Document No.

:
BLOWDOWN DRUM (4C-1)
Revision : A
PRESSURE TEST PROCEDURE Revision Date: 17/06/2019
Page 1 of 8
PEKERJAAN PEMBANGUNAN
FASILITAS LNG TERMINAL JAWA
TIMUR

BLOWDOWN DRUM (4C-1)


PRESSURE TEST PROCEDURE

A 17/06/2019 ISSUED FOR REVIEW RB AR UT


Issued Checked Appr'd Appr'd Appr'd
Rev. Date Description
PT GT LADANG TEKNIK PGASOL
压力试验工艺规程 文 件 编 号
Pressure test procedure Doc. No.

版本/修订号 Rev. A

Page No. 2

一、总则 General
1. 本守则适用于制造完工的容器的压力试验。

This regulation is applied to pressure test for finishing manufacture vessels.


2. 罐体进行压力试验时,监检人员应当到现场进行监督检验。
Pressure test for tank should be carried out under the supervision of inspector.
二、压力试验前的准备工作 Preparation work before pressure test.
1. 人员要求:

Personnel requirements:
 具有高度的责任心和认真的工作态度;
With high sense of responsibility and serious working attitude;
 经过相应的岗前培训并具有丰富的压力试验操作经验;
After corresponding training for the job and have rich experience in operating pressure
test;
 了解运行工艺原理,熟悉本工艺文件及所用设备、仪器的原理性能。
Understand the process principle, familiar with the process documents and the principle
of equipment and instrument used performance.
2. 设备、场地要求:
Equipment、site requirements:
 压力试验前,罐体各连接部位的紧固螺栓,应当装配齐全,紧固妥当;

Fixed bolt on connecting parts of the tank shall be fully assembled and properly
secured before pressure test.
 试验用压力表必须采用用两个量程相同并经过校验合格的压力表,压力表的量程
在试验压力的 2 倍左右为宜,但不应低于 1.5 倍和高于 3 倍的试验压力。压力表
有效期为 6 个月,所使用的压力表需在有效期范围内。试验用压力表应当安装在
被试验罐体顶部便于观察的位置。压力试验时,罐体上焊接的临时受压元件,应
当采取适当的措施,保证其强度和安全性。

Pressure test must use two check-qualified pressure gauges of same range. Range is
usually twice of test pressure, but not less than 1.5 times and more than 3 times of test
压力试验工艺规程 文 件 编 号
Pressure test procedure Doc. No

版本/修订号 Rev. A

Page No. 3

pressure. The pressure gauge is valid for 6 months, and it must be within the validity
period when used. It shall be installed at the top of the tank to be easily observed.
Appropriate measures shall be taken to ensure the temporary compression element
welded on the tank strength and safety during the test.
 压力试验应在可靠的有安全防护措施专用场地进行,并且经过单位技术负责人和
安全管理部门检查认可。

Pressure test shall be carried out in a reliable and safe place, and shall be inspected and
approved by the technical director and the safety management department.
三、压力试验一般要求 General requirement of pressure test
1. 容器的开孔补强圈应在压力试验前通入 0.4~0.5MPa 的压缩空气检查焊接接头质量,
检查时在焊缝表面涂肥皂水,无气泡为合格。

Before the pressure test, compressed air of 0.4~0.5MPa (normal pressure vessel is 0.1MPa)
should be filled into the reinforcing ring of vessel to check the quality of welding joint.
Spray suds on welding seam surface when check., No bubble for qualified.
2. 容器试验前,应将内部杂物清理干净,外部清除焊渣,修补表面缺陷,并保持容器外
部清洁。

Before test, clean up all inside sundries, clear away welding slag outside, fill up the hollow
and keep cleaning of the outside vessel.
3. 容器上所有接管法兰和管口,应用公称压力相应的阀门工装进行封堵。有法兰盖时,
应直接用法兰盖封口。

All the connecting flanges and nozzles on the vessel should be sealed with auxiliary tools
such as blind plate of equal nominal pressure (including bolt, nut and gasket) and pipe
plug. Use flange cover to seal them directly if having flange cover.
4. 保压期间不得采用连续加压来维持试验压力。试验过程中不得带压紧固螺栓或对受压
元件施加外力。

It is not supposed to pressurize continuously to hold test pressure during inspection. During
the test, push fixed bolt or bringing external force to pressure part are not allowed.
5. 压力试验过程中,不得进行与试验无关的工作,无关人员不得进入试验现场或者停留。
压力试验工艺规程 文 件 编 号
Pressure test procedure Doc. No

版本/修订号 Rev. A

Page No. 4

During the test, irrelevant work is forbidden and irrelevant person are rejected to stay there.
6. 在试验过程中,如果发现有异常响声、压力下降或加压装置发生故障等不正常现象时,
应立即停止试验,查明原因,排除故障。

Stop test immediately if any abnormal situations happen during test such as abnormal noise,
pressure decrease and breakdown of pressurization equipment. Then find out reasons and
remove bug.
7. 容器内部有压力时,不得对受压元件进行任何修理,如返修补焊和紧固螺栓等工作,
在确认容器内无压力后可拆卸试验系统和临时附件。气压试验在试验压力下禁止碰撞
和敲击容器。

When there is pressure in the vessel ,shall not be any repair of the pressure parts, If the
vessel repair welding and bolts etc,Test system and temporary accessories can be removed
after the confirmation that there is no pressure in the container. Collision and percussion of
vessel is prohibited during pressure test.
四、液压试验 Hydraulic test
1. 试验压力按图样规定。
Test pressure should be accordance with drawing.
2. 试验介质采用水,水的氯离子含量不超过 25mg/L。试验合格后应当立即将水渍清除
干净。

Water is used in the test as a medium and the chloride ion of it is not more than 25mg/L.
Water stain shall be cleaned up immediately after passing the test.
3. 罐体内应当充满液体,滞留在罐体内的气体应当排净,罐体外表面应当保持干燥。
The tank should be filled with liquid, discharged all the air in it and kept tank surface dry.
4. 液压试验时压力应缓慢上升,升压至设计压力,检查确认无泄漏等异常现象后,继续
升压至试验压力,保压时间不少于 30min,然后将压力降至设计压力,并保持足够长
的时间以对所有焊接接头和连接部位进行检查。

Pressure shall increase to the design pressure slowly during hydraulic test. After checking
and confirming no leakage and other abnormal phenomena, continue to increase the pressure
until it reaches the test pressure, keep the pressure not less than 30min usually. Then
压力试验工艺规程 文 件 编 号
Pressure test procedure Doc. No

版本/修订号 Rev. A

Page No. 5

decrease the pressure to the design pressure and keep a long time to inspect all welding
joints and connecting positions.
5. 液压试验完毕后,应及时将水排净,并用去水去油的压缩空气或氮气将容器内表面吹
干。

After the hydraulic test, discharge all water immediately, and use compressed air with no
water and oil to dry the inner surface of vessel.
6. 液压试验后下列条件均符合为合格:
After hydraulic test, if all the following requirements are satisfied, it is qualified:
 无渗漏;

No leakage
 无可见的变形;

No visible deformation
 试验过程无异常的响声;

No unusual sound during test


 对抗拉强度规定值下限大于等于 540MPa 的材料,表面经无损检测抽查未发现裂缝。

The lower limit of stipulated tensile strength is not less than material of 540MPa. No
crack when doing NDT.
五、气压试验 Pneumatic test
1. 气压试验一般采用干燥、洁净的空气,也可按图样要求采用氮气或其它惰性气体。

Pneumatic test usually uses dry and clean air. Nitrogen or other inert gases are also allowed
according to the design requirements.
2. 气压试验时,试验温度(罐体器壁金属温度)应当比罐体器壁金属无延性转变温度至
少高 30℃(见表一)。

During pneumatic test, test temperature (Tank wall metal temperature) shall be higher than
the tank wall metal Nil-ductility Transition Temperature at least 30℃. (See Table 1)
3. 气压试验压力按图样规定。

Pneumatic test pressure should be accordance with the drawing.


4. 试验时压力应缓慢上升至规定试验压力的 10%,保压时间不少于 30min,并且对所有
压力试验工艺规程 文 件 编 号
Pressure test procedure Doc. No

版本/修订号 Rev. A

Page No. 6

焊缝和连接部位进行初次检查,如有泄漏,则应卸压修补后,并按要求进行着色检测,
再重新试验。初次泄漏检查合格后,再继续缓慢升压至规定试验压力的 50%;如无异
常现象,其后按照规定试验压力的 10%逐级升压,直到试验压力,保压足够时间;然
后降至设计压力,保压足够时间进行检查,检查期间压力应当保持不变。

During the test, pressure should increase slowly to 10% of indicated test pressure, keep the

pressure not less than 30min, and a preliminary leak inspection is started for all welding
connectors and connecting positions. If leak, re-test after pressure relief and repair. After the
preliminary leak test is qualified, increase the pressure slowly to 50% of indicated test
pressure, then increase pressure to the indicated test pressure with a 10% range of indicated

test pressure. Keep the pressure for enough time and decrease the pressure to design pressure.
Keep this pressure for a long time and start a leak inspection, the pressure should be kept
constant during the inspection.
5. 气压试验过程中,压力容器无异常响声,经肥皂液或其他检漏液检查无漏气,无可见
的变形即为合格。

During the test, if no abnormal noise, no visible transformation and no leak inspected by
liquid soap or other detection liquid, it is qualified.
6. 气压到规定试验压力后,缓慢降压到设计压力,保持不少于 30min 检查时间,检查期
间压力应当保持不变,检查完成后泄压到无压力。容器上的发泡液随后清洗干净。

The pressure is decreased to design pressure after it has reached the indicated test pressure
and maintain 30min at least for inspection. The pressure shall be remained unchanged during
inspection and decreased to no pressure after inspection. Then clean the foaming liquid on
the vessel.
六、其他要求 Other requests
记录表格见附件 See attachment for record form
压力试验工艺规程 文 件 编 号
Pressure test procedure Doc. No

版本/修订号 Rev. A

Page No. 7

水 压 压 力 试 验 检 验 报 告
P R E S S UR E T E S T R E P O RT
产品编号 PRODUCT No.:
内容器
试压部位 试验日期 工艺过程卡编号
Inner
LOCATION DATE PROC.CARD No.
vessel
压力表精度等级 压力表量程 压力表有效日期
ACCURACY GRD.OF MEASURING RANGE MPa VALID DATE FOR
PRESSURE GAUGE OF PRESSURE GAUGE PRESSURE GAUGE
压力表表盘直径
清洁水
压力表编号 (mm) 试验介质
φ100 Clean
PRESSURE GAUGE No. PRESSURE GAUGE TESTING MEDIUM
Water
DIAL SIZE
氯离子含量 (mg/L) 环境温度 (℃) 介质温度 (℃)
mg/L
Cl- CONTENT AMBIENT TEMP. MEDIUM TEMP.
P
设计要求 试验压力 Test Press Mpa
设计压力 Design Press
压力试验

曲 线

DESIGN
REQUIREMENTS
T
PRESSURE TEST 30 min 足够时间 enough time
CURVE 保压时间 保压时间 maintain time

P
实 际 试验压力 Test Press Mpa
设计压力 Design Press
压力试验

曲 线

CURVE OF ACTUAL T
30 min 足够时间 enough time
PRESSURE TEST
保压时间 保压时间 maintain time
结论 CONCLUSION:
本产品经 Mpa 试验,无渗漏;无可见的变形;无异常响声;试验结论合格。
THIS PRODUCT TESTED BY Mpa.THERE IS NO LEAKAGE,ABNORMAL DEFORMATION
AND SOUND.TESTING RESULT IS ACCEPTED.
监 检 员: 审 核: 检 验 员: 日 期:
INSPECTED BY: REVIEWED BY: TESTED BY: DATE:
压力试验工艺规程 文 件 编 号
Pressure test procedure Doc. No

版本/修订号 Rev. A

Page No. 8

气 压 压 力 试 验 报 告
P R E S S UR E T E S T R E P O RT
产品编号 PRODUCT No.:
试压部位 试验日期 工艺过程卡编号
LOCATION DATE PROC.CARD No.
压力表精度等级 压力表量程 压力表检定
ACCURACY MEASURING RANGE 有效日期
MPa
GRD.OF PI OF PI DATE FOR PI
压力表编号 压力表表盘直径(mm) 试验介质
N2
PI No. PO DOAL SIZE TESTING MEDIUM
氯离子含量(mg/L) 环境温度 介质温度(℃)
/
Cl- CONTENT AMBIENT TEMP.(℃) MEDIUM TEMP.
设计要求
压力试验
曲 线
DESIGN
REQUIREMENTS
PRESSURE TEST
CURVE

实 际
压力试验
曲 线
CURVE OF ACTUAL
PRESSURE TEST

结论 CONCLUSION:
本产品经 MPa 试验,罐体无异常响声,经过肥皂液检查无漏气,无可见的变形;试验结论合格。
This product tested by MPa. There is no abnormal noise of tank, no leak after a soap solution to check,
no visible deformation; Testing result is accepted.
监检员: 审 核: 检验员: 日 期:
INSPECTED BY: REVIEWED BY: TESTED BY: DATE: