County – Ballard / McCracken

Route – US 60
BALLARD/MCCRACKEN COUNTY – US 60
Item No – 1-115.0 / 1-115.1 / 1-118.0

Welcome
The Kentucky Transportation Cabinet (KYTC) welcomes you to The purpose of the project is to improve mobility and safety for Alternate 2 also consist of curb & gutter through Kevil with a 3-
the Public Information Meeting for the US 60 reconstruction the US 60 corridor in eastern Ballard County. US 60 is the only Lane or a 5-Lane option. The 4-lane option would include a 40-
project from the east end of the Humphrey Creek Bridge, Ballard east-west arterial link in Kentucky west of Paducah, leading to foot median. These alternates include:
Co. to About 1,500 feet west of KY 1154 (existing 4-Lane), the only Ohio River highway crossing for an 80-mile stretch.
McCracken Co. This meeting will present the project purpose and Listed on the National Highway System and a state-designated Alternate 1: This alignment would be new construction along a
need along with the alternates that have been developed to truck route, its narrow lanes, limited passing opportunities, new corridor south of existing US 60, using a rural template with
address the needs and meet the goals of the project. To assist in closely spaced access points through Kevil, and substandard shoulders. Alternate 1 proposed length is 6.29 miles.
the design and development of this project, we request the curves make the route challenging for freight carriers.
public provide comments on the project alternates and the Alternate 2: This alignment is to reconstruction along existing US
potential improvements for your community. The proposed project calls for the widening of US 60. The goals 60 using a rural template with shoulders up to Kevil where an
of the US 60 widening include: urban template consisting of curb & gutter and a center two-way
The purpose of this meeting is to gather public information and 1) Improve Safety. left turn lane will be constructed for both the 3-lane and 5-lane
input on the preliminary alternatives for improvements to US 60. 3) Improve Horizontal & Vertical Curves. options. Alternate 2 proposed length is 6.51 miles.
The information we gather tonight, the data we get from 2) Improve Traffic Flow from LaCenter thru Kevil on US 60.
environmental consultants, and the engineers’ studies will help 4) Support Economic Development. Alternate 3: This alignment is to be new construction along a new
decide the preferred alignment for the project. 5) Improve US 60 East – West Connectivity. corridor following the old Illinois Central Railroad alignment
north of existing US 60 using a rural template with shoulders.
KYTC appreciates your involvement in the project and we Project Alternative Overview and Public Meeting Exhibits Alternate 3 would join the existing US 60 at Clarkline Road and
encourage you to visit the informational displays and speak with KYTC is considering four different alternates all beginning at then follow the Alternate 2 urban template through Kevil. The
the project team members regarding any questions you may Humphrey Creek Bridge in Ballard County and ending at the proposed length of Alternate 3and the Kevil segment is 6.46
have concerning the project. Please complete the survey form existing US 60 4-lane roadway near Lester Harris Road in miles.
and place it in the box near the sign-in table or take the form McCracken County.
home with you and submit it later. All written comments will be Alternate 4: No Build alternate would mean no improvements
accepted for the official Alternates 1, 2 & 3 each have two options of either a 4-Lane or would be constructed and the existing US 60 would remain as it
meeting record up to 10 days Chris Kuntz, PE 2-lane Roadway being considered by the project team. is today.
after the public meeting by KYTC District 1 Office
mail or email to Chris Kuntz, 5501 Kentucky Dam Rd.
PE, KYTC Project manager. Or, Paducah, KY 42003
the questionnaire can be Chris.Kuntz@ky.gov
completed on-line at the Phone: (270) 898-2431
below location:
https://qk4.typeform.com/to/dOJjOu

Project Summary and Purpose and Need


US 60 is considered a principal arterial on the national highway
system and the national truck network, providing east-west
connectivity from Paducah thru Wickliffe, to Illinois & Missouri.
BALLARD/MCCRACKEN COUNTY – US 60
TYPICAL SECTIONS KYTC. “2016 Final Combined PIP” Accessed August 28, 2018 US 60 Public Information Meeting
https://transportation.ky.gov/YourTurn/Documents/2016%20Final%20Combined%20PIP.PDF
Item No. 1-115.0 /1-115.1 / 1-118.0

June 11, 2019

Public meeting displays will be available on District 1’s website:


https://transportation.ky.gov/DistrictOne/Pages/default.aspx