TEST PAPER : Part –B for Production staff ( Resin) Marks -30

Name Date:

.
1. When for Reactor cleaning

and how it is done?

2. Name five important pre-checks o be done before starting a Thermopac?

3. Why Nitrogen purging is done in a reactor and what is the recommended flow rate?

4. How do you add xylene into the Reactor and if the separator is empty, what do you do to

bring the Xylene level upto the reflux line?

5. What is the function of vacuum pump in Resin processing and at what point the vacuum line is connected?