DISEÑO HIDRÁULICO

Project Inventory: Mekaraya OK.wtg


Title SISTEMA DE MICRORIEGO MEKARAYA
Engineer Ing. Henry Cruz
Company Consultor
Date 30/05/2019
Notes
Scenario Summary
ID 1
Label Base
Notes
Active Topology Base Active Topology
Physical Base Physical
Demand Base Demand
Initial Settings Base Initial Settings
Operational Base Operational
Age Base Age
Constituent Base Constituent
Trace Base Trace
Fire Flow Base Fire Flow
Energy Cost Base Energy Cost
Transient Base Transient
Pressure Dependent Demand Base Pressure Dependent Demand
Failure History Base Failure History
User Data Extensions Base User Data Extensions
Steady State/EPS Solver Calculation
Base Calculation Options
Options
Transient Solver Calculation Options Base Calculation Options

Network Inventory
Pipes 19 Variable Speed Pump
0
Batteries
Junctions 3 PRV's 4
Hydrants 8 PSV's 0
Tanks 2 PBV's 0
-Circular 1 FCV's 0
-Non-Circular 1 TCV's 0
-Variable Area 0 GPV's 0
Reservoirs 3 Isolation Valves 0
Pumps 0 Spot Elevations 0
Pump Stations 0

Transient Network Inventory


Turbines 0 Rupture Disks 0
Periodic Head-Flows 0 Discharges to Atmosphere 0
Air Valves 0 Orifices Between Pipes 0
Hydropneumatic Tanks 0 Valves With Linear Area
0
Change
Surge Valves 0 Surge Tanks 0
Check Valves 0

Pressure Pipes Inventory


50.0 (mm) 870.00 m 150.0 (mm) 308.16 m
75.0 (mm) 2 596.67 m All Diameters 5 936.67 m
100.0 (mm) 2 161.84 m

Bentley Systems, Inc. Haestad Methods Solution Bentley WaterCAD V8i (SELECTseries 4)
Mekaraya OK.wtg Center [08.11.04.58]
05/06/2019 27 Siemon Company Drive Suite 200 W Page 1 of 1
Watertown, CT 06795 USA +1-203-755-1666
Página 1 de 1

Scenario: Base
Current Time Step: 0.000Hr
FlexTable: Junction Table

ALTURA
ID NUDO ELEVACION CAUDAL HIDRAULICA PRESION
(m) (L/s) (m H2O)
(m)
52 CL-1 3 734.98 0.00 3 768.39 33.35
54 CL-2 3 715.99 0.00 3 763.57 47.49
53 CP-1 3 748.42 0.00 3 767.57 19.11
71 T-2 3 629.00 0.00 3 674.57 45.48

E:\PROYECTOS EMPRESAS\PROYECTOS_USCAMAYTA\G.A.M. de Independencia\02 EDTP Meckaraya FONADIN -


Ajustado 07 02 2018\01 Riego Mekaraya\Anexo 11.- Diseño Hidráulico\WATERCAD_Mekaraya\Con tanque\Mekaraya OK.wtg

file:///C:/Users/HENRY-PC/AppData/Local/Temp/Bentley/WaterCAD/htibokfz.xml 05/06/2019
Página 1 de 1

Scenario: Base
Current Time Step: 0.000Hr
FlexTable: Hydrant Table

ALTURA
ID CAMARA DE ELEVACION CAUDAL HIDRAULICA PRESION Demand Collection
DISTRIBUCION (m) (L/s) (m H2O)
(m)
34 CD-1 3 843.15 3.00 3 845.97 2.80 <Collection: 1 item>
35 CD-2 3 808.72 0.00 3 819.08 10.34 <Collection: 1 item>
36 CD-3 3 740.26 3.00 3 766.01 25.70 <Collection: 1 item>
37 CD-4 3 719.13 0.00 3 723.26 4.13 <Collection: 1 item>
38 CD-5 3 712.63 3.00 3 718.42 5.78 <Collection: 1 item>
39 CD-6 3 693.65 0.00 3 712.29 18.61 <Collection: 1 item>
40 CD-7 3 676.61 3.00 3 708.59 31.92 <Collection: 1 item>
41 CD-8 3 668.00 0.00 3 674.57 6.56 <Collection: 1 item>

E:\PROYECTOS EMPRESAS\PROYECTOS_USCAMAYTA\G.A.M. de Independencia\02 EDTP Meckaraya FONADIN -


Ajustado 07 02 2018\01 Riego Mekaraya\Anexo 11.- Diseño Hidráulico\WATERCAD_Mekaraya\Con tanque\Mekaraya OK.wtg

file:///C:/Users/HENRY-PC/AppData/Local/Temp/Bentley/WaterCAD/0r4rqcag.xml 05/06/2019
Página 1 de 1

Scenario: Base
Current Time Step: 0.000Hr
FlexTable: Pipe Table

INICIO FIN DIAMETRO LONGITUD Hazen- CAUDAL VELOCIDAD


ID TUBERIA MATERIAL
NUDO NUDO (mm) (m) Williams C (L/s) (m/s)
46 P-1 TOMA 1 CC-1 50.0 PVC 870.00 150.0 3.24 1.65
67 P-2 TOMA 2 CC-1 75.0 PVC 29.17 150.0 11.51 2.61
47 P-3 CC-1 T-1 100.0 PVC 500.00 150.0 13.49 1.72
48 P-4 T-1 CD-1 100.0 PVC 50.00 150.0 12.00 1.53
49 P-5 CD-1 CRP-1 100.0 PVC 290.00 150.0 9.00 1.15
50 P-6 CRP-1 CD-2 100.0 PVC 100.00 150.0 9.00 1.15
51 P-7 CD-2 CRP-2 100.0 PVC 230.00 150.0 9.00 1.15
55 P-8 CRP-2 CL-1 100.0 PVC 182.30 150.0 9.00 1.15
56 P-9 CL-1 CP-1 100.0 PVC 68.20 150.0 9.00 1.15
57 P-10 CP-1 CD-3 100.0 PVC 129.50 150.0 9.00 1.15
58 P-11 CD-3 CL-2 100.0 PVC 430.00 150.0 6.00 0.76
59 P-12 CL-2 CRP-3 100.0 PVC 181.84 150.0 6.00 0.76
60 P-13 CRP-3 CD-4 150.0 PVC 308.16 150.0 6.00 0.34
61 P-14 CD-4 CD-5 75.0 PVC 210.00 150.0 6.00 1.36
62 P-15 CD-5 CD-6 75.0 PVC 960.00 150.0 3.00 0.68
63 P-16 CD-6 CD-7 75.0 PVC 580.00 150.0 3.00 0.68
64 P-17 CD-7 CRP-4 75.0 PVC 90.00 150.0 0.00 0.00
65 P-18 CRP-4 CD-8 75.0 PVC 220.00 150.0 0.00 0.00
66 P-19 CD-8 T-2 75.0 PVC 507.50 150.0 0.00 0.00

E:\PROYECTOS EMPRESAS\PROYECTOS_USCAMAYTA\G.A.M. de Independencia\02 EDTP Meckaraya FONADIN - Ajustado 07 02 2018\01 Riego


Mekaraya\Anexo 11.- Diseño Hidráulico\WATERCAD_Mekaraya\Con tanque\Mekaraya OK.wtg

file:///C:/Users/HENRY-PC/AppData/Local/Temp/Bentley/WaterCAD/dhv2wa4t.xml 05/06/2019
Página 1 de 1

Scenario: Base
Current Time Step: 0.000Hr
FlexTable: Reservoir Table

CAUDAL
Obras de ELEVACION DE Hydraulic
ID Zone
toma (m) SALIDA Grade (m)
(L/s)
29 TOMA 1 3 906.00 <None> 3.24 3 906.00
30 TOMA 2 3 861.96 <None> 11.51 3 861.96
31 CC-1 3 859.72 <None> -1.27 3 859.72

E:\PROYECTOS EMPRESAS\PROYECTOS_USCAMAYTA\G.A.M. de Independencia\02 EDTP Meckaraya FONADIN -


Ajustado 07 02 2018\01 Riego Mekaraya\Anexo 11.- Diseño Hidráulico\WATERCAD_Mekaraya\Con tanque\Mekaraya OK.wtg

file:///C:/Users/HENRY-PC/AppData/Local/Temp/Bentley/WaterCAD/pzmeijox.xml 05/06/2019
Página 1 de 1

Scenario: Base
Current Time Step: 0.000Hr
FlexTable: Tank Table

Elevation Elevation Volume Flow


Elevation Elevation Diameter Hydraulic Flow (In
ID Label Zone (Minimum) (Maximum) (Inactive) (Out net)
(Base) (m) (Initial) (m) (m) Grade (m) net) (L/s)
(m) (m) (ML) (L/s)
68 T-1 <None> 3 845.99 3 846.09 3 846.99 3 847.49 0.00 6.77 -1.49 3 846.99 1.49

E:\PROYECTOS EMPRESAS\PROYECTOS_USCAMAYTA\G.A.M. de Independencia\02 EDTP Meckaraya FONADIN - Ajustado 07 02 2018\01 Riego Mekaraya\Anexo 11.- Diseño
Hidráulico\WATERCAD_Mekaraya\Con tanque\Mekaraya OK.wtg

file:///C:/Users/HENRY-PC/AppData/Local/Temp/Bentley/WaterCAD/3i2ehkfs.xml 05/06/2019
Página 1 de 1

Scenario: Base
Current Time Step: 0.000Hr
FlexTable: PRV Table

Pressure
CAMARA ELEVACION DIAMETRO CAUDAL PRESION Setting
ID
ROMPEPRESION (m) (mm) (L/s) (m H2O) (Initial) (m
H2O)
42 CRP-1 3 820.28 100.0 9.00 22.15 0.00
43 CRP-2 3 770.59 100.0 9.00 45.64 0.00
44 CRP-3 3 723.51 150.0 6.00 38.96 0.00
45 CRP-4 3 674.57 75.0 0.00 33.95 0.00

E:\PROYECTOS EMPRESAS\PROYECTOS_USCAMAYTA\G.A.M. de Independencia\02 EDTP Meckaraya FONADIN -


Ajustado 07 02 2018\01 Riego Mekaraya\Anexo 11.- Diseño Hidráulico\WATERCAD_Mekaraya\Con tanque\Mekaraya OK.wtg

file:///C:/Users/HENRY-PC/AppData/Local/Temp/Bentley/WaterCAD/bewumi21.xml 05/06/2019
SIMULACIÓN
DÍA 2
ZONA B
Página 1 de 1

Scenario: Base
Current Time Step: 0.000Hr
FlexTable: Junction Table

ALTURA
ID NUDO ELEVACION CAUDAL HIDRAULICA PRESION
(m) (L/s) (m H2O)
(m)
52 CL-1 3 734.98 0.00 3 768.39 33.35
54 CL-2 3 715.99 0.00 3 760.84 44.76
53 CP-1 3 748.42 0.00 3 767.57 19.11
71 T-2 3 629.00 0.00 3 673.16 44.08

E:\PROYECTOS EMPRESAS\PROYECTOS_USCAMAYTA\G.A.M. de Independencia\02 EDTP Meckaraya FONADIN -


Ajustado 07 02 2018\01 Riego Mekaraya\Anexo 11.- Diseño Hidráulico\WATERCAD_Mekaraya\Con tanque\Mekaraya OK.wtg

file:///C:/Users/HENRY-PC/AppData/Local/Temp/Bentley/WaterCAD/5csm44mz.xml 05/06/2019
Página 1 de 1

Scenario: Base
Current Time Step: 0.000Hr
FlexTable: Hydrant Table

ALTURA
ID CAMARA DE ELEVACION CAUDAL HIDRAULICA PRESION Demand Collection
DISTRIBUCION (m) (L/s) (m H2O)
(m)
34 CD-1 3 843.15 0.00 3 845.97 2.81 <Collection: 1 item>
35 CD-2 3 808.72 3.00 3 818.23 9.50 <Collection: 1 item>
36 CD-3 3 740.26 0.00 3 766.02 25.70 <Collection: 1 item>
37 CD-4 3 719.13 3.00 3 722.99 3.85 <Collection: 1 item>
38 CD-5 3 712.63 0.00 3 718.15 5.51 <Collection: 1 item>
39 CD-6 3 693.65 3.00 3 696.02 2.37 <Collection: 1 item>
40 CD-7 3 676.61 0.00 3 692.32 15.68 <Collection: 1 item>
41 CD-8 3 668.00 3.00 3 673.16 5.16 <Collection: 1 item>

E:\PROYECTOS EMPRESAS\PROYECTOS_USCAMAYTA\G.A.M. de Independencia\02 EDTP Meckaraya FONADIN -


Ajustado 07 02 2018\01 Riego Mekaraya\Anexo 11.- Diseño Hidráulico\WATERCAD_Mekaraya\Con tanque\Mekaraya OK.wtg

file:///C:/Users/HENRY-PC/AppData/Local/Temp/Bentley/WaterCAD/euz1dqir.xml 05/06/2019
Página 1 de 1

Scenario: Base
Current Time Step: 0.000Hr
FlexTable: Pipe Table

INICIO FIN DIAMETRO LONGITUD Hazen- CAUDAL VELOCIDAD


ID TUBERIA MATERIAL
NUDO NUDO (mm) (m) Williams C (L/s) (m/s)
46 P-1 TOMA 1 CC-1 50.0 PVC 870.00 150.0 3.24 1.65
67 P-2 TOMA 2 CC-1 75.0 PVC 29.17 150.0 11.51 2.61
47 P-3 CC-1 T-1 100.0 PVC 500.00 150.0 13.49 1.72
48 P-4 T-1 CD-1 100.0 PVC 50.00 150.0 12.00 1.53
49 P-5 CD-1 CRP-1 100.0 PVC 290.00 150.0 12.00 1.53
50 P-6 CRP-1 CD-2 100.0 PVC 100.00 150.0 12.00 1.53
51 P-7 CD-2 CRP-2 100.0 PVC 230.00 150.0 9.00 1.15
55 P-8 CRP-2 CL-1 100.0 PVC 182.30 150.0 9.00 1.15
56 P-9 CL-1 CP-1 100.0 PVC 68.20 150.0 9.00 1.15
57 P-10 CP-1 CD-3 100.0 PVC 129.50 150.0 9.00 1.15
58 P-11 CD-3 CL-2 100.0 PVC 430.00 150.0 9.00 1.15
59 P-12 CL-2 CRP-3 100.0 PVC 181.84 150.0 9.00 1.15
60 P-13 CRP-3 CD-4 150.0 PVC 308.16 150.0 9.00 0.51
61 P-14 CD-4 CD-5 75.0 PVC 210.00 150.0 6.00 1.36
62 P-15 CD-5 CD-6 75.0 PVC 960.00 150.0 6.00 1.36
63 P-16 CD-6 CD-7 75.0 PVC 580.00 150.0 3.00 0.68
64 P-17 CD-7 CRP-4 75.0 PVC 90.00 150.0 3.00 0.68
65 P-18 CRP-4 CD-8 75.0 PVC 220.00 150.0 3.00 0.68
66 P-19 CD-8 T-2 75.0 PVC 507.50 150.0 0.00 0.00

E:\PROYECTOS EMPRESAS\PROYECTOS_USCAMAYTA\G.A.M. de Independencia\02 EDTP Meckaraya FONADIN - Ajustado 07 02 2018\01 Riego


Mekaraya\Anexo 11.- Diseño Hidráulico\WATERCAD_Mekaraya\Con tanque\Mekaraya OK.wtg

file:///C:/Users/HENRY-PC/AppData/Local/Temp/Bentley/WaterCAD/an434fgp.xml 05/06/2019
Página 1 de 1

Scenario: Base
Current Time Step: 0.000Hr
FlexTable: Reservoir Table

CAUDAL
Obras de ELEVACION DE Hydraulic
ID Zone
toma (m) SALIDA Grade (m)
(L/s)
29 TOMA 1 3 906.00 <None> 3.24 3 906.00
30 TOMA 2 3 861.96 <None> 11.51 3 861.96
31 CC-1 3 859.72 <None> -1.27 3 859.72

E:\PROYECTOS EMPRESAS\PROYECTOS_USCAMAYTA\G.A.M. de Independencia\02 EDTP Meckaraya FONADIN -


Ajustado 07 02 2018\01 Riego Mekaraya\Anexo 11.- Diseño Hidráulico\WATERCAD_Mekaraya\Con tanque\Mekaraya OK.wtg

file:///C:/Users/HENRY-PC/AppData/Local/Temp/Bentley/WaterCAD/rmwrh5au.xml 05/06/2019
Página 1 de 1

Scenario: Base
Current Time Step: 0.000Hr
FlexTable: Tank Table

Elevation Elevation Volume Flow


Elevation Elevation Diameter Hydraulic Flow (In
ID Label Zone (Minimum) (Maximum) (Inactive) (Out net)
(Base) (m) (Initial) (m) (m) Grade (m) net) (L/s)
(m) (m) (ML) (L/s)
68 T-1 <None> 3 845.99 3 846.09 3 846.99 3 847.49 0.00 6.77 -1.49 3 846.99 1.49

E:\PROYECTOS EMPRESAS\PROYECTOS_USCAMAYTA\G.A.M. de Independencia\02 EDTP Meckaraya FONADIN - Ajustado 07 02 2018\01 Riego Mekaraya\Anexo 11.- Diseño
Hidráulico\WATERCAD_Mekaraya\Con tanque\Mekaraya OK.wtg

file:///C:/Users/HENRY-PC/AppData/Local/Temp/Bentley/WaterCAD/xmiicmuf.xml 05/06/2019
Página 1 de 1

Scenario: Base
Current Time Step: 0.000Hr
FlexTable: PRV Table

Pressure
CAMARA ELEVACION DIAMETRO CAUDAL PRESION Setting
ID
ROMPEPRESION (m) (mm) (L/s) (m H2O) (Initial) (m
H2O)
42 CRP-1 3 820.28 100.0 12.00 19.70 0.00
43 CRP-2 3 770.59 100.0 9.00 44.79 0.00
44 CRP-3 3 723.51 150.0 9.00 35.08 0.00
45 CRP-4 3 674.57 75.0 3.00 17.14 0.00

E:\PROYECTOS EMPRESAS\PROYECTOS_USCAMAYTA\G.A.M. de Independencia\02 EDTP Meckaraya FONADIN -


Ajustado 07 02 2018\01 Riego Mekaraya\Anexo 11.- Diseño Hidráulico\WATERCAD_Mekaraya\Con tanque\Mekaraya OK.wtg

file:///C:/Users/HENRY-PC/AppData/Local/Temp/Bentley/WaterCAD/degm1jhz.xml 05/06/2019
SIMULACIÓN
DÍA 3
ZONA C
Página 1 de 1

Scenario: Base
Current Time Step: 0.000Hr
FlexTable: Junction Table

ALTURA
ID NUDO ELEVACION CAUDAL HIDRAULICA PRESION
(m) (L/s) (m H2O)
(m)
52 CL-1 3 734.98 0.00 3 769.55 34.50
54 CL-2 3 715.99 0.00 3 765.99 49.90
53 CP-1 3 748.42 0.00 3 769.16 20.70
71 T-2 3 629.00 6.00 3 657.80 28.74

E:\PROYECTOS EMPRESAS\PROYECTOS_USCAMAYTA\G.A.M. de Independencia\02 EDTP Meckaraya FONADIN -


Ajustado 07 02 2018\01 Riego Mekaraya\Anexo 11.- Diseño Hidráulico\WATERCAD_Mekaraya\Con tanque\Mekaraya OK.wtg

file:///C:/Users/HENRY-PC/AppData/Local/Temp/Bentley/WaterCAD/l3xta0jm.xml 05/06/2019
Página 1 de 1

Scenario: Base
Current Time Step: 0.000Hr
FlexTable: Hydrant Table

ALTURA
ID CAMARA DE ELEVACION CAUDAL HIDRAULICA PRESION Demand Collection
DISTRIBUCION (m) (L/s) (m H2O)
(m)
34 CD-1 3 843.15 0.00 3 846.71 3.54 <Collection: 1 item>
35 CD-2 3 808.72 0.00 3 819.72 10.98 <Collection: 1 item>
36 CD-3 3 740.26 0.00 3 768.43 28.11 <Collection: 1 item>
37 CD-4 3 719.13 0.00 3 723.26 4.13 <Collection: 1 item>
38 CD-5 3 712.63 0.00 3 718.42 5.78 <Collection: 1 item>
39 CD-6 3 693.65 0.00 3 696.30 2.65 <Collection: 1 item>
40 CD-7 3 676.61 0.00 3 682.93 6.31 <Collection: 1 item>
41 CD-8 3 668.00 0.00 3 669.50 1.50 <Collection: 1 item>

E:\PROYECTOS EMPRESAS\PROYECTOS_USCAMAYTA\G.A.M. de Independencia\02 EDTP Meckaraya FONADIN -


Ajustado 07 02 2018\01 Riego Mekaraya\Anexo 11.- Diseño Hidráulico\WATERCAD_Mekaraya\Con tanque\Mekaraya OK.wtg

file:///C:/Users/HENRY-PC/AppData/Local/Temp/Bentley/WaterCAD/fl0a55m3.xml 05/06/2019
Página 1 de 1

Scenario: Base
Current Time Step: 0.000Hr
FlexTable: Pipe Table

INICIO FIN DIAMETRO LONGITUD Hazen- CAUDAL VELOCIDAD


ID TUBERIA MATERIAL
NUDO NUDO (mm) (m) Williams C (L/s) (m/s)
46 P-1 TOMA 1 CC-1 50.0 PVC 870.00 150.0 3.24 1.65
67 P-2 TOMA 2 CC-1 75.0 PVC 29.17 150.0 11.51 2.61
47 P-3 CC-1 T-1 100.0 PVC 500.00 150.0 13.49 1.72
48 P-4 T-1 CD-1 100.0 PVC 50.00 150.0 6.00 0.76
49 P-5 CD-1 CRP-1 100.0 PVC 290.00 150.0 6.00 0.76
50 P-6 CRP-1 CD-2 100.0 PVC 100.00 150.0 6.00 0.76
51 P-7 CD-2 CRP-2 100.0 PVC 230.00 150.0 6.00 0.76
55 P-8 CRP-2 CL-1 100.0 PVC 182.30 150.0 6.00 0.76
56 P-9 CL-1 CP-1 100.0 PVC 68.20 150.0 6.00 0.76
57 P-10 CP-1 CD-3 100.0 PVC 129.50 150.0 6.00 0.76
58 P-11 CD-3 CL-2 100.0 PVC 430.00 150.0 6.00 0.76
59 P-12 CL-2 CRP-3 100.0 PVC 181.84 150.0 6.00 0.76
60 P-13 CRP-3 CD-4 150.0 PVC 308.16 150.0 6.00 0.34
61 P-14 CD-4 CD-5 75.0 PVC 210.00 150.0 6.00 1.36
62 P-15 CD-5 CD-6 75.0 PVC 960.00 150.0 6.00 1.36
63 P-16 CD-6 CD-7 75.0 PVC 580.00 150.0 6.00 1.36
64 P-17 CD-7 CRP-4 75.0 PVC 90.00 150.0 6.00 1.36
65 P-18 CRP-4 CD-8 75.0 PVC 220.00 150.0 6.00 1.36
66 P-19 CD-8 T-2 75.0 PVC 507.50 150.0 6.00 1.36

E:\PROYECTOS EMPRESAS\PROYECTOS_USCAMAYTA\G.A.M. de Independencia\02 EDTP Meckaraya FONADIN - Ajustado 07 02 2018\01 Riego


Mekaraya\Anexo 11.- Diseño Hidráulico\WATERCAD_Mekaraya\Con tanque\Mekaraya OK.wtg

file:///C:/Users/HENRY-PC/AppData/Local/Temp/Bentley/WaterCAD/txmnphx2.xml 05/06/2019
Página 1 de 1

Scenario: Base
Current Time Step: 0.000Hr
FlexTable: Reservoir Table

CAUDAL
Obras de ELEVACION DE Hydraulic
ID Zone
toma (m) SALIDA Grade (m)
(L/s)
29 TOMA 1 3 906.00 <None> 3.24 3 906.00
30 TOMA 2 3 861.96 <None> 11.51 3 861.96
31 CC-1 3 859.72 <None> -1.27 3 859.72

E:\PROYECTOS EMPRESAS\PROYECTOS_USCAMAYTA\G.A.M. de Independencia\02 EDTP Meckaraya FONADIN -


Ajustado 07 02 2018\01 Riego Mekaraya\Anexo 11.- Diseño Hidráulico\WATERCAD_Mekaraya\Con tanque\Mekaraya OK.wtg

file:///C:/Users/HENRY-PC/AppData/Local/Temp/Bentley/WaterCAD/4dskowvr.xml 05/06/2019
Página 1 de 1

Scenario: Base
Current Time Step: 0.000Hr
FlexTable: Tank Table

Elevation Elevation Volume Flow


Elevation Elevation Diameter Hydraulic Flow (In
ID Label Zone (Minimum) (Maximum) (Inactive) (Out net)
(Base) (m) (Initial) (m) (m) Grade (m) net) (L/s)
(m) (m) (ML) (L/s)
68 T-1 <None> 3 845.99 3 846.09 3 846.99 3 847.49 0.00 6.77 -7.49 3 846.99 7.49

E:\PROYECTOS EMPRESAS\PROYECTOS_USCAMAYTA\G.A.M. de Independencia\02 EDTP Meckaraya FONADIN - Ajustado 07 02 2018\01 Riego Mekaraya\Anexo 11.- Diseño
Hidráulico\WATERCAD_Mekaraya\Con tanque\Mekaraya OK.wtg

file:///C:/Users/HENRY-PC/AppData/Local/Temp/Bentley/WaterCAD/mctdghoh.xml 05/06/2019
Página 1 de 1

Scenario: Base
Current Time Step: 0.000Hr
FlexTable: PRV Table

Pressure
CAMARA ELEVACION DIAMETRO CAUDAL PRESION Setting
ID
ROMPEPRESION (m) (mm) (L/s) (m H2O) (Initial) (m
H2O)
42 CRP-1 3 820.28 100.0 6.00 24.73 0.00
43 CRP-2 3 770.59 100.0 6.00 47.73 0.00
44 CRP-3 3 723.51 150.0 6.00 41.37 0.00
45 CRP-4 3 674.57 75.0 6.00 6.27 0.00

E:\PROYECTOS EMPRESAS\PROYECTOS_USCAMAYTA\G.A.M. de Independencia\02 EDTP Meckaraya FONADIN -


Ajustado 07 02 2018\01 Riego Mekaraya\Anexo 11.- Diseño Hidráulico\WATERCAD_Mekaraya\Con tanque\Mekaraya OK.wtg

file:///C:/Users/HENRY-PC/AppData/Local/Temp/Bentley/WaterCAD/1ngt0pfg.xml 05/06/2019