Method
task/operation being Task Carried assessment: Ongoing
Statement Action by
Sajimon KK assessed: out by? 15 January 09
by When?
Site
Ref No: Rev – 02 – RA – 2009 - Depa Cross reference to N.B. Residual risk:
SSOW/method Other on site The risk left
statement: (Highlight SSOW/Method statement control measures after all control
one below) Ref No: may be required measures have
Page No: due to weather been put in
YES NO M/S 001 conditions/other place – see
Risk Persons at risk reasons at time risk matrix at
severity of footer:
E C P Oth
(before task/operation:
Activity/ Significant ers
controls Control measures Work must not
Operation hazard
are in required: start until the
place) risks have
been assessed:
Oxygen High Yes Yes Yes Prior to the Foreman to secure Project Site Engineer
15 Deficiency commencement confined space Manager
of the activity operation entry Supervisor
permit and comply Construction
Confine with detailed Manager Foreman
Space instructions /
Operation requirements Site Manager Charge hand
specified in the work
permit Project Workers
Engineer
Safety to perform air Helpers
monitoring using HSE Manager
oxygen analyzer
Safety to perform
atmospheric testing
to ensure within the
safe level.
Toxic High Yes Yes Yes
Substances Removal of toxic Medium
substances using
pump or any other
machine.
Safety to perform
monitoring to ensure
lower explosive limit
or LEL < 10% safe.
Provide adequate
ventilation to ensure
air circulation.