Project Manager

 Overall responsible in the project implementation and to ensure the timely delivery of all
contract requirements are met based on the construction schedule and within the budget.
 Oversees and evaluates project status and recommends corrective action and control measures
for proper and timely accomplishment of the project.
 Schedules and plans all actual construction and related works and improve proper sequencing
of works for the timely completion of the project.
 Ensures that project requirements as to manpower, materials, equipment and finance is within
the Preconstruction Planning.
 Supervises the payment for materials and works accomplished to ensure that all obligations to
suppliers and sub-contractors are paid.
 Coordinates with the project’s design engineers and/or consultants on the technical aspects of
the constructive activities.

Construction Manager

 Responsible for overall site management, dissemination or execution of quality procedures that
meets project specification and project requirements.
 Establishment of construction organization monitor job quality, schedule control and overall
project management.
 The Construction Manager is responsible in executing the works as per client procedure and
approved method statement.
 Ensures the proper interpretation of all technical plans and specifications.
 Oversees the project execution and operations, to ensure that all contract requirements are met
based on the targets and policies of both the client and the Company.
 Ensures the implementation of the quality plans and objectives of the department and project
assignment.

QA/QC Manager/Project Superintendent

 Assume the overall responsibility of Quality Assurance/ Quality Control (QA/QC) concerns

 Directs Field Architect/Engineers’ on the operation’s request regarding the inspections of line &
grade, excavations, rebar/formworks installations, concrete pouring, stripping, architectural
material installation and other related activities
 Ensures that prior to activity implementation; prerequisites and methodology are
properly followed and executed
 Ensures that punch lists are closed within the time frame allotted
 Directs inspectors in the witnessing of laboratory test conducted for materials to be
used including soil compaction test
 Prepares QAQC scorecard template for preconstruction and construction based on the
project scope of work
 Provides inputs in the preparation and implementation of Project Quality Plan
 Coordinates with TSD/Operations Group on the Submittal Registry Log
 Coordinates the proper interpretation of all technical plans and specifications
 Shall be responsible for the execution of this procedure, monitoring and control of activities
pertaining to the pre-fabrication erection and installation of piping and its components,
compliance with HSE procedure.
 Evaluates, checks and verifies project accomplishments vis-a-vis budget
 Coordinates with the Construction Manager on the progress of accomplishments,
problems and actions for the proper execution of construction
 Ability to coach and mentor workmates/subordinates for continuous improvement as well
as work performance

Project Engineer

 Field engineering inspection and supervision in the area of piping works and ensuring
implementation and adherence to project specifications, procedures and HSE policies.
 Shall provide technical support to the operation of piping works and ensure that piping
fabrication and erection, inspection and testing meet the project specification ensuring with
latest IFC. Continuously check and review the changes status during the work.
 Shall control of all kind of resources and coordinate with Project superintendent on execution
of work and ensure productivity.
 Shall ensure that all site activities are performed in environmentally safe and responsible
manner accordance with HSE and follow-up all safety procedures, permit to work, etc.
 Shall supervise piping works and ensure the compliance with established construction schedule
and project requirements as per applicable specifications and standards.
 Coordinate with QC personnel to study the cause of any reported defects and arrange to take
corrective and preventive action.
 Adhere to the client HSE requirements.
 Comply with client PTW requirements.

QA/QC Engineer/Inspector
• Carry out the inspection as per the Inspection and test plan.
• Approving/ rejecting the item based on inspection.
• Submitting the quality records to the client and getting their approval.
• Responsible to keep records of all inspection related activities & Material traceability.
• Adhere to the HSE requirements.
• Shall be responsible for inspection on production of pipes, fittings and spools to ensure the
procedures are being followed in order to ensure that quality standards being achieved as
per Project procedures, requirements and specifications.
• Shall be responsible for maintenance of NDT records & Project documentation.

Safety Supervisor
 Prepares Safety protocols
 Advise the construction crew on HSE aspects and ensure their safety.
 Arrange through Job performer for toolbox talk covering risk assessment in language
understandable by workers.
 Cross checking certified material devices and equipment are used.
 Do weekly, monthly HSE audit.
 Ensure appropriate safety measures are taken as per the risk assessment and controlled
documents.
 Ensure that all staff adhere to the HSE plan and HSE requirements.
Safety Officer
 Shall be responsible for the implementation of the HSE procedures before and during the
execution of Piping fabrication and erection.
 Shall be responsible for check for any unsafe conditions on the working areas and liaise with
field Supervisor ensuring that the work is carried out as per approved Project safety plan and
procedure.