You are on page 1of 45

INVESTIGATION OF BEAMS

DESIGN OF BEAMS
ROOF BEAMS

Length, L (mm) : 6000 Concrete Cover (mm) : 75


Width, b (mm) : 300 Bar Diameter (mm) : 16
Height, h (mm) : 400 Stirrup Diameter (mm) : 10
Fs(Mpa) : 275.86 F'c (Mpa) : 20.7
Effective Depth
d: 307 mm
d' : 93 mm
Beta Code
B: 0.85

No. of Rebars
n LEFT Midspan RIGHT
Top 6 3 6
Bottom 4 3 4

Steel Area, As ( mm2 )


𝐴�=𝑛 ( 1/4
𝜋𝑑_𝑏^2 )
LEFT Midspan RIGHT
As ( TOP ) 1206.37 603.19 1206.37
As ( BOTT. ) 804.25 603.19 804.25

Steel Ratio, ρ
�= 𝐴�/𝑏𝑑

LEFT Midspan RIGHT


ρ ( TOP ) 0.01310 0.00655 0.01310
ρ (BOTT. ) 0.00873 0.00655 0.00873

Checking for Beam Steel Ratio


�_𝑏𝑎𝑙=0.85𝐵_1 (𝐹^′
𝑐)/𝐹�( 600/(600+𝐹�) ) �_𝑏𝑎𝑙 = 0.03714

�_𝑚𝑖𝑛=√(𝐹^′ 𝑐)/(4
𝐹�) ≥ 1.4/𝐹�
�_𝑚𝑖𝑛 0.00508
=
ρ ( TOP ) ρ ( BOTTOM )
Adequacy at LEFT: Steel ratio used is adequate Steel ratio used is adequate
Adequacy at Midspan: Steel ratio used is adequate Steel ratio used is adequate
Adequacy at RIGHT: Steel ratio used is adequate Steel ratio used is adequate
Computation for Rn, (Mpa)
𝑅𝑛= �𝐹�[1−0.59�( 𝐹𝑦/(𝐹^
′ 𝑐) )]
LEFT Midspan RIGHT
Rn ( Top ) 3.24 1.71 3.24
Rn ( Bott. ) 2.24 1.71 2.24

Moment Capacity, ΦMn (KN.m)


∅𝑀𝑛= ∅𝑅𝑛𝑏𝑑^2 Φ = 0.9
LEFT Midspan RIGHT
ΦMn ( + ) 82.48 43.61 82.48 TOP
ΦMn ( - ) 57.09 43.61 57.09 BOTTOM

Moment Actual ( *see STAAD postprocessing ) , (KN.m)


LEFT Midspan RIGHT
Mn ( + ) 41.70 0.00 74.20 TOP
Mn ( - ) 44.70 0.00 4.68 BOTTOM

Adequacy of Moment Capacity


LEFT Midspan RIGHT
Mn ( + ) ADEQUATE! ADEQUATE! ADEQUATE! TOP
Mn ( - ) ADEQUATE! ADEQUATE! ADEQUATE! BOTTOM

Design of Stirrups

Effective Depth
d: 307 mm
d' : 93 mm

𝑊𝑢=
〖𝑊𝑢〗 _𝑡𝑜𝑝 18.33 kn/m
(8 〖�𝑀𝑛〗 _𝑐𝑜𝑚𝑝𝑢𝑡𝑒𝑑)/𝐿^
= _𝑏𝑜𝑡𝑡
〖𝑊𝑢〗 12.69 kn/m
2 𝑜𝑚=
𝑢�𝑒 𝑊𝑢= 18.33 kn/m 𝑅= 𝑊𝑢𝐿/2 54.98663

Computation if Stirrups is Required


𝑉𝑐=0.17√𝐹^′ 𝑐𝑏𝑑 ( kN ) Φ = 0.75
*Note: If Vu> 0.50ΦVc -> Stirrups are required
If Vu< 0.50ΦVc -> Stirrups are not required

Vu ( Kn ) ΦVc 0.50ΦVc Remarks


d at support 49.36 Stirrups are required
53.43 26.71
at L/3 18.3288767702 Stirrups are not required

Computation for Maximum Spacing


𝑉�= (𝑉𝑢 −
∅𝑉𝑐 )/∅
𝑉�= (𝑉𝑢 −
∅𝑉𝑐 )/∅
*Note: 0.33√𝐹^′ 𝑐𝑏𝑑
If Vs< Maximum Spacing = d/2 or 600 (smaller)
0.33√𝐹^′ 𝑐𝑏𝑑
if Vs> Maximum Spacing = d/4 or 300 (smaller)

Maximum Spaciing
Vs 0.33√𝐹^′ 𝑐𝑏𝑑 Max Spacing (mm)
d from support -5.42 150
138.28
at L/3 -46.80 150

Computation for Required Spacing


�= Φ = 0.75
(∅𝐴𝑣𝐹𝑦𝑡𝑑)/ Av = 157.08
(𝑉𝑢−∅𝑉𝑐)
S (mm) Remarks
d from support -1850 Use Max Spacing O.C.
al L/3 -11990 Use Max Spacing O.C.

No. of Rebars ( If other bar dia. Is used. ) = 25 mm


n LEFT Midspan RIGHT
Top 3 2 3
Bottom 2 2 2

No. of Rebars ( If other bar dia. Is used. ) = 16 mm


n LEFT Midspan RIGHT
Top 6 3 6
Bottom 4 3 4

N.O.B ΦMn ( computed )


7 107.21
6 91.90
5 76.59
4 61.28
3 45.96
2 30.64
INVESTIGATION OF BEAMS
DESIGN OF BEAMS
ROOF BEAMS

Length, L (mm) : 3000 Concrete Cover (mm) : 40


Width, b (mm) : 400 Bar Diameter (mm) : 20
Height, h (mm) : 600 Stirrup Diameter (mm) : 10
Fs(Mpa) : 275.86 F'c (Mpa) : 20.7
Effective Depth
d: 540 mm
d' : 60 mm
Beta Code
B: 0.85

No. of Rebars
n LEFT Midspan RIGHT
Top 4 5 4
Bottom 5 5 5

Steel Area, As ( mm2 )


𝐴�=𝑛 ( 1/4
𝜋𝑑_𝑏^2 )
LEFT Midspan RIGHT
As ( TOP ) 1256.64 1570.80 1256.64
As ( BOTT. ) 1570.80 1570.80 1570.80

Steel Ratio, ρ
�= 𝐴�/𝑏𝑑

LEFT Midspan RIGHT


ρ ( TOP ) 0.00582 0.00727 0.00582
ρ (BOTT. ) 0.00727 0.00727 0.00727

Checking for Beam Steel Ratio


�_𝑏𝑎𝑙=0.85𝐵_1 (𝐹^′
𝑐)/𝐹�( 600/(600+𝐹�) ) �_𝑏𝑎𝑙 = 0.03714

�_𝑚𝑖𝑛=√(𝐹^′ 𝑐)/(4
𝐹�) ≥ 1.4/𝐹�
�_𝑚𝑖𝑛 0.00508
=
ρ ( TOP ) ρ ( BOTTOM )
Adequacy at LEFT: Steel ratio used is adequate Steel ratio used is adequate
Adequacy at Midspan: Steel ratio used is adequate Steel ratio used is adequate
Adequacy at RIGHT: Steel ratio used is adequate Steel ratio used is adequate
Computation for Rn, (Mpa)
𝑅𝑛= �𝐹�[1−0.59�( 𝐹𝑦/(𝐹^
′ 𝑐) )]
LEFT Midspan RIGHT
Rn ( Top ) 1.53 1.89 1.53
Rn ( Bott. ) 1.89 1.89 1.89

Moment Capacity, ΦMn (KN.m)


∅𝑀𝑛= ∅𝑅𝑛𝑏𝑑^2 Φ = 0.9
LEFT Midspan RIGHT
ΦMn ( + ) 160.77 198.55 160.77 TOP
ΦMn ( - ) 198.55 198.55 198.55 BOTTOM

Moment Actual ( *see STAAD postprocessing ) , (KN.m)


LEFT Midspan RIGHT
Mn ( + ) 114.00 0.43 0.55 TOP
Mn ( - ) 37.80 45.00 70.70 BOTTOM

Adequacy of Moment Capacity


LEFT Midspan RIGHT
Mn ( + ) ADEQUATE! ADEQUATE! ADEQUATE! TOP
Mn ( - ) ADEQUATE! ADEQUATE! ADEQUATE! BOTTOM

Design of Stirrups

Effective Depth
d: 540 mm
d' : 60 mm

𝑊𝑢=
〖𝑊𝑢〗 _𝑡𝑜𝑝 176.49 kn/m
(8 〖�𝑀𝑛〗 _𝑐𝑜𝑚𝑝𝑢𝑡𝑒𝑑)/𝐿^
= _𝑏𝑜𝑡𝑡 176.49 kn/m
〖𝑊𝑢〗
2 𝑜𝑚=
𝑢�𝑒 𝑊𝑢= 176.49 kn/m 𝑅= 𝑊𝑢𝐿/2 264.73592

Computation if Stirrups is Required


𝑉𝑐=0.17√𝐹^′ 𝑐𝑏𝑑 ( kN ) Φ = 0.75
*Note: If Vu> 0.50ΦVc -> Stirrups are required
If Vu< 0.50ΦVc -> Stirrups are not required

Vu ( Kn ) ΦVc 0.50ΦVc Remarks


d at support 169.43 Stirrups are required
125.30 62.65
at L/3 88.2453051521 Stirrups are required

Computation for Maximum Spacing


𝑉�= (𝑉𝑢 −
∅𝑉𝑐 )/∅
𝑉�= (𝑉𝑢 −
∅𝑉𝑐 )/∅
*Note: 0.33√𝐹^′ 𝑐𝑏𝑑
If Vs< Maximum Spacing = d/2 or 600 (smaller)
0.33√𝐹^′ 𝑐𝑏𝑑
if Vs> Maximum Spacing = d/4 or 300 (smaller)

Maximum Spaciing
Vs 0.33√𝐹^′ 𝑐𝑏𝑑 Max Spacing (mm)
d from support 58.84 270
324.30
at L/3 -49.41 270

Computation for Required Spacing


�= Φ = 0.75
(∅𝐴𝑣𝐹𝑦𝑡𝑑)/ Av = 157.08
(𝑉𝑢−∅𝑉𝑐)
S (mm) Remarks
d from support 290 Use Max Spacing O.C.
al L/3 550 Use Max Spacing O.C.

No. of Rebars ( If other bar dia. Is used. ) = 25 mm


n LEFT Midspan RIGHT
Top 3 4 3
Bottom 4 4 4

No. of Rebars ( If other bar dia. Is used. ) = 16 mm


n LEFT Midspan RIGHT
Top 7 8 7
Bottom 8 8 8

N.O.B ΦMn ( computed )


7 294.76
6 252.66
5 210.56
4 168.45
3 126.34
2 84.23
INVESTIGATION OF BEAMS
DESIGN OF BEAMS
2-G-1

Length, L (mm) : 4000 Concrete Cover (mm) : 40


Width, b (mm) : 350 Bar Diameter (mm) : 20
Height, h (mm) : 450 Stirrup Diameter (mm) : 10
Fs(Mpa) : 275.86 F'c (Mpa) : 20.7
Effective Depth
d: 390 mm
d' : 60 mm
Beta Code
B: 0.85

No. of Rebars
n LEFT Midspan RIGHT
Top 6 4 6
Bottom 7 3 7

Steel Area, As ( mm2 )


𝐴�=𝑛 ( 1/4
𝜋𝑑_𝑏^2 )
LEFT Midspan RIGHT
As ( TOP ) 1884.96 1256.64 1884.96
As ( BOTT. ) 2199.11 942.48 2199.11

Steel Ratio, ρ
�= 𝐴�/𝑏𝑑

LEFT Midspan RIGHT


ρ ( TOP ) 0.01381 0.00921 0.01381
ρ (BOTT. ) 0.01611 0.00690 0.01611

Checking for Beam Steel Ratio


�_𝑏𝑎𝑙=0.85𝐵_1 (𝐹^′
𝑐)/𝐹�( 600/(600+𝐹�) ) �_𝑏𝑎𝑙 = 0.03714

�_𝑚𝑖𝑛=√(𝐹^′ 𝑐)/(4
𝐹�) ≥ 1.4/𝐹�
�_𝑚𝑖𝑛 0.00508
=
ρ ( TOP ) ρ ( BOTTOM )
Adequacy at LEFT: Steel ratio used is adequate Steel ratio used is adequate
Adequacy at Midspan: Steel ratio used is adequate Steel ratio used is adequate
Adequacy at RIGHT: Steel ratio used is adequate Steel ratio used is adequate
Computation for Rn, (Mpa)
𝑅𝑛= �𝐹�[1−0.59�( 𝐹𝑦/(𝐹^
′ 𝑐) )]
LEFT Midspan RIGHT
Rn ( Top ) 3.40 2.36 3.40
Rn ( Bott. ) 3.88 1.80 3.88

Moment Capacity, ΦMn (KN.m)


∅𝑀𝑛= ∅𝑅𝑛𝑏𝑑^2 Φ = 0.9
LEFT Midspan RIGHT
ΦMn ( + ) 162.70 112.87 162.70 TOP
ΦMn ( - ) 185.96 86.30 185.96 BOTTOM

Moment Actual ( *see STAAD postprocessing ) , (KN.m)


LEFT Midspan RIGHT
Mn ( + ) 31.30 15.10 13.00 TOP
Mn ( - ) 175.00 34.50 22.60 BOTTOM

Adequacy of Moment Capacity


LEFT Midspan RIGHT
Mn ( + ) ADEQUATE! ADEQUATE! ADEQUATE! TOP
Mn ( - ) ADEQUATE! ADEQUATE! ADEQUATE! BOTTOM

Design of Stirrups

Effective Depth
d: 390 mm
d' : 60 mm

𝑊𝑢=
〖𝑊𝑢〗 _𝑡𝑜𝑝 81.35 kn/m
(8 〖�𝑀𝑛〗 _𝑐𝑜𝑚𝑝𝑢𝑡𝑒𝑑)/𝐿^
= _𝑏𝑜𝑡𝑡
〖𝑊𝑢〗 92.98 kn/m
2 𝑜𝑚=
𝑢�𝑒 𝑊𝑢= 92.98 kn/m 𝑅= 𝑊𝑢𝐿/2 185.96038

Computation if Stirrups is Required


𝑉𝑐=0.17√𝐹^′ 𝑐𝑏𝑑 ( kN ) Φ = 0.75
*Note: If Vu> 0.50ΦVc -> Stirrups are required
If Vu< 0.50ΦVc -> Stirrups are not required

Vu ( Kn ) ΦVc 0.50ΦVc Remarks


d at support 149.70 Stirrups are required
79.18 39.59
at L/3 61.9867919984 Stirrups are required

Computation for Maximum Spacing


𝑉�= (𝑉𝑢 −
∅𝑉𝑐 )/∅
𝑉�= (𝑉𝑢 −
∅𝑉𝑐 )/∅
*Note: 0.33√𝐹^′ 𝑐𝑏𝑑
If Vs< Maximum Spacing = d/2 or 600 (smaller)
0.33√𝐹^′ 𝑐𝑏𝑑
if Vs> Maximum Spacing = d/4 or 300 (smaller)

Maximum Spaciing
Vs 0.33√𝐹^′ 𝑐𝑏𝑑 Max Spacing (mm)
d from support 94.02 190
204.94
at L/3 -22.93 190

Computation for Required Spacing


�= Φ = 0.75
(∅𝐴𝑣𝐹𝑦𝑡𝑑)/ Av = 157.08
(𝑉𝑢−∅𝑉𝑐)
S (mm) Remarks
d from support 130 Use Spacing
al L/3 460 Use Max Spacing O.C.

No. of Rebars ( If other bar dia. Is used. ) = 25 mm


n LEFT Midspan RIGHT
Top 4 3 4
Bottom 5 3 5

No. of Rebars ( If other bar dia. Is used. ) = 16 mm


n LEFT Midspan RIGHT
Top 10 7 10
Bottom 11 5 11

N.O.B ΦMn ( computed )


7 212.85
6 182.45
5 152.05
4 121.65
3 91.24
2 60.83
INVESTIGATION OF BEAMS
DESIGN OF BEAMS
3-B-1

Length, L (mm) : 3000 Concrete Cover (mm) : 40


Width, b (mm) : 350 Bar Diameter (mm) : 20
Height, h (mm) : 500 Stirrup Diameter (mm) : 10
Fs(Mpa) : 275.86 F'c (Mpa) : 20.7
Effective Depth
d: 440 mm
d' : 60 mm
Beta Code
B: 0.85

No. of Rebars
n LEFT Midspan RIGHT
Top 4 3 4
Bottom 3 3 3

Steel Area, As ( mm2 )


𝐴�=𝑛 ( 1/4
𝜋𝑑_𝑏^2 )
LEFT Midspan RIGHT
As ( TOP ) 1256.64 942.48 1256.64
As ( BOTT. ) 942.48 942.48 942.48

Steel Ratio, ρ
�= 𝐴�/𝑏𝑑

LEFT Midspan RIGHT


ρ ( TOP ) 0.00816 0.00612 0.00816
ρ (BOTT. ) 0.00612 0.00612 0.00612

Checking for Beam Steel Ratio


�_𝑏𝑎𝑙=0.85𝐵_1 (𝐹^′
𝑐)/𝐹�( 600/(600+𝐹�) ) �_𝑏𝑎𝑙 = 0.03714

�_𝑚𝑖𝑛=√(𝐹^′ 𝑐)/(4
𝐹�) ≥ 1.4/𝐹�
�_𝑚𝑖𝑛 0.00508
=
ρ ( TOP ) ρ ( BOTTOM )
Adequacy at LEFT: Steel ratio used is adequate Steel ratio used is adequate
Adequacy at Midspan: Steel ratio used is adequate Steel ratio used is adequate
Adequacy at RIGHT: Steel ratio used is adequate Steel ratio used is adequate
Computation for Rn, (Mpa)
𝑅𝑛= �𝐹�[1−0.59�( 𝐹𝑦/(𝐹^
′ 𝑐) )]
LEFT Midspan RIGHT
Rn ( Top ) 2.11 1.61 2.11
Rn ( Bott. ) 1.61 1.61 1.61

Moment Capacity, ΦMn (KN.m)


∅𝑀𝑛= ∅𝑅𝑛𝑏𝑑^2 Φ = 0.9
LEFT Midspan RIGHT
ΦMn ( + ) 128.47 98.00 128.47 TOP
ΦMn ( - ) 98.00 98.00 98.00 BOTTOM

Moment Actual ( *see STAAD postprocessing ) , (KN.m)


LEFT Midspan RIGHT
Mn ( + ) 105.00 0.51 0.45 TOP
Mn ( - ) 16.20 18.30 51.90 BOTTOM

Adequacy of Moment Capacity


LEFT Midspan RIGHT
Mn ( + ) ADEQUATE! ADEQUATE! ADEQUATE! TOP
Mn ( - ) ADEQUATE! ADEQUATE! ADEQUATE! BOTTOM

Design of Stirrups

Effective Depth
d: 440 mm
d' : 60 mm

𝑊𝑢=
〖𝑊𝑢〗 _𝑡𝑜𝑝 114.19 kn/m
(8 〖�𝑀𝑛〗 _𝑐𝑜𝑚𝑝𝑢𝑡𝑒𝑑)/𝐿^
= _𝑏𝑜𝑡𝑡
〖𝑊𝑢〗 87.11 kn/m
2 𝑜𝑚=
𝑢�𝑒 𝑊𝑢= 114.19 kn/m 𝑅= 𝑊𝑢𝐿/2 171.29096

Computation if Stirrups is Required


𝑉𝑐=0.17√𝐹^′ 𝑐𝑏𝑑 ( kN ) Φ = 0.75
*Note: If Vu> 0.50ΦVc -> Stirrups are required
If Vu< 0.50ΦVc -> Stirrups are not required

Vu ( Kn ) ΦVc 0.50ΦVc Remarks


d at support 121.05 Stirrups are required
89.33 44.67
at L/3 57.0969878648 Stirrups are required

Computation for Maximum Spacing


𝑉�= (𝑉𝑢 −
∅𝑉𝑐 )/∅
𝑉�= (𝑉𝑢 −
∅𝑉𝑐 )/∅
*Note: 0.33√𝐹^′ 𝑐𝑏𝑑
If Vs< Maximum Spacing = d/2 or 600 (smaller)
0.33√𝐹^′ 𝑐𝑏𝑑
if Vs> Maximum Spacing = d/4 or 300 (smaller)

Maximum Spaciing
Vs 0.33√𝐹^′ 𝑐𝑏𝑑 Max Spacing (mm)
d from support 42.28 220
231.22
at L/3 -42.98 220

Computation for Required Spacing


�= Φ = 0.75
(∅𝐴𝑣𝐹𝑦𝑡𝑑)/ Av = 157.08
(𝑉𝑢−∅𝑉𝑐)
S (mm) Remarks
d from support 330 Use Max Spacing O.C.
al L/3 760 Use Max Spacing O.C.

No. of Rebars ( If other bar dia. Is used. ) = 25 mm


n LEFT Midspan RIGHT
Top 3 2 3
Bottom 2 2 2

No. of Rebars ( If other bar dia. Is used. ) = 16 mm


n LEFT Midspan RIGHT
Top 7 5 7
Bottom 5 5 5

N.O.B ΦMn ( computed )


7 240.15
6 205.85
5 171.55
4 137.25
3 102.94
2 68.63
INVESTIGATION OF BEAMS
DESIGN OF BEAMS
3-G-1

Length, L (mm) : 4000 Concrete Cover (mm) : 40


Width, b (mm) : 300 Bar Diameter (mm) : 20
Height, h (mm) : 400 Stirrup Diameter (mm) : 10
Fs(Mpa) : 275.86 F'c (Mpa) : 20.7
Effective Depth
d: 340 mm
d' : 60 mm
Beta Code
B: 0.85

No. of Rebars
n LEFT Midspan RIGHT
Top 5 2 5
Bottom 5 2 5

Steel Area, As ( mm2 )


𝐴�=𝑛 ( 1/4
𝜋𝑑_𝑏^2 )
LEFT Midspan RIGHT
As ( TOP ) 1570.80 628.32 1570.80
As ( BOTT. ) 1570.80 628.32 1570.80

Steel Ratio, ρ
�= 𝐴�/𝑏𝑑

LEFT Midspan RIGHT


ρ ( TOP ) 0.01540 0.00616 0.01540
ρ (BOTT. ) 0.01540 0.00616 0.01540

Checking for Beam Steel Ratio


�_𝑏𝑎𝑙=0.85𝐵_1 (𝐹^′
𝑐)/𝐹�( 600/(600+𝐹�) ) �_𝑏𝑎𝑙 = 0.03714

�_𝑚𝑖𝑛=√(𝐹^′ 𝑐)/(4
𝐹�) ≥ 1.4/𝐹�
�_𝑚𝑖𝑛 0.00508
=
ρ ( TOP ) ρ ( BOTTOM )
Adequacy at LEFT: Steel ratio used is adequate Steel ratio used is adequate
Adequacy at Midspan: Steel ratio used is adequate Steel ratio used is adequate
Adequacy at RIGHT: Steel ratio used is adequate Steel ratio used is adequate
Computation for Rn, (Mpa)
𝑅𝑛= �𝐹�[1−0.59�( 𝐹𝑦/(𝐹^
′ 𝑐) )]
LEFT Midspan RIGHT
Rn ( Top ) 3.73 1.62 3.73
Rn ( Bott. ) 3.73 1.62 3.73

Moment Capacity, ΦMn (KN.m)


∅𝑀𝑛= ∅𝑅𝑛𝑏𝑑^2 Φ = 0.9
LEFT Midspan RIGHT
ΦMn ( + ) 116.54 50.47 116.54 TOP
ΦMn ( - ) 116.54 50.47 116.54 BOTTOM

Moment Actual ( *see STAAD postprocessing ) , (KN.m)


LEFT RIGHT
Mn ( + ) 17.20 9.10 89.20 TOP
Mn ( - ) 94.90 30.10 15.00 BOTTOM

Adequacy of Moment Capacity


LEFT Midspan RIGHT
Mn ( + ) ADEQUATE! ADEQUATE! ADEQUATE! TOP
Mn ( - ) ADEQUATE! ADEQUATE! ADEQUATE! BOTTOM

Design of Stirrups

Effective Depth
d: 340 mm
d' : 60 mm

𝑊𝑢=
〖𝑊𝑢〗 _𝑡𝑜𝑝 58.27 kn/m
(8 〖�𝑀𝑛〗 _𝑐𝑜𝑚𝑝𝑢𝑡𝑒𝑑)/𝐿^
= _𝑏𝑜𝑡𝑡
〖𝑊𝑢〗 58.27 kn/m
2 𝑜𝑚=
𝑢�𝑒 𝑊𝑢= 58.27 kn/m 𝑅= 𝑊𝑢𝐿/2 116.54052

Computation if Stirrups is Required


𝑉𝑐=0.17√𝐹^′ 𝑐𝑏𝑑 ( kN ) Φ = 0.75
*Note: If Vu> 0.50ΦVc -> Stirrups are required
If Vu< 0.50ΦVc -> Stirrups are not required

Vu ( Kn ) ΦVc 0.50ΦVc Remarks


d at support 96.73 Stirrups are required
59.17 29.58
at L/3 38.8468394352 Stirrups are required

Computation for Maximum Spacing


𝑉�= (𝑉𝑢 −
∅𝑉𝑐 )/∅
𝑉�= (𝑉𝑢 −
∅𝑉𝑐 )/∅
*Note: 0.33√𝐹^′ 𝑐𝑏𝑑
If Vs< Maximum Spacing = d/2 or 600 (smaller)
0.33√𝐹^′ 𝑐𝑏𝑑
if Vs> Maximum Spacing = d/4 or 300 (smaller)

Maximum Spaciing
Vs 0.33√𝐹^′ 𝑐𝑏𝑑 Max Spacing (mm)
d from support 50.08 170
153.14
at L/3 -27.10 170

Computation for Required Spacing


�= Φ = 0.75
(∅𝐴𝑣𝐹𝑦𝑡𝑑)/ Av = 157.08
(𝑉𝑢−∅𝑉𝑐)
S (mm) Remarks
d from support 220 Use Max Spacing O.C.
al L/3 860 Use Max Spacing O.C.

No. of Rebars ( If other bar dia. Is used. ) = 25 mm


n LEFT Midspan RIGHT
Top 4 2 4
Bottom 4 2 4

No. of Rebars ( If other bar dia. Is used. ) = 16 mm


n LEFT Midspan RIGHT
Top 8 4 8
Bottom 8 4 8

N.O.B ΦMn ( computed )


7 185.53
6 159.04
5 132.54
4 106.04
3 79.54
2 53.03
INVESTIGATION OF BEAMS
DESIGN OF BEAMS
4-B-1

Length, L (mm) : 3000 Concrete Cover (mm) : 40


Width, b (mm) : 250 Bar Diameter (mm) : 20
Height, h (mm) : 400 Stirrup Diameter (mm) : 10
Fs(Mpa) : 275.86 F'c (Mpa) : 20.7
Effective Depth
d: 340 mm
d' : 60 mm
Beta Code
B: 0.85

No. of Rebars
n LEFT Midspan RIGHT
Top 3 2 3
Bottom 3 2 3

Steel Area, As ( mm2 )


𝐴�=𝑛 ( 1/4
𝜋𝑑_𝑏^2 )
LEFT Midspan RIGHT
As ( TOP ) 942.48 628.32 942.48
As ( BOTT. ) 942.48 628.32 942.48

Steel Ratio, ρ
�= 𝐴�/𝑏𝑑

LEFT Midspan RIGHT


ρ ( TOP ) 0.01109 0.00739 0.01109
ρ (BOTT. ) 0.01109 0.00739 0.01109

Checking for Beam Steel Ratio


�_𝑏𝑎𝑙=0.85𝐵_1 (𝐹^′
𝑐)/𝐹�( 600/(600+𝐹�) ) �_𝑏𝑎𝑙 = 0.03714

�_𝑚𝑖𝑛=√(𝐹^′ 𝑐)/(4
𝐹�) ≥ 1.4/𝐹�
�_𝑚𝑖𝑛 0.00508
=
ρ ( TOP ) ρ ( BOTTOM )
Adequacy at LEFT: Steel ratio used is adequate Steel ratio used is adequate
Adequacy at Midspan: Steel ratio used is adequate Steel ratio used is adequate
Adequacy at RIGHT: Steel ratio used is adequate Steel ratio used is adequate
Computation for Rn, (Mpa)
𝑅𝑛= �𝐹�[1−0.59�( 𝐹𝑦/(𝐹^
′ 𝑐) )]
LEFT Midspan RIGHT
Rn ( Top ) 2.79 1.92 2.79
Rn ( Bott. ) 2.79 1.92 2.79

Moment Capacity, ΦMn (KN.m)


∅𝑀𝑛= ∅𝑅𝑛𝑏𝑑^2 Φ = 0.9
LEFT Midspan RIGHT
ΦMn ( + ) 72.62 49.96 72.62 TOP
ΦMn ( - ) 72.62 49.96 72.62 BOTTOM

Moment Actual ( *see STAAD postprocessing ) , (KN.m)


LEFT Midspan RIGHT
Mn ( + ) 21.30 2.30 1.77 TOP
Mn ( - ) 16.20 0.00 51.90 BOTTOM

Adequacy of Moment Capacity


LEFT Midspan RIGHT
Mn ( + ) ADEQUATE! ADEQUATE! ADEQUATE! TOP
Mn ( - ) ADEQUATE! ADEQUATE! ADEQUATE! BOTTOM

Design of Stirrups

Effective Depth
d: 340 mm
d' : 60 mm

𝑊𝑢=
〖𝑊𝑢〗 _𝑡𝑜𝑝 64.55 kn/m
(8 〖�𝑀𝑛〗 _𝑐𝑜𝑚𝑝𝑢𝑡𝑒𝑑)/𝐿^
= _𝑏𝑜𝑡𝑡
〖𝑊𝑢〗 64.55 kn/m
2 𝑜𝑚=
𝑢�𝑒 𝑊𝑢= 64.55 kn/m 𝑅= 𝑊𝑢𝐿/2 96.828816

Computation if Stirrups is Required


𝑉𝑐=0.17√𝐹^′ 𝑐𝑏𝑑 ( kN ) Φ = 0.75
*Note: If Vu> 0.50ΦVc -> Stirrups are required
If Vu< 0.50ΦVc -> Stirrups are not required

Vu ( Kn ) ΦVc 0.50ΦVc Remarks


d at support 74.88 Stirrups are required
49.31 24.65
at L/3 32.2762720121 Stirrups are required

Computation for Maximum Spacing


𝑉�= (𝑉𝑢 −
∅𝑉𝑐 )/∅
𝑉�= (𝑉𝑢 −
∅𝑉𝑐 )/∅
*Note: 0.33√𝐹^′ 𝑐𝑏𝑑
If Vs< Maximum Spacing = d/2 or 600 (smaller)
0.33√𝐹^′ 𝑐𝑏𝑑
if Vs> Maximum Spacing = d/4 or 300 (smaller)

Maximum Spaciing
Vs 0.33√𝐹^′ 𝑐𝑏𝑑 Max Spacing (mm)
d from support 34.10 170
127.62
at L/3 -22.71 170

Computation for Required Spacing


�= Φ = 0.75
(∅𝐴𝑣𝐹𝑦𝑡𝑑)/ Av = 157.08
(𝑉𝑢−∅𝑉𝑐)
S (mm) Remarks
d from support 320 Use Max Spacing O.C.
al L/3 950 Use Max Spacing O.C.

No. of Rebars ( If other bar dia. Is used. ) = 25 mm


n LEFT Midspan RIGHT
Top 2 2 2
Bottom 2 2 2

No. of Rebars ( If other bar dia. Is used. ) = 16 mm


n LEFT Midspan RIGHT
Top 5 4 5
Bottom 5 4 5

N.O.B ΦMn ( computed )


7 185.51
6 159.03
5 132.53
4 106.04
3 79.54
2 53.03
INVESTIGATION OF BEAMS
DESIGN OF BEAMS
4-G-1

Length, L (mm) : 4000 Concrete Cover (mm) : 40


Width, b (mm) : 200 Bar Diameter (mm) : 20
Height, h (mm) : 300 Stirrup Diameter (mm) : 10
Fs(Mpa) : 275.86 F'c (Mpa) : 20.7
Effective Depth
d: 240 mm
d' : 60 mm
Beta Code
B: 0.85

No. of Rebars
n LEFT Midspan RIGHT
Top 3 2 3
Bottom 2 2 2

Steel Area, As ( mm2 )


𝐴�=𝑛 ( 1/4
𝜋𝑑_𝑏^2 )
LEFT Midspan RIGHT
As ( TOP ) 942.48 628.32 942.48
As ( BOTT. ) 628.32 628.32 628.32

Steel Ratio, ρ
�= 𝐴�/𝑏𝑑

LEFT Midspan RIGHT


ρ ( TOP ) 0.01963 0.01309 0.01963
ρ (BOTT. ) 0.01309 0.01309 0.01309

Checking for Beam Steel Ratio


�_𝑏𝑎𝑙=0.85𝐵_1 (𝐹^′
𝑐)/𝐹�( 600/(600+𝐹�) ) �_𝑏𝑎𝑙 = 0.03714

�_𝑚𝑖𝑛=√(𝐹^′ 𝑐)/(4
𝐹�) ≥ 1.4/𝐹�
�_𝑚𝑖𝑛 0.00508
=
ρ ( TOP ) ρ ( BOTTOM )
Adequacy at LEFT: Steel ratio used is adequate Steel ratio used is adequate
Adequacy at Midspan: Steel ratio used is adequate Steel ratio used is adequate
Adequacy at RIGHT: Steel ratio used is adequate Steel ratio used is adequate
Computation for Rn, (Mpa)
𝑅𝑛= �𝐹�[1−0.59�( 𝐹𝑦/(𝐹^
′ 𝑐) )]
LEFT Midspan RIGHT
Rn ( Top ) 4.58 3.24 4.58
Rn ( Bott. ) 3.24 3.24 3.24

Moment Capacity, ΦMn (KN.m)


∅𝑀𝑛= ∅𝑅𝑛𝑏𝑑^2 Φ = 0.9
LEFT Midspan RIGHT
ΦMn ( + ) 47.49 33.59 47.49 TOP
ΦMn ( - ) 33.59 33.59 33.59 BOTTOM

Moment Actual ( *see STAAD postprocessing ) , (KN.m)


LEFT Midspan RIGHT
Mn ( + ) 7.40 0.52 39.70 TOP
Mn ( - ) 9.40 13.00 15.00 BOTTOM

Adequacy of Moment Capacity


LEFT Midspan RIGHT
Mn ( + ) ADEQUATE! ADEQUATE! ADEQUATE! TOP
Mn ( - ) ADEQUATE! ADEQUATE! ADEQUATE! BOTTOM

Design of Stirrups

Effective Depth
d: 240 mm
d' : 60 mm

𝑊𝑢=
〖𝑊𝑢〗 _𝑡𝑜𝑝 23.74 kn/m
(8 〖�𝑀𝑛〗 _𝑐𝑜𝑚𝑝𝑢𝑡𝑒𝑑)/𝐿^
= _𝑏𝑜𝑡𝑡
〖𝑊𝑢〗 16.79 kn/m
2 𝑜𝑚=
𝑢�𝑒 𝑊𝑢= 23.74 kn/m 𝑅= 𝑊𝑢𝐿/2 47.48836

Computation if Stirrups is Required


𝑉𝑐=0.17√𝐹^′ 𝑐𝑏𝑑 ( kN ) Φ = 0.75
*Note: If Vu> 0.50ΦVc -> Stirrups are required
If Vu< 0.50ΦVc -> Stirrups are not required

Vu ( Kn ) ΦVc 0.50ΦVc Remarks


d at support 41.79 Stirrups are required
27.84 13.92
at L/3 15.8294531835 Stirrups are required

Computation for Maximum Spacing


𝑉�= (𝑉𝑢 −
∅𝑉𝑐 )/∅
𝑉�= (𝑉𝑢 −
∅𝑉𝑐 )/∅
*Note: 0.33√𝐹^′ 𝑐𝑏𝑑
If Vs< Maximum Spacing = d/2 or 600 (smaller)
0.33√𝐹^′ 𝑐𝑏𝑑
if Vs> Maximum Spacing = d/4 or 300 (smaller)

Maximum Spaciing
Vs 0.33√𝐹^′ 𝑐𝑏𝑑 Max Spacing (mm)
d from support 18.59 120
72.07
at L/3 -16.02 120

Computation for Required Spacing


�= Φ = 0.75
(∅𝐴𝑣𝐹𝑦𝑡𝑑)/ Av = 157.08
(𝑉𝑢−∅𝑉𝑐)
S (mm) Remarks
d from support 410 Use Max Spacing O.C.
al L/3 2330 Use Max Spacing O.C.

No. of Rebars ( If other bar dia. Is used. ) = 25 mm


n LEFT Midspan RIGHT
Top 2 2 2
Bottom 2 2 2

No. of Rebars ( If other bar dia. Is used. ) = 16 mm


n LEFT Midspan RIGHT
Top 5 4 5
Bottom 4 4 4

N.O.B ΦMn ( computed )


7 130.89
6 112.21
5 93.52
4 74.83
3 56.13
2 37.43
INVESTIGATION OF BEAMS
DESIGN OF BEAMS
RG-1

Length, L (mm) : 4000 Concrete Cover (mm) : 40


Width, b (mm) : 250 Bar Diameter (mm) : 20
Height, h (mm) : 350 Stirrup Diameter (mm) : 10
Fs(Mpa) : 275.86 F'c (Mpa) : 20.7
Effective Depth
d: 290 mm
d' : 60 mm
Beta Code
B: 0.85

No. of Rebars
n LEFT Midspan RIGHT
Top 5 3 5
Bottom 3 3 3

Steel Area, As ( mm2 )


𝐴�=𝑛 ( 1/4
𝜋𝑑_𝑏^2 )
LEFT Midspan RIGHT
As ( TOP ) 1570.80 942.48 1570.80
As ( BOTT. ) 942.48 942.48 942.48

Steel Ratio, ρ
�= 𝐴�/𝑏𝑑

LEFT Midspan RIGHT


ρ ( TOP ) 0.02167 0.01300 0.02167
ρ (BOTT. ) 0.01300 0.01300 0.01300

Checking for Beam Steel Ratio


�_𝑏𝑎𝑙=0.85𝐵_1 (𝐹^′
𝑐)/𝐹�( 600/(600+𝐹�) ) �_𝑏𝑎𝑙 = 0.03714

�_𝑚𝑖𝑛=√(𝐹^′ 𝑐)/(4
𝐹�) ≥ 1.4/𝐹�
�_𝑚𝑖𝑛 0.00508
=
ρ ( TOP ) ρ ( BOTTOM )
Adequacy at LEFT: Steel ratio used is adequate Steel ratio used is adequate
Adequacy at Midspan: Steel ratio used is adequate Steel ratio used is adequate
Adequacy at RIGHT: Steel ratio used is adequate Steel ratio used is adequate
Computation for Rn, (Mpa)
𝑅𝑛= �𝐹�[1−0.59�( 𝐹𝑦/(𝐹^
′ 𝑐) )]
LEFT Midspan RIGHT
Rn ( Top ) 4.96 3.22 4.96
Rn ( Bott. ) 3.22 3.22 3.22

Moment Capacity, ΦMn (KN.m)


∅𝑀𝑛= ∅𝑅𝑛𝑏𝑑^2 Φ = 0.9
LEFT Midspan RIGHT
ΦMn ( + ) 93.83 60.92 93.83 TOP
ΦMn ( - ) 60.92 60.92 60.92 BOTTOM

Moment Actual ( *see STAAD postprocessing ) , (KN.m)


LEFT Midspan RIGHT
Mn ( + ) 11.40 5.00 39.70 TOP
Mn ( - ) 29.00 21.00 5.36 BOTTOM

Adequacy of Moment Capacity


LEFT Midspan RIGHT
Mn ( + ) ADEQUATE! ADEQUATE! ADEQUATE! TOP
Mn ( - ) ADEQUATE! ADEQUATE! ADEQUATE! BOTTOM

Design of Stirrups

Effective Depth
d: 290 mm
d' : 60 mm

𝑊𝑢=
〖𝑊𝑢〗 _𝑡𝑜𝑝 46.92 kn/m
(8 〖�𝑀𝑛〗 _𝑐𝑜𝑚𝑝𝑢𝑡𝑒𝑑)/𝐿^
= _𝑏𝑜𝑡𝑡
〖𝑊𝑢〗 30.46 kn/m
2 𝑜𝑚=
𝑢�𝑒 𝑊𝑢= 46.92 kn/m 𝑅= 𝑊𝑢𝐿/2 93.830051

Computation if Stirrups is Required


𝑉𝑐=0.17√𝐹^′ 𝑐𝑏𝑑 ( kN ) Φ = 0.75
*Note: If Vu> 0.50ΦVc -> Stirrups are required
If Vu< 0.50ΦVc -> Stirrups are not required

Vu ( Kn ) ΦVc 0.50ΦVc Remarks


d at support 80.22 Stirrups are required
42.06 21.03
at L/3 31.2766837575 Stirrups are required

Computation for Maximum Spacing


𝑉�= (𝑉𝑢 −
∅𝑉𝑐 )/∅
𝑉�= (𝑉𝑢 −
∅𝑉𝑐 )/∅
*Note: 0.33√𝐹^′ 𝑐𝑏𝑑
If Vs< Maximum Spacing = d/2 or 600 (smaller)
0.33√𝐹^′ 𝑐𝑏𝑑
if Vs> Maximum Spacing = d/4 or 300 (smaller)

Maximum Spaciing
Vs 0.33√𝐹^′ 𝑐𝑏𝑑 Max Spacing (mm)
d from support 50.89 140
108.85
at L/3 -14.37 140

Computation for Required Spacing


�= Φ = 0.75
(∅𝐴𝑣𝐹𝑦𝑡𝑑)/ Av = 157.08
(𝑉𝑢−∅𝑉𝑐)
S (mm) Remarks
d from support 180 Use Max Spacing O.C.
al L/3 850 Use Max Spacing O.C.

No. of Rebars ( If other bar dia. Is used. ) = 25 mm


n LEFT Midspan RIGHT
Top 4 2 4
Bottom 2 2 2

No. of Rebars ( If other bar dia. Is used. ) = 16 mm


n LEFT Midspan RIGHT
Top 8 5 8
Bottom 5 5 5

N.O.B ΦMn ( computed )


7 158.21
6 135.63
5 113.04
4 90.44
3 67.84
2 45.23
INVESTIGATION OF BEAMS
DESIGN OF BEAMS
RB-1

Length, L (mm) : 3000 Concrete Cover (mm) : 40


Width, b (mm) : 150 Bar Diameter (mm) : 16
Height, h (mm) : 200 Stirrup Diameter (mm) : 10
Fs(Mpa) : 275.86 F'c (Mpa) : 20.7
Effective Depth
d: 142 mm
d' : 58 mm
Beta Code
B: 0.85

No. of Rebars
n LEFT Midspan RIGHT
Top 3 2 3
Bottom 2 3 2

Steel Area, As ( mm2 )


𝐴�=𝑛 ( 1/4
𝜋𝑑_𝑏^2 )
LEFT Midspan RIGHT
As ( TOP ) 603.19 402.12 603.19
As ( BOTT. ) 402.12 603.19 402.12

Steel Ratio, ρ
�= 𝐴�/𝑏𝑑

LEFT Midspan RIGHT


ρ ( TOP ) 0.02832 0.01888 0.02832
ρ (BOTT. ) 0.01888 0.02832 0.01888

Checking for Beam Steel Ratio


�_𝑏𝑎𝑙=0.85𝐵_1 (𝐹^′
𝑐)/𝐹�( 600/(600+𝐹�) ) �_𝑏𝑎𝑙 = 0.03714

�_𝑚𝑖𝑛=√(𝐹^′ 𝑐)/(4
𝐹�) ≥ 1.4/𝐹�
�_𝑚𝑖𝑛 0.00508
=
ρ ( TOP ) ρ ( BOTTOM )
Adequacy at LEFT: Steel ratio used is adequate Steel ratio used is adequate
Adequacy at Midspan: Steel ratio used is adequate Steel ratio used is adequate
Adequacy at RIGHT: Steel ratio used is adequate Steel ratio used is adequate
Computation for Rn, (Mpa)
𝑅𝑛= �𝐹�[1−0.59�( 𝐹𝑦/(𝐹^
′ 𝑐) )]
LEFT Midspan RIGHT
Rn ( Top ) 6.07 4.43 6.07
Rn ( Bott. ) 4.43 6.07 4.43

Moment Capacity, ΦMn (KN.m)


∅𝑀𝑛= ∅𝑅𝑛𝑏𝑑^2 Φ = 0.9
LEFT Midspan RIGHT
ΦMn ( + ) 16.53 12.07 16.53 TOP
ΦMn ( - ) 12.07 16.53 12.07 BOTTOM

Moment Actual ( *see STAAD postprocessing ) , (KN.m)


LEFT Midspan RIGHT
Mn ( + ) 15.00 0.51 1.77 TOP
Mn ( - ) 5.84 10.00 12.00 BOTTOM

Adequacy of Moment Capacity


LEFT Midspan RIGHT
Mn ( + ) ADEQUATE! ADEQUATE! ADEQUATE! TOP
Mn ( - ) ADEQUATE! ADEQUATE! ADEQUATE! BOTTOM

Design of Stirrups

Effective Depth
d: 142 mm
d' : 58 mm

𝑊𝑢=
〖𝑊𝑢〗 _𝑡𝑜𝑝 14.69 kn/m
(8 〖�𝑀𝑛〗 _𝑐𝑜𝑚𝑝𝑢𝑡𝑒𝑑)/𝐿^
= _𝑏𝑜𝑡𝑡
〖𝑊𝑢〗 14.69 kn/m
2 𝑜𝑚=
𝑢�𝑒 𝑊𝑢= 14.69 kn/m 𝑅= 𝑊𝑢𝐿/2 22.040454

Computation if Stirrups is Required


𝑉𝑐=0.17√𝐹^′ 𝑐𝑏𝑑 ( kN ) Φ = 0.75
*Note: If Vu> 0.50ΦVc -> Stirrups are required
If Vu< 0.50ΦVc -> Stirrups are not required

Vu ( Kn ) ΦVc 0.50ΦVc Remarks


d at support 19.95 Stirrups are required
12.36 6.18
at L/3 7.3468178655 Stirrups are required

Computation for Maximum Spacing


𝑉�= (𝑉𝑢 −
∅𝑉𝑐 )/∅
𝑉�= (𝑉𝑢 −
∅𝑉𝑐 )/∅
*Note: 0.33√𝐹^′ 𝑐𝑏𝑑
If Vs< Maximum Spacing = d/2 or 600 (smaller)
0.33√𝐹^′ 𝑐𝑏𝑑
if Vs> Maximum Spacing = d/4 or 300 (smaller)

Maximum Spaciing
Vs 0.33√𝐹^′ 𝑐𝑏𝑑 Max Spacing (mm)
d from support 10.13 70
31.98
at L/3 -6.68 70

Computation for Required Spacing


�= Φ = 0.75
(∅𝐴𝑣𝐹𝑦𝑡𝑑)/ Av = 157.08
(𝑉𝑢−∅𝑉𝑐)
S (mm) Remarks
d from support 450 Use Max Spacing O.C.
al L/3 3200 Use Max Spacing O.C.

No. of Rebars ( If other bar dia. Is used. ) = 25 mm


n LEFT Midspan RIGHT
Top 2 1 2
Bottom 1 1 1

No. of Rebars ( If other bar dia. Is used. ) = 16 mm


n LEFT Midspan RIGHT
Top 3 2 3
Bottom 2 3 2

N.O.B ΦMn ( computed )


7 49.49
6 42.44
5 35.38
4 28.31
3 21.24
2 14.17
INVESTIGATION OF BEAMS
DESIGN OF BEAMS
ROOF BEAMS

Length, L (mm) : 6000 Concrete Cover (mm) : 40


Width, b (mm) : 200 Bar Diameter (mm) : 16
Height, h (mm) : 300 Stirrup Diameter (mm) : 10
Fs(Mpa) : 275.86 F'c (Mpa) : 20.7
Effective Depth
d: 242 mm
d' : 58 mm
Beta Code
B: 0.85

No. of Rebars
n LEFT Midspan RIGHT
Top 3 2 3
Bottom 2 2 2

Steel Area, As ( mm2 )


𝐴�=𝑛 ( 1/4
𝜋𝑑_𝑏^2 )
LEFT Midspan RIGHT
As ( TOP ) 603.19 402.12 603.19
As ( BOTT. ) 402.12 402.12 402.12

Steel Ratio, ρ
�= 𝐴�/𝑏𝑑

LEFT Midspan RIGHT


ρ ( TOP ) 0.01246 0.00831 0.01246
ρ (BOTT. ) 0.00831 0.00831 0.00831

Checking for Beam Steel Ratio


�_𝑏𝑎𝑙=0.85𝐵_1 (𝐹^′
𝑐)/𝐹�( 600/(600+𝐹�) ) �_𝑏𝑎𝑙 = 0.03714

�_𝑚𝑖𝑛=√(𝐹^′ 𝑐)/(4
𝐹�) ≥ 1.4/𝐹�
�_𝑚𝑖𝑛 0.00508
=
ρ ( TOP ) ρ ( BOTTOM )
Adequacy at LEFT: Steel ratio used is adequate Steel ratio used is adequate
Adequacy at Midspan: Steel ratio used is adequate Steel ratio used is adequate
Adequacy at RIGHT: Steel ratio used is adequate Steel ratio used is adequate
Computation for Rn, (Mpa)
𝑅𝑛= �𝐹�[1−0.59�( 𝐹𝑦/(𝐹^
′ 𝑐) )]
LEFT Midspan RIGHT
Rn ( Top ) 3.10 2.14 3.10
Rn ( Bott. ) 2.14 2.14 2.14

Moment Capacity, ΦMn (KN.m)


∅𝑀𝑛= ∅𝑅𝑛𝑏𝑑^2 Φ = 0.9
LEFT Midspan RIGHT
ΦMn ( + ) 32.69 22.58 32.69 TOP
ΦMn ( - ) 22.58 22.58 22.58 BOTTOM

Moment Actual ( *see STAAD postprocessing ) , (KN.m)


LEFT Midspan RIGHT
Mn ( + ) 54.60 0.00 0.00 TOP
Mn ( - ) 2.07 0.00 19.90 BOTTOM

Adequacy of Moment Capacity


LEFT Midspan RIGHT
Mn ( + ) INCREASE BARS! ADEQUATE! ADEQUATE! TOP
Mn ( - ) ADEQUATE! ADEQUATE! ADEQUATE! BOTTOM

Design of Stirrups

Effective Depth
d: 242 mm
d' : 58 mm

𝑊𝑢=
〖𝑊𝑢〗 _𝑡𝑜𝑝 7.26 kn/m
(8 〖�𝑀𝑛〗 _𝑐𝑜𝑚𝑝𝑢𝑡𝑒𝑑)/𝐿^
= _𝑏𝑜𝑡𝑡
〖𝑊𝑢〗 5.02 kn/m
2 𝑜𝑚=
𝑢�𝑒 𝑊𝑢= 7.26 kn/m 𝑅= 𝑊𝑢𝐿/2 21.79307

Computation if Stirrups is Required


𝑉𝑐=0.17√𝐹^′ 𝑐𝑏𝑑 ( kN ) Φ = 0.75
*Note: If Vu> 0.50ΦVc -> Stirrups are required
If Vu< 0.50ΦVc -> Stirrups are not required

Vu ( Kn ) ΦVc 0.50ΦVc Remarks


d at support 20.04 Stirrups are required
28.08 14.04
at L/3 7.2643566438 Stirrups are not required

Computation for Maximum Spacing


𝑉�= (𝑉𝑢 −
∅𝑉𝑐 )/∅
𝑉�= (𝑉𝑢 −
∅𝑉𝑐 )/∅
*Note: 0.33√𝐹^′ 𝑐𝑏𝑑
If Vs< Maximum Spacing = d/2 or 600 (smaller)
0.33√𝐹^′ 𝑐𝑏𝑑
if Vs> Maximum Spacing = d/4 or 300 (smaller)

Maximum Spaciing
Vs 0.33√𝐹^′ 𝑐𝑏𝑑 Max Spacing (mm)
d from support -10.72 120
72.67
at L/3 -27.75 120

Computation for Required Spacing


�= Φ = 0.75
(∅𝐴𝑣𝐹𝑦𝑡𝑑)/ Av = 157.08
(𝑉𝑢−∅𝑉𝑐)
S (mm) Remarks
d from support -740 Use Max Spacing O.C.
al L/3 -6070 Use Max Spacing O.C.

No. of Rebars ( If other bar dia. Is used. ) = 25 mm


n LEFT Midspan RIGHT
Top 2 1 2
Bottom 1 1 1

No. of Rebars ( If other bar dia. Is used. ) = 16 mm


n LEFT Midspan RIGHT
Top 3 2 3
Bottom 2 2 2

N.O.B ΦMn ( computed )


7 84.47
6 72.41
5 60.35
4 48.29
3 36.22
2 24.15
INVESTIGATION OF BEAMS
DESIGN OF BEAMS
ROOF BEAMS

Length, L (mm) : 6000 Concrete Cover (mm) : 40


Width, b (mm) : 200 Bar Diameter (mm) : 16
Height, h (mm) : 300 Stirrup Diameter (mm) : 10
Fs(Mpa) : 275.86 F'c (Mpa) : 20.7
Effective Depth
d: 242 mm
d' : 58 mm
Beta Code
B: 0.85

No. of Rebars
n LEFT Midspan RIGHT
Top 3 2 3
Bottom 2 2 2

Steel Area, As ( mm2 )


𝐴�=𝑛 ( 1/4
𝜋𝑑_𝑏^2 )
LEFT Midspan RIGHT
As ( TOP ) 603.19 402.12 603.19
As ( BOTT. ) 402.12 402.12 402.12

Steel Ratio, ρ
�= 𝐴�/𝑏𝑑

LEFT Midspan RIGHT


ρ ( TOP ) 0.01246 0.00831 0.01246
ρ (BOTT. ) 0.00831 0.00831 0.00831

Checking for Beam Steel Ratio


�_𝑏𝑎𝑙=0.85𝐵_1 (𝐹^′
𝑐)/𝐹�( 600/(600+𝐹�) ) �_𝑏𝑎𝑙 = 0.03714

�_𝑚𝑖𝑛=√(𝐹^′ 𝑐)/(4
𝐹�) ≥ 1.4/𝐹�
�_𝑚𝑖𝑛 0.00508
=
ρ ( TOP ) ρ ( BOTTOM )
Adequacy at LEFT: Steel ratio used is adequate Steel ratio used is adequate
Adequacy at Midspan: Steel ratio used is adequate Steel ratio used is adequate
Adequacy at RIGHT: Steel ratio used is adequate Steel ratio used is adequate
Computation for Rn, (Mpa)
𝑅𝑛= �𝐹�[1−0.59�( 𝐹𝑦/(𝐹^
′ 𝑐) )]
LEFT Midspan RIGHT
Rn ( Top ) 3.10 2.14 3.10
Rn ( Bott. ) 2.14 2.14 2.14

Moment Capacity, ΦMn (KN.m)


∅𝑀𝑛= ∅𝑅𝑛𝑏𝑑^2 Φ = 0.9
LEFT Midspan RIGHT
ΦMn ( + ) 32.69 22.58 32.69 TOP
ΦMn ( - ) 22.58 22.58 22.58 BOTTOM

Moment Actual ( *see STAAD postprocessing ) , (KN.m)


LEFT Midspan RIGHT
Mn ( + ) 37.70 0.00 8.29 TOP
Mn ( - ) 9.98 0.00 34.20 BOTTOM

Adequacy of Moment Capacity


LEFT Midspan RIGHT
Mn ( + ) INCREASE BARS! ADEQUATE! ADEQUATE! TOP
Mn ( - ) ADEQUATE! ADEQUATE! INCREASE BARS! BOTTOM

Design of Stirrups

Effective Depth
d: 242 mm
d' : 58 mm

𝑊𝑢=
〖𝑊𝑢〗 _𝑡𝑜𝑝 7.26 kn/m
(8 〖�𝑀𝑛〗 _𝑐𝑜𝑚𝑝𝑢𝑡𝑒𝑑)/𝐿^
= _𝑏𝑜𝑡𝑡
〖𝑊𝑢〗 5.02 kn/m
2 𝑜𝑚=
𝑢�𝑒 𝑊𝑢= 7.26 kn/m 𝑅= 𝑊𝑢𝐿/2 21.79307

Computation if Stirrups is Required


𝑉𝑐=0.17√𝐹^′ 𝑐𝑏𝑑 ( kN ) Φ = 0.75
*Note: If Vu> 0.50ΦVc -> Stirrups are required
If Vu< 0.50ΦVc -> Stirrups are not required

Vu ( Kn ) ΦVc 0.50ΦVc Remarks


d at support 20.04 Stirrups are required
28.08 14.04
at L/3 7.2643566438 Stirrups are not required

Computation for Maximum Spacing


𝑉�= (𝑉𝑢 −
∅𝑉𝑐 )/∅
𝑉�= (𝑉𝑢 −
∅𝑉𝑐 )/∅
*Note: 0.33√𝐹^′ 𝑐𝑏𝑑
If Vs< Maximum Spacing = d/2 or 600 (smaller)
0.33√𝐹^′ 𝑐𝑏𝑑
if Vs> Maximum Spacing = d/4 or 300 (smaller)

Maximum Spaciing
Vs 0.33√𝐹^′ 𝑐𝑏𝑑 Max Spacing (mm)
d from support -10.72 120
72.67
at L/3 -27.75 120

Computation for Required Spacing


�= Φ = 0.75
(∅𝐴𝑣𝐹𝑦𝑡𝑑)/ Av = 157.08
(𝑉𝑢−∅𝑉𝑐)
S (mm) Remarks
d from support -740 Use Max Spacing O.C.
al L/3 -6070 Use Max Spacing O.C.

No. of Rebars ( If other bar dia. Is used. ) = 25 mm


n LEFT Midspan RIGHT
Top 2 1 2
Bottom 1 1 1

No. of Rebars ( If other bar dia. Is used. ) = 16 mm


n LEFT Midspan RIGHT
Top 3 2 3
Bottom 2 2 2

N.O.B ΦMn ( computed )


7 84.47
6 72.41
5 60.35
4 48.29
3 36.22
2 24.15
INVESTIGATION OF BEAMS
DESIGN OF BEAMS
ROOF BEAMS

Length, L (mm) : 6000 Concrete Cover (mm) : 40


Width, b (mm) : 250 Bar Diameter (mm) : 16
Height, h (mm) : 400 Stirrup Diameter (mm) : 10
Fs(Mpa) : 275.86 F'c (Mpa) : 20.7
Effective Depth
d: 342 mm
d' : 58 mm
Beta Code
B: 0.85

No. of Rebars
n LEFT Midspan RIGHT
Top 8 6 8
Bottom 4 4 4

Steel Area, As ( mm2 )


𝐴�=𝑛 ( 1/4
𝜋𝑑_𝑏^2 )
LEFT Midspan RIGHT
As ( TOP ) 1608.50 1206.37 1608.50
As ( BOTT. ) 804.25 804.25 804.25

Steel Ratio, ρ
�= 𝐴�/𝑏𝑑

LEFT Midspan RIGHT


ρ ( TOP ) 0.01881 0.01411 0.01881
ρ (BOTT. ) 0.00941 0.00941 0.00941

Checking for Beam Steel Ratio


�_𝑏𝑎𝑙=0.85𝐵_1 (𝐹^′
𝑐)/𝐹�( 600/(600+𝐹�) ) �_𝑏𝑎𝑙 = 0.03714

�_𝑚𝑖𝑛=√(𝐹^′ 𝑐)/(4
𝐹�) ≥ 1.4/𝐹�
�_𝑚𝑖𝑛 0.00508
=
ρ ( TOP ) ρ ( BOTTOM )
Adequacy at LEFT: Steel ratio used is adequate Steel ratio used is adequate
Adequacy at Midspan: Steel ratio used is adequate Steel ratio used is adequate
Adequacy at RIGHT: Steel ratio used is adequate Steel ratio used is adequate
Computation for Rn, (Mpa)
𝑅𝑛= �𝐹�[1−0.59�( 𝐹𝑦/(𝐹^
′ 𝑐) )]
LEFT Midspan RIGHT
Rn ( Top ) 4.42 3.46 4.42
Rn ( Bott. ) 2.40 2.40 2.40

Moment Capacity, ΦMn (KN.m)


∅𝑀𝑛= ∅𝑅𝑛𝑏𝑑^2 Φ = 0.9
LEFT Midspan RIGHT
ΦMn ( + ) 116.37 91.07 116.37 TOP
ΦMn ( - ) 63.24 63.24 63.24 BOTTOM

Moment Actual ( *see STAAD postprocessing ) , (KN.m)


LEFT Midspan RIGHT
Mn ( + ) 57.10 0.00 77.90 TOP
Mn ( - ) 16.50 74.10 2.74 BOTTOM

Adequacy of Moment Capacity


LEFT Midspan RIGHT
Mn ( + ) ADEQUATE! ADEQUATE! ADEQUATE! TOP
Mn ( - ) ADEQUATE! INCREASE BARS! ADEQUATE! BOTTOM

Design of Stirrups

Effective Depth
d: 342 mm
d' : 58 mm

𝑊𝑢=
〖𝑊𝑢〗 _𝑡𝑜𝑝 25.86 kn/m
(8 〖�𝑀𝑛〗 _𝑐𝑜𝑚𝑝𝑢𝑡𝑒𝑑)/𝐿^
= _𝑏𝑜𝑡𝑡
〖𝑊𝑢〗 14.05 kn/m
2 𝑜𝑚=
𝑢�𝑒 𝑊𝑢= 25.86 kn/m 𝑅= 𝑊𝑢𝐿/2 77.583037

Computation if Stirrups is Required


𝑉𝑐=0.17√𝐹^′ 𝑐𝑏𝑑 ( kN ) Φ = 0.75
*Note: If Vu> 0.50ΦVc -> Stirrups are required
If Vu< 0.50ΦVc -> Stirrups are not required

Vu ( Kn ) ΦVc 0.50ΦVc Remarks


d at support 68.74 Stirrups are required
49.60 24.80
at L/3 25.8610123536 Stirrups are required

Computation for Maximum Spacing


𝑉�= (𝑉𝑢 −
∅𝑉𝑐 )/∅
𝑉�= (𝑉𝑢 −
∅𝑉𝑐 )/∅
*Note: 0.33√𝐹^′ 𝑐𝑏𝑑
If Vs< Maximum Spacing = d/2 or 600 (smaller)
0.33√𝐹^′ 𝑐𝑏𝑑
if Vs> Maximum Spacing = d/4 or 300 (smaller)

Maximum Spaciing
Vs 0.33√𝐹^′ 𝑐𝑏𝑑 Max Spacing (mm)
d from support 25.52 170
128.37
at L/3 -31.65 170

Computation for Required Spacing


�= Φ = 0.75
(∅𝐴𝑣𝐹𝑦𝑡𝑑)/ Av = 157.08
(𝑉𝑢−∅𝑉𝑐)
S (mm) Remarks
d from support 430 Use Max Spacing O.C.
al L/3 2540 Use Max Spacing O.C.

No. of Rebars ( If other bar dia. Is used. ) = 25 mm


n LEFT Midspan RIGHT
Top 4 3 4
Bottom 2 3 2

No. of Rebars ( If other bar dia. Is used. ) = 16 mm


n LEFT Midspan RIGHT
Top 8 6 8
Bottom 4 4 4

N.O.B ΦMn ( computed )


7 119.43
6 102.38
5 85.32
4 68.26
3 51.20
2 34.14
INVESTIGATION OF BEAMS
DESIGN OF BEAMS
ROOF BEAMS

Length, L (mm) : 6000 Concrete Cover (mm) : 40


Width, b (mm) : 250 Bar Diameter (mm) : 16
Height, h (mm) : 300 Stirrup Diameter (mm) : 10
Fs(Mpa) : 275.86 F'c (Mpa) : 20.7
Effective Depth
d: 242 mm
d' : 58 mm
Beta Code
B: 0.85

No. of Rebars
n LEFT Midspan RIGHT
Top 4 3 4
Bottom 3 3 3

Steel Area, As ( mm2 )


𝐴�=𝑛 ( 1/4
𝜋𝑑_𝑏^2 )
LEFT Midspan RIGHT
As ( TOP ) 804.25 603.19 804.25
As ( BOTT. ) 603.19 603.19 603.19

Steel Ratio, ρ
�= 𝐴�/𝑏𝑑

LEFT Midspan RIGHT


ρ ( TOP ) 0.01329 0.00997 0.01329
ρ (BOTT. ) 0.00997 0.00997 0.00997

Checking for Beam Steel Ratio


�_𝑏𝑎𝑙=0.85𝐵_1 (𝐹^′
𝑐)/𝐹�( 600/(600+𝐹�) ) �_𝑏𝑎𝑙 = 0.03714

�_𝑚𝑖𝑛=√(𝐹^′ 𝑐)/(4
𝐹�) ≥ 1.4/𝐹�
�_𝑚𝑖𝑛 0.00508
=
ρ ( TOP ) ρ ( BOTTOM )
Adequacy at LEFT: Steel ratio used is adequate Steel ratio used is adequate
Adequacy at Midspan: Steel ratio used is adequate Steel ratio used is adequate
Adequacy at RIGHT: Steel ratio used is adequate Steel ratio used is adequate
Computation for Rn, (Mpa)
𝑅𝑛= �𝐹�[1−0.59�( 𝐹𝑦/(𝐹^
′ 𝑐) )]
LEFT Midspan RIGHT
Rn ( Top ) 3.28 2.53 3.28
Rn ( Bott. ) 2.53 2.53 2.53

Moment Capacity, ΦMn (KN.m)


∅𝑀𝑛= ∅𝑅𝑛𝑏𝑑^2 Φ = 0.9
LEFT Midspan RIGHT
ΦMn ( + ) 43.27 33.40 43.27 TOP
ΦMn ( - ) 33.40 33.40 33.40 BOTTOM

Moment Actual ( *see STAAD postprocessing ) , (KN.m)


LEFT Midspan RIGHT
Mn ( + ) 55.60 0.00 81.30 TOP
Mn ( - ) 16.70 75.00 48.00 BOTTOM

Adequacy of Moment Capacity


LEFT Midspan RIGHT
Mn ( + ) INCREASE BARS! ADEQUATE! INCREASE BARS! TOP
Mn ( - ) ADEQUATE! INCREASE BARS! INCREASE BARS! BOTTOM

Design of Stirrups

Effective Depth
d: 242 mm
d' : 58 mm

𝑊𝑢=
〖𝑊𝑢〗 _𝑡𝑜𝑝 9.62 kn/m
(8 〖�𝑀𝑛〗 _𝑐𝑜𝑚𝑝𝑢𝑡𝑒𝑑)/𝐿^
= _𝑏𝑜𝑡𝑡
〖𝑊𝑢〗 7.42 kn/m
2 𝑜𝑚=
𝑢�𝑒 𝑊𝑢= 9.62 kn/m 𝑅= 𝑊𝑢𝐿/2 28.846986

Computation if Stirrups is Required


𝑉𝑐=0.17√𝐹^′ 𝑐𝑏𝑑 ( kN ) Φ = 0.75
*Note: If Vu> 0.50ΦVc -> Stirrups are required
If Vu< 0.50ΦVc -> Stirrups are not required

Vu ( Kn ) ΦVc 0.50ΦVc Remarks


d at support 26.52 Stirrups are required
35.10 17.55
at L/3 9.6156619055 Stirrups are not required

Computation for Maximum Spacing


𝑉�= (𝑉𝑢 −
∅𝑉𝑐 )/∅
𝑉�= (𝑉𝑢 −
∅𝑉𝑐 )/∅
*Note: 0.33√𝐹^′ 𝑐𝑏𝑑
If Vs< Maximum Spacing = d/2 or 600 (smaller)
0.33√𝐹^′ 𝑐𝑏𝑑
if Vs> Maximum Spacing = d/4 or 300 (smaller)

Maximum Spaciing
Vs 0.33√𝐹^′ 𝑐𝑏𝑑 Max Spacing (mm)
d from support -11.43 120
90.84
at L/3 -33.97 120

Computation for Required Spacing


�= Φ = 0.75
(∅𝐴𝑣𝐹𝑦𝑡𝑑)/ Av = 157.08
(𝑉𝑢−∅𝑉𝑐)
S (mm) Remarks
d from support -690 Use Max Spacing O.C.
al L/3 -5690 Use Max Spacing O.C.

No. of Rebars ( If other bar dia. Is used. ) = 25 mm


n LEFT Midspan RIGHT
Top 2 2 2
Bottom 2 2 2

No. of Rebars ( If other bar dia. Is used. ) = 16 mm


n LEFT Midspan RIGHT
Top 4 3 4
Bottom 3 3 3

N.O.B ΦMn ( computed )


7 84.48
6 72.43
5 60.36
4 48.30
3 36.23
2 24.15
INVESTIGATION OF BEAMS
DESIGN OF BEAMS
ROOF BEAMS

Length, L (mm) : 6000 Concrete Cover (mm) : 40


Width, b (mm) : 250 Bar Diameter (mm) : 16
Height, h (mm) : 350 Stirrup Diameter (mm) : 10
Fs(Mpa) : 275.86 F'c (Mpa) : 20.7
Effective Depth
d: 292 mm
d' : 58 mm
Beta Code
B: 0.85

No. of Rebars
n LEFT Midspan RIGHT
Top 3 3 3
Bottom 2 3 2

Steel Area, As ( mm2 )


𝐴�=𝑛 ( 1/4
𝜋𝑑_𝑏^2 )
LEFT Midspan RIGHT
As ( TOP ) 603.19 603.19 603.19
As ( BOTT. ) 402.12 603.19 402.12

Steel Ratio, ρ
�= 𝐴�/𝑏𝑑

LEFT Midspan RIGHT


ρ ( TOP ) 0.00826 0.00826 0.00826
ρ (BOTT. ) 0.00551 0.00826 0.00551

Checking for Beam Steel Ratio


�_𝑏𝑎𝑙=0.85𝐵_1 (𝐹^′
𝑐)/𝐹�( 600/(600+𝐹�) ) �_𝑏𝑎𝑙 = 0.03714

�_𝑚𝑖𝑛=√(𝐹^′ 𝑐)/(4
𝐹�) ≥ 1.4/𝐹�
�_𝑚𝑖𝑛 0.00508
=
ρ ( TOP ) ρ ( BOTTOM )
Adequacy at LEFT: Steel ratio used is adequate Steel ratio used is adequate
Adequacy at Midspan: Steel ratio used is adequate Steel ratio used is adequate
Adequacy at RIGHT: Steel ratio used is adequate Steel ratio used is adequate
Computation for Rn, (Mpa)
𝑅𝑛= �𝐹�[1−0.59�( 𝐹𝑦/(𝐹^
′ 𝑐) )]
LEFT Midspan RIGHT
Rn ( Top ) 2.13 2.13 2.13
Rn ( Bott. ) 1.45 2.13 1.45

Moment Capacity, ΦMn (KN.m)


∅𝑀𝑛= ∅𝑅𝑛𝑏𝑑^2 Φ = 0.9
LEFT Midspan RIGHT
ΦMn ( + ) 40.89 40.89 40.89 TOP
ΦMn ( - ) 27.89 40.89 27.89 BOTTOM

Moment Actual ( *see STAAD postprocessing ) , (KN.m)


LEFT Midspan RIGHT
Mn ( + ) 50.70 2.16 55.30 TOP
Mn ( - ) 2.66 45.00 0.19 BOTTOM

Adequacy of Moment Capacity


LEFT Midspan RIGHT
Mn ( + ) INCREASE BARS! ADEQUATE! INCREASE BARS! TOP
Mn ( - ) ADEQUATE! INCREASE BARS! ADEQUATE! BOTTOM

Design of Stirrups

Effective Depth
d: 292 mm
d' : 58 mm

𝑊𝑢=
〖𝑊𝑢〗 _𝑡𝑜𝑝 9.09 kn/m
(8 〖�𝑀𝑛〗 _𝑐𝑜𝑚𝑝𝑢𝑡𝑒𝑑)/𝐿^
= _𝑏𝑜𝑡𝑡
〖𝑊𝑢〗 9.09 kn/m
2 𝑜𝑚=
𝑢�𝑒 𝑊𝑢= 9.09 kn/m 𝑅= 𝑊𝑢𝐿/2 27.258407

Computation if Stirrups is Required


𝑉𝑐=0.17√𝐹^′ 𝑐𝑏𝑑 ( kN ) Φ = 0.75
*Note: If Vu> 0.50ΦVc -> Stirrups are required
If Vu< 0.50ΦVc -> Stirrups are not required

Vu ( Kn ) ΦVc 0.50ΦVc Remarks


d at support 24.61 Stirrups are required
42.35 21.17
at L/3 9.0861356066 Stirrups are not required

Computation for Maximum Spacing


𝑉�= (𝑉𝑢 −
∅𝑉𝑐 )/∅
𝑉�= (𝑉𝑢 −
∅𝑉𝑐 )/∅
*Note: 0.33√𝐹^′ 𝑐𝑏𝑑
If Vs< Maximum Spacing = d/2 or 600 (smaller)
0.33√𝐹^′ 𝑐𝑏𝑑
if Vs> Maximum Spacing = d/4 or 300 (smaller)

Maximum Spaciing
Vs 0.33√𝐹^′ 𝑐𝑏𝑑 Max Spacing (mm)
d from support -23.66 140
109.60
at L/3 -44.35 140

Computation for Required Spacing


�= Φ = 0.75
(∅𝐴𝑣𝐹𝑦𝑡𝑑)/ Av = 157.08
(𝑉𝑢−∅𝑉𝑐)
S (mm) Remarks
d from support -410 Use Max Spacing O.C.
al L/3 -2750 Use Max Spacing O.C.

No. of Rebars ( If other bar dia. Is used. ) = 25 mm


n LEFT Midspan RIGHT
Top 2 2 2
Bottom 1 2 1

No. of Rebars ( If other bar dia. Is used. ) = 16 mm


n LEFT Midspan RIGHT
Top 3 3 3
Bottom 2 3 2

N.O.B ΦMn ( computed )


7 101.96
6 87.40
5 72.84
4 58.28
3 43.71
2 29.15
INVESTIGATION OF BEAMS
DESIGN OF BEAMS
ROOF BEAMS

Length, L (mm) : 6000 Concrete Cover (mm) : 40


Width, b (mm) : 200 Bar Diameter (mm) : 16
Height, h (mm) : 300 Stirrup Diameter (mm) : 10
Fs(Mpa) : 275.86 F'c (Mpa) : 20.7
Effective Depth
d: 242 mm
d' : 58 mm
Beta Code
B: 0.85

No. of Rebars
n LEFT Midspan RIGHT
Top 3 2 3
Bottom 2 2 2

Steel Area, As ( mm2 )


𝐴�=𝑛 ( 1/4
𝜋𝑑_𝑏^2 )
LEFT Midspan RIGHT
As ( TOP ) 603.19 402.12 603.19
As ( BOTT. ) 402.12 402.12 402.12

Steel Ratio, ρ
�= 𝐴�/𝑏𝑑

LEFT Midspan RIGHT


ρ ( TOP ) 0.01246 0.00831 0.01246
ρ (BOTT. ) 0.00831 0.00831 0.00831

Checking for Beam Steel Ratio


�_𝑏𝑎𝑙=0.85𝐵_1 (𝐹^′
𝑐)/𝐹�( 600/(600+𝐹�) ) �_𝑏𝑎𝑙 = 0.03714

�_𝑚𝑖𝑛=√(𝐹^′ 𝑐)/(4
𝐹�) ≥ 1.4/𝐹�
�_𝑚𝑖𝑛 0.00508
=
ρ ( TOP ) ρ ( BOTTOM )
Adequacy at LEFT: Steel ratio used is adequate Steel ratio used is adequate
Adequacy at Midspan: Steel ratio used is adequate Steel ratio used is adequate
Adequacy at RIGHT: Steel ratio used is adequate Steel ratio used is adequate
Computation for Rn, (Mpa)
𝑅𝑛= �𝐹�[1−0.59�( 𝐹𝑦/(𝐹^
′ 𝑐) )]
LEFT Midspan RIGHT
Rn ( Top ) 3.10 2.14 3.10
Rn ( Bott. ) 2.14 2.14 2.14

Moment Capacity, ΦMn (KN.m)


∅𝑀𝑛= ∅𝑅𝑛𝑏𝑑^2 Φ = 0.9
LEFT Midspan RIGHT
ΦMn ( + ) 32.69 22.58 32.69 TOP
ΦMn ( - ) 22.58 22.58 22.58 BOTTOM

Moment Actual ( *see STAAD postprocessing ) , (KN.m)


LEFT Midspan RIGHT
Mn ( + ) 18.10 8.76 37.80 TOP
Mn ( - ) 4.00 19.50 5.22 BOTTOM

Adequacy of Moment Capacity


LEFT Midspan RIGHT
Mn ( + ) ADEQUATE! ADEQUATE! INCREASE BARS! TOP
Mn ( - ) ADEQUATE! ADEQUATE! ADEQUATE! BOTTOM

Design of Stirrups

Effective Depth
d: 242 mm
d' : 58 mm

𝑊𝑢=
〖𝑊𝑢〗 _𝑡𝑜𝑝 7.26 kn/m
(8 〖�𝑀𝑛〗 _𝑐𝑜𝑚𝑝𝑢𝑡𝑒𝑑)/𝐿^
= _𝑏𝑜𝑡𝑡
〖𝑊𝑢〗 5.02 kn/m
2 𝑜𝑚=
𝑢�𝑒 𝑊𝑢= 7.26 kn/m 𝑅= 𝑊𝑢𝐿/2 21.79307

Computation if Stirrups is Required


𝑉𝑐=0.17√𝐹^′ 𝑐𝑏𝑑 ( kN ) Φ = 0.75
*Note: If Vu> 0.50ΦVc -> Stirrups are required
If Vu< 0.50ΦVc -> Stirrups are not required

Vu ( Kn ) ΦVc 0.50ΦVc Remarks


d at support 20.04 Stirrups are required
28.08 14.04
at L/3 7.2643566438 Stirrups are not required

Computation for Maximum Spacing


𝑉�= (𝑉𝑢 −
∅𝑉𝑐 )/∅
𝑉�= (𝑉𝑢 −
∅𝑉𝑐 )/∅
*Note: 0.33√𝐹^′ 𝑐𝑏𝑑
If Vs< Maximum Spacing = d/2 or 600 (smaller)
0.33√𝐹^′ 𝑐𝑏𝑑
if Vs> Maximum Spacing = d/4 or 300 (smaller)

Maximum Spaciing
Vs 0.33√𝐹^′ 𝑐𝑏𝑑 Max Spacing (mm)
d from support -10.72 120
72.67
at L/3 -27.75 120

Computation for Required Spacing


�= Φ = 0.75
(∅𝐴𝑣𝐹𝑦𝑡𝑑)/ Av = 157.08
(𝑉𝑢−∅𝑉𝑐)
S (mm) Remarks
d from support -740 Use Max Spacing O.C.
al L/3 -6070 Use Max Spacing O.C.

No. of Rebars ( If other bar dia. Is used. ) = 25 mm


n LEFT Midspan RIGHT
Top 2 1 2
Bottom 1 1 1

No. of Rebars ( If other bar dia. Is used. ) = 16 mm


n LEFT Midspan RIGHT
Top 3 2 3
Bottom 2 2 2

N.O.B ΦMn ( computed )


7 84.47
6 72.41
5 60.35
4 48.29
3 36.22
2 24.15

You might also like