You are on page 1of 1

SAUDIARAMCO.

NOTES:

PLANT NORTH
TRUE NORTH
1. ALL DIMENSION ARE IN MILLIMETERS UNLESS OTHERWISE NOTED.

2. THE GROUNDING LAYOUT INDICATED ON THIS DRAWING IS

H
29¡

KA
INDICATIVE ONLY.

K
MA
3. INSTALLATION DETAIL NEED TO REFERENCE

A00-P-CBL-VA-375984-001~005.

OF
4. BURIED GROUNDING CONDUCTORS FOR GROUND GRID SHALL BE

BARE TINNED COPPER.

CONSENT
5. ALL BURIED GROUNDING CONDUCTORS SHALL BE INSTALLED

750mm BELOW GRADE.

6. ALL GROUND CONNECTIONS SHALL BE CLEANED AND TINNED

BEFORE TERMINATION.

TTEN
7. CABLE TRAY SHALL BE BONDED TO THE GROUNDING GRID

AT INTERVALS OF 25 METERS ALONG THE LENGTH OF THE TRAY

WRI
RUN AND CABLE TRAY ENDS SHALL BE BONDED TO MAIN GROUND

GRID AS PER SAUDI ARAMCO LIBRARY DRAWING DD-950022 SHEET

THE
007.

8. BURIED GROUNDING CONDUCTOR SHALL HAVE CLEARANCE OF

300MM (MIN) FROM ANY UNDERGROUND OBSTRUCTIONS.

THOUT
DRAWING LIMIT N 9403.624 9. ALL PLATFORMS AND STAIRS BOLTED TOGETHER NEED TO BE

CONNECTED WITH BONDING JUMPERS.

WI
10. GROUNDING CONDUCTORS EXTENDING THROUGH CONCRETE OR

ASPHLT SHALL BE RUN IN PVC CONDUIT OR PVC COATED

NG
RIGID STEEL CONDUIT.

DRAWI
11. GROUNDING SHALL COMPLY WITH SEAS-P-111.

12. ELECTRICAL MANHOLES SHALL BE GROUNDED USING TWO

GROUND RODS LOCATED CLOSE TO DIAGONALLY OPPOSITE

S
ON

THI
CORNERS OF THE MANHOLES.REFER TO SECTION 9.12 OF
A29-MH-026
NUATI

SAES-P-111.

ON
SEE DWG A29-P-CBL-VA-241363-002
AIR YARD GATE YARD GATE
SEE DWG A10-P-CBL-VA-241357-102

A29-BF-301
AIR LOCK
LOCK

NUATI

FROM
A29-STU-301

A29-MH-023 A29-CFU-301 LEGEND


623 FOR CONTI

UNDERGROUND BARE TINNED COPPER CONDUCTOR 185SQMM


01B
01B

NED
A29-AHU-301B
A29-AHU-301B SWITCHGEAR ROOM

NE E 9200 FOR CONTI


INTERIOR GROUNDING SEE GROUNDING INSULATED COPPER CONDUCTOR 35SQMM

OBTAI
DWG.A29-P-CBL-VA-241364-001
GROUNDING INSULATED COPPER CONDUCTOR 70SQMM
TRENCH
A29-AHU-301A SEE STRU. DWG.

GROUNDING INSULATED COPPER CONDUCTOR 185SQMM


A29-MH-027

BE
A29-AHU-301A
GROUNDING INSULATED COPPER CONDUCTOR 400SQMM

GROUNDING INSULATED COPPER CONDUCTOR 120SQMM

PART,SHALL
A29-MH-025 01C 01C
GROUND TEST WELL WITH GROUND ROD

A29-MH-024 GROUND ROD


NE E 9010.

LIGHTNING POLE
01C
X3 X2 X1 X3 X2 X1

CONNECT WITH IGCC #5

N
X0 X0

I
GROUNDING GRID CADWELD JOINT (T CONNECTION)

FULL,OR
H3 H2 H1 H3 H2 H1
CADWELD JOINT (CROSS CONNECTION)

MATCHLI
LINK LINK BOLTED CONNECTION TO GROUND BAR, EQUIPMENT,
BOX G27
BOX
MATCHLI

01C FENCE POSTS ETC


-

G22 G23 COPPER GROUNDING BAR

N
I
- -

ON
LP-329001 X X : GROUNDING INSTALLATION DETAIL NO.
01B 01B 01B

REPRODUCTI
Y Y : TYPE I.D. AUX. NO.

YARD GATE YARD GATE YARD GATE YARD GATE 01B


01B 01B
REFERENCE DRAWINGS
GROUNDING LAYOUT-SS-329 INTERIOR A29-P-CBL-VA-241364-001
NOTES AND LEGEND A00-P-CBL-VA-240459-001
YARD GATE YARD GATE YARD GATE
GROUNDING INSTALLATION DETAIL A00-P-CBL-VA-375984-001~005
GROUNDING GRID -SS-329 A29-P-CBL-VA-241364-002

SAUDIARAMCO.NO
A29-MH-052
ELECTRICAL EQUIPMENT LAYOUT (SS-329) A29-P-EDT-VA-238354-001
LIGHTNING PROTECTION LAYOUT (SS-329) A29-B-HAZ-VA-240392-001
SS-329 LIGHTNING COVERAGE LAYOUT A29-B-HAZ-VA-240392-002

MATCHLINE N 9340.003 FOR CONTINUATION SEE DRAWING A29-P-CBL-VA-241363-003

OF
KEY PLAN

PROPERTY
SOLE
THE
ARE
SS-329

N
HEREI
0 5 10 15 20 25

METERS

NED
SCALE: 1 : 250M

CONTAI
REVISION VALIDATION

THIS REVISION NO. 00 IS COVERED, FOR ALL APPROVAL AND CERTIFICATION


REQUIREMENTS, PER SAEP-334, UNDER DRAWING COMPLETION CERTIFICATE NO:

ON
10-01525-0004-006

NFORMATI
DESIGN CERTIFICATION REVIEW FOR KEY DRAWINGS OTHER
(DESIGN AGENCY) REQUIRED (SAUDI ARAMCO)

ENGG./DATE CERTIFIED BY/DATE CONST. AGENCY/DATE OPERATIONS/DATE BY/DATE

LC.CHEN B.ANDERS
07/15/16 07/15/16

REV.NO. DATE REVISION DESCRIPTION

I
00 07/15/16 ISSUED FOR CONSTRUCTION

THE
JOB ORDER/EWO NO.
THIS REVISION IS NOT TO BE USED FOR
10-01525-0004 CONSTRUCTION UNTIL CERTIFIED AND DATED

SAUDI ARABIAN OIL COMPANY

AND
DRAWING TYPE

GROUNDING PLAN/LAYOUT/DETAIL CBL

NG
SS-329 EXTERIOR

DRAWI
ELECTRICAL POWER DISTRIBUTION & INT

JAZAN SAUDI ARABIA

S
PLANT NO. INDEX DRAWING NUMBER SHT. NO. REV. NO.

THI
A29 P VA-241364 003 00
Saudi Aramco 2615 ENG. (05/05)

RESTRICTED VECTOR CADD-01