DESIGN CALCULATION OF ANCHORAGE LENGTH FOR STUDS

LIFT WELL P.C. PANELS INSTALLATION


FOR BEDOK TOWN N5 C7(PT), 8 & 16(PT) (MUP 18)

I. DESIGN CRITERIA :
fc' = 40 Mpa (@ Service Condition)
b = 0.40 (Bond Coefficient)
fbu = b fc'0.5 (Design Ultimate Anchorage Bond Stress)
= 2.53 Mpa

II. LOADINGS :
A. Dead Load
WDL1 = 8.39 kg/m (CHS-01) L1 = 5.78 m (CHS-01)
WDL2 = 6.15 kg/m (SHS-01) L2 = 6.36 m (SHS-01)

WDL1 = 475.73 N
WDL2 = 383.71 N
WDLtotal = 859.44 N

B. Live Load
WLL1 = 4.80 kPa (for Lobby)

considering 0.8 m width;


WLL1 = 4.80 (0.80)
= 3.84 kN/m

C. Ultimate Load : (h = 0.9 m)

U.L. = 1.4DL + 1.7 LL

VDL = 859.44 N
VLL = WL = 3.84 ( 0.9 ) = 3456 N

Vu = 1.4VDL + 1.7VLL
= 7078 N

D. Check for Bond Length : (Provide 2 studs per MS plate) ; D = 12 mm

T = p D fbu Le ; Le = T/pDfbu

T = Tensile force per Stud


= Vu/2 = 3539 N

3539
Le =
p (12) (2.53)

L e = 37 mm

Therefore, the anchorage length provided = 100 mm, is sufficient


to hold the actual service load.
DESIGN CALCULATION OF ANCHORAGE LENGTH FOR STUDS
LIFT WELL P.C. PANELS INSTALLATION
FOR BEDOK TOWN N5 C7(PT), 8 & 16(PT) (MUP 18)

I. DESIGN CRITERIA :
fc' = 40 Mpa (@ Service Condition)
b = 0.28 (Bond Coefficient for Plain Bars)
fbu = b fc'0.5 (Design Ultimate Anchorage Bond Stress)
= 1.77 Mpa

II. LOADINGS :
A. Dead Load
WDL1 = 8.39 kg/m (CHS-01) L1 = 5.78 m (CHS-01)
WDL2 = 6.15 kg/m (SHS-01) L2 = 6.36 m (SHS-01)

WDL1 = 475.73 N
WDL2 = 383.71 N
WDLtotal = 859.44 N

B. Live Load
WLL1 = 0.00 kPa (for Lobby)

considering 0.8 m width;


WLL1 = 0.00 (0.80)
= 0.00 kN/m

C. Ultimate Load : (h = 1.15 m)

U.L. = 1.4DL + 1.7 LL

VDL = 859.44 N
VLL = WL = 0.00 ( 1.15 ) = 0 N

Vu = 1.4VDL + 1.7VLL
= 1203 N

D. Check for Bond Length : (Provide 2 studs per MS plate) ; D = 12 mm

T = p D fbu Le ; Le = T/pDfbu

T = Tensile force per Stud


= Vu/2 = 601.6 N

602
Le =
p (12) (1.77)

Le = 9 mm

Therefore, the anchorage length provided = 100 mm, is adequate


to hold the actual service load.
DESIGN CALCULATION OF ANCHORAGE LENGTH FOR STUDS
LIFT WELL P.C. PANELS INSTALLATION
FOR BEDOK TOWN N5 C7(PT), 8 & 16(PT) (MUP 18)

I. DESIGN CRITERIA :
fc' = 40 Mpa (@ Service Condition)
b = 0.28 (Bond Coefficient for Plain Bars)
fbu = b fc'0.5 (Design Ultimate Anchorage Bond Stress)
= 1.77 Mpa

II. ULTIMATE PULL-OUT TENSION FORCE, Pu :

A. Residential Flat Imposed Load


W = 0.75 kN/m (Horizontal Force acting @ the Handrail)
L = 0.80 m (center to center distance of plates)

Pu = WL = 0.75 ( 0.80 ) = 600 N

B. Check for Bond Length : (Provide 2 studs per MS plate) ; D = 12 mm

T = p D fbu Le ; Le = T/pDfbu

T = Tensile force per Stud


= Pu/2 = 300 N

300
Le =
p (12) (1.77)

Le = 4 mm

Therefore, the anchorage length provided = 100 mm, is adequate


to hold the actual service load.
DESIGN CALCULATION OF ANCHORAGE LENGTH FOR STUDS
LIFT WELL P.C. PANELS INSTALLATION
FOR BEDOK TOWN N5 C7(PT), 8 & 16(PT) (MUP 18)

I. DESIGN CRITERIA :
fc' = 40 Mpa (@ Service Condition)
b = 0.28 (Bond Coefficient for Plain Bars)
fbu = b fc'0.5 (Design Ultimate Anchorage Bond Stress)
= 1.77 Mpa

II. LOADINGS :
A. Dead Load
WDL1 = 8.39 kg/m (CHS-01) L1 = 7.40 m (CHS-01)
WDL2 = 6.15 kg/m (SHS-01) L2 = 8.14 m (SHS-01)

VDL1 = (8.39) (7.40) (9.81) = 609 N


VDL2 = (6.15) (8.14) (9.81) = 491 N
VDL = 1100 N

B. Residential Flat Imposed Load


WLL = 0.75 kN/m (Horizontal Force acting @ the Handrail)

C. Ultimate Load : (h = 0.80 m)

U.L. = 1.4DL + 1.7 LL

VDL = 1100 N
VLL = WL = 0.75 ( 0.80 ) = 600 N

Vu = 1.4VDL + 1.7VLL
= 2560 N

D. Check for Bond Length : (Provide 2 studs per MS plate) ; D = 12 mm

T = p D fbu Le ; Le = T/pDfbu

T = Tensile force per Stud


= Vu/2 = 1280 N

1280
Le =
p (12) (1.77)

L e = 19 mm

Therefore, the anchorage length provided = 100 mm, is adequate


to hold the actual service load.
DESIGN CALCULATION OF ANCHORAGE LENGTH FOR STUDS
LIFT WELL P.C. PANELS INSTALLATION
FOR BEDOK TOWN N5 C7(PT), 8 & 16(PT) (MUP 18)

I. DESIGN CRITERIA :
fc' = 40 Mpa (@ Service Condition)
b = 0.28 (Bond Coefficient for Plain Bars)
fbu = b fc'0.5 (Design Ultimate Anchorage Bond Stress)
= 1.77 Mpa

II. LOADINGS :
A. Dead Load
WDL1 = 8.39 kg/m (CHS-01) L1 = 7.40 m (CHS-01)
WDL2 = 6.15 kg/m (SHS-01) L2 = 8.14 m (SHS-01)

VDL1 = (8.39) (7.40) (9.81) = 609 N


VDL2 = (6.15) (8.14) (9.81) = 491 N
VDL = 1100 N

B. Residential Flat Imposed Load


WLL = 0.75 kN/m (Horizontal Force acting @ the Handrail)

C. Total Load : (spacing = 1.60 m)

F = VDL + VLL

VDL = 1100 N
VLL = WL = 0.75 ( 1.60 ) (0.50) = 600 N

F = VDL + VLL
= 1700 N

D. Check for Bond Length : (Provide 2 studs per MS plate) ; D = 12 mm

T = p D fbu Le ; Le = T/pDfbu

T = Tensile force per Stud


= F/2 = 850 N

850
Le =
p (12) (1.77)

L e = 13 mm

Therefore, the anchorage length provided = 100 mm, is adequate


to hold the actual service load.
DESIGN CALCULATION OF ANCHORAGE LENGTH FOR STUDS
LIFT WELL P.C. PANELS INSTALLATION
FOR BEDOK TOWN N5 C7(PT), 8 & 16(PT) (MUP 18)

I. DESIGN CRITERIA :
fc' = 40 Mpa (@ Service Condition)
b = 0.28 (Bond Coefficient for Plain Bars)
fbu = b fc'0.5 (Design Ultimate Anchorage Bond Stress)
= 1.77 Mpa

II. LOADINGS :
A. Residential Flat Imposed Load
WLL = 0.75 kN/m (Horizontal Force acting @ the Handrail)

B. Horizontal Force, F : (spacing = 1.60 m)

F = WLL x spacing

Considering 4 studs;
F = 0.75 ( 1.60 ) / 4
= 0.30 kN
= 300 N

C. Check for Bond Length : D = 12 mm

T = F = p D fbu Le ; Le = F/pDfbu

300
Le =
p (12) (1.77)

Le = 4 mm

Therefore, the anchorage length provided = 100 mm, is adequate


to hold the actual service load.