You are on page 1of 1

Name: RODRIGUEZ, KRYZHIA M.

ID Number: 7008902

I BILLING CUT-OFF PERIOD


Weekly : Friday to Thursday

II DATA TO BE PROVIDED TO PAYROLL


Cut off Period : JANUARY 18 - 24, 2019

Project Hours Worked Remarks


No Date BU/Dept Rest day
Code Name Regular Hrs Reg OT NDO Specific Task
/Holiday
Escalator 06 and 08 plans and detail
1 18-Jan Infrastructure 1949 LRT 2 East Ext. Proj. 9 - - -
revisions (W 16x50 to tube)
2 19-Jan SATURDAY
3 20-Jan SUNDAY
Submission of Masinag Escalator
Infrastructure 1949 LRT 2 East Ext. Proj. - - -
4 21-Jan 9 details for approval
Building 2070 Solaire Vertis Research MMSP Location
Building 2042 Bluehaven Arnaiz - - - Tracing For Construction drawings
5 22-Jan 9
Utilities 1907 Camana Perimeter fence layout revision
Building 2042 Bluehaven Arnaiz - - - Tracing For Construction drawings
6 23-Jan 9
Utilities 1907 Camana Perimeter fence details revision
7 24-Jan Utilities 1907 Camana 9 - - - Perimeter fence details revision

You might also like