You are on page 1of 2
SCHEDULE OF MEASURING POINTS 4 WG-200 WITH ALUMINUM DIE-CASTING SHIFT CONTROL, EXPANSION VALVE AND 2-STAGE PRESSURE CONTROL VALVE TABLE - 17 ‘THE MARKED POSITIONS (ce 53) CORRESPOND WITH THE POSITIONS ON THE TABLE 24 ‘THE MEASUREMENTS HAVE TO BE CARRIED OUT AT HOT TRANSMISSION (ABOUT 80° - 95°) ! SURING POINTS FOR PRE: URE OIL AND TEMPERATURE IN FRONT OF THE CONVERTER MIOxt OPENING PRESSURE 8,5 bar CLUTCH FORWARD KV Mioxt CLUTCH REVERSE. KR Ml0x1 63 — = CLUTCH Kl Mioxt CLUTCH K2 Mi0x! CLUTCH K3 MIOxt CLUTCH K4 MlOxt BEHIND THE CONVERTER Ml4xl.5 - ‘TEMPERATURE 100° C (SHORT-TIME 120°C) 16 AND OPENING PRESSURE 5 bar SYSTEM PRESSURE 16+2 bar MIOx1 21 REDUCING VALVE 10 bar MIOxL MEASURING POINTS FOR DELIVERY RATES 15= CONNECTION TO HEAT EXCHANGER M26x1,5 16= CONNECTION FROM HEAT 2XCHANGER M26x1,5 INDUCTIVE TRANSMITTER 6 = INDUCTIVE TRANSMITTER FOR EL. SPEEDOMETER MI8x1,5 21= INDUCTIVE TRANSMITTER TURBINE SPEED MI8x1,5 34= INDUCTIVE TRANSMITTER OUTPUT SPFED. MI8x1,5 DETAIL "X" 8 3 g i

You might also like