WRX CONSULTANTS
DESIGN CALCULATION Page No :

Project : C & S MANUAL Structure : 10-PILE GROUP ECCENTRICITY


Computed By : HSLIM Date : ### Checked By : Date :

Dimensions A& B are the original pile's spacing. 10 - PILE-GROUP 3/B


Dimensions a1 - a10, & b1 - b10 are the ecc. pile's spacing 300 X 300 RC PILES

PILE WORKING LOAD = 900 KN PER PILE

COLUMN SERVICE AXIAL LOAD ( W ) = 8500 KN

B B A= 785 mm
b3 b4
Y B= 900 mm
0.5B
1 2 3 PILE 1 ECCENTRICITY
+ - -47 mm

b1 -b1 + - 13 mm
A b5 b8
a5 a7 a9 PILE 2 ECCENTRICITY
4 a1 a2 5 a3 6 a4 7 + - -32
X X mm
+ - -45
-a1 -a2 -a3 -a4 mm
A C.G. of column a8 a10 PILE 3 ECCENTRICITY
a6 b6 b7 - + -26 mm
8 10
9 + - -41 mm

b2 -b2 PILE 4 ECCENTRICITY


+ - -44 mm
b9 b10
Y + - 30 mm
B B B
PILE 5 ECCENTRICITY
+ - 54 mm
10 - PILE-GROUP 3/B
+ - -60 mm

a1 = 30 mm PILE 6 ECCENTRICITY
a2 = -60 mm - + 77 mm
a3 = 80 mm
a4 = -82 mm + - 80 mm
a5 = 798 mm
a6 = 844 mm PILE 7 ECCENTRICITY
a7 = 740 mm - + 90 mm
a8 = 687 mm
a9 = 744 mm + - -82 mm
a10 = 887 mm
b1 = -32 mm PILE 8 ECCENTRICITY
b2 = 75 mm + - -78 mm
b3 = 853 mm
b4 = 874 mm - + 59 mm
b5 = 1306 mm
b6 = 504 mm PILE 9 ECCENTRICITY
b7 = 527 mm + - 75 mm
b8 = 1440 mm
b9 = 822 mm - + -98 mm
b10 = 811 mm
PILE 10 ECCENTRICITY
- + -89 mm

- + 102 mm

FILE : 10PILECC
Sheet2

10 - PILE-GROUP 3/B
300 X 300 RC PILES

N.A. ABOUT Y - Y AXIS


Y
ey = b1 + b2 + b3 - b4 + b5 + b6 - b7 - b8 + b9 - b10 = -12.40 mm about y - y axis + -
10
Y
My-y = W.ey = -105.40 KN.M
Sum dy2
Sum dy2 = (b1 - ey)^2 + (b2 - ey)^2 + (b3 - ey)^2 + (b4 + ey)^2 + = 7,140,982 mm2
(b5 - ey)^2 + (b6 - ey)^2 + (b7 + ey)^2 + (b7+ ey)^2 + (b9 - e)^2 + (b10 + ey)^2

N.A. ABOUT X - X AXIS

ex = a1 + a2 + a3 + a4 + a5 - a6 + a7 - a8 + a9 - a10 = -16.80 mm about x - x axis +


10 X X
-
Mx-x = W.ex = -142.80 KN.M
Sum dx2
Sum dx2 = (a1 - ex)^2 + (a2 - ex)^2 + ( 3 - ex ^2 + (a4 - ex) ^2 + = 3,723,816 mm2
(a5 - ex)^2 + (a6 + ex)^2 + (a7 - ex)^2 + (a8 + ex)^2 + (a9 - ex)^2 + (b10 + ex)^2

COMPUTATION OF PILE LOAD

Pile W My-y. dy Mx-x. dx Total


Number No. of pile + Sum dy2 + sum dx2 = Load
in KN

1 850.00 + 12.77 + 31.25 = 894.02 pile - ok

2 850.00 + -0.29 + 29.02 = 878.73 pile - ok

3 850.00 + -12.72 + 29.17 = 866.46 pile - ok

4 850.00 + 19.46 + 1.79 = 871.25 pile - ok

5 850.00 + 7.62 + -1.66 = 855.97 pile - ok

6 850.00 + -7.60 + 3.71 = 846.12 pile - ok

7 850.00 + -21.07 + -2.50 = 826.43 pile - ok

8 850.00 + 12.32 + -31.72 = 830.59 pile - ok

9 850.00 + 1.29 + -25.70 = 825.59 pile - ok

10 850.00 + -11.79 + -33.37 = 804.84 pile - ok

Sum = 8500.00