Ambuja Cements Limited

Unit- Rabriyawas

Classification: Standard Operating Procedure Page.: 2 Nos


SOP No.: ACL-WI-KL-001 Rev. No. 00
Originating Department: Production Revised Date of Issue: 01.03.2018
Prepared By: (Team
Anil K Chordia, S P Gautam, Manish Ranjan, S S Singh
Members)
Approved By:
V Saxena
Plant Head/ HOD
SOP: Work Instruction for Belt Conveyor discharge chute cleaning job.
Permit to Work Requirements: Yes
Mandatory PPEs: Safety Helmet, Safety goggles, Nose Mask, Reflective jacket, Safety Shoes
Related Hazards:

1. Exposure to dust
2. Slip /Trip /Fall from stairs
3. Caught in under and between the equipment/parts.
4. Exposure to high temperature.
5. Falling object
6. Electric shock
7. Accidental start of gas /material circuit
8. Power failure
Consequences of the deviation:

1. Respiratory Problems
2. Injury fracture due to hit of material /slip and trip
3 Skin damage

01. Purpose: The Purpose of this SOP is to comply with applicable regulatory requirements and to identify the
precautions and general safety rules that should be followed when doing the Job.

02. Scope: This SOP applies to all persons associated with ACL (employees, contractors, workmen)

03. Abbreviation:

SOP: Standard Operating Procedure

HOD: Head of department

ACL: Ambuja Cements limited

PPE: Personal Protective Equipment

04. Accountability: Section In-charge/ Engineer/Shift manager/Patroller/Attendant


B-03.2_Register - Standard Department: Production Page No. 1
Operating Procedure
Ambuja Cements Limited
Unit- Rabriyawas
05. Responsibility: HOD

06. Tools & Tackles:


1. Nylon Sling 2 Nos –5mtr long –Capacity – 5 MT

07. Manpower Requirements: 02

08. Results & Acceptance: Working person will not get injured during feeding

09. Frequency of Realization: As per requirement

10. Step Procedure:

 Place two pallets of bricks one over other by means of a fork lift truck.
 Tie the sling from bottom base of lower pallet folding it to the top of upper pallet.
 Fix the eye of both the slings on the crane hook.
 Guide the operator to lift the load slowly.
 Place the pallets on the kiln platform and lower the hook at ground again.

11. Communications:

Awareness information which can inspire work men towards behavioral safety to achieve zero harm should be given
by TBT, Monthly safety meetings etc.

12. Amendment Details

Date Rev Change Reason - Change Changed by

B-03.2_Register - Standard Department: Production Page No. 2


Operating Procedure
Ambuja Cements Limited
Unit- Rabriyawas

Classification: Standard Operating Procedure Page.: 2 Nos


SOP No.: ACL-WI-KL-002 Rev. No. 00
Originating Department: Production Revised Date of Issue: 01.10.2018
Prepared By: (Team
Anil K Chordia, S P Gautam, Manish Ranjan, S S Singh
Members)
Approved By:
V Saxena
Plant Head/ HOD
SOP: Work Instruction for shifting of brick by Electric Wire Rope Hoist (Rope-Master)
Permit to Work Requirements: Yes
Mandatory PPEs: Safety Helmet, Safety goggles, Nose Mask, Reflective jacket, Safety Shoes, Ear plugs
Related Hazards:

1.Exposure to dust
2.Slip /Trip /Fall from stairs
3.Caught in under and between the equipement/parts.
4.Exposure to high temperature.
5.Falling object
6.Electric shock
7.Accidental start of gas /material circuit
8.Power failure
Consequences of the deviation:

1. Respiratory Problems
2. Injury fracture due to hit of material /slip and trip
3. Skin damage

01. Purpose: The Purpose of this SOP is to comply with applicable regulatory requirements and to identify the
precautions and general safety rules that should be followed when doing the Job.

02. Scope: This SOP applies to all persons associated with ACL (employees, contractors, workmen)

03. Abbreviation:

SOP: Standard Operating Procedure

HOD: Head of department

ACL: Ambuja Cements limited

PPE: Personal Protective Equipment

04. Accountability: Section In-charge/ Engineer/Shift manager/Patroller/Attendant

B-03.2_Register - Standard Department: Production Page No. 3


Operating Procedure
Ambuja Cements Limited
Unit- Rabriyawas
05. Responsibility: HOD

06. Tools & Tackles:

 Nylon Sling 2 Nos –5mtr long –Capacity – 5 MT


 D-Shackle 1 No -Capacity – 5 MT

07. Manpower Requirements: 04

08. Results & Acceptance: Working person will not get injured during feeding

09. Frequency of Realization: As per requirement

10. Step by Step Procedure:

 Place one pallet of bricks by means of a fork lift truck.


 Tie the one sling from one end of bottom base of pallet.
 Tie the other sling from other end of bottom base of pallet.
 Fix the eye of both the slings on the D-shackle & hook of hoist.
 Guide the operator to lift the load slowly.
 Place the pallets on the kiln platform and lower the hook at ground again.

11. Communications:

Awareness information which can inspire work men towards behavioral safety to achieve zero harm should be given
by TBT, Monthly safety meetings etc.

12. Amendment Details

Date Rev Change Reason - Change Changed by

B-03.2_Register - Standard Department: Production Page No. 4


Operating Procedure
Ambuja Cements Limited
Unit- Rabriyawas

Classification: Standard Operating Procedure Page.: 2 Nos


SOP No.: ACL-WI-KL-003 Rev. No. 00
Originating Department: Production Revised Date of Issue: 01.10.2018
Prepared By: (Team
Anil K Chordia, S P Gautam, Manish Ranjan, S S Singh
Members)
Approved By:
V Saxena
Plant Head/ HOD
SOP: Work Instruction for shifting of brick by Brick Elevator
Permit to Work Requirements: Yes
Mandatory PPEs: Safety Helmet, Safety goggles, Nose Mask, Reflective jacket, Safety Shoes, Ear plugs
Related Hazards:

1.Exposure of dust
2.Slip /Trip /Fall from stairs
3.Caught in under and between the equipement/parts.
4.Exposure to high temperature.
5.Falling object
6.Accidental start of gas /material circuit
7.Power failure
Consequences of the deviation:

1. Respiratory Problems
2. Injury fracture due to hit of material /slip and trip
3 skin damage

01. Purpose: The Purpose of this SOP is to comply with applicable regulatory requirements and to identify the
precautions and general safety rules that should be followed when doing the Job.

02. Scope: This SOP applies to all persons associated with ACL (employees, contractors, workmen)

03. Abbreviation:

SOP: Standard Operating Procedure

HOD: Head of department

ACL: Ambuja Cements limited

PPE: Personal Protective Equipment

04. Accountability: Section In-charge/ Engineer/Shift manager/Patroller/Attendant

B-03.2_Register - Standard Department: Production Page No. 5


Operating Procedure
Ambuja Cements Limited
Unit- Rabriyawas
05. Responsibility: HOD

06. Tools & Tackles:

 Spade with wooden handle – 02 Nos

07. Manpower Requirements: 05

08. Results & Acceptance: Working person will not get injured during feeding

09. Frequency of Realization: As per requirement

10. Step by Step Procedure:

 Keep rubber pad below the discharge of elevator to collect the brick.
 Keep two men power at ground floor.
 Keep 3-4 men power at burner platform.
 Start the elevator.
 Place a brick in elevator bucket.
 Collect the brick at burner platform.
 Transport the bricks in such a way that these can be collect easily at burner platform.
 Make the staging of brick.
 Stop elevator after completion of brick shifting.

11. Communications:

Awareness information which can inspire work men towards behavioral safety to achieve zero harm should be given
by TBT, Monthly safety meetings etc.

12. Amendment Details

Date Rev Change Reason - Change Changed by

B-03.2_Register - Standard Department: Production Page No. 6


Operating Procedure
Ambuja Cements Limited
Unit- Rabriyawas

Classification: Standard Operating Procedure Page.: 2 Nos


SOP No.: ACL-WI-KL-004 Rev. No. 00
Originating Department: Production Revised Date of Issue: 01.10.2018
Prepared By: (Team
Anil K Chordia, S P Gautam, Manish Ranjan, S S Singh
Members)
Approved By:
V Saxena
Plant Head/ HOD
SOP: Work Instruction for shifting of brick by PH Lifts
Permit to Work Requirements: Yes
Mandatory PPEs: Safety Helmet, Safety goggles, Nose Mask, Reflective jacket, Safety Shoes, Ear plugs
Related Hazards:

1.Respiratory Problem
2.Slip /Trip /Fall from stairs
3.Caught in under and between the equipement/parts.
4.Exposure to high temperature.
5.Falling object
6.Accidental start of gas /material circuit
7.Power failure
Consequences of the deviation:

1. Respiratory Problems
2. Injury fracture due to hit of material /slip and trip
3. Skin damage

01. Purpose: The Purpose of this SOP is to comply with applicable regulatory requirements and to
identify the precautions and general safety rules that should be followed when doing the Job.

02. Scope: This SOP applies to all persons associated with ACL (employees, contractors, workmen)

03. Abbreviation:

SOP: Standard Operating Procedure

HOD: Head of department

ACL: Ambuja Cements limited

PPE: Personal Protective Equipment

B-03.2_Register - Standard Department: Production Page No. 7


Operating Procedure
Ambuja Cements Limited
Unit- Rabriyawas
04. Accountability: Section In-charge/ Engineer/Shift manager/Patroller/Attendant

05. Responsibility: HOD

06. Tools & Tackles: Nil

07. Manpower Requirements: 04

08. Results & Acceptance: Working person will not get injured during feeding

09. Frequency of Realization: As per requirement

10. Step by Step Procedure:

 Take the lift at required floor from where brick to be shifted.


 Place 70-80 bricks in lift gently.
 Close the door of lift.
 Start the lift.
 Stop the lift at required floor where bricks are to be unloaded.
 Remove the bricks from lift cabin & staging at floor.
 Repeat the above procedure for further shifting.

11. Communications:

Awareness information which can inspire work men towards behavioral safety to achieve zero harm
should be given by TBT, Monthly safety meetings etc.

12. Amendment Details

Date Rev Change Reason - Change Changed by

B-03.2_Register - Standard Department: Production Page No. 8