You are on page 1of 4

FIELD INSPECTION AND TEST REPORT

230kV VOLTAGE TRANSFORMER INDIVIDUAL TEST REPORT

ERECTION SITE: Bang Pakong Combined Cycle (Units 1-2 Replacement) LOCATION: 230kV GIS Building
CONTRACT NO.: PANEL NO.:
CUSTOMER: Electricity Generating Authority of Thailand DEVICE NO.: 11ADA10CE010 Ph.A

INDIVIDUAL TEST ITEM

DATE OF RESULT
No. INDIVIDUAL TEST
TEST PASS FAIL
1 Visual check.
2 Insulation resistance measurement.
3 Ratio and Polarity test.
4 Resistance of Secondary winding measurement.

INSTRUMENT

DATE OF DATE OF
No. INSTRUMENT MANUFACTURER TYPE/MODEL SERIAL NO.
CALIBRATION EXPRIRE

NOTE:

Responsibility Tested by Confirm by Witnessed by


Company Collective Engineering Black & Veatch Electricity Generating Authority of Thailand

Signature

Name
Date

Page 1 of 4
FIELD INSPECTION AND TEST REPORT

230kV VOLTAGE TRANSFORMER INDIVIDUAL TEST REPORT

ERECTION SITE: Bang Pakong Combined Cycle (Units 1-2 Replacement) LOCATION: 230kV GIS Building
CONTRACT NO.: PANEL NO.:
CUSTOMER: Electricity Generating Authority of Thailand DEVICE NO.: 11ADA10CE010 Ph.A

Technical data
Manufacture Nominal system voltage kV
Type Max. system voltage kV
Year of manufacture Rated ratio
Total weigh kg Rated burden VA
Rated frequency Hz Accuracy class
Insulation level BIL kV Serail no.
Standard EGAT Serial no.

NAME PLATE

Responsibility Tested by Confirm by Witnessed by


Company Collective Engineering Black & Veatch Electricity Generating Authority of Thailand

Signature

Name
Date

Page 2 of 4
FIELD INSPECTION AND TEST REPORT

230kV VOLTAGE TRANSFORMER INDIVIDUAL TEST REPORT

ERECTION SITE: Bang Pakong Combined Cycle (Units 1-2 Replacement) LOCATION: 230kV GIS Building
CONTRACT NO.: PANEL NO.:
CUSTOMER: Electricity Generating Authority of Thailand DEVICE NO.: 11ADA10CE010 Ph.A

1. Visual check.

- Equipment checked against specification sheet. Satisfy Un-Satisfy


- Correct and compleate installation checked. Satisfy Un-Satisfy
- Nameplate checked. Satisfy Un-Satisfy
- Insulator checked. Satisfy Un-Satisfy
- No oil leakege checked. Satisfy Un-Satisfy
- Oil level checked. Satisfy Un-Satisfy
- Secondary wiring complate checked. Satisfy Un-Satisfy
- Ground connection checked.

Remark :

2. Insulation resistance measurement.


Instrument : Date of test : :
Manufact : Ambient Temperature : C
Model : Humidity : %
Serial No. :
Cal Date :

Test Connection Applied Voltage Resistance


Energize Ground ( Vdc ) at 1 minute
HV LV ( All core ) + Ground
LV ( core X ) HV + LV ( remainder core ) + Ground
LV ( core Y ) HV + LV ( remainder core ) + Ground

Responsibility Tested by Confirm by Witnessed by


Company Collective Engineering Black & Veatch Electricity Generating Authority of Thailand

Signature

Name
Date

Page 3 of 4
FIELD INSPECTION AND TEST REPORT

230kV VOLTAGE TRANSFORMER INDIVIDUAL TEST REPORT

ERECTION SITE: Bang Pakong Combined Cycle (Units 1-2 Replacement) LOCATION: 230kV GIS Building
CONTRACT NO.: PANEL NO.:
CUSTOMER: Electricity Generating Authority of Thailand DEVICE NO.: 11ADA10CE010 Ph.A

3. Ratio and Polarity test.


Instrument : Date of test : :
Manufact : Ambient Temperature : C
Model : Humidity : %
Serial No. :
Cal Date :

Secondary Winding Ratio Test


Core Terminals Rated Ratio Primary Secondary % Current Phase Dev. Polarity Check
No. Primary Secondary Ratio (A) (A) error
X1-X3 230000/√3 115 1155 Subtractive
Core X
X2-X3 230000/√3 66.4 2000 Additive
Y1-Y3 230000/√3 115 1155 Subtractive
Core Y
Y2-Y3 230000/√3 66.4 2000 Additive

4. Resistance of Secondary winding measurement.


Instrument : Date of test : :
Manufact : Ambient Temperature : C
Model : Humidity : %
Serial No. :
Cal Date :

Secondary Winding
Winding Resistance ( Ω ) Remark
Core No. Terminals Rated Ratio
X1-X3 1155
Core X
X2-X3 2000
Y1-Y3 1155
Core Y
Y2-Y3 2000

Responsibility Tested by Confirm by Witnessed by


Company Collective Engineering Black & Veatch Electricity Generating Authority of Thailand

Signature

Name
Date

Page 4 of 4