TECHNICAL DESCRIPTION:
LINE BEARING DISTANCE
1-2 N 40 DEG. 21' E 23.5988
2-3 S 49 DEG. 44' E 20.4679

.
3-4 S 36 DEG. 6' W 6.8796

.M
43 7-D
3 4-5 S 49 DEG. 44' W. 19.5408

SQ
5-1 N 41 DEG. 59' W 18.4339

87 4
2. 99
TOTAL LOT AREA: 502.8743 SQ.M.

50 OT
1

L
4 LOT DESCRIPTION

A=
5
LOT PLAN
PERSPECTIVE

ST.
ON
MAY

ROAD
ON ST.

MAY

SM BYPASS
GOLDEN PENSION HOUSE
LAORO'S GRILL PREMIUM TUNA

.
THE COURTYARDS

D ST
AT PUEBLO DE ORO

W OO
PED RO
N. R OA

AD
SEN IOR C YPR

RO
R ED
AVE. ESS ST.

SS
PA
PED RO
N. R OA

BY
SEN IOR

SM
SAN ISID AVE.
RO ST.
JOTEC AUTO ENGINEERINGZ
SAN ISID PED RO
RO ST. N. R OA
SEN IOR
AVE.
SAN ISID
RO ST. THIS SITE

.
BLVD
ATTA
R EG
LAS RA
MBLAS
GOLDEN GLOW VILLAGE PARK
VICINITY MAP
Submitted by: Project Title: Submitted to: Sheet Content: Sheet No:
ELEDIA, P.N.P; GEMINA, L.M.T;
CIVIL ENGINEERING DEPARTMENT JAVIER, J.D. & NAPAY, P.J.D ENGR.BENJAMIN L. PERSPECTIVE
PROPOSED TWO STOREY
UNIVERSITY OF SCIENCE AND
TECHNOLOGY OF SOUTHERN YEAR: 4TH YR

S t u d e n t
DATE SUBMITTED:
COMMERCIAL BUILDING NUNAG JR. & S I T E
DEVELOPMENT
P L A N
1
I n s t r u c t o r
P H I L I P P I N E S SECTION: BSCE 4A_B1 January 20, 2018 L O C A T I O N : Z o n e 4 , P a g - a s a , U b a y , B o h o l
GROUND FLOOR PLAN
SECOND FLOOR PLAN
Submitted by: Project Title: Submitted to: Sheet Content: Sheet No:
ELEDIA, P.N.P; GEMINA, L.M.T;
CIVIL ENGINEERING DEPARTMENT JAVIER, J.D. & NAPAY, P.J.D ENGR.BENJAMIN L. F L O O R
PROPOSED TWO STOREY
UNIVERSITY OF SCIENCE AND
TECHNOLOGY OF SOUTHERN YEAR: 4TH YR

S t u d e n t
DATE SUBMITTED:
COMMERCIAL BUILDING NUNAG JR. P L A N
2
I n s t r u c t o r
P H I L I P P I N E S SECTION: BSCE 4A_B1 January 20, 2018 L O C A T I O N : Z o n e 4 , P a g - a s a , U b a y , B o h o l
FRONT ELEVATION RIGHT-SIDE ELEVATION
REAR ELEVATION LEFT-SIDE ELEVATION
Submitted by: Project Title: Submitted to: Sheet Content: Sheet No:
ELEDIA, P.N.P; GEMINA, L.M.T;
CIVIL ENGINEERING DEPARTMENT JAVIER, J.D. & NAPAY, P.J.D ENGR.BENJAMIN L.
PROPOSED TWO STOREY
UNIVERSITY OF SCIENCE AND
TECHNOLOGY OF SOUTHERN YEAR: 4TH YR

S t u d e n t
DATE SUBMITTED:
COMMERCIAL BUILDING NUNAG JR. ELEVATIONS
3
I n s t r u c t o r
P H I L I P P I N E S SECTION: BSCE 4A_B1 January 20, 2018 L O C A T I O N : Z o n e 4 , P a g - a s a , U b a y , B o h o l
10 MM Ø BOTTOM BARS 10 MM Ø TOP TEMP. BARS
@ SUPPORT 0.30 M O.C. @ COLUMN SUPPORT
@ MIDSPAN 0.20 M O.C. @ 0.15 M O.C.

10 MM Ø TOP BARS
@ SUPPORT 0.20M
O.C. BOTH ENDS
BARS @ MIDSPAN @ 0.15
10 MM Ø CUTTED TOP

M O.C. BOTH ENDS


0.10 M THICK
SLAB
FOUNDATION

10 MM Ø TOP BARS
@ SUPPORT 0.20M
O.C. BOTH WAYS
PLAN
8-20mmØ bars spaced
equally bothways NOTE:
TOP BARS ARE PLACED @ 95mm SPACE
10 MM Ø TOP BARS 10 MM Ø CUTTED TOP 10 MM Ø TOP BARS FROM THE FLOOR OF THE SLAB FORM.
10 MM Ø TOP TEMP. BARS @ SUPPORT 0.20 M BARS @ MIDSPAN @ @ SUPPORT 0.20 M
@ SUPPORT 0.20 M O.C. O.C. BOTH ENDS 0.15 M O.C. BOTH ENDS O.C. BOTH ENDS BOTTOM BARS ARE PLACED @ 25mm SPACE
FROM THE FLOOR OF THE SLAB FORM.
RC SLAB DETAIL (S-1) PLAN
4-20mm Ø Vertical Main Bars
w/ 10mm Ø TIES @ 0.150m 10mm Ø TOP BARS SP. @
SPACING O.C 0.15 O.C. @ L/4
NGL
NGL
10mm Ø BOTTOM BARS SP.
@ 0.20 O.C. B.W.
10mm Ø Horizontal
BARS @ 0.60m O.C. @ RC SLAB DETAIL (S-1) SECTION
Every third Layers
CF1 DETAIL WF1 DETAIL
Submitted by: Project Title: Submitted to: Sheet Content: Sheet No:
ELEDIA, P.N.P; GEMINA, L.M.T;
CIVIL ENGINEERING DEPARTMENT JAVIER, J.D. & NAPAY, P.J.D ENGR.BENJAMIN L. FOUNDATION
PROPOSED TWO STOREY
UNIVERSITY OF SCIENCE AND
TECHNOLOGY OF SOUTHERN YEAR: 4TH YR DATE SUBMITTED:

S t u d e n t
COMMERCIAL BUILDING NUNAG JR. PLAN &
S L A B
DETAILS
4
I n s t r u c t o r
P H I L I P P I N E S SECTION: BSCE 4A_B1 January 20, 2018 L O C A T I O N : Z o n e 4 , P a g - a s a , U b a y , B o h o l
BEAM PLAN
TRUSS DETAIL
ROOF BEAM PLAN
Submitted by: Project Title: Submitted to: Sheet Content: Sheet No:
ELEDIA, P.N.P; GEMINA, L.M.T;
CIVIL ENGINEERING DEPARTMENT JAVIER, J.D. & NAPAY, P.J.D ENGR.BENJAMIN L. BEAM &
PROPOSED TWO STOREY
UNIVERSITY OF SCIENCE AND
TECHNOLOGY OF SOUTHERN YEAR: 4TH YR

S t u d e n t
DATE SUBMITTED:
COMMERCIAL BUILDING NUNAG JR. R O O
B E A
P L A

F
M
N
5
I n s t r u c t o r
P H I L I P P I N E S SECTION: BSCE 4A_B1 January 20, 2018 L O C A T I O N : Z o n e 4 , P a g - a s a , U b a y , B o h o l
USE 10MMØ STIRRUPS SPACED FROM
L/4 L/4
SUPPORTS AS FOLLOWS:
2 @ 2", 4 @ 4", 6@ 8", REST @10" O.C.
4-16mmØ Dbars 4-16mmØ Dbars
3-16mmØ Dbars
BEAM PLAN 2-16mmØ Dbars
4-16mmØ Dbars
BEAM SECTION DIMENSIONS (m) REBARS L/5
BEAM NUMBER L/5
AT LEFT SUPPORT AT MIDSPAN AT RIGHT SUPPORT WIDTH HEIGHT (Ø mm)
BEAM DETAIL (B1)
B1 0.25 0.40 16
RB1 0.25 0.40 12
USE 10MMØ STIRRUPS SPACED FROM
L/4 L/4
SUPPORTS AS FOLLOWS:
2 @ 2", 4 @ 4", 6@ 8", REST @10" O.C.
4-12mmØ Dbars 4-12mmØ Dbars
3-12mmØ Dbars
BEAM DETAILS
2-12mmØ Dbars
4-12mmØ Dbars
L/5
L/5
BEAM DETAIL (RB1)
Submitted by: Project Title: Submitted to: Sheet Content: Sheet No:
ELEDIA, P.N.P; GEMINA, L.M.T;
CIVIL ENGINEERING DEPARTMENT JAVIER, J.D. & NAPAY, P.J.D ENGR.BENJAMIN L. B E A M
PROPOSED TWO STOREY
UNIVERSITY OF SCIENCE AND
TECHNOLOGY OF SOUTHERN YEAR: 4TH YR DATE SUBMITTED:

S t u d e n t
COMMERCIAL BUILDING NUNAG JR. DETAILS
6
I n s t r u c t o r
P H I L I P P I N E S SECTION: BSCE 4A_B1 January 20, 2018 L O C A T I O N : Z o n e 4 , P a g - a s a , U b a y , B o h o l