00 1.00000 0.00 602.11 582.52 0.00 0.00 0.00
71 PLANCHA GALVANIZADA 0.00 0.00 1.00000 0.00 652.95 649.98 0.00 36,200.29 36,200.29
Saldo por
MATERIAL Ima Imo Amortización Adelanto
P.U. a fecha V.R. F.R. Monto (a V.R.) amortizar
Val N° FECHA IU DESCRIPCIÓN DEL MATERIAL UTILIZADO agos-2018 May-2018 S/IGV otorgado S/IGV
S/IGV
001 MOVIMIENTO DE TIERRAS EN GENERAL Y ENROCADO DE DEFENSA TORRENTERA 0.00 0.00 0.00 0.00 0.00
FEBRERO 2019
002 PORTADA DE ACCESO, CERCO PERIMETRICO Y VEREDAS EXTERIORES 0.00 0.00 0.00 0.00 0.00
003 003 AREA RECREATIVA, JUEGOS INFANTILES, ESTARES Y CAMINERIAS 6,254.54 75,096.41 81,350.95 161,847.17 80,496.22
004 LOSA MULTIDEPORTIVA Y DE FULBITO 112,743.15 58,549.64 171,292.79 171,636.56 343.77
005 CAMPO DE PORTIVO DE FUTBOL 126,348.93 49,535.54 175,884.47 254,103.88 78,219.41
OBRA
: CREACION DE LOS SERVICIOS RECREATIVOS Y DEPORTIVOS EN EL CAMPO Nº 1 DE LA ASOCIACION PARQUE INDUSTRIAL PORVENIR AREQUIPA - APIPA SECTOR I, DISTRITO DE CERRO
COLORADO, AREQUIPA-AREQUIPA.
ENTIDAD : MUNICIPALIDAD DISTRITAL DE CERRO COLORADO
CONTRATISTA : CONSORCIO MAFER
RESIDENTE : ING. FERNANDO EDUARDO PAREDES CAIHUA C.I.P. 108347 VALOR REFERENCIAL 3,466,766.95
SUPERVISOR : ING. ANTONY ADAN RONCAL CAÑI C.I.P. 100173 COSTO DE OBRA 3,466,766.95
PLAZO : 179 DÍAS CALENDARIO FACTOR DE RELACION 1.00000
INICIO DE PLAZO : 19 DE SETIEMBRE DEL 2018 FECHA BASE DE PRESUPUESTO May-18
FINALIZACION DE PLAZO : 10 DE ABRIL DEL 2019
ORIGINAL RENOVADA
C/F Nº GARANTE GARANTIZA
MONTO FECHA VENC. MONTO FECHA VENC.
OBRA : CREACION DE LOS SERVICIOS RECREATIVOS Y DEPORTIVOS EN EL CAMPO Nº 1 DE LA ASOCIACION PARQUE INDUSTRIAL PORVENIR AREQUIPA - APIPA SECTOR I, DISTRITO DE CERRO COLORADO, AREQUIPA-AREQUIPA.
VALORIZACIONES DE OBRA PROGRAMADAS - MONTO SIN I.G.V. (S/.) VALORIZACIONES DE OBRA EJECUTADAS - MONTO SIN I.G.V. (S/.)
PERIODO
CONTRATO % PARCIAL ACUMULADO % ACUM CONTRATO % PARCIAL ACUMULADO % ACUM.
CURVA "S"
VALORIZACIONES DE OBRA ACELERADO - MONTO SIN I.G.V. (S/.)
PERIODO 1
CONTRATO % PARCIAL ACUMULADO % ACUM
0 0
September-18 250,667.53 8.53% 250,667.53 8.53% 0.8
October-18 410,564.57 13.97% 661,232.10 22.51%
ULADO
61.92%
0.6
CURVA "S"
1
0.8
PORCENTAJE ACUMULADO
November-18 332,808.17 11.33% 994,040.27 33.83% 61.92%
December-18 38,403.37 1.31% 1,032,443.64 35.14% 0.6
January-19 324,190.55 11.03% 1,356,634.19 46.18%
46.18%
February-19 154,535.55 5.26% 1,511,169.74 51.44%
March-19 455,689.47 15.51% 1,966,859.21 66.95% 0.4 33.83% 35.14%
35.03%
April-19 971,078.88 33.05% 2,937,938.09 100.00%
0.87%
0
September-18 October-18 November-18 December-18 January-1
FECHA PROGRAMADA
PROGRAMADO EJECUTADO A
- VALORIZACIÓN N° 07 - MARZO 2019
ATRASADO
ADELANTADO (%)
(%)
7.66%
13.35%
13.48%
0.11%
- 15.75%
- 2.10%
CURVA "S"
100.00% 100.00%
1
93.33%
66.95%
61.92%
6 64.85%
CURVA "S"
100.00% 100.00%
1
93.33%
66.95%
61.92%
6 64.85%
51.44%
51.18%
46.18%
4 33.83% 35.14%
35.03%
22.51%
20.35%
2
8.53% 9.16%
0.87%
0
September-18 October-18 November-18 December-18 January-19 February-19 March-19 Apri l -19
FECHA PROGRAMADA
PLAZO DE EJECUCION
06-mar-19 01-abr-19
TOTAL
31-mar-19 10-abr-19
179 Dias
26 Días 10 Días
- - 8,860.84
- - 3,580.00
- - 410.00
- - 656.00
-
- - 9,212.00
- - 3,454.50
-
- - 23,057.64
- - 158,361.75
-
- - 1,323.80
-
- 1,230.00 2,460.00
-
- - 2,030.56
- - 2,676.00
- - 7,570.00
- - 10,580.00
- - 33,660.00
- - 10,050.00
PLAZO DE EJECUCION
-
-
- - 33.60
-
- - 296.88
- - 825.80
-
- - 565.68
-
- - 1,606.46
- - 8,586.08
- - 8,484.00
- - 2,894.50
- - 12,693.92
-
- - 2,395.38
-
- - 4,998.43
- - 1,553.59
-
1,110.72 - 1,110.72
-
- - 4,351.92
738.00 - 738.00
-
PLAZO DE EJECUCION
- - 425.70
- - 760.68
- - 692.04
-
-
- - 280.00
- - 185.00
-
- - 4,954.80
- - 989.60
-
6,133.43 - 19,356.00
10,358.98 - 31,843.53
-
301.03 - 2,894.50
378.49 - 4,367.18
100.84 - 3,191.60
-
- 30,710.00 30,710.00
-
- 14,240.00 14,240.00
-
- 22,770.25 51,709.75
-
841.00 - 841.00
- 2,460.00 2,460.00
-
PLAZO DE EJECUCION
-
- - 370.00
- - 560.00
-
122.85 - 1,255.50
-
6,048.75 4,032.50 24,685.00
1,311.71 874.47 6,175.38
29,378.92 19,585.94 93,264.00
-
-
- - 1,624.00
- - 1,073.00
907.20 - 1,350.00
-
2,312.40 - 2,312.40
247.40 - 247.40
-
5,615.94 - 5,615.94
5,433.54 - 5,433.54
6,802.02 - 6,802.02
-
- 22,109.35 22,109.35
-
5,570.46 - 5,570.46
PLAZO DE EJECUCION
-
5,405.50 - 5,405.50
-
2,705.60 - 2,705.60
-
290.00 - 290.00
-
5,988.08 8,982.12 14,970.20
-
3,500.00 - 3,500.00
9,745.72 - 9,745.72
5,000.00 - 5,000.00
5,338.98 - 5,338.98
1,949.15 - 1,949.15
1,016.95 - 1,016.95
1,525.42 - 1,525.42
2,500.00 - 2,500.00
847.46 - 847.46
1,355.93 - 1,355.93
-
7,400.00 - 14,800.00
-
-
28.00 - 28.00
-
332.99 - 332.99
49.48 - 49.48
PLAZO DE EJECUCION
-
135.76 - 135.76
-
1,010.00 - 1,010.00
2,094.28 - 2,094.28
2,525.00 - 2,525.00
1,272.96 - 1,272.96
627.30 - 627.30
2,550.50 - 2,550.50
1,505.52 - 1,505.52
2,560.00 - 2,560.00
-
- 1,021.97 1,021.97
-
- 356.00 356.00
-
- 1,877.34 1,877.34
-
-
140.00 - 140.00
92.50 - 92.50
337.50 - 337.50
-
1,644.12 - 1,644.12
- 339.43 339.43
-
1,760.43 - 1,760.43
PLAZO DE EJECUCION
-
- 4,159.10 4,159.10
578.90 - 578.90
4,171.30 - 4,171.30
-
- 8,049.00 8,049.00
-
- 21,768.00 21,768.00
- 9,708.01 9,708.01
-
- 5,332.08 5,332.08
- 917.40 917.40
- 458.60 458.60
- 2,460.00 2,460.00
-
-
2,632.00 - 2,632.00
1,739.00 - 1,739.00
6,345.00 - 6,345.00
-
9,874.00 14,811.00 24,685.00
-
13,523.28 67,616.40 81,139.68
- 63,225.62 63,225.62
-
3,724.71 - 3,724.71
1,312.00 - 1,312.00
PLAZO DE EJECUCION
-
-
- - 1,729.65
- - 108.21
-
- - 2,023.35
- - 123.70
- - 1,281.30
- - 1,197.45
-
- - 223.92
1,177.40 - 1,177.40
5,127.98 - 8,651.50
7,103.75 - 41,201.75
-
1,083.10 - 1,083.10
289.45 - 289.45
1,363.50 - 1,363.50
-
948.75 - 948.75
4,267.50 - 4,267.50
-
- 1,119.00 1,119.00
- 186.50 186.50
- 3,366.00 3,366.00
PLAZO DE EJECUCION
-
290.00 - 290.00
1,382.50 - 1,382.50
2,460.00 - 2,460.00
-
- 8,474.58 8,474.58
- 4,237.28 4,237.28
- 13,559.28 13,559.28
- 4,237.30 4,237.30
- 8,277.90 8,277.90
-
- 5,977.08 5,977.08
-
-
1,729.65 - 1,729.65
- - 108.21
-
2,023.35 - 2,023.35
123.70 - 123.70
1,281.30 - 1,281.30
1,197.45 - 1,197.45
-
223.92 - 223.92
1,177.40 - 1,177.40
8,651.50 - 8,651.50
-
1,083.10 - 1,083.10
PLAZO DE EJECUCION
289.45 - 289.45
1,363.50 - 1,363.50
-
948.75 - 948.75
4,267.50 - 4,267.50
-
- 1,119.00 1,119.00
- 186.50 186.50
-
- 22,825.15 22,825.15
-
290.00 - 290.00
1,640.00 - 1,640.00
-
- 8,474.58 8,474.58
- 4,237.28 4,237.28
- 13,559.28 13,559.28
- 4,237.30 4,237.30
- 8,277.90 8,277.90
-
- 5,977.08 5,977.08
-
-
- - 46.62
- - 70.56
-
- - 2,890.50
PLAZO DE EJECUCION
- - 247.40
- - 1,921.95
- - 168.75
-
- - 12,005.00
- - 3,931.30
- - 1,008.75
9,518.75 - 9,518.75
3,159.68 - 3,159.68
196.40 - 196.40
-
- - 5,240.61
- - 2,894.50
- - 10,453.50
- - 3,271.39
- - 4,579.00
- - 1,568.25
- - 5,170.86
- - 2,379.32
- - 7,666.20
- - 6,137.50
-
- - 22,668.00
-
1,535.50 - 1,535.50
1,422.50 - 1,422.50
379.50 - 379.50
PLAZO DE EJECUCION
458.90 - 458.90
1,465.00 - 1,465.00
-
4,956.25 - 4,956.25
4,313.25 2,875.50 7,188.75
-
4,232.40 - 4,232.40
-
91.74 - 91.74
55.30 - 55.30
- 58.00 58.00
-
900.00 - 900.00
-
8,361.00 - 8,361.00
8,049.00 - 8,049.00
1,128.40 - 1,128.40
-
4,948.76 - 4,948.76
3,125.52 1,562.76 4,688.28
205.08 205.08 410.16
-
- 2,940.72 2,940.72
- 410.00 410.00
- 492.00 492.00
-
- 519.32 519.32
PLAZO DE EJECUCION
- 310.56 310.56
- 74.90 74.90
-
- 258.00 258.00
- 328.00 328.00
-
- 1,710.00 1,710.00
- 2,070.00 2,070.00
-
4,262.08 - 4,262.08
3,093.90 - 3,093.90
1,154.44 1,154.44 2,308.88
- 4,355.52 4,355.52
287.70 - 287.70
230.16 - 230.16
- 229.12 229.12
-
-
6,008.06 - 6,008.06
2,612.20 - 2,612.20
194.92 - 194.92
-
657.00 - 657.00
2,260.30 - 2,260.30
131.40 - 131.40
131.40 - 131.40
193.74 - 193.74
PLAZO DE EJECUCION
-
195.50 - 195.50
482.00 - 482.00
105.00 - 105.00
274.50 - 274.50
1,195.00 - 1,195.00
1,614.50 - 1,614.50
366.00 - 366.00
-
399.20 - 399.20
288.15 - 288.15
-
- 474.54 474.54
-
- 6.75 6.75
-
- 2,124.00 2,124.00
- 2,460.00 2,460.00
-
-
4,160.31 - 4,160.31
-
712.00 - 712.00
1,889.25 - 1,889.25
-
429.50 - 429.50
218.44 - 218.44
PLAZO DE EJECUCION
-
234.43 - 234.43
- 383.74 383.74
-
-
- - 253.56
- - 1,226.60
-
- 262.20 262.20
- 125.76 125.76
-
- 1,535.04 1,535.04
-
- - 66.20
-
- - 157.00
- - 198.00
- - 396.00
-
136.50 - 136.50
146.75 - 146.75
-
- 587.23 587.23
-
- 4,914.32 4,914.32
-
- 208.36 208.36
PLAZO DE EJECUCION
- 833.44 833.44
- 230.68 230.68
-
-
- - 1,365.00
- - 259.00
-
- - 12,486.96
- - 3,265.68
- - 6,406.50
-
- - 3,181.95
- - 42,471.00
- - 20,816.67
- - 8,597.59
- - 403.50
-
- - 13,495.72
- - 36,797.49
- - 37,161.44
- - 43,252.53
- - 2,417.00
- - 7,686.23
- - 578.90
- - 17,146.27
PLAZO DE EJECUCION
-
- - 5,692.50
- - 31,664.85
-
3,464.32 4,157.18 7,621.50
-
1,383.83 6,919.15 8,302.98
559.50 559.50 1,119.00
-
- - 290.00
-
-
- - 21,233.52
- - 31,041.00
- - 24,048.00
-
1,200.84 36,825.76
6,196.97 4,131.32 34,427.64
- 1,450.64 1,450.64
- 1,000.00 1,000.00
-
- 12,394.38 12,394.38
-
-
- - 74.00
- - 112.00
- - 2,000.00
PLAZO DE EJECUCION
-
- - 3,468.60
- - 247.40
- - 2,349.05
-
- - 1,367.06
- - 13,786.54
- - 4,009.93
- - 2,017.50
- - 14,316.20
- - 4,937.00
- - 392.80
-
- - 4,088.61
- - 2,894.50
- - 10,453.50
- - 5,552.68
- - 4,579.00
- - 1,568.25
- - 5,172.93
- - 3,642.11
- - 7,666.20
- - 9,230.80
-
- - 29,468.40
-
- - 7,984.60
PLAZO DE EJECUCION
- - 2,845.00
- - 1,897.50
- - 2,294.50
- - 2,930.00
-
- - 7,454.20
- - 10,811.88
-
- - 6,630.76
-
- - 152.90
- - 276.50
- - 290.00
-
- - 1,800.00
-
- - 8,361.00
- - 9,095.37
- - 1,692.60
-
- 7,423.14
- 8,855.64 8,855.64
615.24 - 615.24
-
5,881.44 - 5,881.44
- 410.00 410.00
- 492.00 492.00
PLAZO DE EJECUCION
-
- 778.98
- 465.84
119.84 - 119.84
-
258.00 - 258.00
246.00 - 246.00
-
- - 2,679.00
- - 2,070.00
-
- 4,950.24 4,950.24
- 5,593.98 5,593.98
- 2,638.72 2,638.72
- - 5,716.62
- 460.32 460.32
345.24 - 345.24
- 343.68 343.68
-
-
- - 7,575.38
- - 4,179.52
- - 389.84
-
- - 1,095.00
- - 2,260.30
- - 131.40
PLAZO DE EJECUCION
- - 131.40
- - 193.74
-
- - 195.50
- - 482.00
- - 105.00
- - 274.50
- - 1,195.00
- - 1,614.50
- - 219.60
-
- 479.04 479.04
- 461.04 461.04
-
- - 474.54
-
- - 337.50
-
- - 3,619.00
- - 1,062.00
- - 2,460.00
-
-
- - 5,673.15
-
- - 712.00
- - 3,778.50
PLAZO DE EJECUCION
-
- - 199.00
- - 241.00
- - 52.50
-
- - 859.00
- - 218.44
-
- - 334.90
- - 383.74
-
-
- - 253.56
- - 1,594.58
-
393.30 - 393.30
-
1,535.04 - 1,535.04
-
- - 99.30
-
- - 314.00
- - 396.00
- - 396.00
-
- - 273.00
- - 293.50
PLAZO DE EJECUCION
- - 167.25
- - 249.25
-
511.14 - 1,022.28
- - 587.23
-
- - 1,569.50
-
208.36 - 208.36
1,041.80 - 1,041.80
346.02 - 346.02
-
-
9,744.30 - 9,744.30
- 13,598.42 13,598.42
2,359.61 - 2,359.61
7,155.82 - 7,155.82
- - 17,264.55
- 8,546.22 8,546.22
-
3,874.50 - 3,874.50
- 2,066.40 2,066.40
- 645.80 645.80
- 19,418.40 19,418.40
- 1,898.16 1,898.16
- 3,796.32 3,796.32
-
PLAZO DE EJECUCION
- 21,487.20 21,487.20
- 14,990.99 14,990.99
- 18,840.64 18,840.64
- 16,032.66 16,032.66
- 142,437.05 142,437.05
-
- 3,321.78 3,321.78
- 871.32 871.32
- 2,624.00 2,624.00
- 4,703.52 4,703.52
- 2,271.54 2,271.54
- 199.98 199.98
- 546.50 546.50
- 4,972.80 4,972.80
- 493.93 493.93
- 1,122.70 1,122.70
- 7,583.49 7,583.49
- 440.63 440.63
- 1,232.23 1,232.23
-
-
250.00 - 250.00
-
348.07 - 348.07
773.78 - 773.78
-
91.01 - 91.01
PLAZO DE EJECUCION
299.92 - 299.92
1,403.45 - 1,403.45
2,751.83 - 2,751.83
2,064.88 - 2,064.88
1,140.33 - 1,140.33
582.58 - 582.58
845.94 845.93 1,691.87
-
- 1,906.77 1,906.77
-
- 817.76 817.76
- 28.06 28.06
-
- 487.24 487.24
-
- 300.00 300.00
- 150.00 150.00
-
- 2,016.41 2,016.41
- 207.46 207.46
- 229.00 229.00
- 103.38 103.38
-
- 2,696.28 2,696.28
- 410.00 410.00
- 387.28 387.28
-
PLAZO DE EJECUCION
- 3,016.26 3,016.26
- 5,296.31 5,296.31
- 655.10 655.10
- 784.89 784.89
- 1,107.43 1,107.43
- 6,565.45 6,565.45
- 635.70 635.70