ATP CHECK LIST FORM
1. OUTDOOR INSTALLATION
Grounding for ODU and Busbar + Label (both side) OK NOK NA Pict 8 & 9
Installation of Ground Kit + Label (both side) OK NOK NA Pict 12 & 13
Measurement with DC
VDC –43.2 VDC to –56.0 VDC OK NOK
Voltmeter
1. Penempatan antena dari kaki tower 2. Pemasangan antena main + label + barcode
3. Pemasangan ODU 2+0, label + barcode 4. Pemasangan ODU 2+0 , label + barcode
7. Pemasangan brackett antena di pipa mounting 8. Pemasangan kabel IF & ground ODU + label +
waterproof
9. Terminasi ground ODU di busbar tower + label 10. Pemasangan kabel ties pada sisi vertikal tray
11. Pemasangan kabel ties pada sisi horisontal tray 12. Pemasangan grounding kit + label
13. Terminasi kabel ground kit di busbar + label 14. Posisi masuknya kabel IF di FEP Shelter/SC. FEP SC
tidak perlu di Sealent, FEP Shelter harus di Sealant.
15. Posisi IDU tampak depan dari SC/rak 19” 16. Pemasangan kabel IF, ground IDU/Modem + label
17. Pemasangan kabel traffic, power IDU + label 18. Label IDU dan barcodenya
19. Pemasangan kabel IF, ground, + label 20. Pemasangan terminal blok LSA + label
21. Pemasangan kabel power di Rectifier/DCPDB 22. Kondisi shelter/SC tempat IDU terpasang tampak
depan
23. Foto SID + Red mark 24. Foto Ketinggian Antenna (pakai meteran)
NA
NA
NA
Rectification
NO Punchlist Item Event Date Date Status Remarks
1 ATF 6 Nov 2017 Open ATF N/A (SOW: Swap Upgrade)
2 FATP 6 Nov 2017 Open FATP Not Sign Team Reviewer Isat
BEFORE AFTER
ATF
Comment Comment
BEFORE AFTER
FATP
Comment Comment
BEFORE AFTER
Comment Comment
BEFORE AFTER
Comment Comment
BEFORE AFTER
Comment Comment
BEFORE AFTER
Comment Comment