Fast track to Sustainable Mobility

POWER POINT PRESENTATION


Dr. Stephan Freudenstein / Jens Kleeberg

17 – 19 March 2008 1
Ballastless tracks – Cross-section of RHEDA 2000® on embankment

17 – 19 March 2008 2
Major references of RHEDA 2000®

Germany
• Production of more than 180,000 concrete bi-block sleepers
• Delivery of more than 20,000 linear meters of turnout sleepers

Taiwan
• Production in Taiwan of more than 125,000 concrete bi-block sleepers
• Delivery of more than 65,000 linear meters of turnout sleepers

The Netherlands
• Production of more than 260,000 concrete bi-block sleepers
• Delivery of more than 11,500 linear meters of turnout sleepers

17 – 19 March 2008 3
The RHEDA development stages

17 – 19 March 2008 4
The RHEDA 2000® development stages

17 – 19 March 2008 5
RHEDA 2000® without longitudinal reinforcement

Var. I: With cement stabilized subbase

17 – 19 March 2008 6
RHEDA 2000® without longitudinal reinforcement – Var. I with cement stabilized subbase

17 – 19 March 2008 7
RHEDA 2000® without longitudinal reinforcement

Var. II: On ballast subbase

17 – 19 March 2008 8
RHEDA 2000® without longitudinal reinforcement – Var. II on ballast subbase

17 – 19 March 2008 9
Major advantageous

• Higher reliability by induced crack formation

• Higher flexibility for adaptation on given substructure conditions

• No earthing system required

• Full compatibility with any signalling system

• Economic gains due to

– Lower material consumption of both concrete and reinforcement

– Less construction steps

– Higher flexibility in construction process

– Increased production rate

17 – 19 March 2008 10