You are on page 1of 1

POZO: ANC1279 FECHA: 24 de Junio del 2015

FORMACION: AT CAMPO: ANCON

TRABAJO A REALIZAR: ZONA: UNS-65

Csg 9 5/8''
0' - 489'

TOPE LOWER SOCORRO @ 294'

489'

Csg 5 1/2"
0' - 3860'

TOPE CPB @ 1364'

TUBERÍA 2 3/8"
0' - 2711'
TOPE SANTO TOMAS @ 2470'
TOC @ 2450'
INTERVALOS PUNZADOS (2506'-2933') CEMENTDO CON 270 Sxs.
(18/01/1965) 33 SHOT. 2506'
2506',2512',2520',2525',2535',2561',2565',2587'
2595',2611',2617',2631',2652',2663',2683',2692
2721'2748',2764',2793',2799',2813',2836',2844' STANDING FIJO 2 3/8"
2851',2871,2874',2886',2896',2906',2916',2933' ASIENTO @ 2711'
FRACTURA 21-01-65
(1000 SXS/836 BLS) 2933' FONDO @ 2730'
PULLING 13/10/1984
TOPE ATLANTA @ 3061' 3051'

INTERVALOS PUNZADOS (3051'-3404')


(02/06/1960) 176 SHOT.
3051'-3058',3064'-3080',3165'-3171'
3187'-3194',3204'-3224',3244'-3252'
3292'-3298',3386'-3404'
FRACTURA 03-06-60
FRACTURA 20-09-61 3404'
(143 SXS/470 BLS)

3611'
PREPERFORADO
(3611'-3860')
FRACTURA 09-12-59

3860´

TD 3873'

You might also like