My name’s Rio Wijaya. I was born Jakarta, 27 September 1987.
I’m moslem and married with two child. I graduate Diploma 3
from Oil and Gas Academy Balongan with major Petroleum
Technic and finish in 2008.
Leadership
Communication Job Description Production Platform Operator :
Team Player
1. Monitoring riser pipeline (pressure and temperature)
Creativity
2. Monitoring air compressor (pressure) for air supply well
and equipment support
3. Following test well to test separator every well
4. Calculation rate production fluid and gas every day
5. Monitoring performance ESP pump (bottom hole pressure,
temperature, ampere)
6. Monitoring wellhead operation (pressure and temperature)
7. Operate manuall valve for open or close at production
header and test header while test well
8. Took oil sample after test well or service well
9. Following weekly activities production platform
10. Start up well after service or restart well, monitor and
shutdown all production facilities, utility equipment.
11. Monitoring Automatic Panel
12. Calculation chemical stock, transfer chemical to daily tank
and check injection rate chemical
13. Housekeeping platform area
14. Following tool box meeting every day
15. Making daily report, weekly report
16. Assist maintenance team if any problem and job activities.
17. SIMOP Operations monitor and record activities SIMOP
18. Troubleshoot well likely underload, overload, gas lock
19. Replace daily chart or weekly chart in switchboard
20. Knowledge of smoke detector, flame detector and gas
Detector
21. Monthly safety inspection
22. Knowledge lifting operation and working height.
23. Check condition medicine (expire,complete or no)
24. Understand use of life boat, life raft, life jacket, eye
washer, life ring, Portable Fire Extingusher, Breathing
Apparatus
25. Maintenance platform
26. Collect waste in platform for sending to Barge
27. Monitoring production facilities
28. Monitoring utilities system
29. Report to Production Supervisor if any unsafe or near mist
condition, local or unit shutdown/problem (ESD)
30. Evaluation permit to work (PTW) for makesure safe or
unsafe condition and record to log book.
31. Follow do STOP program for observe or minimaze hazard.
32. Follow HSE regulation and permit system, LOTO, Tag and
effective compliance by company.
33. Purging sytem after tank cleaning for leak test
Training