installation of fixtures 5
installation of telecom fixtures 5
installation of FA panels 5
Pipe installation works 15
hydrotesting works 5
installation of fixtures 10
disinfection works 5
Painting internal & external 10
Landscaping & hardscaping works inside plot 15
installation of marble floor 25
installation of wooden closet 10
painting of doors and windows 10
As built drawings preparation 15
All O&M submission 5
excavation 7
base foundation 10
columns GF 7
Concrete block wall GF 12
FF slab 15
Columns FF 10
Concrete block wall FF 15
Roof slab 20
parapet wall & compound wall 7
Stair case room 30
Roof water proofing works/ wet areas 10
Plastering works 25
Painting works 15
Installation of doors and windows 10
Tile works 15
Flooring works 20
ornamental beeding works 10
handrails installation 7
ceiling works 10
installation of HVAC equipments 7
installation of HVAC conduits 15
Installation of HVAC accessories 10
preliminary inspection of HVAC systems 5
installation of gates 5
installation of steel structures 5
installation of FE 3
installation of Fire Fighting equipment systems 10
installation of Kitchen exhaust 2
installation of kichen cabinet 5
Installation of Conduits 20
Cable/wire pulling works 10
installation of fixtures 5
installation of telecom fixtures 5
installation of FA panels 5
Pipe installation works 15
hydrotesting works 5
Page 16
TASK
installation of fixtures 10
disinfection works 5
Painting internal & external 10
Landscaping & hardscaping works inside plot 15
installation of marble floor 25
installation of wooden closet 10
painting of doors and windows 10
base foundation 10
columns GF 7
Concrete block wall GF 12
FF slab 15
Columns FF 10
Concrete block wall FF 15
Roof slab 20
parapet wall & compound wall 7
Stair case room 30
Roof water proofing works/ wet areas 10
plastering works 25
painting works 15
installation of doors and windows 10
tile works 15
flooring works 20
ornamental beeding works 10
handrails installation 7
ceiling works 10
installation of HVAC equipments 7
installation of HVAC conduits 15
Installation of HVAC accessories 10
preliminary inspection of HVAC systems 5
installation of gates 5
installation of steel structures 5
installation of FE 3
installation of Fire Fighting equipment systems 10
installation of Kitchen exhaust 2
installation of kichen cabinet 5
Installation of Conduits 20
Cable/wire pulling works 10
installation of fixtures 5
installation of telecom fixtures 5
installation of FA panels 5
Pipe installation works 15
hydrotesting works 5
installation of fixtures 10
disinfection works 5
Painting internal & external 10
Landscaping & hardscaping works inside plot 15
installation of marble floor 25
installation of wooden closet 10
painting of doors and windows 10
columns GF 7
Page 17
TASK
Page 18
TASK
painting works 15
installation of doors and windows 10
tile works 15
flooring works 20
ornamental beeding works 10
handrails installation 7
ceiling works 10
installation of HVAC equipments 7
installation of HVAC conduits 15
Installation of HVAC accessories 10
preliminary inspection of HVAC systems 5
installation of gates 5
installation of steel structures 5
installation of FE 3
installation of Fire Fighting equipment systems 10
installation of Kitchen exhaust 2
installation of kichen cabinet 5
Installation of Conduits 20
Cable/wire pulling works 10
installation of fixtures 5
installation of telecom fixtures 5
installation of FA panels 5
Pipe installation works 15
hydrotesting works 5
installation of fixtures 10
disinfection works 5
Painting internal & external 10
Landscaping & hardscaping works inside plot 15
installation of marble floor 25
installation of wooden closet 10
painting of doors and windows 10
excavation 7
base foundation 10
columns GF 7
Concrete block wall GF 12
FF slab 15
Columns FF 10
Concrete block wall FF 15
Roof slab 20
parapet wall & compound wall 7
Stair case room 30
Roof water proofing works/ wet areas 10
plastering works 25
painting works 15
installation of doors and windows 10
tile works 15
flooring works 20
ornamental beeding works 10
handrails installation 7
ceiling works 10
Page 19
TASK
Page 20
TASK
Page 21
TASK
Page 22
TASK
Page 23
TASK
Page 24
TASK
handrails installation 7
ceiling works 10
installation of HVAC equipments 7
installation of HVAC conduits 15
Installation of HVAC accessories 10
preliminary inspection of HVAC systems 5
installation of gates 5
installation of steel structures 5
installation of FE 3
installation of Fire Fighting equipment systems 10
installation of Kitchen exhaust 2
installation of kichen cabinet 5
Installation of Conduits 20
Cable/wire pulling works 10
installation of fixtures 5
installation of telecom fixtures 5
installation of FA panels 5
Pipe installation works 15
hydrotesting works 5
installation of fixtures 10
disinfection works 5
Painting internal & external 10
Landscaping & hardscaping works inside plot 15
installation of marble floor 25
installation of wooden closet 10
painting of doors and windows 10
base foundation 10
columns GF 7
Concrete block wall GF 12
FF slab 15
Columns FF 10
Concrete block wall FF 15
Roof slab 20
parapet wall & compound wall 7
Stair case room 30
Roof water proofing works/ wet areas 10
plastering works 25
painting works 15
installation of doors and windows 10
tile works 15
flooring works 20
ornamental beeding works 10
handrails installation 7
ceiling works 10
installation of HVAC equipments 7
installation of HVAC conduits 15
Installation of HVAC accessories 10
preliminary inspection of HVAC systems 5
installation of gates 5
installation of steel structures 5
Page 25
TASK
installation of FE 3
installation of Fire Fighting equipment systems 10
installation of Kitchen exhaust 2
installation of kichen cabinet 5
Installation of Conduits 20
Cable/wire pulling works 10
installation of fixtures 5
installation of telecom fixtures 5
installation of FA panels 5
Pipe installation works 15
hydrotesting works 5
installation of fixtures 10
disinfection works 5
Painting internal & external 10
Landscaping & hardscaping works inside plot 15
installation of marble floor 25
installation of wooden closet 10
painting of doors and windows 10
Excavation of cable routes 90
duct bank construction if required 180
sand filling 90
cable laying 50
warning tape installation 25
sand filling 50
backfilling 50
installation of route marker 25
cable laying 25
cable termination works 25
inspection 25
Tie-in works and commissioning 5
Excavation of cable routes 90
duct bank construction if required 180
sand filling 90
cable laying 50
warning tape installation 25
sand filling 25
backfilling 50
installation of route marker 25
cable laying 50
cable termination works 100
inspection 25
Tie-in works and commissioning 5