Quality Management
The Quality Department is monitoring the Audit Programme of the Supervision Consultants
Quality Management System Integration
(SC) and Construction Contractors (CC). The summary of CARs and Observations raised /
closed during the audits by SCs and CCs are given below.
This month HPD Quality Department has implemented the Performance KPI
assessments for Contractors and Supervision Consultants on all projects, except on Audit By Audits CARs Raised CARs Closed OBS Raised OBS Closed
P007-C5-P1, P008-C2, and P008-C3 projects.
4 out of 5 QA Processes in Blueworks has been completed and approved by HPD Supervision Consultant 9 9 3 9 0
Manager. 1 process is pending for review by PQD. Construction Contractor 7 2 7 21 0
A centralized location for QMS documents including Functional Management Plans and
Guidelines is maintained in CDMS and access has been provided to all HPD staff. Status of QSD/ANAS Audit Reports and Responses
No. of Response Waiting Audit in Report
Projects Provided to In Progress Response from Progress by Awaited from
Audited QSD SC ANAS ANAS
Audits 15 9 - 3 1 2
P029-C1
The Quality Department has carried out a total of 4 Audits on the Expressway P015
P012 P017-C2
Programme out of the 4 planned for the month of January 2019. There were 4 P003*
P007-C1
Observations raised during the audit. There were 3 CARs and 8 Observations closed
during the Follow-up Audits. * Follow-up Audit
The Compliance / system and Follow up Audits were conducted on the following
ANAS has conducted follow-up audits on Project P003, P023-C1 and P023-C4. Project P003
Projects:
Follow-up Audit report has not been issued by ANAS.
The evidence for close out for the audit findings were reviewed by HPD Pavement team and
Project Audited Audit Scope
Supervision Consultants.
P003 CDM Smith Follow-up Audit
P017-C1-IN Halcrow Follow-up Audit Key Quality issues Actions to address the key issues
P023-C2 AECOM Compliance Audit – Utilities
International Roughness Index (IRI) Action plan to resolve the IRI non compliant
P023-C3 AECOM Follow-up Audit Non-Conformances on the EXW. sections of road pavement to be implemented
Parsons
P007-C1
P007-C2
P008-C2
P008-C3
P017-C2
P023-C1
P023-C2
P023-C3
P023-C4
P017-C1-IN
P060
CDM Smith
CDM Smith
P007-C5-P1
P007-C7-P2
Halcrow
Halcrow
Halcrow
Parsons
Parsons
AECOM
AECOM
AECOM
AECOM
KEO
P012
P005
P029-C1
Halcrow
P010
P011
P015
WSP
Parsons
Parsons
Egis
Egis
P003
8.0 7.4
7.0 6.8 6.9 1 P005 QD/SBG 6.9 1 P029-C1 Boom 7.4
6.4 6.5 6.6 6.5 6.5
6.2 5.9 6.2
5.8 5.5 Al Jaber
6.0 2 P012 6.8 2 P005 QD/SBG 7.0
4.9 T&GC
4.7
Leighton – Al
3 P023-C3 6.7 3 P011 CHEC 6.9
4.0 Jaber
P007-C7-
4 P007-C2 Dogus - Onur 6.5 4 CCCT 6.8
P2
2.0 Al Jaber
5 P007-C1 Six - Boom 6.3 5 P012 6.6
T&GC
L&T
Hyundai
SIX-BOOM
CHEC
Tekfen
P017-C2
P023 C1
P029-C1
P010
P017-C1-IN
Al Jaber T&GC
P015
P007-C7-P2
J&P
P011
QDVC-BOTC
LEIGHTON-AJE
DOGUS-ONUR
Tekfen
P060
P005
P007 C1
Boom
J&P
P003
P023 C2
Boom
CCCT
P023 C3
P007C2
P012
6 P015 L&T 5.7 6 P017-C2 Tekfen 6.5
Status
Road Length %
(Lane Km) Construction Contractor QC KPIs Evaluation Scores
Total Road Lane Length Scope 8.85 9.22 9.09 8.97
9.69
3560 10.00 8.38 8.65 8.23 7.75
for IRI 8.00 6.88 7.30 7.60 7.36 6.98
6.00
Compliant Road Lane Length 2512 71% 4.00
2.00
Out of Specification Limits 0.00
424 12%
P007-C1
P007-C2
P008-C2
P008-C3
P017-C2
P023-C1
P023-C2
P023-C3
P029-C1
P003
P005
P017-C1-IN
P060
P007-C7-P2
P007-C5-P1
Road Lane Length
Significantly Out of
Specification Limit Road Lane 77 2% Internal Projects External Projects
Length
Sep-18 QC KPI Scores Dec-18 QC KPI Scores Target Score
Balance Road Lane Length
(Includes WC Laid to be tested, Test Results 548 15%
awaited and WC to be placed)
The Supervision Consultants should provide an action plan to resolve and rectify the non HPD Quality Department is monitoring the status of testing frequency compliance on the
compliant road pavement sections of the road pavements and submit to HPD Pavement Expressway Programme. In order to ensure that the Construction Contractors are
Team for approval. achieving the required Material Sampling and Testing Frequencies, as stipulated in the
The rideability compliance levels achieved on the Projects and status of IRI resolution plans Project Specifications and QCS, each project Supervision Consultants are required to
are presented in Appendix 4. provide a monthly summary to the HPD.
Relaying of Asphalt Wearing Course was done on Project P003 as per the approved IRI An overview indicating the compliance level on the Expressway Programme for the month
resolution action plan. of January 2019 is attached to this report.
7
6 NCRs OBS
4 4
3
2 2 2 2
1 1
Overall Asphalt Performance 4 Week Rolling - NCRs/10,000 Tons Trend
Target Ratio: ≤ 0.5
Marshall
Thickness
Tack Coat
In-Place Av
Contents
IRI
Gradation
Fuel Spillage
Compaction
Operations
Defects
Settlement
Level Control
Surface
Bitumen
In-Place Av
Asphalt
Paving
0.0
01-Dec 08-Dec 15-Dec 22-Dec 29-Dec 05-Jan 12-Jan 19-Jan 26-Jan 02-Feb 09-Feb
3 3 2
12 - Concrete & Clay Blocks / Bricks N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A
13 - Masonry / Mortar for Tiles, Plaster etc N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A
14 - Interlocking Blocks (or Paving Blocks) N/A N/A N/A N/A N/A N/A N/A N/A
16 - Waterproofing / Protective Coating N/A N/A N/A N/A N/A N/A N/A
17 - Pipes / Sprinklers N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A
18 - PRC Pipes / GRP Lined RC Pipes / Precast
Pipes / GRP (Long, Short Pieces) N/A N/A N/A N/A N/A N/A N/A
19 - Functionality Tests for Piping Systems N/A N/A N/A N/A N/A
20 - Road Furniture Markings / Thermoplastic /
Accessories etc N/A N/A N/A N/A N/A N/A N/A N/A N/A
21 – Microsilica (or Silica Fume), GGBS, PFA (or Fly
Ash) etc N/A N/A N/A N/A N/A N/A
22 - Commissioning / Activation Tests N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A
23 - Manhole Covers, Road Gullies / Gratings etc N/A N/A N/A N/A N/A N/A N/A
25 - Ground Water (Dewatering), Water for Concrete
/ Curing, TSE, Storm Water, Foul Sewer N/A N/A N/A N/A N/A
27 - Others (Specify) - Rockfill N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A
28 - Others (Specify) - CBM N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A
Full Compliance with Frequency Partial Compliance with Frequency Not Complying with Frequency
Improvement noted from the previous Deficiencies noted from the previous
To reduce the additional “Testing Frequency Compliance Report”, HPD Quality Department and QSDreport
have revised the Ashghal QA/QC Questionnaire
report
to cover the cumulative testing frequency compliance
reporting on the new Projects.
* P003, P005, P007-C1, P007-C2, P023-C1 and P023-C3 are reporting monthly testing frequency compliance levels.
Testing Laboratory ACES DTL FUGRO QEL FUGRO QEL FUGRO QEL ACES QEL QEL FUGRO QEL ACES ACES
Laid To be Tested 0 2 5 3 0 0 14 0 54 0 0 70 24 0 0
Length of Road Lanes Tested 79 30 18 55 11 45 191 215 36 255 24 275 567 689 608
% IRI Out of Specification limits 39% 20% 3% 22% 0% 0% 42% 32% 14% 39% N/A 57% 10% 0% 0%
IRI Action Plan Status Legend Implemented With SC Under Review Rejected
Overall 2423 2018 83% 1131 1058 94% 1.3 1.5 5 7 99.8%
NCRs/10,000 Tons: 0 to 0.5 NC/10,000 T 0.6 to 1.0 NC/10,000 T Above 1.0 NC/10,000 T