Periodo Año
Año Poblacion Diferencia Variacion %
1980 8,500 0 2010
1990 11,135 2635 31.00 1 2011
2000 15,032 3897 35.00 2 2012
2010 19,992 4960 33.00 3 2013
Σ= 11492 98.99 4 2014
5 2015
6 2016
Taza de crecimiento Anual 7 2017
Aritmetica Geometrica 8 2018
383.07 3.30 15097 9 2019
10 2020
Poblacion Actual = 26,776.00 11 2021
F = P ((1 + i) ^ n) = 26,776.36 26,776.00 12 2022
13 2023
Poblacion Proyecto = 37,046.00 14 2024
F = P ((1 + i) ^ n) = 37,046.44 37,046.00 15 2025
16 2026
Poblacion Proyecto = 43,575.00 17 2027
F = P ((1 + i) ^ n) = 43,575.65 43,575.00 18 2028
19 2029
20 2030
21 2031
22 2032
23 2033
DE PROYECTO
6125
7348
8954
Poblacion 12268
Aritmetico Geometrico
19,992 19,992
20,375 20,651
20,758 21,332
21,141 22,035
21,524 22,762
21,907 23,513
22,290 24,288
22,673 25,089
23,056 25,916
23,439 26,771
23,822 27,654
24,205 28,566
24,588 29,508
24,971 30,481
25,354 31,486
25,737 32,524
26,120 33,597
26,503 34,705
26,886 35,850
27,269 37,032
27,652 38,253
28,035 39,515
28,418 40,818
28,801 42,164
Datos de Proyecto Cantidad Unidad
Poblacion del Ultimo censo = 19,992.00 Hab
Poblacion actual = 26,776.00 Hab
Poblacion Proyecto = 43,575.00 Hab
Clima = Frio
Dotacion = 175 Lts/Hab/Dia
Gasto de Proyecto o Gasto medio diario = 88.26 Lts/seg
Gasto maximo diario = 57.76 Lts/seg
Gasto Maximo horario = 86.64 Lts/seg
Coeficiente de Variacion diaria = 1.2
Coeficiente de Variacion horaria = 1.5
Fuente de abastecimiento = Manantial
Tipo de Captacion = Caja Col.
Conduccion = Bombeo
Capacidad de regularizacion = 842.14 m3
Potabilizacion = 86.64 Lts/seg
Distribucion = Abierta
Comentarios
Gasto = 57.76 Lts/seg. 0.05776 m3/seg.
Vminima = 0.50 m/seg.
Vmaxima = 5.00 m/seg.
Diametros Posibles
Ǿ= 4 13,879,682.75 0
Ǿ= 6 3,038,063.01 0
Ǿ= 8 1,951,953.47
Ǿ= 10 1,773,742.31
Ǿ= 12 1,750,623.02 1
Ǿ= 14 1,757,697.67
Ǿ= 16 1,754,241.36
Ǿtentativo = 11.40 Dimenciones de Excavacion en (mts)
Longitud Ancho Profundidad
Diametro 1 4 Plg 1,155.00 0.60 1.00 Diametro Nominal
Diametro 2 6 Plg 1,155.00 0.70 1.10 mm Plg.
Diametro 3 8 Plg 1,155.00 0.75 1.15 25.40 1
Diametro 4 10 Plg 1,155.00 0.80 1.20 50.80 2
Diametro 5 12 Plg 1,155.00 0.85 1.25 63.50 2 1/2
Diametro 6 14 Plg 1,155.00 0.90 1.30 76.20 3
Diametro 7 16 Plg 1,155.00 1.00 1.40 101.60 4
152.40 6
Velocidad 1 7.12 m/seg 203.20 8
Velocidad 2 3.17 m/seg 254.00 10
Velocidad 3 1.78 m/seg 304.80 12
Velocidad 4 1.14 m/seg 355.60 14
Velocidad 5 0.79 m/seg 406.40 16
Velocidad 6 0.58 m/seg 457.20 18
Velocidad 7 0.45 m/seg 508.00 20
609.60 24
ha = 5.00 m 762.00 30
hi = 85.00 m 914.40 36
E
Material
kg/cm2
Acero 2,100,000.00
Hierro Fundido (Fo Fo) 930,000.00
Concreto Simple 125,000.00
Asbesto - Cemento 328,000.00
PVC 25,750.00
Polietileno 5,200.00
Agua 22,433.40
GOLPE DE ARIETE
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
Presion de Trabajo Diametro Esp. pared V Sobrepresion SP x Val SP x Tubo Carga normal Presion Tot.
145V Ea D Et e Ea D/Et e 1 + (Ea D/Et e) (1 + (Ea D/Et e))^(1/2)
de la Tuberia kg/cm2 (Cm) (Cm) (m/seg) hGa = 5 / 10 80 % de 11 20 % de 11 de op. (m) 13 + 14
35.16 10.16 1.27 7.12 1,033.0394 227,923.34 32,702.50 6.9696 7.9696 2.8230 365.9305 292.7444 73.1861 789.5567 862.7428 0
22.15 15.24 1.24 3.17 459.1286 341,885.02 31,930.00 10.7073 11.7073 3.4216 134.1855 107.3484 26.8371 170.4766 197.3137 1
11.25 20.32 0.84 1.78 258.2598 455,846.69 21,630.00 21.0747 22.0747 4.6984 54.9679 43.9743 10.9936 107.3512 118.3448 0
Diam. (Plg) 4 Clase PVC RD-26 Diam. (Plg) 6 Clase PVC RD-26 Diam. (Plg) 8 Clase PVC RD-26
CONCEPTO
Cantidad Unidad P.U. Importe Cantidad Unidad P.U. Importe Cantidad Unidad P.U. Importe
Excavacion en Material Clase "A" 172.50 m3 42.21 7,281.23 221.38 m3 42.21 9,344.24 247.97 m3 42.21 10,466.76
Excavacion en Material Clase "B" 414.00 m3 62.30 25,792.20 531.30 m3 62.30 33,099.99 595.13 m3 62.30 37,076.29
Excavacion en Material Clase "C" 103.50 m3 237.60 24,591.60 132.83 m3 237.60 31,559.22 148.78 m3 237.60 35,350.43
Plantilla Apizonada 69.00 m 3
95.82 6,611.58 80.50 m 3
95.82 7,713.51 86.25 m 3
95.82 8,264.48
S/Instalacion Junteo y Prueba de Tuberia 1150.00 ml 266.20 306,130.00 1150.00 ml 266.20 306,130.00 1150.00 ml 397.91 457,596.50
Relleno Compactado 280.06 m3 91.10 25,513.66 355.79 m3 91.10 32,412.05 404.78 m3 91.10 36,875.88
Relleno a Volteo 326.37 m 3
40.89 13,345.27 420.85 m 3
40.89 17,208.72 457.13 m3 40.89 18,691.84
Atraques de Concreto f`c=100 kg/cm2 0.00 m3 0.00 0.00 0.00 m3 0.00 0.00 0.00 m3 0.00 0.00
Acarreo 108.72 m3 0.00 141.68 ml 0.00 169.20 ml 0.00
Equipo de Bombeo 1.00 Pza 0.00 1.00 Pza 0.00 1.00 Pza 0.00
RESUMEN
A B C D E F G
Presion de Trabajo Diametro Nominal KWH Costo por Hora de Bombeo Costo Anual de Bombeo Cargo Anual de
de la Tuberia en Amortizacion
kg/cm2 H.P. Costo Total de Conduccion (Conduccion) Costo Anual
=A (F.C.) =B($/KWH) =C(Hrs de Bomb por año)
mm Plg
35.16 101.60 4 857.2330 639.2386 1,578.92 13,831,334.31 409,265.53 48,348.44 13,879,682.75
22.15 152.40 6 185.0889 138.0208 340.91 2,986,382.91 437,467.72 51,680.10 3,038,063.01
11.25 203.20 8 116.5527 86.9134 214.68 1,880,562.08 604,322.17 71,391.39 1,951,953.47
0.127
Diametro Nom. Area en m2 Gasto m3/s Vel m/seg Longitud m Coef. Man. Const. Man.
Q2
mm Plg. (A) (Q) (V) (L) (n) (K)
254.00 10 0.0507 0.0578 1.14 1,155.00 0.0033 0.009 1.2452
304.80 12 0.0730 0.0578 0.79 1,155.00 0.0033 0.009 0.4709
355.60 14 0.0993 0.0578 0.58 1,155.00 0.0033 0.009 0.2070
GOLPE DE ARIETE
1 2 3 4 5 6 7 8 9
RESUMEN
A B C D
Presion de Trabajo Diametro Nominal KWH Costo por Hora de Bombeo Costo Anual de Bombeo
de la Tuberia en
kg/cm2 H.P.
=A (F.C.) =B($/KWH) =C(Hrs de Bomb por año)
mm Plg
11.25 254.00 10 103.4448 77.1388 190.53 1,669,066.98
11.25 304.80 12 99.8814 74.4816 183.97 1,611,573.21
11.25 355.60 14 98.6667 73.5758 181.73 1,591,973.97
Perd. Fricc. Otras Perd. Perd. Total Q (hft) 76η
HP=Qhft/76η
hf=KLQ 2
10% hf hft=hf+%hf Q en Lts/s η = 70 %
4.7983 0.4798 95.2781 5,503.26 53.20 103.4448
1.8146 0.1815 91.9961 5,313.69 53.20 99.8814
0.7975 0.0798 90.8773 5,249.07 53.20 98.6667
ARIETE
10 11 12 13 14 15
0.00
1,177,045.00 1,402,837.32
EN
E F G
Cargo Anual de
Amortizacion
Costo Total de Conduccion (Conduccion) Costo Anual
GOLPE DE ARIETE
1 2 3 4 5 6 7 8 9
Comprobacion 0.00
Costo Total de Conduccion 1,439,848.25
RESUMEN
A B C D
Presion de Trabajo Diametro Nominal KWH Costo por Hora de Bombeo Costo Anual de Bombeo
de la Tuberia en
kg/cm2 H.P.
=A (F.C.) =B($/KWH) =C(Hrs de Bomb por año)
mm Plg
11.25 406.40 16 98.1815 73.2140 180.84 1,584,145.38
Perd. Fricc. Otras Perd. Perd. Total Q (hft) 76η
HP=Qhft/76η
hf=KLQ 2
10% hf hft=hf+%hf Q en Lts/s η = 70 %
0.3912 0.0391 90.4304 5,223.26 53.20 98.1815
ARIETE
10 11 12 13 14 15
EN
E F G
Cargo Anual de
Amortizacion (Conduccion)
Costo Total de Conduccion Costo Anual
195.00
185.00
175.00
Elevaciones
165.00
155.00
145.00
135.00
125.00
115.00
105.00
95.00
0 50 100 150 200 250 300 350 400 450 500 550 600 650 700 750 800 850 900 950 1000 1050 1100 1150
Cadenamientos
Cadenamiento T.N. Tuberia Estatica Piezometrica S.P. Por GA
0 95.00
0 100.00 98.75 185.00 187.00 191.86
50 112.00 110.75 185.00 186.91 191.77
100 120.00 118.75 185.00 186.82 191.68
150 125.00 123.75 185.00 186.74 191.60
200 126.00 124.75 185.00 186.65 191.51
250 122.00 120.75 185.00 186.56 191.42
300 121.00 119.75 185.00 186.48 191.34
350 121.00 119.75 185.00 186.39 191.25
400 127.00 125.75 185.00 186.30 191.16
450 135.00 133.75 185.00 186.22 191.08
500 140.00 138.75 185.00 186.13 190.99
550 148.00 146.75 185.00 186.04 190.90
600 152.00 150.75 185.00 185.95 190.81
650 158.00 156.75 185.00 185.87 190.73
700 160.00 158.75 185.00 185.78 190.64
750 160.00 158.75 185.00 185.69 190.55
800 160.00 158.75 185.00 185.61 190.47
850 158.00 156.75 185.00 185.52 190.38
900 157.00 155.75 185.00 185.43 190.29
950 162.00 160.75 185.00 185.35 190.21
1000 164.00 162.75 185.00 185.26 190.12
1050 167.00 165.75 185.00 185.17 190.03
1100 172.00 170.75 185.00 185.09 189.95
1150 185.00 183.75 185.00 185.00 189.86
Diferencia
93.11
81.02
72.93
67.85
66.76
70.67
71.59
71.50
65.41
57.33
52.24
44.15
40.06
33.98
31.89
31.80
31.72
33.63
34.54
29.46
27.37
24.28
19.20
6.11