Km 126+440 - Km 126+560
Km 116+200
Longitud 7.00
Area seccion = 0.245
0.95 0.10 0.10
0.75 0.10 0.08
0.75 0.10 0.08
Excavacion: 6.720
Ve(m3) = 1.60x0.60x7.00
1.60 0.60 7.00
ESTUDIO DEFINITIVO PARA LA CONSTRUCCIÓN Y MEJORAMIENTO DE LA
CARRETERA CUSCO - QUILLABAMBA TRAMO: ALFAMAYO - CHAULLAY -
PROYECTO QUILLABAMBA
Metrado de Gaviones
Calculos de areas:
Calculos de volumenes:
Area Volumen
Ubicación Distancia Corte Relleno Corte Relleno
m2 m3 m2 m3
085+240 0 4.30 0.00 0.00 0.00
085+250 10 4.30 0.00 43.00 0.00
085+260 10 5.35 0.00 48.25 0.00
085+270 10 4.79 0.00 50.70 0.00
085+280 10 3.45 0.00 41.20 0.00
085+290 10 2.57 0.00 30.10 0.00
085+300 10 1.15 0.76 18.60 1.90
085+320 20 1.34 0.00 24.90 3.80
085+330 10 10.48 0.00 59.10 0.00
085+340 10 13.20 0.00 9.62 0.00
085+350 10 11.90 0.00 125.50 0.00
085+360 10 10.49 0.00 111.95 0.00
085+370 10 12.34 0.00 114.15 0.00
085+380 10 13.19 0.00 127.65 0.00
085+400 20 7.85 0.00 210.40 0.00
085+410 10 4.32 0.00 60.85 0.00
085+420 10 1.49 0.00 29.05 0.00
Totales= 1,105.02 5.70
ESTUDIO DEFINITIVO PARA LA CONSTRUCCIÓN Y MEJORAMIENTO DE LA CARRETERA CUSCO -
PROYECTO QUILLABAMBA TRAMO: ALFAMAYO - CHAULLAY - QUILLABAMBA
Encofrado:
A1 (m2)= 0.70x(4.49+8.12) Caras 1 y 4
A2 (m2)= 0.60x(4.49+8.12) Caras 2 y 3
A3 (m2)= 2(2x0.10x0.60 + 1.00x0.10) Cara frontal
At (m2)= 16.83
Excavacion: Longitud:
As (m2)= (1.20+1.09)X0.95/2 L(m)= 6.31 Zona a encofrar
As (m2)= 1.09
Vol (m3)= 6.88
Resumen de metrados
Enrocados:
Longitud Volumen
m m3
45.40 29.06
Gaviones:
Encauzamiento de puentes:
Longitud
Ancho promedio Altura Volumen
Ubicación Aguas arriba Aguas abajo
m m m m m3
Alfamayo 18 25.00 0.40 180.00
084+665 16 25.00 0.40 160.00
Huamanmarca 16 30.00 0.40 192.00
098+652 22 25.00 0.40 220.00
Amaybamba 21 30.00 0.40 252.00
103+552 20 30.00 0.40 240.00
Sicre 16 25.00 0.40 160.00
105+019 16 20.00 0.40 128.00
Ipal 18 30.00 0.40 216.00
105+728 16 25.00 0.40 160.00
Huyro 26 25.00 0.40 260.00
108+341 26 20.00 0.40 208.00
Incatambo 15 30.00 0.40 180.00
090+888 15 25.00 0.40 150.00
Chontamayo 20 30.00 0.40 240.00
111+994 20 25.00 0.40 200.00
Huayopata 16 30.00 0.40 192.00
114+012 16 20.00 0.40 128.00
Totales= 255.00 215.00 3466.00