Sheet1

WRX CONSULTANTS
DESIGN CALCULATION Page No :

Project : NTUC Tender Structure : 7-PILE GROUP


Computed By : WRX Date : Checked By : Date :

A = 10800 7 -PILE-GROUP F

e= B = 6300 e=
2250 2250
S1 = 4500 S1 = 4500

f = 3900
AS2
S2 = a=
3900 1500

X b= X E = 1800
1500
AS1 C = 9600
S2 =
3900
C/2 f = 3900

Y
A/2

S1 = 4500

Soffit of beam or slab

AS2
d= D = 5000
4850

COL

150
100

50 Lean concrete AS1 T13 - 250 Binders


7 PILE - GROUP 400

PILE SIZE ( dia. ) = 1500 mm sq. ( D ) Minimum = 3800 mm


PILE SPACING D use 5000 mm
S1 = 4500 mm a= 1500 mm
S2 = 3900 mm b= 1500 mm
fcu = 40 N/mm2
PILE WORKING LOAD ( WL ) = 14679 KN fy = 460 N/mm2
AS1 = 40 mm dia.bar 1257 mm2
d= 4850 mm AS2 = 40 mm dia.bar 1257 mm2

FILE : 7PILECG
Sheet2

WRX CONSULTANTS
DESIGN CALCULATION Page No :

Project : NTUC Tender Structure : 7-PILE GROUP


Computed By : WRX Date : ### Checked By : Date :

IF dia. < 550 mm than D = 2dia. + 100 = NA mm PILE-GROUP F


IF dia. > 550 mm than D = 1/3 ( 8dia. - 600 ) = 3800 MM

A = ( S1/dia. x 2 + 1 )dia. + 300 = 10800 mm


B = ( S1/dia. + 1 )dia. + 300 = 6300 mm
C = ( S2/dia. x 2 + 1 )dia. + 300 = 9600 mm
E = dia. + 300 = 1800 mm

ULTIMATE LOAD ( N ) = 7 x 1.5WL = 154129.5 KN

PUNCHING SHEAR STRESS = N / ( 2(a+b))d = 5.30 N/mm2


more than 5.06 N/mm2
increase depth of pilecap or stump size

Y -Y AXIS

Moment ( M ) =
( 1.5WL x ( S1 - a/2 )) + ( 2 x 1.5WL x ( S1/2 - a/2 )) / C = 15482 KN.M / M
M / 1000.d2 = 0.66
K = M / 1000.d2.fcu = 0.02
Lever arm factor ( la ) = 0.5 + 0.25 - K/0.9 = 0.95
AS2 minimum = 0.15%1000.D = 7500 mm2 / M
AS2 required = M / 0.87.fy.la.d = 8396 mm2 / M
T 40 AT 150 mm

AS2 use T 40 AT 150


AS2 provided = 8378 mm2 / M

Shear v = 3 x 1.5WL / C.d = 1.42 N/mm2


av = S1/2 - dia/2 - a/2 + dia/5 = 1050 mm
100AS2prov./1000.d = 0.17
vc = 0.41 N/mm2
Enchanced shear stress = vc.2.d / av = 3.80 N/mm2
Shear check OK

X -X AXIS

Moment ( M ) =
2 x 1.5WL x ( S2 - b/2 ) / A = 12844 KN.M / M
M / 1000.d2 = 0.55
K = M / 1000.d2.fcu = 0.01
Lever arm factor ( la ) = 0.5 + 0.25 - K/0.9 = 0.95
AS1 minimum = 0.15%1000.D = 7500 mm2 / M
AS1 required = M / 0.87.fy.la.d = 6966 mm2 / M
T 40 AT 168 mm

AS2 use T 40 AT 150


AS2 provided = 8378 mm2 / M

Shear v = 2 x 1.5WL / A .d = 0.84 N/mm2


av = S2 - dia/2 - b/2 + dia/5 = 2700 mm
100AS1prov./1000.d = 0.17
vc = 0.41 N/mm2
Enchanced shear stress = vc.2.d / av = 1.48 N/mm2
Shear check OK