The preventive maintenance activities on the PF7000 Air-Cooled Drive (A-Frame or B-Frame)
can be broken down into two categories: One is Operational Maintenance, which can be
completed while the drive is running. The other is Annual Maintenance, which should be
completed during scheduled downtime.
Refer to the Tools/Parts/Information Requirements at the end of this section for a list of
documentation and materials needed to properly complete the preventive maintenance
documents.
OPERATIONAL MAINTENANCE
This process really involves only one task: Changing or Cleaning the Air Filters. The PF7000
drives require consistent, unrestricted airflow to keep the power devices cool. The air filter is the
main source of blockage in the air path.
The drive will provide an air filter alarm whenever the pressure differential across the devices
drops to a drive-specific level. Referring to the Air Filter Block parameter, this can be anywhere
from 7% to 17% blocked, depending on the heatsink and device configuration. This may seem
like a small number, but it takes significant blockage to begin to lower the voltage from the
pressure sensor.
The percentage is a measure of voltage drop, and should not be viewed as a percentage of the
opening that is covered. They are not related linearly.
Once you receive an Air Filter Warning, you should immediately make plans to change
or clean the filter. You should still have days or weeks until the drive reaches an Air Filter
Fault, but this is dependent on site-specific particle conditions.
This can be done while the drive is running. Refer to User s Manual, Chapter 6 Component
Definition and Maintenance for a detailed description of the process.
ANNUAL MAINTENANCE
As the name implies, these maintenance tasks should be performed on an annual basis. These
are recommended tasks, and depending on the installation conditions and operating conditions,
you may find that the interval can be lengthened. For example, we do not expect that torqued
power connections will require tightening every year. Due to the critical nature of the
applications run on MV drives, the key word is preventive. Investing approximately 8.0 hours per
year on these tasks is time well spent in adding insurance against unexpected downtime.
PF7000 A or B Frame Preventative Maintenance Checklists 3
(* This only needs to recorded if parts have been modified/changed since the last PM activities)
Safety Tests
Lock out and tag all sources of power as per OSHA guidelines
Test for voltage potential in cabinet with appropriate safety equipment.
Remove step down CPT or PT fuses and place them in a safe place outside of the drive
cabinet (To be done with control power off).
Carry out the physical inspection and verification for the proper operation of the
contactor/isolator interlocks, and door interlocks.
o Refer to Publication 1500-TD222B-EN-E, which is the MV Mechanical
Interlocking Directory
Carry out the physical inspection and verification for the proper operation of the key
interlocks
Physical verification of the additional cooling fans mounted in the AC Line Reactor
cabinet, Harmonic Filter cabinet for mounting and connections.
Carry out the cleaning of the fans and ensure that the ventilation passages are not
blocked and the impellers are freely rotating without any obstruction.
Carry out the insulation meggering of the drive, motor, isolation transformer/line reactor,
and the associated cabling
o Refer to User s Manual, Chapter 6 Component Definition and Maintenance for
meggering procedure
Check clamp head indicator washers for proper clamp pressure, and adjust as
necessary
o Refer to User s Manual, Chapter 6 Component Definition and Maintenance for
details on proper clamp pressure
Apply 3 Phase Control power to the PF7000 drive, and test power to all of the vacuum
contactors (input, output, and bypass) in the system, verifying all contactors can close
and seal in
o Refer to Publication 1502-5.0 for a detailed description of all contactor
maintenance
Verify all single-phase cooling fans for operation
o This includes the cooling fans in the AC/DC Power supplies and the DC/DC
converter
Verify the proper voltage levels at the CPT (if installed), AC/DC Power Supplies, DC/DC
converter, isolated gate power supply boards
o Refer to User s Manual, Chapter 4 Commissioning for appropriate
procedures/voltage levels for the above checks
Verify the proper gate pulse patterns using Gate Test Operating Mode
If there have been any changes to the system during the outage, place the drive in
System Test Operating Mode and verify all functional changes
If there were any changes to the motor, input transformer, or associated cabling, you will
have to retune the drive to the new configuration using autotuning
Save all parameter changes (if any) to NVRAM
Run the application up to full speed/full load, or to customer satisfaction
o Capture the drive variables while running, in the highest access level if possible
FINAL REPORTING
A complete, detailed report on all steps in the Preventive Maintenance procedures
should be recorded to identify changes.
A completed copy of this checklist should be included
A detailed description of ALL ADJUSTMENTS/MEASUREMENTS that were taken
during the process should be included in an addendum (Interlock Adjustments, Loose
Connections, Voltage Readings, Parameters, etc.)
6 PF 7000 A or B Frame Preventative Maintenance Checklist
Converter Tests Confirm that SCR and SGCT gating pulse sequence is correct for all
devices.
PF7000 A or B Frame Preventative Maintenance Checklists 7
System Tests
Perform a system test with low voltage control/test power.
Prove all protection functions as desired.
Verify that all emergency stop devices function.
Calibrate the analog I/O.
Verify that the fan is operating properly.
Power Tests
Check for system resonance (PWM rectifier only). Waveforms should
be saved.
Measure input contactor drop out time. (2-cycle advance warning
needed if input contactor is not part of drive line-up)
Verify that line voltage is at rated value.
8 PF 7000 A or B Frame Preventative Maintenance Checklist
Customer Information
COMPANY
ADDRESS
SERVICE CONTACT
Control Cell
MAX VOLTS Hz
Power Cell
UNIT SERIES Hz BIL (kV) CURENT (Amps) RECTIFIER TYPE
VOLTS Hz KVAR
VOLTS Hz KVAR
DC Link
MANUFACTURER SERIAL NO. MODEL
Input Reactor
CONFIGURATION: MANUFACTURER MODEL NO. SERIAL NO.
LINE ISOLATION
REACTOR TRANSFORMER
KVA / CURRENT TEMP. RISE IMPEDANCE
VOLTAGE:
PRIMARY: SECONDARY:
10 PF 7000 A or B Frame Preventative Maintenance Checklist
Miscellaneous Information
Auxiliary Cooling Blower Motor (if any)
HP/KW: VOLTS: PHASE:
FLC: RPM: S.F.:
MANUFACTURER: MODEL: FRAME SIZE:
Drives Source of Control Power
LIGHTING PANEL OTHERS:
UPS:
NUMBER: (SPECIFY)
Environmental conditions
OTHERS:
AIR CONDITIONED FAN FORCED AIR (SPECIFY)
Other Pertinent Information
12 PF 7000 A or B Frame Preventative Maintenance Checklist
DCB M 80190-239-
CIB 80190-319-
UPS ---
PRINTER ---
* Note: The drive can have more than one of this circuit board.
PF7000 A or B Frame Preventative Maintenance Checklists 13
SGCT Testing
Measured Resistance
SGCT Resistance Measurement
Inverter Rectifier (PWM only)
SGCT Anode-Cathode Resistance __________ __________ k __________ __________ k
(Heatsink to heatsink) (Lowest) (Highest) (Lowest) (Highest)
SCR Testing
The following steps outline how to verify SCR semiconductors and
all associated snubber components. A quick reference to the
expected resistance and capacitance values as well as a simple
schematic diagram is located in below:
Sharing Resistance
To Gate
Snubber Capacitor Driver Board
Snubber Resistance
Testpoint
Heatsink Heatsink
Measured Resistance
SCR Anode-Cathode Resistance __________ __________ k
(Heatsink to Heatsink) (Lowest) (Highest)
Control Power Tests Prior to energizing the drive, verify that the control power being fed
into the input breakers are rated as designated on the electrical
diagram.
U-V: ________ V
Input Control Voltage (V L-L) V-W: ________ V
W-U: ________ V
Control Power Transformer Installed? Yes No
U-V: ________ V
CPT Secondary Voltage (V L-L) V-W: ________ V
W-U: ________ V
Board LEDs
One operational green LED on each of the 6 outputs, visible from the
input ends of the unit that detects failed 20V output.
There may be more than one IGDPS. Record voltages for all of them.
SWITCH 1 2 3
DIP1
DIP2
DIP3
DIP4
DIP5
DIP6
DIP7
DIP8
KEY: ON = X / OFF = O
Parameters
Parameters can be printed out using the door-mounted printer,
HyperTerminal, or DriveTools. In either of the methods, ensure
that all of the following information is recorded and returned to
Product Support. Ensure you Print the Drive Setup and the
Variables.
Waveforms
Waveforms are very critical to understanding the conditions
surrounding the drive operation. Please ensure you capture the
bare minimum waveform requirements outlined in the
Commissioning sections of the PF7000 manuals.
Revision 1.0 May/2006