COMMENTS SHEET

S.No IR N0 : KFSH/ACC/MECH/280 01 Of 01

A GENERAL COMMENTS:

The work inspected under this IR is found to be executed with approved General
arrangement Drawings. In effect, any re-work / modifications / adjustments required
1 later to meet the Design Intent / requirements of ID, ARCH and/or any other trade is
contractor responsibility.

Any rework required at the work inspected under this IR due to miscoordination with
2 other utilities need to be highlighted and re-inspected.

B SPECIFIC COMMENTS:

Insulation of the inspected chilled water black steel piping network included in thisIR
conforms to the attached Drawing - The attached Drawing is an approved Shop
Drawing.
Following were found to be as per the attached Drawing / Schedule
1
• Layout of the piping network included in this IR
• Material of insulation
• Size of the insulation
2
Insulation done for chilled water supply and chilled water return pipe network at high
level only without FCU hook up and isolation valve from the main riser.

3 Insulation shall be continious all over and in particular at joints where proper overlap
shall be ensured to avoid gaps.
4 Contractor to protect the executed work from any scratch/damage until the closure of
false ceiling.
5 contractor shall be provide Identification for the piping system as per the
specifications .
Contractor to ensure pipe alignment is not disturbed during working with other trade
6
activity and the level and alignment of pipes are maintained.

Any changes in the installation accessibility due to other utilities installation need to be
7
modified without any extra cost.

Seismic restraints supports not installed, to be calculated by specialist and provided


8 &submit for approval.

9 Thermal contraction for chilled water pipe should be calculated and consider.
S.No COMMENTS SHEET
IR N0 : KFSH/ACC/MECH/280 01 Of 01

A GENERAL COMMENTS:

BASIC APPROACH TO THERMAL INSULATION OF CHILLED WATER PIPING APPEARS TO BE


MISSING. REFER TO ATTACHED COPY OF SPECIFICATION SECTION 230719 AND PICTURES
1 TAKEN AT SITE. SUBMIT THE PENDING METHOD STATEMENT FOR INSULATION OF
CHILLED WATER PIPING. FOLLOW APPROVED METHOD STATEMENT.