POZO: ANC1275 FECHA: 23 de Junio del 2015

FORMACION: AT CAMPO: ANCON

TRABAJO A REALIZAR: SERVICIO COMPLETO ZONA: UNS-68

VARILLON PULIDO 1 1/4" X 11'

LIQUIDO
GAS

CSG 9 5/8" API 40#


0 - 448'

456'

TOPE LOWER SOCORRO @ 546'

47 TC 2 3/8" 10H STD


800' 17 TL 2 3/8" 10H STD
1 TL 2 3/8´´ 8H E.U.E.
26 V 3/4" X 25'
40 V 5/8" X 25'
DISPAROS SELECTIVOS
07-05- 1998
800'-802',828'-830',847'-849',861'-865'
873'-875',879'-881',886'-889',897'-899'
924'-926',966'-968',976'-978'
1007'-1012',1033'-1035'
1039'-1042',1068'-1072',1080'-1082' CSG 5 1/2" API 17#
1097-1101',1104'-1106',1118'-1121' 0 - 3637'
1125'-1128',1157'-1159',1169'-1172' PREPERFORADO
1179'-1182',1264'-1267',1276'-1278' 3021 - 3637'
1298'-1303',1334'-1344',1344'-1349'
1355'-1359',1400'-1404',1499'-1503'
1574'-1581',1603'-1607',1618'-1621' ASIENTO DE BOMBA @ 1664.4'
1629'-1633',1654'-1657',1678'-1681'
BOMBA # 2299 (20-125 RWAC 12-4)
1681'
PERFORADO + TAPON @ 1684.2'

TOPE CPB @ 1737'


TOC SIN REFERENCIA
CEMENTADO CON 230 SXS.

EZ-DRILL @ 2046'
12 - MAYO - 1998
TOPE SANTO TOMAS @ 2314'

INTERVALOS PUNZADOS
11-12-59 (278 SHOTS)
2359'-2371',2374'-2391',2399'-2435'
2459'-2464',2592'-2595',2651'-2655'
2685'-2688',2726'-2731',2741'-2752'
2757'-2763',2784'-2790',2804'-2808'
FRACTURA 14-12-59
(120 SXS/340 BLS) 3021'
FRACTURA 26-02-65
(940 SXS/1038 BLS)

TOPE ATLANTA @ 3061'

PREPERFORADO
(3021'-3637') FONDO @ 3500'
FRACTURA 29-09-59 06 - MAYO - 1998
(150 SXS/440 BLS)
3637'

TD 3664'