SCHEDULE OF MEASURING POINTS 4 WG-200 WITH ALUMINUM DIE-CASTING
SHIFT CONTROL, EXPANSION VALVE AND 2-STAGE PRESSURE CONTROL VALVE
TABLE - 17
‘THE MARKED POSITIONS (ce 53) CORRESPOND WITH THE POSITIONS ON THE TABLE 24
‘THE MEASUREMENTS HAVE TO BE CARRIED OUT AT HOT TRANSMISSION (ABOUT 80° - 95°) !
SURING POINTS FOR PRE:
URE OIL AND TEMPERATURE
IN FRONT OF THE CONVERTER MIOxt
OPENING PRESSURE 8,5 bar
CLUTCH FORWARD KV Mioxt
CLUTCH REVERSE. KR Ml0x1 63 —
= CLUTCH Kl Mioxt
CLUTCH K2 Mi0x!
CLUTCH K3 MIOxt
CLUTCH K4 MlOxt
BEHIND THE CONVERTER Ml4xl.5 -
‘TEMPERATURE 100° C (SHORT-TIME 120°C) 16
AND
OPENING PRESSURE 5 bar
SYSTEM PRESSURE 16+2 bar MIOx1 21
REDUCING VALVE 10 bar MIOxL
MEASURING POINTS FOR DELIVERY RATES
15= CONNECTION TO HEAT EXCHANGER M26x1,5
16= CONNECTION FROM HEAT 2XCHANGER M26x1,5
INDUCTIVE TRANSMITTER
6 = INDUCTIVE TRANSMITTER FOR EL. SPEEDOMETER MI8x1,5
21= INDUCTIVE TRANSMITTER TURBINE SPEED MI8x1,5
34= INDUCTIVE TRANSMITTER OUTPUT SPFED. MI8x1,5DETAIL "X"
8
3
g
i