You are on page 1of 5

Classification: Internal Use

Classification: Internal Use


Rev. No.: 08
Dated: Aug/2017 EQUIPMENT / PIPING THICKNESS MEASUREMENT SHEET
SMP / WI No.: SMP-INSP-051
INSPECTION DEPARTMENT
Page: 1 of 2
Drowing/Sketch Thickness Thickness Reading
Insulation - X Measurement
Orig.
(mm)
Remark(s)

N Scaffolding- 6 Location *
Thk.
(mm) 0 90 180 270 N E S W
(TMLs)
1-1ӯ 4.5
2-1ӯ 4.5
3-1ӯ 4.5
4-1ӯ 4.5
5-1ӯ 4.5
6-1ӯ 4.5
7-1ӯ 4.5
8-1ӯ 4.5
9-1ӯ 4.5
10-1ӯ 4.5
11-1ӯ 4.5
12-1ӯ 4.5
13-1ӯ 4.5
14-1ӯ 4.5
15-1ӯ 4.5
16-1ӯ 4.5
17-1ӯ 4.5
18-1ӯ 4.5
19-1ӯ 4.5
20-1ӯ 4.5

Thickness Gauge S.R. No. : GE DM5E (S/N: 1309726)


Calibration date : 23-DEC-2018
Probe # and Frequency : DK-537 - 5 MHz (S/N: 1835/58)
Location: TV-8208 near North East side. Applicable Procedure : PK SHEM 7.05 & SMP-INSP-051
Criteria for passing Inspection : API 570
Eqpt. / Piping Material : A 106 GR.B / A 53 GR.B
Corrosion Allowance (mm) : 1.2 mm
Corrosion Rate (mm / Year) : -
Remaining Life (Year) : -
Surface Temperature (ºC) : AMBIENT
Condition of Piping : Satisfactory X Unsatisfactory
:
Recommendation (if any)
Classification: Internal Use
Plant : VCM – UNIT 82 Description : NORTH OF TV-8208 Inspector(s) : ADAM Date : 05/06/2019
Eqpt / Line No. : 25-AIH-8232137-RE31O Service : AIH JP
Classification: Internal Use
Form No.: INSP-051-02
Rev. No.: 08 EQUIPMENT / PIPING THICKNESS MEASUREMENT SHEET
Dated: Aug/2017
SMP / WI No.: SMP-INSP-051
INSPECTION DEPARTMENT
Page: 2 of 2
Drowing/Sketch Thickness Thickness Reading
Insulation - X Measurement
Orig.
(mm)
Remark(s)

N Scaffolding- 6 Location *
Thk.
(mm) 0 90 180 270 N E S W
(TMLs)
21-1ӯ 4.5
22-1ӯ 4.5
23-1ӯ 4.5
24-1ӯ 4.5
25-1ӯ 4.5
26-1ӯ 4.5
27-1ӯ 4.5
28-1ӯ 4.5
29-1ӯ 4.5
30-1ӯ 4.5
31-1ӯ 4.5
32-1ӯ 4.5
33-1ӯ 4.5
34-1ӯ 4.5
35-1ӯ 4.5
36-1ӯ 4.5
37-1ӯ 4.5
38-1ӯ 4.5
39-1ӯ 4.5

Thickness Gauge S.R. No. : GE DM5E (S/N: 1309726)


Calibration date : 23-DEC-2018
Probe # and Frequency : DK-537 - 5 MHz (S/N: 1835/58)
Applicable Procedure : PK SHEM 7.05 & SMP-INSP-051
Criteria for passing Inspection : API 570
Eqpt. / Piping Material : A 106 GR.B / A 53 GR.B
Corrosion Allowance (mm) : 1.2 mm
Corrosion Rate (mm / Year) : -
Remaining Life (Year) : -
Surface Temperature (ºC) : AMBIENT
Condition of Piping : Satisfactory X Unsatisfactory
Classification: Internal Use :
Recommendation (if any)

Plant : VCM – UNIT 82 Description : NORTH OF TV-8208 Inspector(s) : ADAM Date : 05/06/2019
Eqpt / Line No. : 25-AIH-8232137-RE31O Service : AIH JP

Location: TV-8208 near North East side.