You are on page 1of 5

Republic of the Philippines

BATAAN PENINSULA STATE UNIVERSITY


Capitol Compound, Balanga City, Bataan
(047)237-2350/Fax (047)237-2350
Website: www.bpsu.edu.ph
E-mail Address: batpenstateu@gmail.com

BIDS AND AWARDS COMMITTEE MEETING

Pre-Procurement Conference for the Construction of


CBA Building at Balanga Campus (FY 2015)
2nd Flr, Administration Bldg., BPSU Main Campus,
City of Balanga, Bataan
June 15, 2015

I. ATTENDANCE
Bids and Awards Committee
Dr. Gregorio J. Rodis BAC Chairperson
Engr. Alfredo D. Valentos Vice Chairperson
Ms. Delia R. Trinidad Member
Ms. Magdalena A. Abella Member
Mr. Rudy C. Flores Member

Technical Working Group/END USER


Arch. Robert O. Aguilar
Engr. Ernesto G. Cabana
Engr. Mar O. Tapia
Ms. Magdalena Abella Balanga Campus Director
Mr. Benjamin Adraneda PPES Balanga Campus
Invited Dean/Faculty

BAC Secretariat
Ms. Lourdes A. Guevara - BAC Secretary
Support Staff

II. AGENDA
Pre-procurement conference for the Supply and Delivery of the Project
Construction of CBA Building at Balanga Campus (FY 2016)
III. MINUTES
 Call to order at 2:00 PM at 2nd Floor, Administration Building, Main
Campus, City of Balanga, Bataan
 Opening Remarks by Dr. Edmundo C. Tungol, BAC Chairperson
 Item for pre-procurement/bidding

ITB No. Title ABC

Construction of College of Business 41,764,000.00


Administration Building – Balanga Campus
Funding : GAA
End User : CBA

HIGHLIGHTS OF THE MEETING

The following were discussed/agreed upon:


 The availability of the programmed budget release for the project
 The technical plans/specifications, terms of reference, bidding
documents and the draft advertisement of the project
 The necessary changes, amendments or revisions to the project
 The recommended method of procurement
 The schedule of activities
 The requirements in the submission of documents by the bidder/s

Having no other issues and concerns to be discussed, the meeting was


adjourned at 4:00 o’ clock in the afternoon.

Prepared by:

LOURDES A. GUEVARA
BAC Secretary

Noted by:

GREGORIO J. RODIS, PhD.


Chairperson, BAC
Republic of the Philippines
BATAAN PENINSULA STATE UNIVERSITY
Capitol Compound, Balanga City, Bataan
(047)237-2350/Fax (047)237-2350
Website: www.bpsu.edu.ph
E-mail Address: batpenstateu@gmail.com

BIDS AND AWARDS COMMITTEE

CERTIFICATION ON POSTING REQUIREMENT


(Under Sec. 21.2.1.c of Revised IRR-RA9184)

This is to certify that the procurement with the hereunder details, to wit:

Construction of CBA Building at the BPSU Balanga Campus including the


entire detailed Engineering Design (Design and Built Scheme)
ABC : 41,764,000.00
PhilGeps Ref. No. 3596287

was advertised in accordance with Sec.21.2.1.c of the Revised IRR of RA 9184


to wit:
a) x x x

b) x x x and

c) Posted at any conspicuous place reserved for this purpose in the


premises of the procuring entity concerned for seven (7)
calendar days, if applicable as certified by the head of the BAC
Secretariat of the procuring entity concerned.

Issued this December 14, 2015 for whatever legal purpose this may serve.

Certified Correct:

LOURDES A. GUEVARA
BAC Secretary
Noted by:

GREGORIO J. RODIS, PhD.


Chairperson, BAC
Republic of the Philippines
BATAAN PENINSULA STATE UNIVERSITY
Capitol Compound, Balanga City, Bataan
(047)237-2350/Fax (047)237-2350
Website: www.bpsu.edu.ph
E-mail Address: batpenstateu@gmail.com

NOTICE OF POST-QUALIFICATION/AWARD

December 2015

RENEDEL R. MENDOZA
General Manager/CEO
HORAM-ABI BUILDERS, INC
Tuyo, Balanga City, Bataan

Dear Engr. Mendoza:

As a result of the Post-Qualification conducted by the BPSU Technical Working Group for
the CONSTRUCTION OF COLLEGE OF BUSINESS AND ACCOUNTANCY BUILDING-
BPSU MAIN CAMPUS with PhilGEPS Reference No. 2015020031849, it was found out
that the Bid Proposal you submitted during the Opening of Bids held on January 14, 2016
was the Lowest Calculated and Responsive Bid.

As such, please submit three (3) copies of your latest Income and Business Tax Returns
filed and paid through BIR Electronic Filing and Payment System (eFPS) within a non-
extendible period of three (3) calendar days from the receipt of this Notice.

Failure to submit the requirements within the prescribed period or any finding against
the veracity of such shall be a ground for forfeiture of your bid security and your
disqualification for the award of the project.

Thank you.

Very truly yours,

GREGORIO J. RODIS, PhD.


University President
Republic of the Philippines
BATAAN PENINSULA STATE UNIVERSITY
Capitol Compound, Balanga City, Bataan
(047)237-2350/Fax (047)237-2350
Website: www.bpsu.edu.ph
E-mail Address: batpenstateu@gmail.com

INVITATION TO OBSERVERS

_____________________________
_____________________________
_____________________________
_____________________________

Dear Sir/Madam:

Greetings!

The Government Procurement Reform Act (RA 9184) Section 13. States that “To
enhance transparency of the process, the BAC shall in all stages of the procurement
process, invite, in addition to the representatives of the COA, at least two observers to sit
in its proceedings, one from a duly-recognized private group in a sector or a discipline
relevant to the procurement at hand, and the other from the non-government
organization.

With the above legal basis, the university would like to invite you to participate, as
one of the observers, in the conduct of the procurement activities of the Bataan Peninsula
State University (BPSU) for the Construction of the College of Business and Accountancy
(CBA) Building at BPSU Balanga Campus to be held on January 14, 2016, 2nd Flr,
Administration Bldg., BPSU Main Campus, City of Balanga, Bataan.

Very truly yours,

You might also like