You are on page 1of 2

Media Production Risk Management Plan

Name Harvey King Date 01/06/2019 Event King Earphones, Solar K advertisement

Position Director Venue/s Inside venues within the Description Analysis and assessment of any potential
school, Halls ,Hallways risks that may occur within the timeframe of
and studio. active production.
Outside areas of
concourse and beyond.

Organization King Earhones Contact info. Hking@thomastallis.org.uk Ref:# TBD

The Risk Likelihood Consequences Level of Pre-emptive Response


Risk

Falling in Low Death High Be aware of surroundings at all Immediate help / response to rescue from body of water.
water times / more so around bodies 999 response if required.
of water.

Vehicle Low Minor Injuries - Low - Cross only when safe and be Ambulance if necessary depending on level of injury received.
Collision Death High aware of surroundings. Follow
road legalities.

Damage of Low Reprimanded / Medium No nonsensical behavior Test integrity of data stored on equipment or status of it,
equipment Fined around equipment, set-up or working / damaged / broken, etc.
otherwise. Always ensure Search for and locate all equipment.
equipment is accounted for and
intact upon location change.

Page 1 of 2
Media Production Risk Management Plan

Lights in Very Low Potential injuries Low - Be aware of location / duration Treat afflicted area with water and restrict contact as to
studio High of time in contact of paglight / reduce probability of increased injury.
potentially overheated device,
phone, camera ect.

Page 2 of 2

You might also like