PMI ACP Practice Exams with explanatory Answers
PRACTICE EXAM: 1
A. Ideal days,
B. Actual days,
C. Story points.
D. Iteration Days
Elevator statement.
C. RACI Matrix.
4. Which One of the below questions not asked in the daily stand up
Meeting?
B. Check the product status from all the members of an agile team.
B. Gather Data.
C. Swap time.
A. Transparency.
B. Inspection.
C. Adoption.
D. Validation.
is created by A. Maslow.
B. Tuchman.
C. Deming.
D. Ishikawa.
9. One of the below is not a valid step in active listening, A.
Listening.
B. Understanding.
C. Leaving early.
D. Responding.
A. Charter names the project manager and gives authority to them to apply resources.
B. Charter is a high level document and does not include project details.
C. Project charter must be signed by the project manager and stakeholders and reviewed by the product
owner.
Product owner.
B. The team.
C. Project manager.
D. Scrum master.
13. Not one of the XP roles A.
XP coach.
B. XP customer.
C. XP Tester.
D. Product Owner.
14. Choose the one given in the list, which is not a valid Lean principle, A.
Eliminate waste.
B. Plan by feature.
D. Design by feature.
Pair programming.
B. Extreme programming.
C. Parallel Programming.
D. Job shadowing.
20. During the Retrospective session, few issues were found. The person is responsible for to resolve all
the issues?
A. Scrum master.
B. Product owner.
D. Project manager.
21. The meetings held at the end of the iteration, which is product based A.
B. Team meeting.
C. Review meeting.
D. Retrospective meeting.
23. One of the following is not related to the core principles of Kanban development, A.
B. Pair Programming.
D. Improve collaboratively.
24. One of the choices are not a valid hierarchy of requirements from large to small,
B. Epic feature user story task C. Feature epic user story task
25. One of the technique used to eliminate waste by analyzing the flow of information and materials is
called
A. Burn up chart.
D. Decomposition.
26. The team meeting used to synchronize their team activities and report any impediments that blocks
the progress is called, A. Product Demo.
C. Retrospective meeting.
D. Status meeting.
27. The best architectures, requirements and designs emerge from one of the following, A.
Product owner.
B. Scrum master.
C. Self-organizing teams.
28. Calculate the process efficiency of the below process, 1 hour meeting has taken 5 minutes to
prepare the contents and send email, 3 minutes to book the conference room.
A. 95%
B. 96 %
C. 88 %
D. 25 %
C. In agile changes to requirements would go through strict change control process and get approval
from many departments.
D. In agile before the project start the requirements are finalized and base lined. All changes go through
the change control process.
30. According to agile manifesto, which one of the below is valid combination related to individuals and
interactions,
31. According to agile principle, one of the below is the primary measure of progress, A.
Extensive documentation.
B. Working software.
C. Good architecture.
organization.
B. To ask questions to find out the project status by the agile manager.
33. One of the tools/techniques used for continuous improvement in the project. A.
Planning poker.
B. Wideband Delphi.
C. Kanban board.
D. Affinity estimating
34. ATDD Steps are, A.
Discuss, Distill.
B. Discuss, Develop.
C. Discuss, Demo.
B. Only the next few iterations are planned in detail, more distant are planned at a higher level.
C. Team present work product to stakeholders, so that they can review the product and give feedback.
D. To do all those things that your project is ready to start like, develop product backlog, having a
release plan.
The team.
B. Scrum master.
D. XP team.
38. The timing of sprint retrospective meeting, A.
C. After sprint review and prior to the next sprint planning meeting.
Product Owner.
B. The team.
C. XP coach.
D. Project Manager.
40. One of the below is not the guideline to improve cycle time A.
41. Your agile team completed 20 story points, in the recent 4 releases. What is your team’s velocity?
A. 80
B. 20
C. 5
D. 24
42. In this plan the required features are defined first, and then the release date is calculated later.
A. Time boxed
B. Scope boxed
D. Product boxed
43. Alright, let’s decide in the parking lot. This argument between 2 team members denotes the
following type of conflict.
A. Level 1
B. Level 2
C. Level 3
D. Level 5
B. Task board
C. Dashboard
D. Information Refrigerator.
45. Current iteration ends, and the customer says the product didn’t meet the acceptance criteria. As a
scrum master the response is
D. Ignore the opinion from a customer, since the task is fixed during iteration.
46. In the last iterations your team completed 4 user stories worth of 10 points each, 3 user stories
worth of 5 points each, and nearly completed 1 user story which has a worth of 20 storypoints. What is
your team’s velocity?
A. 75
B. 35 C. 55
47. The total number of story points to be completed is 45. Number of team members in the agile team
is 6. The velocity of the team is 5. How many iterations will it take for the team to complete the 45 story
points? A. 5
B. 7
C. 8
D. 9
48. Team 1 completes 30 story points in a 2 week iteration. Team 2 completes only 15 story points and it
has more team members than team 1. You are the agile manager for both the teams. In this situation,
how you can handle?
B. Increase the number of resources in the Team 2, to match the story points of Team 1.
D. Increase the bonus for Team 2 to motivate them to complete more stories.
Iteration backlog.
B. Product backlog.
C. Sprint backlog.
D. Risk backlog.
50. John and Peter are working in the same working area. Tim is talking to Peter regarding the changes
which aregoing to happen in the organization. Since John and Peter are in the same area, John
overheard the conversation. This type ofcommunication in agile is called, A. Indirect communication.
B. Osmotic communication.
C. Indirect communication.
D. Verbal communication.
51. The chart which shows a bird’s eye view of the project, and shows work completed in story points.
Used to identify it instantly if there is any deviation from the planned project work. A.
Dashboard.
C. Burn up chart.
D. Kanban board.
52.In agile development team, the developer estimates the time required to complete an activity,
assuming there are no interruptions, so that work can be completed 100% efficiently is called, A.
Shuffle Time.
B. Cycle Time.
C. Actual Days.
D. Ideal Time.
55. One of the agile framework based on the project size and project criticality.
A. XP
B. TDD
C. Crystal
D. Lean
B. Synchronizing communication.
D. Both A and B.
Verbal.
B. Email communication.
C. Face to Face.
SWOT analysis.
C. Stakeholder Analysis.
D. Elevator Statement.
Planning poker.
D. Round Robin.
61. One of the below is not related to pride related factors in team motivation theory. A.
Pride in work.
B. Pride in contribution.
D. Pride in accomplishment.
62. The contract type in which it allows customers to end the project and stop paying when they don’t
see value in the project. A. Fixed Price Contract.
Responsibility.
B. Integrity.
C. Respect.
D. Fairness.
Exciters.
B. Satisfiers.
C. Indifferent.
A. Projectized organization.
B. Functionally assigned.
C. Fractionally assigned.
D. Distributed team.
A. MoSCoW
B. DEEP
C. DRY
D. INVEST
Check in.
B. Working Agreements.
Plus/Delta.
Self-organized team.
B. Intolerant.
C. Embellished.
A. Discuss
B. Distill
C. Develop
Forming (Directing).
B. Storming (Coaching).
C. Norming (Command).
D. Performing (Delegating).
B. Remove obstacles.
Pair programming.
C. Refactoring.
C. Plan by feature.
Osmotic communication.
B. Frequent delivery.
C. Personal safety.
80. The usage of this iteration at the end of the agile project increases the reliability of the project
schedule.
A. Iteration 0
B. Hardening iteration.
C. Buffer iteration.
D. Handoff iteration.
81. A daily meeting happened at the same time and at the same place to discuss 3 questions like what
did you do yesterday, what you are planning to do today, and if there any obstacles blocking the way to
do the task. This meeting is called as A. Retrospective.
82. A variation in the scrum, which is an enhancement, i.e. scrum with lean thinking is called,
A. Lean
B. Scrum # C. Scrum ##
D. XP.
83. During feature development, one of the below combination of features should be considered first, A.
84. One of the below options are not correct for successful agile teams, A.
co-located.
C. Empowered.
D. Self-organizing.
85. In the scrum process definition of done is not created by one of them in the list given below, A.
Product owner.
B. Scrum Master.
C. Sponsor
D. Team.
86. Project A has the IRR of 20 % and Project B has the IRR of 15 % and project C has the IRR of 25 %. In
this option, which project do we need to select based on the IRR?
A. A
B. B C. C
B. Team meeting.
D. Retrospective meeting.
B. co-location.
Inception.
B. Elaboration.
C. Transition.
Frequent delivery.
B. Pair programming.
C. Continual feedback.
D. Safety.
95. The smallest set of functionality that will provide value to the customer is called as, A.
Functionality
C. Profitability.
D. Revenue.
C. Negative schedule variance is undesirable, and it denotes project is behind schedule and over budget.
C. A negative cost variance is undesirable, and it denotes project is behind schedule and over budget.
99. Which one of the below about the schedule performance index is correct, A.
B. A value less than 1 schedule performance index means the project is ahead of schedule.
C. A value less than 1 schedule performance index means the project is behind the schedule and
undesirable and over budget also.
D. Negative schedule performance index denotes the project is within the budget.
100. Which one of the below about thecost performance index is correct, A.
B. A value less than 1 cost performance index means the project is ahead of schedule.
C. A value less than 1 cost performance index means the project is behind the schedule and undesirable
and over budget also.
D. Negative cost performance index denotes the project is within the budget.
ANSWERS TO PRACTICE EXAM: 1
1. Answer: D.
Explanation: Option D is not the correct option. Story size can be specified in Ideal days, actual days and
story points.
2. Answer: C
Explanation: RACI Matrix is not used in agile tooling.Elevator statements are brief and can be shared
with a fellow elevator passenger,explain the project vision in the short amount of time it takes to ride an
elevator from one floor to another. Product Datasheet used to display objectives of the project. It
contains 1page summary of key objectives, capabilities, and information needed for the project. It
contains graphic images and narrative content, notifying customers about what they can expect in the
product.
3. Answer: D.
Explanation: Value stream mapping is a lean manufacturing technique used to analyze and design the
flow of materials and information required to bring a product or service to a consumer. The steps in
value stream mapping have identified the value stream target, define the current state, clarify the
current opportunity, and depict the future state. Option D is not the valid step in value stream mapping.
4. Answer: B
Explanation: In daily standup meeting 3 questions should be asked in general. 1. What did you work on
yesterday? 2. What you are going to work on today? 3. Is there any impediments you are encountering?
Option B is wrong. Daily stand up meeting is not for the product status update from team members.
5. Answer: C
Explanation: Retrospective structure is as follows, set the stage, gather data, generate insights, and
decide what to do, close the retrospective, shuffle time. Option C is not a valid retrospective structure.
6. Answer: D
Explanation: Valid agile empirical process are Transparency, inspection and adoption. Option D is not a
valid agile empirical process.
7. Answer: C
Explanation: Except option C, other choices are valid roles of agile manager. Assign jobs to the team
members are not the responsibility of the agile team manager. Team self organizes and assign the tasks
between themselves.
8. Answer: C
Explanation: Option C is the correct answer. Maslow’s theory is used to motivate people based on the
hierarchy of needs. Ishikawa diagram used to find out the root cause of the issue. Team formation is
stated by Tuckman model. Plan, Do, check, Act is popularized by Deming.
9. Answer: C
Explanation: Active listening steps are listening, understanding, retaining, responding. Leaving early is
not a valid step in active listening. Option C is not correct. Option A, B, and D are correct steps in active
listening.
10. Answer: A
Explanation: Valid agile manifesto for agile software development are, individuals and interactions over
process and tools. Working software over comprehensive documentation. Customer collaboration over
contract negotiation. Responding to change over following a plan. Option A is not correct. It should be
individuals and interactions over process and tools.
11. Answer: C
Explanation: Option C is not correct. Other options A, B, and D are valid characteristics of the project
charter. Charter names Project manager, and specify critical success factors. It is created based on some
need for the organization.
12. Answer: C
Explanation: Product owner usually writes the user stories, and responsible for product backlog. They
are also responsible for backlog grooming and prioritization of user stories between iterations.The team
is responsible for the product which is self-organizing, and tasks are not assigned to them. Scrum Master
helps the team to follow process, and remove impediments on the way. Option C is not a valid primary
role in the scrum.
13. Answer: D
Explanation: The valid XP roles are XP coach, XP customer, XP tracker, XP tester and XP programmer. The
product owner is a not a valid XP role. Option D is not correct. Valid options are A, B and C.
14. Answer: B
Explanation: The main lean principle is eliminating waste. Valid lean principles are eliminating waste,
empower the team, optimize as a whole, decide as late as possible, deliver as early as possible, amplify
learning and build integrity in. Option B, which is not a valid, lean principle. It is one of the XP practices.
15. Answer: C
Explanation: Schedule variance can be calculated as SV= EV - PV (schedule variance = Earned value -
Planned value). Option A which is to calculate the CV (cost variance) = EV – AC. Option B used to
calculate the cost performance index. Option D is used to calculate the schedule performance index.
16. Answer: C
Explanation: Option C is the test driven environment characteristics, which are Test, code, refactor, and
deliver. Option A refactor is missing. Option B configure is not the correct choice. Option D also not
correct.
17. Answer: C
Explanation: FDD (feature driven development) framework consists of this below steps, Develop the
model, build a feature list, Plan by feature, design by feature, and build by feature. Validate the feature
is not a valid FDD framework. Option C is not a valid FDD framework from the choices.
18. Answer: A
Explanation: Option A is correct choice. The responsibility for prioritizing the user stories belongs to the
joint effort of the team and product owner. Option B, Option C and Option D are not correct.
19. Answer: A
Explanation: It is called pair programming. One pair writes the code and the other pair reviews the code.
It helps reducing the defects in the programs.
20. Answer: C
Explanation: Issues found during retrospectives are process based. This issue needs to be resolved by
the entire agile team. Option C is the correct answer.
21. Answer: C
Explanation: Product based meeting, which is held at the end of each iteration is called Review meeting.
The retrospective meeting is held at the end of all iteration and it is process based. Agile Team identifies
the ways to improve its performance through retrospective. Agile team has daily stand up meeting,
which occurs daily at the same time, same place for 15 minutes to synchronize team member’s
activities. It won’t happen at the end of the iteration. Option A, B and D are not valid choices.
22. Answer: A
Explanation: Retrospective is one of the feedback cycle, which is used to improve the team
performance. Daily stand up meeting also one of the agile feedback cycle and is conducted mainly to
synchronize team member’s activities. It is used to identify the issues before they become problematic.
At the Iteration Review meeting, team present work product to stakeholders, so that they can review
the product and give feedback. Option A is not a valid feedback cycle in agile.
23. Answer: B
Explanation: Option B relates to pair programming. 5 core principles of Kanban development are Limit
WIP,Visualize the flow, manage the flow, make project policies explicit, and improve collaboratively.
24. Answer: D
Explanation: Option D is not a valid hierarchy of requirements from large to small. Other options A, B
and C are valid hierarchy of requirements from large to small. Task represents the smallest breakdown
of work. User stories are divided into smaller manageable tasks.
25. Answer: C
Explanation: Value Stream mapping is a technique in lean manufacturing to analyze the flow of
materials and information required to deliver a product. Option C is correct. Burn up chart shows work
completed in story points. This chart is not related to analyzing the flow of materials to eliminate waste.
Force field analysis is a tool used to examine organizational factors that are supporting or opposing the
change. It considers the organization’s driving and restraining forces & it is also not related. Dividing the
user stories, into smaller, manageable tasks is called decomposition and this choice also not a valid
choice.
26. Answer: B
Explanation: Product Demo occurs last day of the iteration. The purpose of the meeting is for the team
to show the customers and stakeholders the work they have done in the current iteration. The meeting
is facilitated by the product owner. The activity that a team review its performance for the purpose of
improving its performance. Held at the end of every iteration. Process centric meeting. During the
retrospective, the team reflects on what happened in the iteration and identifies actions for
improvement going forward. A daily standup meeting is to synchronize team member’s activities.
Option B is the correct choice.
27. Answer: C
Explanation:According to the agile principle, the best architectures, requirements and designs emerge
from self-organizing teams. Option C is the correct choice. All other options are not correct.
28. Answer: C
Explanation:Process cycle efficiency can be calculated as Total value added time/Total cycle time. Value
added time is 60 minutes. Total cycle time (5+ 3+ 60). So process cycle efficiency 60/68 = 88 %. Option C
is the correct answer.
29. Answer: B
Explanation: As per the agile principle, welcome changing requirements, even late in development. Agile
process harness change for the customer’s competitive advantage. Option B is correct. Option A is not a
valid agile principle. Agile naturally fits into changes are normal, and no need for strict change control
process to get approval for changing requirements. Option D relates to waterfall projects.
30. Answer: D
Explanation: Option D is correct. Individuals and Interactions over process and tools. Other options A, B
and C are not correct.
31. Answer: B
Explanation: According to the agile principle, working software is the primary measure of progress.
Documentation also needed, only barely sufficient is enough. Good architecture, and encouraging
working environment are not the valid choices. Option B is the correct answer.
32. Answer: A
Explanation: Option A, is called the force-field analysis, which is used to find out the supporting and
opposing forces in the organization during the introduction of changes or during the introduction of
agile concepts. Option B is not correct. 5 why’s not asked to find out the project status. Option D also
not correct. 5 why’s are asked to find out the root-cause of the issue.
33. Answer: C
Explanation: Planning poker is one of the agile technique used to estimate the story points of a user
story. It is used for estimation, and not used for continuous improvement. Wideband Delphi is a
consensus based estimating technique, in which the estimators known each other and it is not the tool
used for continuous improvement. Option D also not correct, Affinity estimating is an agile estimation
technique, which is used for quickly estimating the relative work effort of a large number of user stories.
Kanban board is a tool, which is used for continuous improvement. Using this value stream map can be
created.
34. Answer: D
Explanation: In ATDD, we need to write test code before product code. The steps in ATDD are Discuss,
Distill, Develop and Demo. Other options A, B, and C are not correct.
35. Answer: B
Explanation: Option A, C, and D are the responsibilities of the product owner. Option B, which is to
remove the impediments for the team is not the responsibility of the product owner. It is the
responsibility of Scrum Master.
36. Answer: D
Explanation: In a hardening iteration, the team stops focusing on delivering new features, and instead
spends their time on stabilizing the system and getting it ready to be released. Option A is for Hardening
iteration. Option B, Rolling wave planning is to plan the next few iterations in detail, more distant are
planned at a higher level. Option C is related to Product Demo. Option D is the correct answer. Iteration
Zero is an iteration where you set up all the servers, make sure we have a release plan, develop a
product backlog, and in general do all those things that your project is ready to start.
37. Answer: C
Explanation: Option A, the team owns the process changes through the retrospective process. Scrum
master support the remove impediments for the team, and make sure the process is followed. The
product owner is responsible for the changes related to the product and they represent customers.
Option D is not the correct choice.
38. Answer: C
Explanation: Sprint retrospective held after the sprint review and prior to the next sprint planning
meeting. Option A, B, and D are not correct.
39. Answer: A
Explanation: backlog grooming is the effort led by product owner, and supported by the team. Option A
is the correct answer. It is supported by the team, scrum master and all. Option C XP coach, Option D,
Project manager are not correct choices.
40. Answer: C
Explanation: Option C is not correct. To improve the cycle time, we should not reduce the user stories in
the iteration. Option A, B and D are the guidelines to improve the cycle time.
41. Answer: B
Explanation: Average numbers of story points completed per iteration are called velocity. In this case the
as an average of 20 story points completed in the latest 4 releases. So the team velocity is 20. Correct
Answer: B. other choices are not correct.
42. Answer: B
Explanation: In a Time boxed plan, work cannot take more than the maximum amount of time defined.
The product vision box contains graphic images and narrative content; notify customers what they can
expect in the product. It is one of the agile tools used. There is no term called product boxed in agile.
The correct answer is B. In the scope boxed plan the features are defined first, and then the release date
is calculated.
43. Answer: D
Explanation: Level 5 conflict. (Not resolvable, better separate the members). The correct option is Level
5 Conflict, which is option D. Other choices are not correct. Level 1 conflict: Problem to solve (It is based
on a problem, not moved towards the individual persons). Level 2 conflict: Disagreement (It is not
related to the problem now. It is getting personal, and self-protection is important at this level). Level 3
Conflict: Contest (It moved beyond the issues now. People taking sides and supporting their side in the
arguments). Level4 conflict: Fight or Flight (resolving the issue is not the goal at this level. It becomes
like it is either us or the opposite group). Level 5 Conflict: World War (issues not the matter now. Not
resolvable, better separate the members).
44. Answer: D
Explanation: The term opposite to information radiator is called information refrigerator. The product
vision box contains graphic images and narrative content; notify customers what they can expect in the
product. It is one of agile tools used. The dashboard is also one type of information radiator. A
dashboard is a type of information radiator that uses the red, green, yellow colors that indicates the
status of the project. Task board is the information radiator used by teams in their standup meetings to
focus their discussions on the necessary topics.
45. Answer: A
Explanation:Once we get the feedback from customers, regarding the product didn’t meet the
acceptance criteria required by customers, then scrum master need to add it in the next iteration
backlog. Option B is not correct; usually we won’t extend the duration, to update the product features
required by customers. Option C also not correct. The current iteration should not be cancelled to
accommodate the requested changes. Option D also not correct. As a scrum master, we can’t say, during
the fixed iteration task is fixed.
46. Answer: C
Explanation:Nearly completed story is not taken into account for velocity calculation. So the velocity is
(4*10 + 3*5 = 40 + 15 = 55).
47. Answer: D
Explanation:Total number of story points/velocity (45/5 =9). The team will complete the story points in 9
iterations.
48. Answer: C
Explanation: Different teams completes different story points during the iteration. We should not
compare the story points between the teams. Each project is different, and each team has a different
meaning / complexity of the definition of story point. So option C is the correct option. Other options
are not correct.
49. Answer: A
Explanation: Iteration backlog is the result of the iteration planning meeting. Sprint backlog is the result
of sprint planning meeting. Option D is not correct.
50. Answer: B
Explanation: The way team members overhear and absorb communication in their working environment
is called Osmotic communication. Option B is correct. Other Options A, C, and D are not correct.
51. Answer: C
Explanation: Burn up chart shows both planned work and completed work during an iteration & it shows
the project from a bird’s eye point of view. It tracks the progress of the project towards completion. It
used to identify if there is any deviation from the planned project work. Option C is the correct choice.
The dashboard shows the day-to-day information that the team provides, so that the management
knows about the project. Burn down chart shows the work remaining in story points or ideal days in a
project. Kanban board is a tool used for continuous improvement.
52. Answer: D
Explanation: Option A is shuffle time, which is the time taken to shift between activities or during
meetings. Cycle time is the time taken for the work from start to finish. Time required to complete an
activity that considers typical interruptions, that results in efficiency below 100% is called Actual Days.
Ideal Time is the time required to complete an activity, assuming there are no interruptions, so that
work can be completed 100% efficiently. Option D is the correct option.
53. Answer: B
Explanation: Option A is the attributes of the user story. Option B is the format of the user story. Option
C and Option D are not correct options.
54. Answer: A
55. Answer: C
Explanation: Crystal is the agile framework based on the project size and project criticality. The
framework contains Crystal clear, Crystal yellow, Crystal orange, Crystal Red and Crystal Maroon. The
framework depends on the team size and criticality of the project, it moves from Clear to Maroon.
Correct Choice Option C. XP is the framework emphasizes the practice of collective ownership,
continuous integration and pair programming. In TDD First the developer writes an (failing) test case
that defines a desired improvement, then produces the minimum amount of code to pass that test, and
finally refactor the new code. Lean focus on value stream mapping. Eliminate waste is the core principle
of ;ean. Option C is the correct Choice.
56. Answer: D
Explanation: Option D is the correct answer. In distributed teams the key factors to consider are high
communication bandwidth, and synchronizing communication.
57. Answer: C
Explanation: The most efficient and effective method of conveying information to and within a
development team is face-to-face conversation. It is one of the agile principle. Option C is the correct
Answer.
58. Answer: B
Explanation: Option A SWOT analysis, used in strategic planning. Stakeholders are those whoever has an
interest in the project happening in the organization. Stakeholder analysis is not a valid option. Elevator
statements are brief and can be shared with a fellow elevator passenger, explain the project vision in
the short amount of time it takes to ride an elevator from one floor to another, which is not correct.
Force field analysis considers driving and opposing forces. Force field analysis is a tool used to examine
organizational factors that are supporting or opposing the change.
59. Answer: A
Explanation: Brainstorming is a collaborative activity for the purpose of generating creative ideas. It is
the group effort to find a solution for the problem by gathering ideas spontaneously given by the team.
The 3 approaches used in brainstorming are free-for-all, silent idea generation and round robin. Planning
poker -One of the agile technique used to estimate the story points of a user story. Option A is not the
approach used in brainstorming.
60. Answer: A
Explanation: A nonlinear number, which the next number is derived by adding the previous 2 numbers.
The reason for using the Fibonacci sequence is to reflect the uncertainty in estimating larger items.
Option A is the correct choice. The remaining choices are not correct.
61. Answer: C
Explanation: The pride related factors used in team motivation are pride in work, pride in the
contribution and pride in accomplishment. Pride in Job Title is not a valid motivation, pride related
factor in team motivation. Option C is the correct answer.
62. Answer: D
Explanation: In a fixed-price contract is a contract where the amount of payment does not depend on
the amount of resources or time expended on the project. The phased development project is funded
on a quarterly basis. The Agile iteration contract is the one based on the team agreed to deliver the
product with the specified quality at the end of the iteration, and at the same time product owner not
changing the priorities during the iteration. In Time & materials contract, allows customers to end the
project and stop paying when they don’t see value in the project. Option D is the correct option.
63. Answer: D
Explanation: Option D is the correct Answer. Retrospective structure contains set the Stage, Gather
Data, Generate insights, decide what to do, close the Retrospective, Shuffle time.
64. Answer: B
Explanation: From the choices option B is not a valid PMI code of Ethics. The valid PMI code of ethics are
Responsibility, Respect, Fairness and Honesty.
65. Answer: D
Explanation: Kano analysis used to classify the customer preference into 4 categories as Exciters,
Satisfiers, Dissatisfiers, and indifferent. (Exciters) The features delivered give high value benefits to the
customers. (Satisfiers) The features bring value to the customer. (Dissatisfiers) Users dislike the product,
if the feature is not there. (Indifferent), Features have no impact to the customers.
66. Answer: C
Explanation: When agile team members are assigned to multiple projects or assigned to project as well
as other roles is called as fractionally assigned. The Agile project manager avoids them and have
resources assigned to only one project at a time. Option C is the correct Answer. Other options A, B, and
D are not correct.
67. Answer: D
Explanation: Attributes of a user story INVEST (independent, negotiable, valuable, estimable, small, and
testable). Option A MoSCoW is used to prioritize user stories in agile (Must have, should have, could
have, won’t have). Option B DEEP is used to denote the Product backlog (It should be Detailed,
Estimable, Emergent, Prioritized). DRY denotes Don’t Repeat Yourself. It means don’t repeat the code.
68. Answer: D
Explanation: Option D is the correct Answer. The activities to help to set the stage includes, Check in,
focus on/focus off, Working agreement and ESVP (explorers, shoppers, vacationers, Prisoners).
69. Answer: D
Explanation: Option D is the correct choice. Team based activities used in the close the retrospective
stage are Plus/Delta, ROTI, HHH and Appreciations.
70. Answer: D
Explanation: Option D is the correct choice. The success criteria are project got shipped, leadership not
changed, team work the same way again in the next project also.
71. Answer: C
Explanation: Option C is the correct choice. Some of the characteristics of high performance team are
Selforganized, committed team, trust each other member of the team, Team has empowered to make
the decisions and not wait for the manager to make decisions, Team participation in major decision
making, Team decisions are based on the consensus driven.
72. Answer: D
Explanation: Option D is the correct answer. Some of the anti-patterns to watch-out for in the process
analysis are one size fits all, intolerant, heavy, embellished, used once etc.
73. Answer: D
Explanation: Option D is the correct answer. ATDD stages are, discuss, distill, develop and demo. Discuss
– during the discuss stage, clarify the details related to the requirements with the product owner. Distill
– find out the necessary tests related to that. Develop – Develop the code and test the code with the
tests developed. Demo – Once the code is passed, then give the demo to the customer.
74. Answer: C
Explanation: In the team formation & Development and situational leadership model, the leader’s roles
are as follows, Forming (Directing), Storming (Coaching), Norming (supporting), Performing (Delegating).
Option C is not correct.
75. Answer: D
Explanation: Option D is the correct answer. The primary duties of the leader serving the team are shield
team from interruptions, remove obstacles to progress, communicate project vision to the team, and
carry food and water (providing essential resources to keep the team productive).
76. Answer: D
Explanation: Option D is the correct answer. XP practices are whole team, pair programming, collective
code ownership, refactoring, planning games, small releases, sustainable pace, metaphor, continuous
integration, simple design, Test driven development.
77. Answer: D
Explanation: Option D is the correct answer. Feature driven development stages are, develop overall
model, build a feature list, plan by feature, design by feature, build by feature.
78. Answer: D
Explanation: Option D is the correct answer. The crystal methodologies principles are frequent delivery,
osmotic communication, reflective improvement, personal safety.
79. Answer: D
Explanation: Option D is the correct answer. Kanban development core principles are visualize the
workflow, limit the work in progress, manage the flow, make process policies explicit and improve
collaboratively.
80. Answer: C
Explanation: Iteration 0 in general to do all those things that your project is ready to start. It’s happening
at the beginning of the project. During hardening iteration no new work is done during this iteration. In
a hardening iteration, the team stops focusing on delivering new features, and instead spends their time
on stabilizing the system and getting it ready to be released. Buffer iteration is the process of adding an
iteration to deal with the unexpected changes or risks to avoid the project delays and increase reliability
of project schedule. Hand of iteration is to do the tasks like documentation for the project, attending
final approval meetings, etc. Correct Answer: C.
81. Answer: D
Explanation: Retrospective is process based meeting, which is used for team process improvements &
this happens at the end of every iteration. Customer review is called product demo. It occurs last day of
the iteration. The purpose of the demo meeting is for the team to show the customers and stakeholders
the work they have done in the current iteration. Team meeting is normal meeting, depends on the
nature of the project, and team members availability it is arranged. Daily stand up is the meeting the 3
questions asked, what did you do yesterday? What you are planning to do today? Is there any obstacles
on your way? Correct Answer: Option D.
82. Answer: B
Explanation: The correct answer is B. Scrum with lean thinking is called as Scrum #. Other options are
not correct.
83. Answer: C
Explanation: Option C is the correct answer. During feature development always consider the high value,
high risk product features first. Other options are not correct.
84. Answer: B
Explanation: Agile teams are crossfunctional, co-located, and task is not assigned to them. The agile
team selects the task themselves called self-organized. And the agile team is empowered to make
decisions regarding the project. Option B is like waterfall approach. In waterfall approach task is
assigned to the team by the project manager. So option B is not correct for successful agile teams.
85. Answer: C
Explanation: The definition of done is created by the entire team, scrum master, and product owner. It is
a joint effort involved with everyone in the project. It is not defined by the sponsor alone. Option C is
the right answer.
86. Answer: C
Explanation: Always select the project with high IRR (internal rate of return). So in this case we select
project C, which has the highest IRR among the choices. Correct Answer: C
87. Answer: B
Explanation: 2 meetings, team held at the end of each iteration Review meeting, and Retrospective
meeting. During the review meeting potentially shippable product increment is presented to
stakeholders for their review. This review meeting is product based meeting. Retrospective meeting is
process based. In this meeting team identify the ways to improve deliverables. Option B is the correct
answer. Other options are not correct.
88. Answer: B
Explanation: Daily Standup meeting is used to synchronize team member’s activities. It is one of the
feedback meetings related to the team. 3 questions asked in the daily standup. 1. What have you done
since last meeting? 2. What you are planning to do between now and next meeting 3. Is there any
obstacles on the way? Iteration Review meeting used to happen at the end of each iteration and it is
product centric. During this meeting customer review the product and provide their feedback.
Retrospective meeting used to happen at the end of every iteration, and it is process centric. Team
meeting is not the feedback cycle in agile. Option B is the correct answer.
89. Answer: C
Explanation: The product owner is the single point of contact for customers, and helps the team to
prioritize the product backlog based on customer priorities. They help to define user story and define
the acceptance criteria. Remove the obstacles for the team is not the product owner’s responsibility. It
is the responsibility of scrum master. Option C is the correct answer.
90. Answer: B
Explanation: The way team members overhear and absorb communication in their working
environment. The team benefits from osmotic communication by collocating its team members. If we
isolate the agile team members, Osmotic communication won’t happen. Osmotic communication is not
happening through instant messenger, or video conference. The team needs to be co-located to make
osmotic communication happen. Option B is the correct Answer.
91. Answer: D
Explanation: The 4 major phases of agile are inception, elaboration, construction, and transition. Option
D is the correct answer.
92. Answer: B
Explanation: The key crystal principles are frequent delivery, continual feedback, constant
communication, safety, focus, automated tests and integration. Option B Pair programming is related to
XP. Option B is the correct choice.
93. Answer: D
Explanation: Criteria for evaluating contract suitability are it should have the project objective, Key roles
are defined in the contract, the scope is defined in the contract, and risks and rewards are shared by the
parties.
94. Answer: A
Explanation: Option A is the correct choice. Unwritten rules about the expectations of the project.
Establish the ground rules for the team and the project.
95. Answer: B
Explanation: Smallest set of functionality, which gives value to the customer. Build the smallest thing
possible to get value as soon as possible. It has 3 attributes minimum, marketable and feature. Option B
is correct Answer.
96. Answer: D
Explanation: Tacit knowledge is the information held by a person about a business, project or activity. It
is a risk, when it is held by one person and it is not shared. This knowledge is undocumented
information, which is not shared. Option D is the correct Answer.
97. Answer: C
98. Answer: C
Explanation: Option C is correct. CV = EV - AC (cost variance = Earned value – Actual cost). Cost variance
negative means the project is behind schedule or over the budget.
99. Answer: C
Explanation: Option C is correct. SPI = EV /PV (schedule performance index = Earned value /Planned
value). A value less than 1 schedule performance index means the project is behind the schedule and
undesirable and over budget also.
100. Answer: C
Explanation: Option C is correct. CPI = EV /AC (cost performance index = Earned value /Actual cost). A
value less than 1 cost performance index means the project is behind the schedule and undesirable and
over budget also.
PRACTICE EXAM: 2
A. The code changes are checked into version control after every iteration.
Absence of trust.
B. Inattention to results.
C. Lack of commitment.
6. In the current iteration the agile team committed for 20 story points. But during the last day of the
iteration looks like they have completed only 15 story points. As an agile manager, what is your
reaction?
A. Ignore the situation.
B. Complete the 15 story points and keep the remaining 5 story points in the backlog.
B. Making mistakes.
C. Being inconsistent.
Risk-based-spike.
B. User story.
A. Improved productivity
B. Improved quality.
C. Improved capacity.
B. ESVP
C. Check in
12. In ESVP (Explorers, Shoppers, Vacationers, Prisoners), the definition of Vacationers is defined as, A.
B. They find all the available information & have new idea based on that.
C. Vacationers are not interested in the retrospective work, to get away from the regular job they
participate in the retrospective session.
D. They feel like they are forced to attend the retrospective session.
D. Only after the project failure during the post review session.
15. One of the following is a central repository that helps to track changes, and save changes and
provides the history of changes. A. Release plan.
B. Product vision box.
16. The total number of story points planned for a release is called, A.
B. Release baseline.
C. Schedule baseline.
17. The main reason for most of the product failures are, A.
Technical risk.
C. Market risk.
18. Waterfall approach is called as, and agile approach is called as, A.
Active, Reactive.
21. The process to minimize the work-inprocess and maximize the business value is called as,
A. XP
B. ITIL
D. Lean
22. The list of capabilities, stories, features that the product team identified is called, A.
Backlog.
B. User stories.
C. Capacity.
B. Both C and D.
B. Phased contract.
25. Remove obstacles for the team is the responsibility of scrum master. By removing obstacles, we are
eliminating
A. Road blocks.
B. Impediments.
C. Project Risk.
26. Risk mitigation technique that happens due to continuously integrate the code changes and confirm
the changes to the code has not broken the base code is called, A. None of the above.
B. Pair programming.
C. Continuous migration.
D. Continuous integration.
27. The diagram which reduces risk due to workload imbalance by spreading it more evenly is called as,
A. Pareto chart.
B. Burn up chart.
28. A meeting which is for the team and by the team, in which the team choose the topic to discuss is
called as,
B. Ideal Day.
C. Normal Day.
D. Actual Day.
30. The day which is defined as the time required to complete an activity, assuming there are no
interruptions, so that work can be completed 100% efficiently, A. Ideal days.
B. A & D
C. Actual Days.
A. The product scope is committed, but the release date is not confirmed.
B. Both the product scope, and release date are confirmed in advance.
C. The release date is committed, but the features to be developed for the release is not defined.
32. When the team considers the factors that will support or oppose a change in the organization
process is called,
D. SWOT analysis.
33. The terminology, which look forward in the future and learn the unknown and reduce the
uncertainty is called, A. Estimating.
B. Predicting.
C. None of the above.
D. Scanning.
34. Decisions are made at the time of last responsible moment is called as A.
B. Deferring commitment.
C. Soft commitment.
D. Hard commitment.
35. To deliver the most valuable requirements to the customer first, makes the customer happy,
because they start realizing the benefits. This kind of product delivery is called, A. Rapid
delivery.
B. Fast delivery.
D. Incremental delivery.
36. If the defects are found very late in the agile software project, it causes A.
Less expensive.
B. More expensive.
If it has bugs.
B. Project level.
C. Release level.
D. Iteration level.
39. Restructuring the code, without changing the external behavior of the code is called as, A.
Working in pairs.
Refactoring
40. Work in progress limit is defined as 10. The maximum number of things that can be allowed in the
stream is,
A.11
B. 15
C. 10
D. 20
axis track the work remaining, and Y axis track the time.
C. Both A & B.
Project Vision.
B. Product Roadmap.
C. Release Planning.
Communication.
B. Simplicity.
C. Courage.
B. Feedback technique.
C. Code review.
45. The process which is performed frequently for the quality of the product is called as, A.
Validation.
C. Verification.
Listening.
B. Negotiation.
C. Facilitation.
A. Epic
B. C and D.
C. User stories.
D. Task.
D. Decisions.
Milestones.
C. Vision.
51. The undue influence of a single strong willed member often because of undisclosed agenda is called,
A. Influencing.
B.Anchoring
C. Refactoring.
D. Pair programming.
Product backlog.
C. Product roadmap.
53. Provides authority to the project manager to apply resources for the project. A.
Elevator Statement.
C. Business case.
D. Product backlog.
B. Collaboration.
Coded.
B. Tested.
C. Defect-free.
C. Plan by feature.
D. Design by feature.
57. The team stops focusing on delivering new features, and instead spends their time on stabilizing the
system and getting it ready to be released is called, A. Iteration 0.
B. Handoff iteration.
C.Hardening iteration.
D. Buffer iteration
B. Speed boat
C. Refactoring.
D. Eliminate waste.
61. The smallest set of functionality, which gives value to the customer is called, A.
Marketable feature.
C. Product features.
D. Desired feature.
62. MoSCoW technique used for prioritization of user stories. W stands for, A.
Would have.
B. Will have.
C. Won’t have.
63. INVEST acronym used in the user story development? The letter “T” stand for A.
Traceable.
B. Testable.
C. Team effort.
D. Taxable.
A. Mutual agreed deliverables by the team, and product owner not changing the iteration backlog
priorities.
B. Mutual agreed deliverables by the team, and product owner can change the iteration backlog
priorities.
C. When the customer doesn’t see value, they stop paying and project ends.
D. When the customer sees value, they stop paying and project continues.
A. When the customer sees value, they stop paying and project ends.
B. When the customer doesn’t see value, they stop paying and project ends.
C. Mutual agreed deliverables by the team, and product owner can change the iteration backlog
priorities.
D. Mutual agreed deliverables by the team, and product owner not changing the iteration backlog
priorities.
A. When the customer doesn’t see value, they stop paying and project ends.
B. Mutual agreed deliverables by the team, and product owner not changing the iteration backlog
priorities during the iteration.
C. Funded based on a quarterly basis, and additional funding approved following each successful
release.
B. Establish the ground rules for the team and the project.
68. ______________ is used to quantify the work effort and complexity required to develop a user story
related to other stories. A. A story card.
B. User stories.
C. Story points.
69. A task of short experiment, carried out to gain the knowledge about a specific question is called, A.
Refactoring.
B. Flexibility matrix.
C. Spike.
D. Pair programming.
70. A process of collecting time series data points about one or more variables and examines the data to
detect the patterns to predict the future is called A. Variance analysis.
B. Trend analysis.
C. Process analysis.
Absolute sizing.
B. Sizing.
C. Relative sizing
D. Comparative sizing.
72. The coach sees an increase in number of escaped defects, which are traced back to a developer.
What action he needs to do,
73. Management asked the agile team for a detailed project plan. The response of the agile coach
should be,
A. Tell the management, that plan is not needed for an agile project.
B. Request the team to stop the work, and prepare the detailed project plan.
C. Work to prepare formal documentation and other deliverables that needs for the project.
D. Adding an iteration to deal with the unexpected changes or risks to avoid the project delays and
increase reliability of project schedule.
75. The number of story points completed by the agile team during an iteration is called, A.
Burn ratio.
B. Burn rate.
C. Velocity.
76. Information radiator that shows story points planned and completed during an iteration is called
A. Burn up chart.
77. Type of information radiator that use green, yellow, and red color indicators to show the status of
specific aspects of the project is called, A. Burn down chart.
B. Burn up chart.
C. Dashboard.
C. Reduce threats.
79. This chart shows the work remaining in story points or ideal days in the project. A.
Burn up chart.
B. Dashboard.
80. The chart shows the work completed, in story points or ideal days in the project, A.
B. Burn up chart.
D. Dashboard.
81. A tool which is used mainly to balance workload imbalances by spreading it more evenly is called as,
A. Burn up chart.
B. Kanban board.
82. ____________can be defined as organizations pay, even though no deliverables are produced, but
based on the level of effort. A. Level of effort.
C. Level of risk.
B. Well defined.
C. Prioritized.
D. Not-prioritized.
Kanban board.
C. Elevator statement.
D. Information Radiator.
A. Actual Time.
B. Ideal Time.
C. Shuffle time.
D. Calendar Time.
87. A chart which is used in collecting requirements, when some distractions happen during discussion is
called as
D. Kanban board.
Team.
B. Product owner.
C. Scrum master.
B. Retrospectives.
C. Demo.
Increase.
B. Reduce.
C. Stop.
A. Self-awareness
B. Project-awareness.
C. Self-management
D. Social awareness
92. Escaped defects are identified by the, A.
Customer.
B. Agile team.
D. Operations.
Name.
B. Picture.
C. Behavioral traits.
A. Detailed
B. Estimable
C. Prioritized
B. Initial architecture
96. Standard that an agile team to follow in the work environment is called as, A.
Agile contract.
B. Team agreement.
C. Working agreement.
D. Agile agreement.
Planning game.
D. Refactoring.
Burn up chart.
D. Dashboard.
Collaboration.
B. Communication.
C. Transparency.
the iteration
C. A and B.
1. Answer: C
Explanation: Option C is the correct answer. One risk mitigation technique used in an agile environment,
that developers need to continuously integrate their code to verify recent changes haven’t broken the
base code, which is already developed. Continuous Integration helps to find the code issues as soon as
possible.
2. Answer: C
Explanation: Wireframes are simple block diagrams that show the placement of elements in a user
interface and demonstrate the intended layout and functionality of a solution. Option C is the correct
answer. Option A is for Extreme persona. Option B is defined for Persona.
3. Answer: D
Explanation: Option D is the correct answer. Option B is for the team formation stages. Option C is not
correct.
4. Answer: D
Explanation: Option D is the correct answer. The main dysfunctions of agile team are absence of trust,
inattention to results, lack of commitment, fear of conflict and avoidance of accountability.
5. Answer: D
Explanation: Option D is the correct answer. The normal steps used in estimating process are
determining the size of the project, calculate the work effort to do the work in hours, convert the work
effort into the schedule, and calculate the cost.
6. Answer: B
Explanation: Option B is the correct answer. Iteration is always time boxed, and duration should not be
extended. In this situation, the team should complete the 15 story points and keep the remaining 5
points in the backlog.
7. Answer: C
Explanation: progressive elaboration is a process of refining the product vision, so that the highest
priority features are developed. In this planning occurs in phases rather than all at the beginning. Plan at
high level in the beginning, and detail planning occurs close to the project.
8. Answer: D
Explanation: Option D is the correct answer. The common failure modes are making mistakes, being
inconsistent, being creatures of habit, prefer to fail conservatively.
9. Answer: A
Explanation: Option A is the correct answer. A short period of proof-ofconcept of work is called
riskbasedspike. Option B and Option D are not correct.
10. Answer: D
Explanation: Option D is the correct answer. The benefits of retrospectives of the agile team are
improved productivity, improved quality, improved capacity and improved capability.
11. Answer: D
Explanation: Option D is the correct answer. In Retrospective process the activities, help to set the stage
are Focus on / Focus off, ESVP, working agreements and check in.
12. Answer: C
Explanation: Option C is the correct answer for vacationers. Option A is for Explorers. Option B is for
shoppers. Option D is for Prisoners.
13. Answer: C
Explanation: Option C is the correct answer. Lessons learnt should be captured throughout the project
from the team. If something good or bad happens during the project, the team remembers then it is
fresh, and forget key details after some time.
14. Answer: C
Explanation: Option C is the correct answer. 3 levels of planning are released, iteration, and daily. Other
options A, B, and D are not correct.
15. Answer: C
Explanation: Version control system is a central repository that helps to track changes, and save changes
and provides the history of changes. Other options are not correct.
16. Answer: D
Explanation: Performance measurement baseline is defined as the total number of story points planned
for a release. Other options are not correct.
17. Answer: C.
Explanation: The reason for product failure is market risk. None of the reasons given in significant
compared to market risk.
18. Answer: C.
Explanation: Sometimes the user story is too large to fit into single iteration. At those times, we need to
split the user story.
20. Answer: B
Explanation: Agile triangle relates to value, quality and constraint. Time, cost, Scope is related to
traditional management.
21. Answer: D.
Explanation: Value stream mapping is a lean tool used to analyze the value stream by means of
eliminating waste, and minimize the work-in-process and maximize the value.
22. Answer: A.
Explanation: The list of capabilities, stories, features that the product team identified is called as
backlog. It used to be maintained by the team, led/prioritized by the product owner.
23. Answer: D.
Explanation: Story cards are used to provide basic information about user stories like requirements,
acceptance criteria etc. Acceptance criteria are written on the back of the story card.
24. Answer: D.
Explanation: Firm fixed price contract is the least preferred contract type of agile projects. In this
contract the price is fixed, but agile welcome changes even in the last minute also. So it is difficult to
accommodate changes in this type of contract.
25. Answer: C
Explanation: By the way removing obstacles/impediments, we are eliminating the risk of the agile
project.
26. Answer: D
Explanation: Continuous integration is one of the risk mitigation technique used in agile environment
that developers need to continuously integrate their code to verify recent changes haven’t broken the
base code, which is already developed.
27. Answer: C
Explanation: CFD, reduces risk due to workload imbalance by spreading it more evenly. This chart gives
the quick overview of what is going on the project. We can find how much work is done, ongoing work,
pending work, etc. It is used where the bottlenecks are there in the workflow. Through CFD we are able
to track how long it will take to deliver the desired results, the total size of the backlog is reduced or
constant or increasing, etc.
28. Answer: B
Explanation: The meeting, which is for the team and by the team, in which the team choose the topic to
discuss is called as an open space meeting.
29. Answer: D
Explanation: A normal work day is called actual day, which starts at either 9 am or 8 am, and contains 8
work hours and 1 hour break.
30. Answer: A.
Explanation: Time required to complete an activity, assuming there are no interruptions, so that work
can be completed 100% efficiently is called ideal days.
31. Answer: C
Explanation: In time boxed plan, the release date is committed, but the features to be developed for the
release is not defined.
32. Answer: A
xplanation: Force field analysis is a tool, used to examine organizational factors that are supporting or
opposing the change. It considers the organization’s driving and restraining forces.
33. Answer: D.
Explanation: The terminology, which look forward in the future and learn the unknown and reduce the
uncertainty is called as scanning. Other options are not correct.
34. Answer: B
Explanation: Decisions are made at the time of last responsible moment is called as Deferring
commitment. Other options are not correct.
35. Answer: D.
Explanation: Build the smallest thing possible to get value as soon as possible to the customer. E.g.
Release the software in incremental by releasing the key features in the first iteration.
36. Answer: B.
Explanation: If we find the defects very late in the project, it is more expensive to fix it. If we find the
defects very early in the project phase, it is less expensive to fix.
37. Answer: B.
Explanation: The developed software is not done completely, if the developed software cannot be
shipped.
38. Answer: D
Explanation: In Agile EVM the progress is usually measured at the end of every iteration.
39. Answer: C
Explanation: Restructuring the code, without changing the external behavior is called as refactoring.
40. Answer: C
Explanation: If the WIP limit is defined means, we can’t add more than the limit to the value stream.
41. Answer: A
Explanation: In burn down chart plotted against the time vs work remaining. In x axis, we plot the time,
and the Y axis, we plot the work remaining in the project.
42. Answer: D.
Explanation: The different levels of agile project planning are product vision, product roadmap, release
planning, and iteration planning, daily stand-up.
43. Answer: D.
Explanation: The 4 values used in agile modeling are communication, simplicity, courage and feedback.
44. Answer: B
Explanation: Prototype is used to get valuable feedback from the users early in the project.
45. Answer: B.
Explanation: The process which is performed frequently for the quality of the product is called as
frequent verification and validation.
46. Answer: D
Explanation: Critical soft skills are, listening, negotiation, conflict resolution, facilitation.
47. Answer: A.
Explanation: Individuals and interactions over process and tools, this manifesto is related to team
empowerment.
48. Answer: A.
Explanation: Epic span around many iterations called a capacity. It is the largest part of the user story.
Epic is a larger user story, can be decomposed into smaller user stories.
49. Answer: D
Explanation: Self-organizing team can make their own decisions. The best architectures, requirements
and designs emerge from self-organizing teams.
50. Answer: D.
Explanation: Project charter includes project vision, milestones, and critical success factors.
51. Answer: B.
Explanation: Undue influence by a single strong willed member often because of undisclosed agenda is
called anchoring.
52. Answer: D.
Explanation: Records of project inputs, outputs are called artifacts. E.g. of artifacts in agile product
backlog, product vision statement, product roadmap.
53. Answer: C
Explanation: Business case is a written document that explains how the use of resources is aligned with
the accomplishment of a goal. It provides authority to the project manager to apply resources for the
project.
54. Answer: D.
55. Answer: D.
Explanation: Done-done means the product is coded, tested, defect-free and accepted by the product
owner.
56. Answer: B.
Explanation: In a hardening iteration, the team stops focusing on delivering new features, and instead
spends their time on stabilizing the system and getting it ready to be released.
58. Answer: D
Explanation: Bang for the buck, Speed boat, Prune the product tree is the some sample innovation
games. Generally it is used to identify customer requirements, improve retrospectives, prioritize
backlogs etc.
59. Answer: C
Explanation: Kanban is based on 3 basic principles • Visualize the workflow • Limit the amount of work
in progress • Enhance the workflow
60. Answer: A.
Explanation: Lean focus on value stream mapping. Eliminate waste is the core principle of lean. Lean
Principles • Eliminate waste • Empower the team • Deliver fast • Optimize the whole • Build quality in •
Defer decisions • Amplify learning.
61. Answer: B.
Explanation: Smallest set of functionality, which gives value to the customer. Build the smallest thing
possible to get value as soon as possible. It has 3 attributes minimum, marketable and feature. Other
options are not correct.
62. Answer: C.
Explanation: One of the Prioritization technique used. (Must have, should have, could have, and won’t
have). Other options are not correct.
63. Answer: B.
Explanation: Attributes of a user story INVEST (independent, negotiable, valuable, estimable, small, and
testable).
64. Answer: A.
Explanation: In agile iteration contract, mutual agreed deliverables by the team, and product owner not
changing the iteration backlog priorities during the iteration. Other options are not correct.
65. Answer: B
Explanation: In Time and materials contract, when the customer doesn’t see value, they stop paying and
project ends. Other options are not correct.
66. Answer: C
Explanation: In Phased development contract funded based on a quarterly basis, and additional funding
approved following each successful release. Other options are not correct.
67. Answer: D.
Explanation: Objectives of kickoff meeting are to communicate the project vision to the team, establish
the ground rules for the team and project, review the business case.
68. Answer: C
Explanation: Story points used to quantify the work effort and complexity required to develop a user
story related to other stories. Other options are not correct.
69. Answer: C
Explanation: Spike is a task of short experiment, carried out to gain the knowledge about a specific
question. Knowledge gained by an exploratory spike, do understand the issue is called process centric
knowledge. Other options are not correct.
70. Answer: B.
Explanation: A process of collecting time series data points about one or more variables and examines
the data to detect the patterns to predict the future is called trend analysis. Other options, A, C, D are
wrong.
71. Answer: C.
Explanation: Placing stories on the wall greatest to the least called relative sizing. It is one of the
estimation technique. Other options are not correct.
72. Answer: B.
Explanation: Since agile is empowered, self-organizing team, the coach should address this issue with
the team. Other options A, C, D are not correct.
73. Answer: D.
Explanation: Management asked the agile team for a detailed project plan. The agile coach uses this
opportunity to educate the senior management on agile principles. Other options are not correct.
74. Answer: A.
Explanation: During iteration H, no new functionality has been developed during this iteration. Other
options are not correct.
75. Answer: C.
Explanation: The number of stories that a team can deliver within the iteration is called velocity. Other
options are not correct.
76. Answer: A.
Explanation: Information radiator that shows story points planned and completed during an iteration is
called as burn up chart. Other options are not correct.
77. Answer: C.
Explanation: Type of information radiator that use green, yellow, and red color indicators to show the
status of specific aspects of the project is called as Dashboard. Other options are not correct.
78. Answer: D.
Explanation: One of the reason, to implement agile in the organization, should minimize cycle time, and
increase the market opportunities for the organization and reduce threats.
79. Answer: C
Explanation: Burn down chart shows the work remaining in story points or ideal days in the project.
Other options are not correct.
80. Answer: B
Explanation: The chart shows the work completed, in story points or ideal days in the project is called as
Burn up chart. Other options are not correct.
81. Answer: C.
Explanation: A tool which is used mainly to balance workload imbalances by spreading it more evenly is
called as cumulative flow diagram. Other options are not correct.
82. Answer: A.
Explanation: Level of effort can be defined as organizations pay, even though no deliverables are
produced, but based on the level of effort. Other options are not correct.
83. Answer: B.
Explanation: User stories at the top of the backlog are well defined. Other options are not correct.
84. Answer: A.
Explanation: A tool used for continuous improvement is called Kanban board. Kanban is a process
designed to help teams work together more effectively. Kanban board used for continuous
improvement. Other options are not correct.
85. Answer: C.
Explanation: Time taken to shift betweenactivities during meetings is called Shuffle time. Other options
are not correct.
86. Answer: C.
Explanation: Agile manager collects lessons learnt throughout the project. Other options are not correct.
87. Answer: B.
Explanation: A chart which is used in collecting requirements, when some distractions happen during
discussion is called as a Parking lot chart.
88. Answer: D
Explanation: Definition of done can be jointly created by the team, product owner and the scrum
master.
89. Answer: D.
Explanation: Continuous improvement can be followed on the agile practices Daily stand up meeting,
Pair programming, Demo, Review, Retrospectives.
90. Answer: B.
Explanation: Work in progress, agile team prefers to reduce because, Work in progress has cost
(investment), but no value (output).
91. Answer: B.
92. Answer: A
93. Answer: D.
95. Answer: D.
Explanation: Spring 0 focuses on developing initial requirement, initial architecture, and setting up the
environment.
96. Answer: C
Explanation: Standard that an agile team to follow in the work environment. It is posted in a common
place.
97. Answer: B.
Explanation: Working software is the primary measure of progress is the agile principle.
98. Answer: B.
99. Answer: D
Explanation: Team space should encourage collocation, collaboration, communication, transparency and
visibility. It should enhance productivity. Agile team space should encourage the maximum interaction
and communication from the team members.
100. Answer: C
Explanation: 2 meetings usually held at the end of the iteration. Review meeting (product based) and
Retrospective meeting (process based).
PRACTICE EXAM: 3
1. High bandwidth communication
A. Messenger communication
B. Phone call
4. Email communication
A. All changes needs to be approved by change control manager before production deployment.
C. At the beginning of the day, all code changes must be checked in.
A. SCRUM
B.LEAN
C.XP
D.KANBAN
A. The information posted in public area, where all stakeholders can know the status of the project.
B. Project manager sends email regularly to team members for key issues.
C. The way team members overhear and absorb communication in their working environment.
A. Extreme personas can help to elicit requirements that regular personas might miss.
A. Kaizen
B. Kanban
C. Fishbone diagram
D. Lean
B. The sponsor
C. The Team
12. Smallest set of functionality, which gives value to the customer, is called?
A. User story
B. Key feature
D. Story Point
C. The Sponsor
B. The tester
C. The customer
D. Project Manager
15. Decide as late as possible is associated with which methodology?
A. Lean
B.XP
C. Scrum
C. Crystal
16. How often does the entire team meet on agile project?
A. Once weekly
B. Daily
A. Cycle time
B. Ideal days
C. Velocity
D. Calendar Days
18. The number of stories that a team can deliver in an iteration is known as,
A. Cycle time
B. Velocity
C. Burn Rate
D. Story point
B. iteration backlog
C. Kanban board
D. information refrigerator
B. Determined by customer
C. It is a limit that how many Work in progress can be in process at one time.
23. The activity that a team review its performance for the purpose of improving its performance for the
next iteration? A. Velocity
B. Refactor
C. Retrospective
D. Planning poker
C. Retrospective meeting.
A. Modifiable
B. Measurable
C. Monetary value
D. Methodology
26. The framework that emphasizes the practice of collective ownership, continuous integration, and
pair programming?
A. XP
B. Lean
C. Crystal
D. DSDM
Talking loudly.
B. Taking notes.
C. Being silent.
A. Could have
C. Communication
D. Clarity
30. In agile methodology the user stories are prioritized by the following?
A. By value
B. By difficulty
A. Collaboration
B. Controlling
C. Compromise
D. Communication skills
B. SV = PV - EV
C. SV = BAC - PV
D. SV = EV/PV
A. Contract negotiation
B. Working software
C. Customer collaboration
D. Responding to change
B. A unit of work
36. How does the agile team estimate the relative size of a user story?
A. Using velocity
37. The agile technique used to estimate story points of a user story?
A. Affinity estimating
B. Wideband Delphi
C. Delphi
D. Planning poker
B. Project manager
C. Sponsor
D. Product owner
C. Code approval
D. Continuous integration
A. Finding Defect
B. Prototyping
D. Team meeting
B. Customer’s personality.
A. MoSCow
C. Maslow’s theory
D. Herzberg’s theory
C. weekly once
A. A team takes ownership of a product and is collectively responsible for its delivery.
D. Team always got instruction from higher authority regarding the decisions.
46. An agile team sets a WIP limit of 5 for its sprint. In this case how many features can be developed
simultaneously during the sprint?
47. Agile team members make decisions collaboratively and take ownership of a decision. The decision
model is known as? A. Participatory
B. Command and Control
D. Individual
49. The document that holds list of product features, to be developed in the project?
A. Sprint backlog
B. Product backlog
C. Iteration backlog
D. Release list
A. Incremental delivery
C. Iteration delivery
D. functionality delivery
51. Which level of agile planning helps estimate when a product will be ready for release?
A. Project planning
B. Release planning
C. Sprint planning
D. Iteration planning
52. Type of activity a team carries out when risk happens? A.
Spike.
C. Report to management.
D. Contingency plan.
A. Qualitative
B. Reactive
C. Quantitative
54. What does “S” stand for in the prioritization technique MoSCoW?
A. Status
B. Stability
C. Should have
C. Retrospective meeting
56. The INVEST acronym used in user story development? The letter “I” stand for
A. Indexed
B. Independent
C. Individual
D. Informational
A. Signboard
B. Continuous improvement
C. Work in progress
D. Information Radiator
B. A defect which is not captured by the development/testing team, and found by the customer.
59. Your agile team completed 10 story points, in the recent 4 releases. What is your team’s velocity?
A.10
B. 20
C. 2.5
D. 40
60. In the last iterations your team completed 3 user stories worth of 5 points each, 2 user stories worth
of 10 points each, and nearly completed 1 user story which has worth 15 story points. What is your
team’s velocity?
A. 35
B. 50
C. 60
D. 40
61. What is the duration of iteration?
A. One month
B. One week
C. 2 to 4 weeks
62. When an agile team shares/hears information unconsciously by means of collocated, what is this
method of communication called?
A. Osmotic communication
B. Team communication
C. Verbal communication
D. Formal communication
63. When a team in trusted and selforganized and make decisions collectively it is called?
A. Independent team
C. Motivated team
D. Empowered team
64. The agile estimation technique, which is used for estimating the relative work effort of large product
backlog?
A. MoSCoW technique
B. Affinity estimating
C. 3 point estimating
66. In scrum methodology, which of the below serves a connection between the product owner and the
team?
C. Sprint review
D. Elevator statement
D. Product quality
A. Providing guidance
B. Providing feedback
C. Empowerment
D. triple constraints
A. Write a test
C. Write code
74. Your agile team is dividing user stories, into smaller, manageable tasks. What is this process called?
A. Reflection
B. WBS
C. Task
D. Decomposition
75. Ideal team member location in agile?
A. Collocation
B. Virtual
C. Distributed
D. Global
76. The process, when a team constructively criticizes its performance for the purpose of improving
performance?
A. Feedback
B. Performance review
C. Reflective
D. Performance assessment
B. Working software
C. Customer collaboration
D. Following a plan
C. Contract negotiation
D. Comprehensive documentation
A. 10
B. 5
C. 7 (plus or minus) 2
D. 15
A. It names the project manager, and gives the Project manager authority to apply resources.
D. Business people and developers work together daily, throughout the project.
86. Refactoring?
A. Continuous improvement
B. Signal
C. XP
D. Scrum
A. Listening
B. Understanding
C. Collaboration
D. Actively responding
89. Not one of the 5 levels of conflict?
A. Problem to solve
B. Escalation
C. Disagreement
D. Contest
91. Which one of the question is not asked in the daily scrum meeting? A.
B. Project Status.
A. Spike
B. Planning game
C. Continuous integration
D. Refactoring
A. XP coach
B. XP programmer
C. XP Tracker
D. Product owner
A. Continuous integration
B. Eliminate waste
C. Amplify learning
96. The agile team places stories on the wall in order of effort from greatest to least. This is an example
of?
A. Relative sizing
B. 3 point estimation
C. Fibonacci sequencing
D. Affinity estimating
B. Product owner
C. Project manager
D. Scrum master
B. Kanban
C. Deming
D. Herzberg theory
A. Crystal
B. XP
C. Scrum
D. Lean
100. Unit of work, that do not add value, but need to be done are known as,
A. Iteration backlog
B. Tasks
C. Story points
D. Capabilities
ANSWERS TO PRACTICE EXAM: 3
1. Answer: C.
Explanation: The most efficient and effective method of conveying information to and within a
development team is called face-to-face conversation. One of the Agile Principle. Most of the message is
communicated through other means than words, such as gestures and facial expressions.
2. Answer: B
Explanation: One risk mitigation technique used in agile environment, that developers need to
continuously integrate their code to verify recent changes haven’t broken the base code, which is
already developed. Continuous Integration helps to find the code issues as soon as possible.
3. Answer: A
4. Answer: C
Explanation: Other choices are wrong. In agile, Projects are built around motivated individuals in the
team.
5. Answer: C
Explanation: Choices A, B, and D denotes the Agile Manifesto. Choice C is not a valid combination of
agile Manifesto.Correct Agile Manifesto: Individuals and Interactions over process and tools.
6. Answer: C
Explanation: The team benefits from osmotic communication by collocating its team members. Although
osmotic communication is more valuable for larger projects, it is, of course, increasingly difficult to
attain as the team size grows. It is better suited for smaller projects.
7. Answer: C
Explanation: In traditional Delphi experts are not aware of other estimators. But in wideband Delphi
estimation, experts are aware of other estimators. All other choices are not correct.
8. Answer: A
Explanation: Persona typically has a name, a picture, and relevant characteristics such as age or income
group, behavioral traits. Extreme personas can help to elicit requirements that regular personas might
miss.Extreme Persona are the people who are not regular users of the product. Considering them helps
in identifying the stories which could be missed otherwise.
9. Answer: D
Explanation: Daily standup meeting is conducted mainly to synchronize team member’s activities. 3
questions mainly asked in the daily meet up are, • What did we do yesterday? • What are we planning
to do today? • Is there any obstacles blocking the way to do the task?
10. Answer: B
Explanation: Kanban is a process designed to help teams work together more effectively. It is based on 3
basic principles, • Visualize the workflow • Limit the work in progress • Enhance the workflow All other
choices are not correct. Fishbone diagram is used to identify rootcause of the issue. Kaizen is Japanese
management philosophy of continuous improvement. Lean focus on value stream mapping. Eliminate
waste is the core principle of lean.
11. Answer: C
Explanation: Items selected from the product backlog for the particular iteration. Prioritized user stories
in the product backlog that the team is committed to develop during a particular iteration.
12. Answer: C
Explanation: Build the smallest thing possible to get value as soon as possible. It has 3 attributes
minimum, marketable and feature. E.g. Release the software in incremental by releasing the key
features in the first iteration.
13. Answer: B
Explanation: The product owner is the single point of contact for customers in SCRUM. They are the
voice of customers and represent stakeholders and business, setting priorities and deliverables. Other
choices PM, sponsor and scrum master are not correct.
14. Answer: A
Explanation: Product owner is responsible to write user stories. They serve a connection between the
customer and the team. They are responsible to write user stories and prioritize them.
Tester/customer/PM are not responsible to write user stories.
15. Answer: A
Explanation: Decide as late as possible is one of the lean principle. It is not applicable to XP, SCRUM and
CRYSTAL.
16. Answer: B
Explanation: Entire agile team meet daily. Team has daily stand up meeting, which occurs daily at the
same time, same place for 15 minutes to synchronize team member’s activities. All other choices are not
correct for agile team.
17. Answer: B
Explanation: Story size specified by Ideal days, actual days, story points. It is the time required to
complete an activity assuming there are no interruptions, so that work can be completed 100%
efficiently. Cycle time is not used for estimating user stories. It is the time taken to complete the work
from start to finish. Velocity is used to find the number of stories that a team can deliver within the
iteration. Calendar days are also not used to estimate the effort of user stories.
18. Answer: B
Explanation: Please refer the previous answer explanation. The number of stories that a team can
deliver within the iteration is called velocity.
19. Answer: A
Explanation: The tool which represents the work remaining on the project is called product backlog.
Prioritized user stories in the product backlog that the team is committed to develop during a particular
iteration is called iteration backlog. The team should update the Kanban board as work progresses on
the project. It is a kind of information radiator. Information Refrigerator is used to denote a chart which
is not visible to everyone, and must be opened up and explored in order to be understood. It is also a
type of restricted information radiator.
20. Answer: C
Explanation: It is determined by the team. Both team and product owner decides what is done to the
project. A list of criteria needs to be met before a product is considered to be done. It is not determined
by the PM or customer or the Scrum master.
21. Answer: C
Explanation: It is used to limit the number of stories developed by the team. When the limit is reached,
no more work is added to the stream. Once the work is completed and moved to done, then only
additional work is added to the stream.
22. Answer: A
Explanation: A visual representation that shows the status regarding a project. Visual display of current
work status, so interested persons can get the information without disturbing the team. It has product
vision, backlog, release plan, burn up, burn down chart and working agreements. Information Radiator is
not used to detect tracks or provide information about stakeholder location. It also won’t display the
number of working days for a project.
23. Answer: C
Explanation: Retrospective used for the process improvement in the team work. During the
retrospective, the team reflects on what happened in the iteration and identifies actions for
improvement going forward. Velocity is the number of stories that a team can deliver within the
iteration and is not related to performance. Refactor is restructuring the code, without changing the
external behavior of the code and not a performance related review for the team. Planning poker is one
of the agile technique used to estimate the story points of a user story code and is not related to the
performance related review for the team
24. Answer: A
Explanation: Sprint planning meeting time boxed for 4 hours. Release planning meetings typically last
between 4 and 8 hours. Retrospective meeting generally last up to an hour. Daily stand up meeting
generally last for 15 minutes.
25. Answer: B
Explanation: Goals are defined by the acronym SMART. Specific, Measurable, Achievable, Relevant, and
Time bounded. Other than B, all options are wrong.
26. Answer: A
Explanation: Core principles of XP. -Planning game - Small releases -Simple design -product theme -TDD
(test driven development) -Refactoring -Pair programming -Collective code ownership - Continuous
integration. Other choices are not correct.
27. Answer: A
Explanation: Choices B, C, and D are wrong. It means the relative ordering of user stories, with respect to
value.
28. Answer: A
Explanation: Receive -- analyze -- evaluate – handle (active listening). Part of Active Listening: Taking
notes, Focus complete attention to the speaker, being silent etc. Not Part of Active Listening: talking
loudly, leaving early, and asking closed end questions.
29. Answer: A
Explanation: One of the Prioritization technique used. (Must have, should have, could have, and won’t
have). A here denotes could have. All other choices are not correct.
30. Answer: A
Explanation: Consider the value to the customer first, when prioritizing user stories. It is not the choice
of PM or Product owner.
31. Answer: A
Explanation: The way team members overhear and absorb communication in their working
environment. The team benefits from osmotic communication by collocating its team members. If we
isolate the agile team members, Osmotic communication won’t happen. Separating team members by
functionality is also a wrong choice; it will block the osmotic communication for the agile project team.
Option D is also a wrong choice.
32. Answer: A
Explanation: Soft skills for agile Emotional intelligence, adaptive leadership, collaboration, servant
leadership, conflict resolution. Controlling, compromise and communication skills are not soft skills for
agile.
33. Answer: A
Explanation: It is the difference between Earned value and planned value. All other choices are wrong.
34. Answer: A
Explanation: Agile manifesto (highlighted values on the right hand side are secondary values). Individual
and interactions over process and tools. Working software over comprehensive documentation.
Customer collaboration over contact negotiation. Responding to change over following a plan.
35. Answer: A
Explanation: It is a fixed unit of development effort. Used to quantify the work effort and complexity
required to develop a user story related to other stories. Option B, C and D are not correct answers. It is
not a unit of work. It is not a fixed unit of testing effort also.
36. Answer: B
Explanation: Agile team estimate the relative size of a user story using story points. Velocity is defined as
the number of stories that a team can deliver within the iteration. Burn rate is the cost of agile team or
the rate at which it consumes resources. Option A, C, and D are not the correct choices.
37. Answer: D
Explanation: Affinity estimating is an agile estimation technique, which is used for quickly estimating the
relative work effort of large number of user stories. Wideband Delphi A consensus based estimating
technique, in which the estimators known each other. In Traditional Delphi, the experts are not aware of
other estimators. Planning poker -One of the agile technique used to estimate the story points of a user
story.
38. Answer: A
Explanation: Removing the obstacles for the team is the responsibility of the Scrum master. It is not the
responsibility of PM or sponsor or product owner. Scrum master ensures that process is followed,
shields the team from interferences and removes impediments.
39. Answer: A
Explanation: A technique in lean manufacturing to analyze the flow of materials and information
required to deliver a product. Code refactoring technique is not related to value stream mapping. Code
approval and continuous integration are not value stream mapping.
40. Answer: B
Explanation: Prototyping is one of the agile feedback technique for the product. Prototype is used to get
valuable feedback from the users early in the project. Finding defect, source code review and team
meeting are not the feedback techniques in agile.
41. Answer: A
Explanation: Prioritized user stories in the backlog that the team is committed to develop during a
particular iteration. Other options are not correct.
42. Answer: A
Explanation: A fictional user of the system under development. A persona is a fictional character that
represents a subset of the market we want to capture. Persona typically has a name, a picture, and
relevant characteristics such as age or income group and behavioral traits. They encourage us to follow a
user-centric approach. Option B, C and D are not correct.
43. Answer: A
Explanation: MoSCow is used to prioritize user stories. Fish bone diagram is used to find the root cause
of the problem. Maslow’s theory is used to motivate people based on hierarchy of needs. Herzberg’s
theory is also a motivation theory.
44. Answer: B
Explanation: In XP, code developed is integrated at least once per day. We can find out integration issue,
interface issues earlier by doing this. All other options are not correct.
45. Answer: A
Explanation: An empowered team takes ownership of a product and is collectively responsible for its
delivery. Decision authority belongs to the entire team and not related to any single individual. Option B,
Option C is wrong. If PM or product owner makes decision for the team it is not empowered. Team that
always got instruction from higher authority regarding the decisions is also not an empowered team.
46. Answer: A
Explanation: If WIP limit is reached no new item is moved into the next column until other items are
moved out. In this case it won’t exceed the limit of 5. Option B, C and D are wrong.
47. Answer: A
Explanation: The decision model where agile team members make decisions collaboratively and take
ownership of decision. This decision model is known as participatory decision making. In command and
control, some individual takes the decision not the team. Option C and D are wrong and not in agile.
48. Answer: A
Explanation: Smallest set of functionality, which gives value to the customer. Build the smallest thing
possible to get value as soon as possible. Option B: feature has high IRR, which is wrong. Option C: A
feature which is important to customer, and high IRR is also wrong. Option D: Decide based on customer
market is also incorrect.
49. Answer: B
Explanation: Both Sprint backlog, and iteration backlog holds a list of product features, to be developed
in the sprint/iteration. Release list is not a valid choice. Only product backlog holds list of product
features, to be developed in the project.
50. Answer: A
Explanation: The delivery which is used in agile is incremental delivery. The product is delivered in
increments in iterations. Option B, C, and D are not valid choices.
51. Answer: B
Explanation: It is release planning. It is planned on tactical level. During Release planning to develop
project schedule, which is developed twice a year. Each Release plan contains many iterations. Roadmap
contains many release plans.
52. Answer: D
Explanation: Spike is a task of short experiment, carried out to gain the knowledge about a specific
question. It is not carried out when risk happens. Contingency plan is a backup plan a team have when a
risk happens to a project. Option A, B and C are not valid options.
53. Answer: A
Explanation: Only qualitative risks are managed in agile. All other options are not correct.
54. Answer: C
Explanation: One of the Prioritization technique used. (Must have, should have, could have, and won’t
have). C here denotes should have. All other choices are not correct.
55. Answer: B
Explanation: Sprint Review meeting time boxed for 4 hours. Release planning meetings typically last
between 4 and 8 hours. Retrospective meeting generally last up to an hour. Daily stand up meeting
generally last about 15 minutes.
56. Answer: B
Explanation: Independent is the correct answer. Attributes of a user story INVEST (independent,
negotiable, valuable, estimable, small, and testable).
57. Answer: A
Explanation: Kanban means Signal. The team should update the Kanban board as work progresses on
the project. Kanban is a process designed to help teams work together more effectively. Kanban board is
used for continuous improvement. All other choices are not the correct meaning of Kanban.
58. Answer: B
Explanation: A defect which is not captured by the development/testing team, and found by the
customer.Less Escaped Defects almost means a good job by the Quality Assurance team. Always, team
tries to keep the number of escaped defects very low. It is possible to correct, but it takes time. Fixing a
single escaped software defect can take from a week to several weeks of effort to correct. It does not
happen in production environment, it is usually found by customer. Option D is also incorrect.
59. Answer: A.
(average number of story points completed per iteration is called velocity). Other choices are not
correct.
60. Answer: A 3*5 + 2*10 =15+20 =35 (A is the right answer). Nearly completed story is not taken
intoaccount for velocity calculation.
61. Answer: C
62. Answer: A
Explanation: The way team members overhear and absorb communication in their working
environment. The team benefits from osmotic communication by collocating its team members. Team
communication, verbal communication and formal communication are incorrect choices.
63. Answer: D
Explanation: An empowered team takesownership of a product and is collectively responsible for its
delivery. Decision authority belongs to the entire team and is not related to any single individual. Cross
functional team do not make decisions like empowered team. Independent team and motivated team
are not the correct options.
64. Answer: B
Explanation: Affinity estimating is an agile estimation technique, which is used for quickly estimating the
relative work effort of a large number of user stories in the product backlog. User stories are arranged in
a wall from small to large size depending on the efforts to develop. MoSCoW technique is a prioritization
technique, not an estimation technique. 3 point estimating is estimation, and is the techniques that
could be used to estimate a task. In three-point estimation, 3 values are produced for every task called
best case, most likely and worst case estimate. Wideband Delphi estimating is a consensus-based
estimating technique.
65. Answer: C
Explanation: A technique in lean manufacturing to analyze the flow of materials and information
required to deliver a product. Value stream mapping is a lean-management technique for analyzing the
current state and designing a future state. It is used to identify waste in the process.
66. Answer: B
Explanation: product backlog serves a connection between the product owner and the team. Iteration
backlog is limited to only one iteration. Sprint review is after every sprint, to review the product. This
option is not correct. Elevator statements are brief and can be shared with a fellow elevator passenger,
explain the project vision in the short amount of time it takes to ride an elevator from one floor to
another. This option also not correct.
67. Answer: D
Explanation: Performing frequent verification and validation helps to ensure product quality. At the end
of iteration during a product review, it is reviewed by the product owner, and defects are corrected in
the next iteration. All other options track the cost, track the budget and product quality and are not
correct choices.
68. Answer: D. it is created at the beginning of the project. It is not created during the sprint review.
Also product roadmap is not created at the beginning of the release or iteration.
69. Answer: A
Explanation: A collaborative activity for the purpose of generating creative ideas. It is the group effort to
find a solution for the problem by gathering ideas spontaneously given by the team. It is not a team
gettogether activity. It is not done to review the product. A collaborative activity for the purpose of
sprint goal, this is also an invalid option.
70. Answer: C
Explanation: Providing guidance/feedback is not an agile concept. A team takes ownership of a product
and is collectively responsible for its delivery. Since the team collectively takes the decision, they try to
give their best. Option D is also not a correct answer.
71. Answer: D
Explanation: Option A, B, and C are not duties of servant leader. Providing support and removing
obstacles are the duties of a servant leader.
72. Answer: B
Explanation: Agility is the ability to balance between flexibility and stability. All other choices are not
correct.
73. Answer: A
Explanation: First the developer writes a (failing) test case that defines a desired improvement, then
produces the minimum amount of code to pass that test, and finally refactor the new code. The steps
are • write a test • verify and validate the test • write product code and apply the test • Refactor the
product code. Verify and validate the test is the second step in TDD. Write code is the third step in TDD.
Refactor the product code is the 4th step in TDD.
74. Answer: D
Explanation: Agile team is dividing the user stories, into smaller, manageable tasks. This process is called
decomposition. Reflection is not the valid option. Task is the result of decomposition.
75. Answer: A
Explanation: The team benefits from osmotic communication by collocating its team members.
Collocation is the ideal agile team location. Virtual, distributed and global are not ideal team members
location in agile.
76. Answer: C
Explanation: The process, when a team constructively criticizes its performance for the purpose of
improving performance is called reflective. The workshop is called reflective workshop. Feedback,
performance review and performance assessment are not valid choices.
77. Answer: A
Explanation: Option A is a valid level of agile planning. Other options given are not correct.
78. Answer: D
Explanation: Individuals and Interactions overprocess and tools. Working software over comprehensive
documentation. Customer collaboration overcontract negotiation. Responding to Change over following
a plan. The value on the left is more important than that on the right. Right hand side values are
secondary values.
79. Answer: B.
Explanation: Responding to Change over following a plan. (Primary value Left hand side)
80. Answer: C
81. Answer: D
Explanation: Unwritten rules about the expectations of the project. Establish the ground rules for the
team and project. E.g. everybody needs to come to the office on time. It is a useful tool to guide group
behavior. It is often called as working agreements. Other choices are not correct.
82. Answer: B.
Explanation: Project charter can be used waterfall as well as agile projects. Option B is not correct. It can
be used for agile projects also. Other options given are related to project charter.
83. Answer: B
Explanation: Attributes of a user story INVEST (independent, negotiable, valuable, estimable, small, and
testable).
86. Answer: A
Explanation: It shouldn’t change the code’s behavior. Refactoring is not done to test the code. Other
options are not correct.
Explanation: Kanban means Signal. The team should update the Kanban board as work progresses on
the project. Kanban is a process designed to help teams work together more effectively.
88. Answer: C
Explanation: Part of Active Listening: Taking notes, Focus complete attention to the speaker, being silent
etc. Not Part of Active Listening: talking loudly, leaving early, and asking closed end questions.
89. Answer: B.
Explanation: Problem to solve, Disagreement, Contest, crusade (flight/fight), World war. This are the 5
levels of conflict.
90. Answer: D
Explanation: 3 pillars of scrum are Visibility, inspection and adoption. Other options are not correct.
91. Answer: B
Explanation: 3 Questions asked in the daily scrum meeting, What have you done since last meeting?
What are you planning to do today? Any obstacles on the way? Asking about project status should not
be asked in the daily scrum meeting.
92. Answer: A
Explanation: Core principles of XP. Planning game, Small releases, Simple design, product theme,TDD
(test driven development),Refactoring, Pair programming, Collective code ownership, Continuous
integration. Spike is not one of the core principles in XP.
93. Answer: D
Explanation: XP Roles are, -XP coach, XP Customer, XP Programmer, XP Tracker, XP Tester. Product
owner is not one of the XP roles.
94. Answer: A
Explanation: Core Lean Principles • eliminate waste • empower the team • deliver fast • optimize the
whole • build in quality • defer decisions • Amplify learning
95. Answer: A
Explanation: ground rules are unwritten rules about the expectations of the project. Establish the
ground rules for the team and project. E.g. everybody needs to come to the office on time. It is a useful
tool to guide group behavior. It is often called as working agreements. Option A is not a ground rule.
96. Answer: A
Explanation: Agile team orders stories on the wall in order of effort from greatest to least is relative
sizing. All other options are not correct.
97. Answer: A
Explanation: The team should update the Kanban board as work progresses on the project. Kanban is a
process designed to help teams work together more effectively. It is the team’s responsibility to update
the Kanban board. It is not the individual responsibility of product owner/project manager/scrum
master.
98. Answer: B
Explanation: It is associated with Kanban. Deming cycle is related to PDCA. Herzberg theory is one of the
motivation theory which is not related to limiting the work in progress. Kaizen is used for continuous
improvement. 99. Answer: B
Explanation: In XP methodology, programmers work in pairs. Other options are not correct.
100. Answer: B
Explanation: Unit of work that do not add value, but need to be done are called tasks. Characteristics of
task, • They represent the smallest breakdown of work. • We can see the task related information on
information radiator. • They do not necessarily add value.