BALANCE

QTY SENT FARVISION RECEIVE/TRAN


HEAD DIA SFER QTY. AS B-A A-C B-C
BY BOM(A) QTY(B) PER GRN (C )

8MM 11 11 19 0.00 -8 -8
10MM 42 40 54 -2.00 -12 -14
BLOCK 12MM 15 15 22 0.00 -7 -7
6/SUB 16MM 23 22 27 -1.00 -4 -5
20MM 20 19 20 -1.00 0 -1
25MM 24 23 22 -1.00 2 1
8MM 100 145 73 45.00 27 72
10MM 69 99 52 30.00 17 47
BLOCK 12MM 44 66 35 22.00 9 31
6/SUPER 16MM 48 74 42 26.00 6 32
20MM 27 41 27 14.00 0 14
25MM 20 35 20 15.00 0 15
8MM 10 9 4 -0.74 6 5
10MM 42 40 32 -1.77 10 8
BLOCK 12MM 12 11 8 -0.99 4 3
7/SUB 16MM 23 22 16 -0.77 7 6
20MM 25 24 23 -1.16 2 1
25MM 23 22 22 -0.67 1 0
8MM 121 111 103 -10.00 18 8
10MM 75 67 57 -8.00 18 10
BLOCK 12MM 45 42 32 -3.00 13 10
7/SUPER 16MM 60 56 51 -4.00 9 5
20MM 21 20 20 -1.00 1 0
25MM 11 18 13 7.00 -2 5
TOTAL 910.1 1032 794 121.90 116 238
S.NO Description of items Units Quantity Rate(Rs.) Amount
SUBSTRUCTURE
1 EARTHWORK IN EXCAVATION CUM 5721.73 95
2 EARTHWORK IN FILLING CUM 1028.05 77
3 SILVER SAND FILLING CUM 300 910
4 PLAIN CEMENT CONCRETE CUM 190 5750
5 TOR STEEL BAR FOR REINFORCEMENT MT 121 51000
6 REINFORCEMENT CEMENT CONCRETE CUM 835 7400
7 SHUTTERING FOR RCC WORK SQM 2525 450
8 BRICKWORK 200MM CUM 140 4860
9 WATERPROOFING WORK SFT 6910.86 93
10 INTERNAL ELECTRICAL WORK SFT 6910.86 50
SUPERSTRUCTURE
11 200MM TK BRICKWORK
12 100MM THK BRICKWORK
13 TOR STEEL BAR FOR REINFORCEMENT
14 REINFORCEMENT CEMENT CONCRETE
15 SHUTTERING FOR RCC WORK
16 PLASTERING WORK
OUTSIDE PLASTER
INSIDE POP
CEILING POP