GE Power

9F POWER PLANTS (50 Hz)


One of the most manufactured gas turbines in the world, GE’s 9F delivers consistent performance
and accommodates a diverse range of fuels, making it ideal for a variety of combined cycle and CHP
power applications. 9F power plants provide flexibility and rapid response so operations can be quickly
adjusted to compensate for changes in demand or use of renewable generation.

CAPABILITY VERSATILITY SUSTAINABILITY


300+ units operating in Operational flexibility that Delivers water conservation
the field with 17+ million can be rapidly adjusted to and World Bank emissions
fired hours & 250,000 compensate for changes in standards without water
fired starts demand or use of renewable injection while operating
generation on liquid fuel

THE 9F.06
The 9F.06 is the largest, most efficient F-class turbine and a
continued evolution of the best of our 9HA and 9F.05 products.
265-359
>
MW SIMPLE CYCLE
OUTPUT
CUSTOMER HIGHLIGHT
COMBINED CYCLE EFFICIENCY 62%
9F.04 9F.05 9F.06 The 466 MW Tianjin
SC Net Output (MW) 287 314 359
Lingang combined cycle
Performance
SC Plant

SC Net Heat Rate (Btu/kWh, LHV) 8,810 8,930 8,146


SC Net Heat Rate (kJ/kWh, LHV) 9,295 9,422 8,595
cogeneration power plant,
SC Net Efficiency (%, LHV) 38.7% 38.2% 41.9%
Compression Pressure Ratio (X:1) 16.9 18.3 19.5 owned and operated
GT Generator Type (Cooling) Hydrogen Hydrogen Hydrogen
Number of Combustor Cans 18 18 16
by China Huaneng
Number of Compressor Stages 18 14 14
Corporation, features a
Number of Turbine Stages 3 3 4
GE 9F.05 gas turbine, a
Gas Turbine Parameters

Exhaust Temperature (°F) 1,151 1,184 1,132


Exhaust Temperature (°C) 622 640 611
Exhaust Energy (MM Btu/hr) 1,524 1,700 1,700
GE 330H hydrogen-cooled
Exhaust Energy (MM kJ/hr) 1,608 1,794 1,794 generator, and a district
GT Turndown Minimum Load (%) 35% 35% 38%
GT Ramp Rate (MW/min) 1
23 24 65 heating solution for winter
NOx (ppmvd) at Baseload (@15% O2) 15 25 15
CO (ppm) at Min. Turndown w/o Abatement 24 24 9
operation from Harbin
Wobbe Variation (%) >+/-15% +/-10% >+/-15% Electric Corporation, GE’s
Startup Time, Conventional/Peaking (Min.)2 23/20 23/20 23/12
CC Net Output (MW) 432 493 532 business partner and
CC Net Heat Rate (Btu/kWh, LHV) 5,692 5,619 5,489
licensing associate. It is one
Performance
1x1 CC Plant

CC Net Heat Rate (kJ/kWh, LHV) 6,006 5,928 5,791


CC Net Efficiency (%, LHV) 59.9% 60.7% 62.2% of the most fuel efficient
Plant Turndown – Minimum Load (%) 45% 46% 49%
Ramp Rate (MW/Minute) 1
22 24 65 Chinese power plants
Startup Time (RR Hot, Minutes)3 30 30 <30
to date. GE 9F.05 gas
Bottoming Cycle Type 3PRH 3PRH 3PRH
1x1 CC Power Plant Features

HP Throttle Press. (psia/bar) 2,400/165 2,685/185 2,685/185 turbine’s high efficiency


HP Throttle Temp. (°F/°C) 1,085/585 1,112/600 1,085/585
Reheat Temp. (°F/°C) 1,085/585 1,112/600 1,058/570
and reliability ensures that
ST Configuration (Type) STF-D650 STF-D650 STF-D650
the Tianjin Lingang plant
GT Generator Type (Cooling) Hydrogen Hydrogen Hydrogen
ST Generator Type (Cooling) Air Hydrogen Hydrogen serves as a dependable
CC Net Output (MW) 866 989 1,067
CC Net Heat Rate (Btu/kWh, LHV) 5,676 5,603 5,476
source of heat and power.
Performance
2x1 CC Plant

CC Net Heat Rate (kJ/kWh, LHV) 5,989 5,911 5,777


CC Net Efficiency (%, LHV) 60.1% 60.9% 62.3%
Plant Turndown – Minimum Load (%) 22% 23% 23%
Ramp Rate (MW/Minute)1 44 48 130
Startup Time (RR Hot, Minutes) 3
39 39 <30
Bottoming Cycle Type 3PRH 3PRH 3PRH
2x1 CC Power Plant Features

HP Throttle Press. (psia/bar) 2,400/165 2,685/185 2,685/185


HP Throttle Temp. (°F/°C) 1,085/585 1,112/600 1,085/585
Reheat Temp. (°F/°C) 1,085/585 1,112/600 1,058/570
ST Configuration (Type) STF-D650 STF-D650 STF-D650
GT Generator Type (Cooling) Hydrogen Hydrogen Hydrogen
ST Generator Type (Cooling) Hydrogen Hydrogen Hydrogen
gepower.com
1.) R amp rates are Fast Ramp via AGC.
2.) S
 tart times recognize purge credit. Turning gear to full speed, full load and synchronized to grid. Peaking maintenance factors may apply depending © 2017 General Electric Company. All rights reserved.
on the operating profile.
3.) Start times are based on rapid response technologies in hot start conditions with purge credit recognized. Simultaneous start sequence of gas
turbine may apply depending on exact project configurations.
GEA32929 (01/2017)
NOTE: All ratings are net plant, based on ISO conditions and natural gas fuel. Actual performance will vary with project speci±c conditions and fuel.
All performance figures based on Once-Through condenser with 1.2” Hga condenser pressure.
2PNRH = Two pressure, non-reheat; 3PRH = Three pressure, reheat