1 TALLERES + EXPOSICION
1.01 OBRAS PROVISIONALES
01.01.01 CARTEL DE IDENTIFICACION DE LA OBRA
1.02 OBRAS PRELIMINARES
01.02.01 TRAZO Y REPLANTEO INICIAL
1.03 MOVIMIENTO DE TIERRAS
01.03.01 EXCAVACION DE ZANJA PARA CIMIENTOS
01.03.02 EXCAVACION PARA CIMIENTOS ZAPATAS HASTA 1.00 MT
01.03.03 RELLENO CON MATERIAL PROPIO
1.04 OBRAS DE CONCRETO SIMPLE
01.04.01 CIMIENTOS Y SOBRECIMIENTOS
01.04.01.01 CIMIENTOS CORRIDOS MEZCLA 1:10 CEMENTO-HORMIGON 30% PIEDRA
01.04.01.02 SOLADOS PARA ZAPATAS E=4"
01.04.02 SOBRECIMIENTO
01.04.02.01 CONCRETO 1:8+25% PM PARA SOBRECIMIENTOS
01.04.02.02 ENCOFRADO Y DESENCOFRADO EN SOBRECIMIENTOS HASTA 0.30m
1.05 CONCRETO ARMADO
01.05.01 ZAPATAS
01.05.01.01 CONCRETO PARA ZAPATAS f'c=210 kg/cm2
01.05.01.02 ACERO fy=4200 kg/cm2 PARA ZAPATAS
01.05.02 COLUMNAS
01.05.02.01 CONCRETO f'c= 210 kg/cm2 EN COLUMNAS
01.05.02.02 ENCOFRADO Y DESENCOFRADO DE COLUMNAS
01.05.02.03 ACERO fy=4200 kg/cm2 PARA COLUMNAS
01.05.03 VIGAS
Costo Directo
Gastos Generales 8%
Utilidad 10%
Sub Total
igv 18%
Presupuesto Total
MANO DE OBRA
Und. Metrado Precio S/. Parcial S/. OPERARIO OFICIAL PEON
90,298.06 47.00 47.00 47.00
300
glb 1 300 300 0.00 0.00 0.00
19.32
m2 27.6 0.7 19.32 3.31 0.00 8.83
65.18
m3 2.52 11.2 28.22 0.00 0.00 26.89
m3 3 9.6 28.8 0.00 0.00 27.42
m3 1.7 4.8 8.16 0.00 0.00 7.77
731.15
432.14
m3 2.52 158.19 398.64 9.68 4.03 25.80
m3 2 16.75 33.5 1.54 0.64 4.10
299.01
m3 0.8 188.34 150.67 3.07 2.56 16.38
m2 8.4 17.66 148.34 33.60 27.97 5.38
53,346.71
389.35
m3 1.4 251.42 351.99 5.38 4.48 17.92
kg 8.51 4.39 37.36 1.96 1.62 0.00
6,798.89
m3 7.68 258.06 1,981.90 49.15 40.93 196.61
m2 74.64 21.88 1,633.12 358.27 298.56 67.18
kg 826.98 3.85 3,183.87 148.86 124.05 0.00
11,192.87
m3 12.22 258.06 3,153.49 78.21 65.13 312.83
m2 117.01 32.29 3,778.25 661.11 551.12 122.86
kg 1109.67 3.84 4,261.13 199.74 166.45 0.00
3,349.61
m3 5.68 267.2 1,517.70 27.26 45.44 181.76
m2 40.64 21.68 881.08 195.07 162.56 36.58
kg 246.97 3.85 950.83 44.45 37.05 0.00
31,615.99
m3 128.1 236.88 30,344.33 614.88 1,024.80 4,099.20
m2 11.1 37.3 414.03 88.80 0.00 118.44
kg 223.34 3.84 857.63 40.20 33.50 0.00
7,742.51
m2 118.38 35.96 4,256.94 902.06 0.00 449.84
m2 111.36 31.3 3,485.57 1,069.06 0.00 534.53
2,101.27
m2 44.92 17 763.64 344.99 0.00 115.00
m2 59.17 17.21 1,018.32 454.43 0.00 151.48
m2 14.21 17 241.57 109.13 0.00 36.38
m 14.95 5.2 77.74 44.85 0.00 9.87
5,489.05 2,590.89 6,573.03
64,605.15
5,168.41 0.07200 0.03399 0.08622
6,460.52
76,234.08
13,722.13
89,956.21
MANO DE OBRA
CAPATAZ OP.EQUIPO LIVIANO LADRILLO CARTEL DE O YESO madera tornillo
47.00 50.00 43.00
ARENA 0.01119
PIEDRA 6' 0.00031
5 PIEDRA 8' 0.00116 0.08977
HORMIGON 0.07645
AGUA 0.00066
ALAMBRE 0.01098
7 CLAVO 0.00321 0.11589
ACERO CORRUGADO 0.10170
ME
GG Y UU
HO
AC. CO
MA. TOR