CHECK LISTS FOR SITE ACTIVITIES

SR. CHECK LIST FOR CHECK LIST NUMBER


NO.
1 Checks while receiving drawings CL – 01
2 Demarcation and Plot layout CL – 02
3 Land Development Works CL – 03
4 Layout of the Buildings on site CL – 04
5 Lineout of Individual Building with side rail CL – 05
6 Plum Concrete CL – 06
7 Plain Cement Concrete CL – 07
8 Mix Design & Weigh Batching CL – 08
9 Slump Test, Cube Casting and Cube Testing CL – 09
10 Concreting of Footings CL – 10
11 Concreting of Columns CL – 11
12 Concreting of Plinth Beams CL – 12
13 Concreting of Lift Raft & Lift Pardi CL – 13
14 Concreting of Staircase CL – 14
15 Concreting of Beams / Slabs CL – 15
16 RCC of Lift Machine Room & O.H.W.T. CL – 16
17 Filling in Plinth & Anti-Termite Treatment CL – 17
18 Rubble Soling CL – 18
19 Uncoursed Rubble Masonry CL – 19
20 Brick Masonry CL – 20
21 External Plaster CL – 21
22 Internal Plaster CL – 22
23 Expansion and Construction Joints CL – 23
24 Curing CL – 24
25 Concealed Plumbing CL – 25
26 Water Supply – Rising Mains and Distribution CL – 26
27 Building Drainage system up to the Vertical CL – 27
Stack
28 C.P. and Sanitary Fittings CL – 28
29 Sewage System from Vertical Stack to Septic CL – 29
Tank / Drain
30 Septic Tank CL – 30
31 External Water Supply – Rising Main CL – 31
32 Electrical Wiring, Fittings & Fixtures CL – 32
33 External Electrical M.S.E.D.C.L. supply CL – 33
34 External Electrical Generator supply CL – 34

-1-
35 Street Light Work CL – 35
36 Water-proofing of Toilets, Dry Balcony and CL – 36
Terrace
37 Tiling Work CL – 37
38 Kitchen Platform CL – 38
39 Aluminum Windows and Doors CL – 39
40 Door Shutters CL – 40
41 Internal Painting for Walls & Ceiling CL – 41
42 External Painting CL – 42
43 Fabrication Work CL – 43
44 Handing over of flat – Check List CL – 44
45 Passenger Lift CL – 45
46 Fire Fighting System CL – 46
47 Road Work CL – 47
48 Landscape Works CL – 48
49 Cleaning of Water Tank CL – 49
50 Cleaning of Drain Line CL – 50
51 Collection and Disposal of Dry Garbage / Wet CL – 51
Garbage
52 Lift Maintenance CL – 52
53 Working and Maintenance of Fire Fighting CL – 53
Equipments
54 Cleaning of Swimming Pool CL – 54
55 Safety Measures at Site CL – 55
56 Rain Water Harvesting CL – 56

CHECK LISTS FOR FIELD TEST


SR. FIELD TEST FOR FIELD TEST NO.
NO
.
1 Receiving, Inspection & Testing : FT – 01
Cement
2 Receiving, Inspection & Testing : Steel FT – 02
3 Receiving, Inspection & Testing : FT – 03
Binding Wire
4 Receiving, Inspection & Testing : Sand FT – 04
(Fine Aggregate)

-2-
5 Receiving, Inspection & Testing : Stone FT – 05
Metal (Coarse Aggregate)
6 Receiving, Inspection & Testing : FT – 06
Murum
7 Receiving, Inspection & Testing : Flush FT – 07
Door
8 Receiving, Inspection & Testing : Bricks FT – 08
9 Receiving, Inspection & Testing : Instant FT - 09
Sunla
10 Receiving, Inspection & Testing : M.S. FT – 10
Windows
11 Receiving, Inspection & Testing : Glass FT – 11
Fixing
12 Receiving, Inspection & Testing : Rolling FT – 12
Shutter
13 Receiving, Inspection & Testing : FT – 13
Aluminum Windows
14 Receiving, Inspection & Testing : FT – 14
Plumbing G.I. Pipes and Fittings
15 Receiving, Inspection & Testing : FT – 15
Plumbing C.I. Pipes and Fittings
16 Receiving, Inspection & Testing : FT – 16
Plumbing PVC Pipes and Fittings
17 Receiving, Inspection & Testing : Hume FT – 17
Pipes
18 Receiving, Inspection & Testing : FT – 18
Mosaic Tiles
19 Receiving, Inspection & Testing : FT – 19
Ceramic / Glazed Tiles
20 Receiving, Inspection & Testing : FT – 20
Granite / Marble / Kotah / Tandoor
Stones
21 Receiving, Inspection & Testing : Wood FT – 21
/ Timber / Plywood / Block Board /
Laminates
22 Receiving, Inspection & Testing : FT – 22
Shingle
23 Receiving, Inspection & Testing : Stone FT – 23
Dust

-3-
24 Receiving, Inspection & Testing : FT – 24
Crushed Sand
25 Receiving, Inspection & Testing : Fly Ash FT – 25
26 Receiving, Inspection & Testing : Fly Ash FT – 26
Bricks
27 Receiving, Inspection & Testing : Citadel FT – 27
Blocks
28 Receiving, Inspection & Testing : CPVC FT – 28
Pipes and Fittings
29 Receiving, Inspection & Testing : RCC FT – 29
Door Frames

OTHER ENGINEERING INFORMATION


1 Handling, Storage and Preservation
2 Sampling Plan
3 Durocrete Mix Design Manual and Mix Deign for M15 to M35 Grade of
concrete
4 Tables of Engineering Information
5 List of I.S. Codes
6 List of Architects and Consultants with Telephone Numbers
7 List of Important Telephone Numbers

-4-
CHECKS WHILE RECEIVING DRAWINGS CL - 01

Before we start any construction


Please took info following in the drawings with you.

Check List

a) P.M.C. approved drawings with commencement letter :


1. Area of plot.
2. Available F.S.I.
3. Consumed F.S.I.
4. Number of Buildings

-5-
5. Number of stories of each building.
6. Set-Back / side margins shown.

b) Layout drawings (project): check the following :


1. Name plate as per specified form.
2. Project name, Drawing Title, Sub-Title and Scale.
3. North direction.
4. Boundaries as per site demarcation.
5. Existing Tree location, Well, Bore well, Electric Poles, Telephone Poles,
Overhead Lines, Both Lt. and H.T. and Hutments / Structures.
6. Building setback, other buildings of structure obstructing existing
structures, Sufficient set back for septic tank. Etc.
7. Road, Septic Tank, UGWT, Bore well, Pump Room, Garden, Transformer
Room, Security Office location etc.
8. R. L. of road top, LT room plinth, society office, top of UGWT, main
entrance road, TBM location etc.
9. Location of Compound wall, Front Gates, and Types of Compound Wall.

c) Working Drawings :
1. North direction and name plate as per specified form.
2. Project name, Drawing Title, Sub-Title and Scale.
3. Whether sizes are as per printed broachers.
4. Flat number as per printed broachers.
5. Brick / Block walling convention.
6. Chajja at terrace level shown in dotted on all plan.
7. Level with respect to T.B.M. for all plan on Plinth, Parking, Landing
and Mid-Landing etc.
8. All room door opening sides with Bath W.C.
9. Duct dimension and open area dimension.
10. Column reduction arrows.
11. Centre line checking such as size of column at footing level, all open ducts,
space and staircase details direction, room sizes as per broachers & wall
thickness.
12. Dotted lines for Chajja, Rolling Shutter’s pardi, drop etc.
13. Kitchen Otta position with sink size
14. Lift position and size.
15. Balcony, W.C. and Bath drop.
16. All windows, door frames opening rolling shutters, R.C.C. grill sizes,
Schedule, exhaust for opening and balcony grill opening.
17. Specification in brief.

-6-
18. W.C. / Bath / Toilet / Terrace sunk line shown shaded.
19. Terrace drain, shopping patterns and rain water pipe opening locations
20. Lift shaft sizes, O.H.W.T. / Lift room positions.
21. Staircase pardi thickness, riser thread details.
22. Parking drawing.
23. Extract details for plinth side flats.
24. Meter cabinet locations.

d) Following points be seen while checking R.C.C. Drawings :


1. To be read as per working drawings.
2. Check the structure at contour level.
3. Sunk slabs W.C. toilet bath.
4. Head room at specific level (beam depth & change in beam depth)
5. Dowel for adjacent structure.
6. Details of column below O.H.W.T.
7. Check Elevation features.
8. Inverted beams for W.C. bath etc.
9. Loft details to be taken along with beam.
10. Floating column details.
11. Terrace level chains slab details.
12. Reinforcement at critical points.

e) Following points be seen while checking Plumbing Drawings :


1. Location of UGWT / OHWT / Septic Tank / STP / WTP.
2. Drawings to support with size and design calculations for capacities of
above.
3. Arrangements of Rain-Water Harvesting.
4. Slope / Flow of drainage to suit site terrain.

f) Following points be seen while checking Electrical Drawings :


1. Location and size for transformer room, meter room for individual
buildings and location of feeder pillars
2. Route for electrical cabling to be done.
3. Location and size of electrical duct.
4. Load calculations for transformer.
5. Detailed electrical conduiting for each flat / building.
6. Detailed meter room layout.

g) Following points be seen while checking Landscape Drawings :

-7-
1. Detailed layout of open space area.
2. Check weather amenities provided are as per broacher / specifications.
3. Check for structural feasibility.

DEMARCATION AND PLOT LAYOUT CL – 02

Check List :

1. Approved demarcation plan with North direction.


2. Plane table survey (Map)
3. Contour Survey (Map) – Contour Survey also to include R.L.’s of approach
road near the points of entry and at regular intervals if the road runs along
the perimeter of the plot.
4. Survey for underground electrical / telephone cables, water supply lines,
drainage lines, nala structures etc.
5. Soil Investigation Report – for deciding type of foundation.
6. Physical verification of the plot with reference to demarcation plan,
existing structure, nala, boundries, H.T. lines approach road etc.
7. Verification of above by Architect and Technical Cell.
8. Road widening markings at site from authorized agency.

Records :

1. Demarcation Plan.
2. Plane table survey plan
3. Contour Map.
4. Verification Certificate of Architect and Technical Cell.

LAND DEVELOPMENT WORKS CL - 03

Check List :

1. Architect to give details of following to all Consultants and Technical Cell


a) Layout of all building.
b) Location and size of U.G.W.T.
c) Location and size of Septic Tank and S.T.P.
d) Location and size of Transformer, L.T. room and Generator room.
e) Design of Compound Wall and Entrance Gate and Security Cabin.

-8-
f) Design and location of any other amenities ( W.T. Plant, Club House,
Garden, Lawn, Swimming Pool, S.T.P., Use of Solar Energy etc )
g) Location of E.S.R. if applicable.
h) Developed Ground Level.
i) Developed Plinth level of all Building and Amenities (preliminary)
j) Developed first slab level
k) Basement level if applicable
l) Layout and Location of Rain-water Harvesting with Storm water
arrangements.
m) Location for Vermiculture / Bio-gas Plant.
2. Existing G.L. with respect to T.B.M.
3. Surface cleaning, dressing and leveling.
4. Trial Pits for each building for foundation strata.
5. Mass Excavation / Pit Excavation – balance cutting and filling.
6. Disposal and Reuse of Excavated earth.
7. Try to maintain natural slope of ground.
8. Excavated GL
9. Approval by RCC consultant for foundation strata.
10. Bore well locations and water yield reports.
11. Provision for proper arrangements of Labour Hutments, GI Sheet fencing,
curing work, electrical lines and plantation.
12. Verification all above by Architect and Technical Cell at site.

Records :

1. Developed plan showing all above amenities and their respective levels.
2. Verification Certificate by Architect / RCC consultant and Technical Cell.

LAYOUT OF THE BUILDINGS ON SITE CL – 04

Check List :

1. As per CL – 02 approved layout showing North direction, Plot Boundaries


of all building, Amenities Area, Open Parking, Compound Wall, Gates,
Roads, U.G.W.T., Electrical Substation, etc.
2. Marking the Buildings and Structures, Roads on ground with lime powder
and check for fouling if any.
3. Check set-backs required for all structure as per rules and regulations
4. Clearance from Architect, Technical Cell for individual building lineout.

-9-
Reference : Approved layout plan.

Records : Approved drawings


Certificate from Architect and Technical Cell.

LINEOUT OF INDIVIDUAL BUILDING WITH SIDE RAIL CL – 05

Check List :

1. Latest approved centre line plan of the building showing North Direction,
adjoining structures, expansion joint if any & reference point with
distances.
`2. Verify the center line with respect to RCC foundation plan, Architectural
Floor plans and service drawings.
3. Establish T.B.M. near each building.
4. Fixing four corners of building and check diagonals.
5. Fixing side rails & all center lines, including lift pit position on rails,
diagonals checking part wise.
6. Making pits for footings & lift on ground with lime powder and check for
fouling of footings etc.
7. Consent from architect, RCC designer and Technical Cell for proceeding
ahead with concrete works.

Reference: Latest approved Center line plan from Architect.

Record : Certificate from Technical Cell and Architect on verification of lineout.

PLUM CONCRETE CL - 06

Check List :

1. Plum concrete is generally used –


a) When in the same pit some portion of pit is excavated more for
required strata, to level this pit plum concrete is used.
b) If two adjacent footings are at different levels, elevate one footing by
proving plum concrete.

- 10 -
2. Grade of concrete for plum concrete is M15.
3. Plum concrete is to be done in layers 230 mm to 300 mm. After each layers
plums (boulders) to be inserted in concrete. After that next layer of
concrete is to be done.
4. Size of plums to be used 6” to 12”
5. Percentage of plums with respect to concrete – maximum 40 %
6. PCC below footing is to be done above plum concrete as per specified
thickness.
7. Curing for 07 days (minimum)

Records : Consumption statement

PLAIN CEMENT CONCRETE CL – 07

Check List :

1. Refer To :
a) Architect drawing.
b) RCC drawing and revision.
c) Strata for foundation approved by RCC consultant.
d) Any service lines passing below PCC or above PCC.
2. Check whether rubble soling below PCC preferred / anti termite
treatment below PCC is necessary.
3. PCC top level as per RCC drawing and also with reference to developed
ground level or road level.
4. Size, depth and diagonals of the pit size is more than required PCC size;
provide side shuttering to get required size.
5. Grade of concrete and thickness of concrete.
6. Placement of concrete and compaction.
7. Top of PCC must in level.
8. Curing for 7 days (minimum)

Records : Consumption statement.

MIX DESIGN AND WEIGH BATCHING CL – 08

- 11 -
Check List :

1. Use of Weigh Batcher :


a) For all major concreting works of RCC like column, beams, slabs, lift
Shaft and water tank, retaining walls, basement raft and walls weigh
batcher should be used.
b) Whenever weigh batcher is under repair or not available due to
unforeseen reasons, weigh batching converted into volume batching
can be adopted
c) The weights should be marked, weighted on an electronic balance &
the same is to be recorded in register by site engineer before first
operation.
d) For RCC normal – volume batching by standard pharmas can be
done.

2. Before starting concrete :


a) Design mix data required from site e.g. brand of cement, samples of
materials
b) Sieve analysis of stone metal.
c) Sieve analysis of natural sand.
d) Sieve analysis of crushed sand.
e) Moisture content in sand.
f) Bulk density of sand.

3. Weigh batcher operations :


a) Weigh batcher installed in level.
b) Calibration – Once in six months.
c) Adjust weigh scale for error.
d) Weights should be washed and cleaned.
e) The design mix of concrete should be displayed prominently near the
weigh batcher.
f) Weights of a particular weigh batcher should not be used for any other
weigh batcher.

4. During Concreting :
a) Type of cement, grade of cement, approved mix design.
b) Exact weight of each type of material i.e. cement, coarse aggregate,
and fine aggregate and – fly ash, shingle, crushed sand if to be used.
c) Check workability of concrete by relating to the slump.

- 12 -
d) Casting of cubes and identification marks – min. 6 cubes.
e) Check weight in pan and marker of weight on scale as these get
disturbed due to vibration.

5. After Concreting :
a) Record actual consumption of material.
b) Compare actual consumption with theoretical consumption.
c) Cube test results with related slump for 7 days and 28 days strengths
d) Curing for 10 days.
e) De-shuttering period with respect to type of cement used and
consultant’s notes on drawings.

Records : 1) Approved design mix

2) Consumption statement.

SLUMP TEST, CUBE CASTING & CUBE TESTING CL -09

A) SLUMP TEST :
This test is conducted for determining consistency of concrete where
nominal size of aggregate does not exceed 38 mm.
Apparatus Used :
i. Slump Cone : Top Diameter 100 mm
Bottom Diameter 200 mm
Height 300 mm
ii. Tamping Rod : Diameter 16 mm
Length 600 mm
Rod rounded at one end.
Procedure :
The internal surface of the slump cone shall be thoroughly cleaned before
commencing the test. Slump cone shall be placed on a carefully leveled
metal plate, the slump cone being firmly held in place while it is being
filled. The slump cone shall be filled in four layers, each approximately
one- quarter of the height of the cone. Each layer shall be tamped with
twenty-five strokes of the rounded end of the tamping rod. The strokes
shall be distributed in a uniform manner over the cross-section of the
cone and for the second and subsequent layers shall penetrate into the
underlying layer. The bottom layer shall be tamped throughout its depth.
After the top layer has been rodded, the concrete shall be struck off level

- 13 -
with a trowel or the tamping rod, so that the mould is exactly filled. Any
mortar which may have leaked out between the mould and the base plate
shall be cleaned away. The mould shall be removed from the concrete
immediately by raising it slowly and carefully in a vertical direction. This
allows the concrete to subside and the slump be measured immediately
by determining the difference between the height of the mould & that of
the highest point of the specimen being tested. The above operation shall
be carried out at a place free from vibration or shock, and within a period
of two minutes after sampling.

B) CASTING OF CUBES :
Cubes of concrete should be cast regularly to estimate the strength of
concrete. Concrete for filling the cubes should be taken from the middle
discharge of concrete mixer. Concrete from beginning or at the end of
discharge should be avoided. Cubes should be filled in 3 equal layers. Each
layer should be uniformly tampered at least 35 times with a 16 mm blunt
rod. Cubes should be properly leveled and finished using hand trowel.
Cubes should be de-molded after 24 hours and immersed in water for
curing. It is important to keep the cubes away from the shocks or
vibrations especially for initial 3 days of casting.
We recommend that minimum 6 cubes should be taken every day and the
batch of 3 cubes be tested for 7 days and 28 days respectively.

As per IS 456 – 2000 minimum frequency of sampling is as follows :

Volume of Concrete Number of Samples


1 – 5 m3 1
6 – 15 m3 2
16 – 30 m3 3
31 – 50 m3 4
51 and above 4 plus one additional for each additional
50 m3

Each sample comprises of 3 cubes.


Size of test specimens cubical in shape shall be 15 cm x 15 cm x 15 cm

C) TESTING OF CUBES FOR COMPRESSIVE STRENGTH :


Cube testing is done at specified age i.e. on 7th and on 28th day.
Age of cubes is calculated from the time of addition of water to the dry
ingredients.

- 14 -
Test specimens stored in water shall be tested immediately on removal
from water and while they are still in the wet condition. Surface water and
grit shall be wiped off the specimens and any projecting fins removed. The
dimensions of the specimens to the nearest 0.2 mm and their weight shall
be noted before testing.
The bearing surfaces of testing machine shall be cleaned before placing
test specimen. The side faces (faces other than top & bottom) of specimen
shall be placed between bearing surfaces. The load shall be applied
without shock & increased continuously at a rate of approximately 140 kg
/ sq.cm / minute until the resistance of the specimen to the increasing
load breaks down & no grater load can be sustained. The maximum load
applied to the specimen shall then be recorded.

Calculation :

The measured compressive strength of the specimen shall be calculated


by dividing the maximum load applied to the specimen during the test by
the cross-sectional area, calculated from the mean dimensions of the
section and shall be expressed to the nearest kg per sq.cm. Average of
three values shall be taken as the representative of the batch provided
the individual variation is not more than +/- 15 percent of the average.
Otherwise repeat test shall be made.

Grade of 28 day’s 03 day’s 07 day’s 14 day’s


Concrete Required Indicative Indicative Indicative
Strength Strength Strength Strength
M 10 13.5 N / mm2 05.4 09.05 11.47
N/mm2 N/mm2 N/mm2
M 15 18.5 N / mm2 07.4 12.40 15.73
N/mm2 N/mm2 N/mm2
M 20 24.0 N / mm2 09.6 16.08 20.40
N/mm2 N/mm2 N/mm2
M 25 29.0 N / mm2 11.6 19.43 24.65
N/mm2 N/mm2 N/mm2
M 30 35.0 N / mm2 14.0 23.45 29.75
N/mm2 N/mm2 N/mm2

- 15 -
M 35 40.0 N / mm2 16.0 26.80 34.00
N/mm2 N/mm2 N/mm2
M 40 45.0 N / mm2 18.0 30.15 38.25
N/mm2 N/mm2 N/mm2

CONCRETING OF FOOTINGS CL – 10

NOTE :CENTRING / SHUTTERING DESIGN SHOULD BE GOT APPROVED BY


CONSULTANT FOR ANY R.C.C. ACTIVITY

Check List :
1. Latest approved center line drawing
2. Latest approved RCC drawings.
3. Footing size and respective column number.
4. Placement of steel with reference to drawings.
5. Orientation of footings and column.
6. Cover blocks for reinforcement.
7. Grade of concrete and mix design.
8. Concrete placement and mechanical vibration.
9. Surface finishing.
10. Cubes with identification marks and related slump – min. 6 cubes.
11. Testing of cubes for 7 days and 28 days strength.
12. Consumption records.
13. Curing ( minimum 10 days )

Records : Cube test reports with related slump

Consumption statement

CONCRETING OF COLUMN CL – 11

Check List :

1. Marking of centers for columns to be done before starting any work for
above floor.
2. Starters to be casted with minimum height 6” & with vibrated concrete.

- 16 -
3. Starters to be casted at least 2 days in advance before erecting the column
shuttering.
4. Check for orientation as per RCC and Architectural drawings.
5. Column reinforcement, links, and their arrangement as per drawings
6. Fixing cover blocks to reinforcement.
7. Checking of shuttering materials.
a) Quality of shuttering material.
b) Apply shuttering oil to plywood and planks.
c) To close the gaps / gabdies with mud paste to prevent cement slurry
flowing out.
8. Column to cast up to bottom of beams.
9. Concrete with mixer should be insisted, if mixer is not used 10% extra
cement is to be used.
10. Checking of column while concreting, for plumb.
11. Type of cement, grade of cement, grade of concrete and design mix.
12. Six cube mould are kept ready to cast cubes from different batches and
slump test for each.
13. Compaction by needle vibrator and poking / tamping.
14. Check for lap length above top of concreting of columns.
15. Checking of columns after concreting
a) De-shuttering of column after 24 hours.
b) Finishing of honeycombing immediately after de-shuttering.
c) Hacking of columns within 3 days from de-shuttering.
16. Cube testing
a) Remove cubes next day and keep for curing.
b) Cover the column by gunny bags.
c) Testing of cubes on due dates ( 7th day and 28th day )

Records : Consumption Statement

Cube test results and related slumps

CONCRETING OF PLINTH BEAMS CL – 12

Check List :

1. PCC below plinth beams as per the requirement.


2. Out to out measurements and right angles and internal dimensions.

- 17 -
3. Provision of foundation of stairs from plinth beams.
4. Check for dimensions of Plinth Beams.
5. Check reinforcement details as per RCC drawing and schedule.
6. Ducting if required for all services lines.
7. Quality of shuttering materials.
8. Gaps and joints of shuttering
9. Covering for all sides of beams.
10. Grade of concrete and design mix.
11. Concrete placement and mechanical vibrator / tamping and surface
finishing.
12. Marking and finishing of top level of plinth beams.
13. Cubes with identification marks and related slump test.
14. Curing for minimum 10 days.

Records : Consumption record

Cube test and related slump

CONCRETING OF LIFT RAFT AND LIFT PARDI CL – 13

Check List :

1. Architectural drawing showing lift shaft size and orientation of shaft with
reference to manufacturers requirements and required depth of pits.
2. Latest approved RCC drawings.
3. Check whether base water proofing is done.
4. Check size, diagonal, plumb, support and depth below level required by
lift manufacturers.
5. Check grade of concrete and reinforcement.
6. Centers of raft, pardi, covering for raft and pardi.
7. Check for lift door opening to be provided in lift pardi wall.
8. Water proofing on sides of lift pardi up to plinth level.
9. Hacking to concrete surface.
10. Cubes with identification marks.
11. Curing for minimum 10 days.
12. Cube tests on 7 and 28 days with related slump.

Records : Consumption Statement

- 18 -
CONCRETING OF STAIRCASE CL - 14

Check List :

1. Scrutiny of RCC Drawing with respect to latest revised Architectural


Drawing and details of staircase such as riser, trade and thickness of waist
slab.
2. Ensure height of riser is within specified limit (not to exceed 175 mm)
3. Before erecting formwork for staircase check by marking on plain ground,
whether arrangement given in drawing is suitable or not.
4. Check whether slab / floor level landing top is provided with sunk slab (50
mm) or not ?
5. The sunken (50 mm) provided should be distributed among all risers at
parking floor.
6. Check quality of shuttering and staging material.
7. Shuttering plates should be well supported by chavi’s for full length.
8. All props supporting chavi’s must in plumb. Top of mundha to cut at an
required angle.
9. Check reinforcement is laid as per RCC drawing or not.
10. Mark top of mid-landing / slab level on shuttering sides.
11. Check shuttering provided to steps is of plywood finish or not ?
12. Check size of risers and trades is as per drawing.
13. Check verticality of risers.
14. Check thickness of waist slab as per drawing.
15. Check dowel provided for upper flight or not ?
16. Concreting as per design mix and proper grade of concrete.
17. Proper compaction of concrete with vibrator and hand pocking.
18. Casting of cubes with related slumps.
19. Curing for minimum 10 days.

Records :

Consumption Statement
Cube Test Results and related slumps.

CONCRETING OF BEAMS / SLABS CL – 15

- 19 -
Check List :

1. Scrutiny of structural drawing with respect to latest revised architectural


drawing and details of staircase such as riser, thread, thickness of waist
slab, sunk for landing flooring, lift size and opening.
2. Level of each bay of the slab and internal panel measurement beam to
beam & diagonals.
3. Location and depth of sunken slab.
4. Proper laps for reinforcement of columns, beams and slab and Lift pardi.
5. Check reduction of columns and reinforcement is done as per above floor
requirements as per RCC drawings.
6. Check for expansion joint details and the same should be provided as per
RCC details.
7. Chairs for reinforcement with 8 mm.
8. Dowels for future columns if any in slab and beams.
9. Quality of Centring and Shuttering and staging materials.
10. Shuttering plates should be well supported by chavis at 3-0” c/c for the
full length.
11. Provide camber for cantilever beams as specified by structural consultant.
12. Cross bracing should be provided for vertical supports (wooden & M.S.
both) for slab and beams at maximum 4’00” interval.
13. Make the top of concrete on sides of beam / slab shuttering around
14. Making of required GHODI of various thickness of slab.
15. Concealed conduit / junction boxes / fan hooks as per electrical drawings.
16. Require number of sleeves opening for RWP, drainage pipe etc.
17. Inform well in advance to Architect, RCC designer, Technical Cell for
checking of slabs.
18. Provide sufficient cover blocks for beams, columns and slabs.
19. Keep six numbers of cubes and one slump cone ready.
20. Type of cement, grade of cement and grade of concrete / design mix.
21. Proper compaction of concrete with vibrator hand pocking
22. Control of W/C ratio in the concrete to be checked frequently as per the
slump desired.
23. Add water proofing compound for sunken slab and terrace slab.
24. Finishing of slab to the required line and level without honeycombing.
25. For curing ensure water ponding minimum 2” depth with maximum size
of 6-0” X 6-0” between bunds for minimum 7 days.
26. Cross-Bracing should not be removed before 03 days after casting.

- 20 -
27. De-shuttering of slabs after 7, 10 or 15 days and beams 14 or 21 days
depending upon span and type of cement used, also refer notes on
consultant’s drawing and instructions of Technical Cell.
28. Cube tests with related slump for 7 days and 28 days strength.

STAGEWISE VERIFICATION SHOULD BE DONE AS BELOW :

STAGE VERIFICATION BY
1. Centring / Shuttering but before
laying reinforcement Project In-Charge
2. After Laying reinforcement
but before concreting RCC Consultant,
Tech. Cell, Architect
3. During Concreting Project In-Charge
4. After concrete for curing
& before de-shuttering Project In-Charge

Records : Consumption statement

Cube test results and related slump

Verification certificate from Architect, RCC consultant, Technical


Cell

RCC OF LIFT MACHINE ROOM AND O.H.W.T. CL – 16

Check List :

1. Lift Machine Room :

a) Check for latest approved drawings from lift manufacturer / and


architect.
b) Check the size of machine room, height, access, ventilation etc.

- 21 -
c) Check for the sleeves in the bottom slab as per drawings.
d) Check for lifting hook in the top slab as per designed capacity
e) Grade of concrete and thickness of concrete.
f) Cube test results related with slump.
g) Curing for minimum 10 days.

2. For O.H.W.T. :

a) Check the capacity as per Architect or Consultants drawings for


domestic, potable water and fire fighting water and treated water for
flushing.
b) Check for Sleeves for washout, inlet, outlet overflow, fire fighting and
treated water for flushing etc.
c) Check for chamfer in concrete for bottom slab
d) Check for chamber cover openings.
e) Grade of concrete and design mix.
f) Water proofing compound.
g) Cube test results with related slumps.
h) Curing for minimum 10 days.

Records : Consumption Statement


Cube test result and related slump
Verification Certificate from Architect, RCC consultant & Technical
Cell

FILLING IN PLINTH AND ANTI TERMITE TREATMENT CL – 17

Check List :

1. Sub ground level and top of filling level.


2. Check for laying underground pipelines, cables, etc.
3. Material used for filling either murrum or black cotton soil mixed murrum
or lime, filling should be done in layers not exceeding 1’6”
4. Flooding with water through holes made in filling.
5. Ramming at every layer.
6. Top 1’6” layer just below the soling shall be of murrum, watered and
rammed thoroughly with compactor.

- 22 -
7. Check necessity of Anti Termite Treatment, if required, then follow pre-
treatment as given below :

Stages :

Stage i) For filling around column footings and plinth beams.


Stage ii) For filling in plinth all surface area.
Stage iii)For filling around external perimeter of building.

Emulsion Spray :

Mix chemical with water ( 1 part of chemical, 30 parts of water ), make


the holes by crowbar at two feet center and two feet deep and spray the
emulsion with pressure pump, consumption 5 liters per Sq. meter.

Records :

Levels of sub ground and final levels

RUBBLE SOLING CL – 18

Check List :

1. Filling and compaction of surface.


2. Soling thickness as directed by Technical Cell. (minimum 230 mm)
3. Voids filled with murrum.
4. Watering and Compaction.
5. Ensure
a) Ducting line for electrical cable, TV cable, Water Supply, Drain pipe etc
b) Anti termite treatment after filling murrum.
c) Top of soling.

Records : Consumption statement

UNCOURCED RUBBLE MASONRY CL – 19

- 23 -
Check List :

1. Architectural drawings.
2. Stage wise / thickness wise bottom and top levels of masonry.
3. Proportion of cement mortar (not more than 1:6) and raking of joints for
specific type of pointing (proportion of mortar not more than 1:2)
4. Provision of one header for every 5 Sq.Ft., staggered horizontally and
vertically.
5. Check whether weep holes required in case of retaining walls.
6. Curing ( for 10 days minimum )
7. Ensure there should not be voids in UCR masonry wall.
8. Ensure that only 3 ft height of wall is constructed in one day.
9. Provide pins for boundary of upper level masonry work for every 5 rft.

Records : Consumption statement

BRICK MASONARY CL – 20

Check List :

1. Latest approved architectural drawings showing thickness of walls, door


windows and other openings.
2. Customer changes / NOC
3. Cleaning the entire floor, stacking of bricks on either side of beam.
4. Cleaning of slab conduits and passing GI wire through conduits before
brickwork starts.
5. Soaking of bricks.
6. Preparation of mortar in proper proportion in M.S. Tray, check whether
cement mortar or any other ready mixed mortar is to be used. Prefer for
design mix and use of mixer for BBM mortar.
7. Confirm diagonals and dimensions of room after first layer.

- 24 -
8. Check right angle, plumb lines, levels, joints ( max ¾” ) at sill and lintel
level.
9. Plumb for external wall to be taken from outside and for internal walls
from side flush with beam / column.
10. Not more than 4’-00” masonry in day’s time.
11. In case of long walls (exceeding 4.5 m length), provision of horizontal /
vertical RCC bands should be considered
12. Provide ¾” metal chip at the junction of RCC and BBM (insert by thumb
pressure)
13. Provide RCC band, if 4” thick brick wall above 3.0 m and if 6” brick wall
above 4.0 m with nominal reinforcement and M15 grade of concrete.
14. Racking of Joints.
15. Provide sufficient number of hold fast embedded in concrete for all
frames property covered.
16. Cleaning the working area.
17 Curing for minimum 10 days.
18. Check the line and plumb of door frame.

Records : Consumption Statement

EXTERNAL PLASTER CL – 21

Check List :

1. Latest approved drawing to be referred for elevation features before


plastering.
2. Soaking of brick wall surfaces well in advance for minimum 3 days before
plaster from both sides.
3. The surface to be plastered shall be cleaned for algae growth, salt
effloresces and dust accumulation.
4. Check for electrical conduiting and switch box fixing for terrace and dry
balcony light points.
5. Type and texture of finished plaster and thickness of plaster (single or
double coat) to be decided before hand.
6. Thiyyas of minimum thickness to be taken two days before plaster.
7. Hacking to concrete and filling between concrete and BBM joints.

- 25 -
8. Ensure the position of all the concealed sleeves for water supply, sanitary,
rain water, electrical pipes etc.
9. Ensure covering of plaster side by tadpatri or plastic at least 3 days before
plastering and 7 days after completing of plaster.
10. Verticality and lines of frames.
11. Provide chicken mesh at joints of RCC and BBM wherever required.
12. Gunny bags spreading near walls to avoid wastage and mortar can be
reused.
13. Check proportion of mortar for base coat and finishing coat mixing to be
done in M.S. trays. Also whether cement mortar or ready mortar to be
used. Prefer for design mix and use of mixer for plaster mortar.
14. For single coat plaster with rubdi coat for sponge finish – thk. 12 + 6 = 18
mm. both coats to be done simultaneously. For double coat plaster – thk.
19 + 6 = 25 mm. Second coat is to be done 03 days after first coat is
completed.
15. Check for line, level and plumb of plaster, check right angles for all
openings.
16. Cleaning of working area to be done on the same day, especially railings,
RCC grills, door and window frames etc.
17. Curing for 10 days minimum.

Records : Consumption Statement

INTERNAL PLASTER CL – 22

Check List :

1. Soaking of brick-wall surface well in advance for minimum 03 days before


plastering.
2. Ensure horizontal and vertical electrical conduits laid chiseling with cutter.
3. Patching up of chiseling area with rich mortar and ¾” metal 2 days before.
4. Sufficient hacking to all RCC work.
5. Making thiyyas of minimum thickness 2 days before plater.
6. Conduiting of plumbing, electrical and other service lines.
7. Customer changes / NOC

- 26 -
8. Check electrical conduiting with reference to electrical points, switch
boxes with DB box.
9. Chicken mesh at joints of RCC and BBM, Excess conduiting locations etc.
10. Verticality and alignment of all doors and windows frames.
11. Proportion of mortar and mixing in tray, check whether prefer cement
mortar or ready mix mortar to be used with type of finishing coat. Prefer
for design mix and use of mixer for plaster.
12. Ensure plumb, right angle, dhar corners, window jam levels, position of
electrical boxes etc.
13. Ensure finishing of loft top.
14. Ensure application of neeru in proper proportion and finish except dado
position.
15. Check for finishing of joints between internal and external plaster.
16. Smooth trowelling of neeru finish on next day.
17. Cleaning of all working area.
18. Check all electrical points and switch boxes are open and cleaned.
19. Curing for minimum 10 days.
20. Donga (white wash) to be applied after 03 weeks.

Records : Consumption Statement.

PROVIDING EXPANSION / CONSTRUCTION JOINTS CL – 23

Expansion Joint :
These joints are provided to accommodate the expansion of adjacent building
parts and to relieve compressive stresses that may otherwise develop.
The joints formed by providing an initial gap between the adjacent building parts
which gets widened or shortened while accommodating the contraction or
expansion of the building. The width of the gap should be sufficient to
accommodate the maximum thermal-induced moment likely to be

- 27 -
encountered. Normally it varies between 10 mm to 40 mm. There should be
complete discontinuity of masonry, reinforcement or concrete at the joint and
the gap should permit unobstructed movement of the adjacent parts. Expansion
joint should start from the top of footing (in case of combined footing for
adjacent columns) tip topmost point of structure.

Spacing of Expansion Joints :


1. Framed Structures : i) For long uniform structures at 30.0 meter interval
ii) Corners of L,H,T and C shaped structures
2. Walls : i) Load bearing walls with cross walls at intervals
at 30.0 m interval
ii) Walls without cross walls – at 30.0 m interval.
Control joints over center of openings may be
given at half the spacing of expansion joints.

Material used to treat expansion joints :


i) Joint Filler : A strip of compressible material used to form and fill the
expansion joints in structure. Joint fillers can be made out of a variety of
materials such as bitumen, bitumen containing cellular material, cork strips,
natural or cellular rubber, expanded plastic, mineral fiber, coconut, pith etc
ii) Ceiling Compound : A material of plastic consistency applied to the joint
in the form of liquid or paste. The function of the ceiling compound is to prevent
the ingress of water or foreign matter. Mastic or hot-applied bituminous
compound is commonly used for this purpose.
iii) Water Bar : A strip which is placed across the joint during construction so
as to form an impervious diaphragm. Water bars may be of natural and synthetic
rubber, polyvinyl chloride or metal.

Construction Joints :
Joints installed at location where construction stops for any reason is known as
construction joint. If it is possible to plan construction in such a way that the
days work ends at expansion or contraction joint, then there is no necessity of
construction joint. But many times it is not possible to complete the concreting
work in one operation. Therefore special measures are necessary to be taken to
achieve perfect continuity in old and new concrete. For structural stability, it is
necessary to ensure that construction joints are provided at pre-determined
locations.

- 28 -
Location of Construction Joints for different members :
1. Slabs : For simply supported one-way slab Construction joint should be
vertical and parallel to main reinforcement. It can also be provided at the
¼ part part of span at right angles to main reinforcement
In case of two-way slab, the joint can be provided ¼ th part of either span.
2. Beams : In case of beams construction joint should be vertical and located
at ¼ th part of span.
3. Columns : 75 mm below beam bottom.
4. R.C.C. Walls : At suitable location where erection of formwork,
compaction of concrete and supervision is convenient.

Old concrete should be treated as below :


1. If the new concrete is to be laid within 48 hours, the face of the old
concrete is cleaned with wire brush and water and a coat of cement
mortar (of the same composition as that of concrete) is applied before
placing new concrete.
2. If the new concrete is to be laid after 48 hours, the face of the old concrete
is first roughened by chiseling. It is then cleaned of scum, loose aggregates
and other foreign matter, wetted and a coat of cement mortar (of the
same composition as that of the concrete) is applied before placing new
concrete.

CURING CL – 24

Curing is the process of preventing the loss of moisture from the concrete /
mortar.
Curing should be done for minimum 07 days for 43 / 53 Grade cement.
Curing should be done for minimum 10 days for blended cement, but
recommended to continue for 14 days.

Installation of Hydro-pneumatic system for curing is recommended.

Following procedure should be adopted for curing.

- 29 -
S. Type of Work Procedure for Curing
No.
1 P.C.C. Sprinkling of water
2 Footings Should be covered by wet gunny bags & by
intermittent sprinkling of water.
3 Columns Should be covered by wet gunny bags & by
intermittent sprinkling of water.
4 Plinth Beams Should be covered by wet gunny bags & by
intermittent sprinkling of water.
5 Slabs & Beams Slabs : Water Ponding of minimum 2”
depth & maximum size 6’ X 6’ between
bunds.
Beams : Outer side should be covered by
wet gunny bags and intermittent sprinkling
of water.
Beams & Slabs : Sprinkling of water from
bottom side of slab & beams after de-
shuttering.
6 Brickwork Intermittent sprinkling of water.
7 Internal / External Intermittent sprinkling of water.
Plaster
8 Water-proofing By ponding
9 Tiling Intermittent sprinkling of water.
10 External Painting Intermittent sprinkling of water.

CONCEALED PLUMBING CL – 25

Check List :

1. Latest approved plumbing layout.


2. Waterproofing requirements.
3. Customer changes / NOC.
4. Chasing with cutter.

- 30 -
5. Ensure type and approved brand of materials ( pipe & fittings ) for
concealed piping work.
6. Coaltar painting to all concealed lines / insulation if any for hot water
lines.
7. Ensure all taps position at tile joints. All fittings to be flush with tiles.
8. Proper filling with mortar.
9. Testing with required pressure and its record. To be tested at 10 kg / cm2
for GI / CPVC pipe line and 07 kg / cm2 for Copper pipe line.
10. Identification marks of PMC & Domestic water.
11. Provision of nahani tarp, P-trap, CI bends outlets below waterproofing.
12. Fixtures levels.
13. Provide escape spouts at top coat level.

Records : Pressure test.


Consumption Statement.

WATER SUPPLY - RISING MAINS AND DISTRIBUTION CL – 26

Check List :

1. Consultant’s approved drawings / specifications for materials and pumps


/ work order.
2. Ensure the provision of valve and NRV, PRV
3. Position of delivery pipes, air vent pipes, over flow pipes, wash out drain
pipes.
4. Joining and alignment of pipes near overhead tank.
5. Installation of water pumps of required capacity its Earthing and Electrical
connection.
6. If auto control system is provided, then ensure
a) Quality of the sensors of the system.
b) Display panel for water tank.
c) Cabling used for system.
d) Protection for dry run.
7. Proper clamping for pipes.
8. Adopt telescopic arrangement in down take pipe lines and check the
plumb and alignment.
9. Pressure of water to each floor.
10. Identification marks on pipes PMC / wash water supply.

- 31 -
Records : Consumption Statement.

BUILDING DRAINAGE SYSTEM UPTO


THE VERTICAL STACK CL – 27

Check List :

1. Check sequence of waterproofing before starting work.


2. Procurement of material as per approved drawing and changes in outlet
of sanitary wares.
3. Ensure the provision for bends, branch pieces etc.
4. Ensure the verticality of the stack before joining internal branches
5. Ensure leak proof joints
6. Ensure sufficient slope to horizontal drain pipes.
7. Introduce plug socket for cleaning.
8. Ensure inspection eye provided wherever necessary.
9. Ensure the position, levels of sanitary ware from the floor levels.
10. Ensure provision of anti siphon age pipes and elongated length of vent
pipe above the roof level.
11. Clamping the pipes rigidly to maintain verticality, plumb, line level, and
slopes.
12. Ensure the free flow of drainage for the desired discharge by testing all
the lines.
13. Do not mix rain water outlets in to sewage or sullage drains.
14. Rain water outlets to connect to rainwater harvesting system.

Records : Consumption Statement

- 32 -
C.P. AND SANITARY FITTINGS CL – 28

Check List :

1. Refer to specification and schedule of fittings, fixtures and sanitary ware


and type of outlet trap of W.C.
2. Customer changes and NOC
3. Free flow of water at least 15 minutes by removing plugs and then fixing
fittings / sanitary wares.
4. C.P. fixtures should be fixed with cloth packing while using the spanners.
5. Check all the fittings for free flow of water, leakages if any ( to be rectified
)
6. Fix the identification mark on domestic and PMC water connection.
7. Ensure the sanitary fitting before fixing for colour code, defects if any.
8. Ensure proper grouting of EWC / WB brackets.
9. Ensure the proper functioning of flush tank / half turn valve / PVC
connection for colour code, defects if any.
10. Seat cover of correct size and matching colour.
11. Check for cleaning of tiles and sanitary ware, C.P. fiitings
12. Ensure that the plugs for boiler connections are easy to remove but at the
same time the plug is non-leaking.

STANDARD HEIGHTS OF PLUMBING FITTINGS


Sr. No. Fittings Height from FFL
1 Open Mixer 30”
2 Shower 78”
3 Tumbler Cock 12”
4 Wash Basin 33”
5 Angle Cock for Wash Basin 18”
6 Angle Cock for Flush Tank 24’
7 Bottle Trap Outlet 18”
8 Low level Cistern height 36”
9 Urinal 24”
10 Soap Dish 36”
11 Kitchen Sink Cock 39”
12 Kitchen Platform 31”
13 Flush Valve 41”
14 Fourway Divertor / Single Lever 39”
Divertor

- 33 -
SEWAGE SYSTEM FROM
VERTICAL STACK TO SEPTIC TANK / DRAIN CL – 29

Check List :

1. Approved drawing / work order / specifications for materials.


2. Sewage line to be 5 m away from UGWT
3. Ensure all invert levels and proper slope.
4. Ensure the alignment of the line.
5. Record initial ground level.
6. Record excavated ground level.
7. Lay pipe in the upgrade direction of the slope and ensure all branches are
connected with proper slope.
8. Fill the joints as specified.
9. Sufficient time before backfilling (2 days)
10. Ensure minimum interval of chambers and provision of chambers at
turnings. Ensure drop in invert level in each chamber between incoming
and outgoing pipes.
11. Ensure that all the chambers / manholes are plastered from inside &
outside with footsteps.
12. Ensure free flow in the pipe line till connecting drain to septic tank or
Municipal chamber.

Records : Consumption Statement / as built drawing

SEPTIC TANK CL – 30

Check List :

1. Approved drawing
2. Invert level of incoming sewer.
3. Record initial ground level.
4. Record final excavated ground level.
5. PCC / RCC, BBM, Water-proofing to be done as per respective check list.
6. Inlet – Outlet levels of tank.

- 34 -
7. Free board.
8. All the documents, Size of the compartments and the baffle walls.
9. Filler media materials and filling procedure.
10. Water tightness of septic tank.
11. Vents are provided.
12. Connected effluent to sock pit or nearest drain or STP

Records : Consumption Statement / as built drawing

EXTERNAL WATER SUPPLY – RISING MAIN CL – 31

Check List :

1. Approved drawing / work order / specification for materials.


2. Whether automatic level control system is to be provided.
3. Pump HP head, discharge and quality of foot valve.
4. Pump foundation.
5. Proper earthing for electrical supply.
6. Union joint on suction and delivery side of pump for easy maintenance.
7. Motor testing
8. Dry run protection.
9. Quality of sensors.
10. Quality of control panels.
11. No air is trapped on suction side.
12. All joints are watertight / leakages to be repaired.
13. NRV and sluice / gate valves on rising main.
14. Identification for drinking water, wash water and recycled water for
flushing.
15. Record the time required to fill the OHWT
16. Ensure that the NRV flap closes as soon as pump stops.
17. Ensure that no water is stagnant on the pump room floor.
18. As built drawing to be prepared.

Records :

Consumption Statement

ELECTRICAL WIRING, FITTINGS AND FIXTURES CL – 32

- 35 -
Check List :

1. Refer to schedule and specifications of fittings and fixtures


2. Customer changes / N.O.C.
3. The quality gauges and the brand name of the wires, as per the approvals,
before starting the works.
4. Check the colour code and specification of the wire for points and avoid
joints wiring.
5. Fix the accessories on the boards, as required with line and level and of
approved brand.
6. Terminate the wire in accessories, considering an extra length for looping.
7. Connect the wires in accessories, considering an extra length for looping.
8. After starting the supply, switch on the main switch and check all the
points with megar and test lamp.

WIRES AND THEIR COLOURS

1.5 mm2 Point Wiring Yellow


2.5 mm2 Sub Main and 16 A Red
Point
4 mm2 Boiler and AC Point Blue

COLOUR PURPOSE
Red, Yellow, Blue Phase Wires
Black Neutral
Green Earthing

EXTERNAL ELECTRICAL M.S.E.D.C.L. SUPPLY CL – 33

Check List :

1. Civil instrument work of LT room and transformer yard based on


approved layout of M.S.E.D.C.L. and electrical inspector and detailing by
Architects and RCC consultants.
2. M.S.E.D.C.L. approved layout of transformer, four pole structure, LT / HT
panels, earthing provision switchgear, feeder pillars, cable layout from
transformer to meter board including sizing.
3. Work order for transformer, LT / HT panels, switchgear, cables, steel
structure, feeder pillar and all accessories required.

- 36 -
4. Electrical contractors scope of work, his work order, installation schedule.
5. Approvals from M.S.E.D.C.L. and electrical inspector after erection.
6. M.S.E.D.C.L. supply from outside mains for charging transformer, testing
and commissioning of the total system.

Records : Approved drawing from M.S.E.D.C.L., Architect and Consultant.

Material Consumption

EXTERNAL ELECTRICAL GENERATOR SUPPLY CL – 34

Check List :

1. Civil construction work as per manufacturer’s requirement, detailing by


architect and RCC consultant.
2. Approved layout of generator foundation, AMF and switching panels,
diesel stock provision, ducting and ventilation, chimney for smoke
disposal, earthing, canopy etc by the approved suppliers and erection
contractor.
3. Schedule for erection, testing and commissioning.
4. Approval from electrical inspector concerned.
5. Maintenance Manual.
6. Maintenance contract.

Records : Approved Drawings

Fuel consumption records

STREET LIGHT WORK CL – 35

Check List :

1. Approved drawings / work order / specification for materials


2. Poles of street lights shall not disturb other services and access.
3. Street light cables shall be laid in pipe or GI pipe with proper cushioning.
4. Provision of earthing (GI wire) for feeder pillar and each pole.
5. Ensure colour code of wires and distribution, connections from pole
junctions to each point.
6. Ensure the intensity of street lights in night ( it shall be uniform )

- 37 -
Records :

Consumption Statement / As built drawing

WATERPROOFING OF TOILETS,
DRY BALCONY, TERRACE, LIFT PIT AND BASEMENT CL – 36

Check List :

A) TOILETS :

1. Fixing of reference levels / bench mark for every floor.


2. Removal of debris ( cleaning of surface with wire brush )
3. Making of holes required for all types of outlets.
4. Base coat to cover all junctions.
5. Fix finished floor levels to ensure proper and sufficient slope towards
outlet pipes with cushioning mortar above those pipes.
6. Proportion of mix for waterproofing treatment at various layers to be
ensured. Use appropriate waterproofing chemicals.
7. Brick bat coba with proper slope.
8. Finishing coat with smooth finishing bottom surface and same carried
over on vertical surfaces for one foot.
9. Escape outlets after top coat.
10. Curing for every coat.
11. Testing by ponding of water for minimum 10 days.

B) TERRACE AND DRY BALCONY :

1. Fixing of reference levels / bench mark for every floor.


2. Removal of debris ( cleaning of surface with wire brush )
3. Provision of rainwater outlets.
4. Base coat to cover all junctions.
5. Fix finished floor levels to ensure proper and sufficient slope towards
outlet pipes with cushioning mortar above those pipes.
6. Proportion of mix for waterproofing treatment at various layers to be
ensured. Use appropriate waterproofing chemicals.
7. Brick bat coba with proper slope.

- 38 -
8. Finishing coat with smooth finishing bottom surface and same carried
over on vertical surfaces for one foot.
9. Curing for every coat.
10. Testing by ponding of water for minimum 10 days.

C) LIFT PIT AND BASEMENT :

1. Fixing of machine cut rough shahabad below raft slab with waterproof
plaster.
2. Fixing of machine cut rough shahabad for RCC pardi from outside with
waterproof plaster up to plinth level.
3. In case of basement encasing column and footings with machine cut
rough shahabad is necessary.
4. Curing for 10 days minimum.

Records : Consumption Statement

TILING WORK CL – 37

Check List :

1. Customer changes / NOC


2. Customer supplied material if any.
3. Drawing for adjusting cut pieces.
4. Sorting of tiles for size, colour and pattern.
5. Removing of all loose mortar from slab and cleaning the surface
thoroughly (Ghadai)
6. Tiles soaking and sorting before fixing. (Use appropriate farma for sorting)
7. Any service line below flooring, especially electrical conduits.
8. Finishing floor levels to be fixed with respect to toilets, terraces and
entrance lobby.
9. Ensure slope for flooring in toilets, terraces and dry balcony towards
outlet / nahani trap.

- 39 -
10. Use of sand-cement mortar for fixing skirting and dado tiles.
11 Proportion of lime / cement mortar – proper mixing of mortar dry as well
as wet mortar.
12 Right angles and plumbs for dado and skirting.
13 Fixing of tiles neatly with sufficient slurry backing ensuring no hollowness
behind tiles.
14 Ensure cutting of dado tiles to the exact size of switch box.
15 Hole cutting for taps, traps, outlets.
16 Fixing of skirting by machine cut tiles.
17 Proper Butt finishing for skirting and dado tiles.
18 Filling of joints with matching colour cement paste on same day.
19 Curing / Curing compound for on joints / Butt.
20. Polishing coat / cleaning with detergent powder.
21. Ensure for gaps / voids by knocking.

Records :

Consumption Statement

KITCHEN PLATFORM CL – 38

Check List :

1. Latest approved drawings (considering drain location).


2. Check for vertical and horizontal partitions below platform for kitchen
cabinet.
3. Customer changes / N.O.C.
4. Customer supplied material.
5. Ensure slope towards sink.
6. Proper bearing in the walls.
7. Position and size of built in sink / S.S. sink / drain board.
8. Ensure cutting of dado tiles to the exact size of switch box.
9. Connection of sink to vertical stack.
10. Sharp edges to be rounded off.
11. Coloured cement for joints.

Records :

- 40 -
Consumption Statement

ALUMINUM WINDOWS AND DOORS CL – 39

Check List :

1. Latest approved drawings and specifications.


2. Check position of M.S. Grill of windows, whether from inside or outside
before fixing windows.
2. Customer changes / N.O.C.
3. Aluminum material section weights, use medium gauge material.
4. Aluminum sections to be used, number of tracks and shutters.
5. Base frame if necessary; anodizing / powder coating for base frame and
window.
6. Right angels of frames, sizes of shutters, bearing, handles, locking
arrangement, provision of mosquito net etc.
7. Verify details of tracks, exhaust fan, a/c openings.
8. Type, Thickness, Quality of Glass and PVC molding around glasses.
9. Removing packing sheet on member and clean all surfaces.
10. Holes from outside at bottom truck for draining out rain water.

DOOR SHUTTERS CL – 40

Check List :

1. Refer to approved drawings / work order / schedule of fittings and


fixtures.
2. Customer changes / NOC
3. Type size, thickness and quality of shutter.
4. Door frame should be checked for plumbs and alignment.
5. All the slots for hinges properly provided.
6. All the screws fitted with the help of screw driver and not hammered.
7. Leaping to be provided as per required.
8. Door fittings and fixtures as per approved schedule / work order.
9. Painting / Polishing to frame and shutters by protecting and fixtures by
proper covering.
10. Flat owner’s name plate on entrance door shutter.

- 41 -
11. Use waterproof shutters.
12. Use minimum 32 mm thick door shutter if Cylindrical Lock is provided and
30 mm thick if Al-Drop / Tadipatti are provided.
13. Use 35 mm thick door shutter for entrance door.
14. Provide minimum 4 hinges for entrance door and 3 hinges for internal
doors.
15. Table for levels of different fittings and fixtures.

1. STANDARD HEIGHT’S FITTINGS FOR BALCONY DOOR :


Sr. Recommended Recommended Position Of
No. Fittings Details Heights from Fittings
FFL
1 Balcony Door
Inside
a) Handle ‘D’ type 95 cm (38”) 6.5 cm (2 ½”) from
bottom opening edge of
shutter.
b) Cylindrical Lock / 100 cm (40”) / Opening Edge
Tadi Patti 82.5 cm (33”)
c) Tower bolt 15 cm Top flush to top 5 cm (2”) from
(6”) of shutter opening edge of
shutter.
d) Door Stopper As per 5 cm (2”) 7.5 cm
requirement (3”) at opening
edge

2. STANDARD HEIGHT’S OF FITTINGS FOR INTERNAL DOOR :


Sr. Recommended Recommended Position Of
No. Fittings Details Heights from Fittings
FFL
1 Internal Door :
Inside
a) Tower Bolt 15 cm Top flush to top 5 cm (2”) from
(6”) of shutter opening edge of
shutter.
b) Handle ‘D’ type 95 cm (33”) 6.5 cm (2 ½”) from
(bottom) opening edge of
shutter

- 42 -
c) Baby Latch 82.5 cm (33”) Opening Edge
d) Rubber Gattu 7.5 cm (3”) 7.5 cm (3”) at
opening edge
2 Outside
a) Handle ‘D’ type 95 cm (38”) 7.5 cm (3”)
bottom
b) Cylindrical Lock / 100 cm (40”) / At opening edge
Tadi Patti 85 cm (34”)
c) Door stopper As per 5 cm (2”) 7.5 cm
requirement (3”) at opening
edge.

3. STANDARD HEIGHT’S OF FITTINGS FOR W.C. / BATHROOM DOOR :


Sr. Recommended Recommended Position Of
No. Fittings Details Heights from Fittings
FFL
1 W.C. / Bath.
(Inside)
a) Handle (Bottom) 95 cm (38”) 6.5 cm (2 ½”) from
opening edge of
shutter.
b) Baby Latch 82.5 cm (33”) Opening edge
c) Hook 160 cm (64”) Center of shutter
d) Rubber Gattu 7.5 cm (3”) 7.5 cm (3”) from
opening edge of
shutter
2 W.C./Bath.
(Outside )
a) Handle (Bottom) 95 cm (38”) 7.5 cm (3”) from
opening edge of
shutter
b) Cylindrical Lock / 100 cm (40”) / Opening Edge of
Tadi patti 85 cm (34”) shutter
4. STANDARD HEIGHT’S OF FITTINGS FOR MAIN DOOR :

Sr. No. Recommended Recommended Position Of Fittings


Fittings Details Heights from FFL
1 Main Door Inside
a) Tower Bolt 15 cm Top flush to top of 5 cm (2”) from opening
(6”) door edge of shutter

- 43 -
b) Safety Chain 145 cm (58”) 5 cm from opening edge
of shutter
c) Eye Piece 145 cm (58”) At center of shutter.
d) Handle ‘D’ type 120 cm (48”) 6.5 cm (2 ½”) from
bottom of shutter opening edge
e) Night Latch 100 cm (40”) Opening edge of shutter
f) Tadi Patti 85 cm (34”) At the opening of edge
g) Rubber Gattu 7.5 cm (3”) 7.5 cm (3”) from
opening edge of shutter
2 Outside
a) Unit number place 175 cm (70”) Center to shutter
b) Name Plate 167.5 cm (67”) Center to shutter
c) Decorative handle 110 cm (44”) 7.5 cm (3”) from
(bottom) opening edge of shutter
d) Al-drop 90 cm (36”) 5 cm (3”) from opening
edge of shutter
e) Door Stopper As per At the opening edge
requirement

INTERNAL PAINTING FOR WALLS AND CEILINGS CL – 41

Check List :

1. Approved colour scheme and check customer’s changes, if any, regarding


paint.
2. Wall has been scraped for all unwanted material like excess cement,
mortar nails, dust etc.
3. Donga has been removed completely and the wall surface is rubbed by
the fine sand paper, wide cracks completely opened and filled with crack
seal compound.
4. Mix, preparation and application of primer.
5. Primer has been allowed to dry for at least 24 hours before application of
putty.
6. All the undulations of minor nature, dents and cracks in proper way are
filled up with putty and surface is smooth to receive paint.

- 44 -
7. Surface has been rubbed with fine paper to get smooth finish after 24
hours of application of putty.
8. Check any brush marks bristles from the brush stick to the wall.
9. Mix, preparation and application of second coat shall be done only after
drying 1st coat.
10. Check for floor, door, windows fittings cleaned properly.
11. Check all cement mortar, unwanted welding burr etc. are removed before
application of primer polishing properly.
12. Check for free movement of hinges, fittings and fixtures of door and
windows before application of primer.
13. Application of zinc cromite metal primer before application of first coat of
oil paint to the steel works.
14. Application of first coat of oil paint and proper finish, fill up putty
whenever necessary, application for second coat of oil paint after 24
hours drying of first coats.

Records : Colour Scheme.


Consumption Statement

EXTERNAL PAINTING CL – 42

Check List :

1. Approved specifications for materials to be used.


2. Approved colour scheme and ensure external wall surface is cleaned
properly before painting is taken up.
3. All the electrical plumbing holes are finished properly before application
of first coat.
4. The surface is watered for 12 hours before application of priming coat /
first coat.
5. Ensure cleaning by scrapping patti before application of first coat.
6. Priming coat / first coat to be applied with proper mix, application and
finishing of surface as per the manufacturers instructions for use.

- 45 -
7. Second coat with proper mix, application and finishing of surface as per
the manufacturers instructions for use.
8. Cleaning the surfaces, windows glass, terrace, floor, pipes, doors, fixtures,
electrical switches etc.
9. Curing as per manufacturers instructions.

Reference : Colour Scheme.

Records : Consumption Statement

FABRICATION WORK CL – 43

Check List :

1. Check the approved drawings, customer changes with NOC


2. Check the material as per approved drawing prior to indenting.
3. Check the material as per specification.
4. Check for :
a) Diagonal / Angles.
b) Plumb.
c) Design.
d) Joints welding.
e) Grinding of joints.
f) Scrapping by sand paper.
5. Check for painting primer coat.
6. Check for painting of oil paints as per specification
7. Check for any damages created during erection, rectify it.
8. Final point touchup.

Records :

Consumption Statement

- 46 -
CUSTOMER CHANGES

Changes within acceptable norms :

1. Deleting of internal wall.


2. Change from EWC (Commode) to IWC (Indian type) with stepped
platform.
3. Change from IWC (Indian type) to EWC (Commode).
4. Increase in dado tiles height.
5. Door and window grills as per our approved patterns.

Changes beyond acceptable norms :

1. Shifting of internal walls and addition of walls


2. Additional loft or change in position / location of loft.
3. Changes which will affect external elevation.
4. Washing machine / wash basin on terrace.

HANDING OVER OF FLAT - CHECK LIST CL – 44

NOTE : ENSURE THAT COMPLIANCE OF FOLLOWING ARE DONE. REFER TO


SPECIFICATION APPROVED FOR FINISHING AND FIXTURE OF ALL TYPES.

A) WALLS AND CEILINGS :


( of all the rooms including bathroom and W.C. )
1. Are all cracks in wall are properly filled ?
2. Are all signs of dampness / leakage on wall removed ?
3. Are all patches or black stripes observed in painting attended ?
4. Are loose patches (if any) in ceiling and walls rectified ?
5. Are all corners sharp and finished ?
6. Are the fan hook in ceiling are proper ?
7. Are the overall finishing proper ?

B) TILING :
1. Is the floor in proper level ?

- 47 -
2. Is the floor and skirting properly polished and cleaned ?
3. Is the skirting in one line and at right angles ?
4. Are the floor tiles of one type ?
5. Is the mosaic / ceramic tiles in the room continued up to outer edge of
main door frame ?
6. Is the butt joint properly finished ?
7. Is the skirting and butt properly inline level and right angle around the
column ?
8. Are cracked tiles replaced and finished properly ?
9. Are glazed tiles cleaned and finished properly ?
10. Are all glazed tiles cleaned and finished properly ?
11. Are the glazed tile dado in right angle and level ?
12. Is the gap between glazed tile dado and room ceiling / flooring filled
properly ?
13. Are jams of windows properly finished with glazed tiles ?
14. Are you sure that there is not a single cracked tile in dado ?
15. Are the glazed tile around W.C. pan properly fixed ?
16. Are you sure that no water accumulates on flooring of W.C. ?
17. Have you confirmed by knocking each tile that there are no loose patches
left in the dado ?
18. Is there proper slope towards nahani trap and no water accumulates in
between ?
19. Is there proper slope given to bathroom ?
20. Is there bath and W.C. floor down than room floor ? Is boundary edge
finished properly ?
21. Is the slope properly given to the balcony towards water spout ?
22. Is the terrace or balcony floor level minimum 1” down than floor ? If not
check whether threshold ( Umbra Patti ) has been provided ?
23. Is the gap between terrace, toilet, dry balcony floor and room floor filled
properly with white cement.
24. Are water spouts in balcony fitted properly and cleaned properly ?
25. Is there any necessity to provide threshold fixed to bath and W.C. ?
26. Is the kitchen platform finished properly ?
27. Is the kitchen platform leak proof ?
28. Are the edges of granite around kitchen sink and fascia patti polished
properly and edges soft chamfered ?
29. Is there proper slope given to kitchen platform top ?
30. Are the glazed tiles near water taps properly cut and fixed ?
31. Is the hole for gas provided with pvc bend above the kitchen otta ?
32. Is polishing of kitchen otta cuddappa verticals and shelves done ?

- 48 -
33. Is edge polishing and rounding done ?
34. Flooring below kitchen platform to be in level with the room floor ?
35. Check whether skirting below kitchen platform provided ?
36. Is the space for gas cylinder ok to put cylinder freely /
37. Are you sure that hole for gas pipe is not chocked with cement / debris ?
38. Is the finishing and painting of walls below kitchen platform done properly
?

D) DOORS AND WINDOWS :


1. Are all doors / windows, opening and closing smoothly ?
2. Is gap between door / windows frame and shutter within tolerance limit
?
3. Are drain holes in aluminum window track from outside provided ?
4. Are the aluminum window tracks cleaned with air blower ?
5. Are all doors / windows properly painted / polished /
6. Are all fitting’s like locks, tower bolts, stoppers, hinges etc working
smoothly ?
7. Are all glass properly fitted, cleaned and crack free ?
8. Is the sealant applied it fill in the gaps between windows and wall ?
9. Is the polishing of main door proper ?
10. Is the no / name plate of the main door fixed ? along with flat no. put on
it ?
11. Are all gaps between window / door frames and walls properly fixed ?
12. Is the gap between sill and aluminum window frame sealed with white
cement / sealant.
13. Are the door / windows shutters free from bend or any defect ?
14. Is the whether shed properly provided to all external door / window with
pani patti in plaster ?
15. Is eye piece provided ?
16. Check whether laminated sheet has been provided for bath / w.c. doors
if so specified ?
17. For protection from rainwater for terrace, door, check whether chajja is
provided ?
18. Are screws to all fittings provided ?
19. Are tadipatti to door shutters fixed correctly for locking arrangement ?
20. Cover molding patti to all door frames fixed or not with proper corner
finishing and painting ?
21. Is finishing of lipping patti to door shutter proper with respect to joints ?
22. Are the hinges of windows, free and out of plaster of window jam ?

- 49 -
23. Are you sure that no windows / door shutter is touching to chajja / loft
plaster.
24. Is the rubber gattu fixed sturdy with 7 cm screw each ?
25. Are all the doors fittings clean and free from screws each ?

E) LOFTS :
1. Are the lofts finished by I.P.S. from top ?
2. Are the ceilings and walls around loft properly painted and finished ?
3. Is the loft properly cleaned and no rabit / debris left out ?
4. Is the finished thickness of loft maintained all over ?

F) PLUMBING AND SANITATION :


1. Are all fixtures like bibtaps, mixers etc fixed properly and at proper height
from floor level.
2. Is there any leakage from taps / other c.p. fixtures /
3. Is there proper pressure to all the taps ?
4. Is there half turn cock or flush tank operating properly ?
5. Is there continuous flow of water through w.c. when half turn cycle or
flush tank is kept open.
6. Is ‘P’ – trap of w.c. properly cleaned to be without any lump.
7. Is there continuous flow of water without any chock-up through nahani
trap when tested for at least 5 minutes. A check for finishing of watta
below nahani trap cover.
8. Is the hot / cold operation proper.
9. Are boiler connections properly plugged, non leaking & easy to remove ?
10. Is the low level flushing water tank operation of commode proper ?
11. Is the seat cover of commode fixed properly and cleaned ?
12. Check whether provision for soap dish mode ?
13. Are the mirror over w.h.b. and tile dado filled with sealant ?
14. Is height of mirror (Bottom) 1.25 m from toilet floor ?
15. Is proper cleaning done for all sanitary fixtures ?
16. Are the brackets of basin painted with oil paint ?
17. Are open GI pipe connected to w.c. painted ?
18. Is basin and counter if any fitted properly ? is the sturdy ?
19. Are all the sanitary fittings in proper condition without any leakage or
crack ?
20. Are the CI or PVC lines (7.5 cm / 10 cm) found leak proof when tested for
at least 15 min. with continue water flow ?
21. Is the fixing of GI / CI / a.c. or PVC lines inline and proper clamping ?
22. Are you sure there is no chock-up in the drainage chamber ?

- 50 -
23. Are the main inlet and outlet GI lines of water tanks leak proof ?
24. Is the white cement filled between w.h.p. and wall smooth, without ay
crack.
25. Is PVC outlet pipe for w.h.b and kitchen sink fixed properly ?
26. Is there any convention marked for municipal water tap and wash water
tap and also respectively GI pipes with colour bads.

G) ELECTRIFICATION :
1. Is the individual meter allotted to flat ?
2. Is the main switch fixed in meter cabinet ?
3. Is there any testing report of electrical points given by electrical
contractor ?
4. Are all the kitkat / fuses fitted properly ?
5. Are all electrical switches working properly ?
6. Is the earthing connection tested for working condition ?
7. Are all the fan hooks in fan boxes ?
8. Are all the switch boards fitted in line and level ?
9. Is the position and quality of electrical points as per working drawings ?
10. Are all extra amenities provided as per customer changes ?
11. Is the colour of switches and accessories same as provided initially ?
12. Are the battens / casing capping in perfect line and right angles ?
13. Are the wires on batten fixed with proper clipping ?
14. Are you sure there is no gap between wall and batten ?
15. Are you sure that no screw is left from boards / switches / plugs etc ?
16. Is the type of bell same as approved initially ?
17. All the fittings fixed on board are inline and level or not ?

H) PAINTING :
1. Is the painting properly done for walls and ceiling ?
2. Is the oil painting done properly for doors and windows ?
3. Are all the windows glasses cleaned by painter /
4. Are all the door / windows fixtures cleaned by painter ?
5. Is the painting done on lofts ?
6. Are all the paint stains cleaned properly ?
7. Are all painting of battens / wires done properly throughout ?

I) MISCELLANEOUS :
1. Is the letter box with owners name provided ?

- 51 -
2. Are the keys for all doors and letter box tagged and their numbers
recorded ?
3. Is the flat number displayed on electrical meter ?
4. Is the electrical meter number and initial reading recorded ?

SALES EXECUTIVE AT SITE SITE IN-CHARGE


SIGN & DATE SIGN & DATE

CERTIFICATE
TO,
THE DIRECTOR
__________________

I HEREBY CERTIFY THAT FLAT NO. ………………… IN BUILDING NO


……………................. AT PROJECT …………………………………….. IS HANDED
OVER TO ME, INCLUDING OF ALL CONTRACT AMENMENTS AND IS TO
THE SATISFACTION OF MYSELF.
I HAVE NO COMPLAINT WHATSOEVER ABOUT ANYTHING IN THIS
MATTER.

NAME OF SALES EXECUTIVE NAME OF THE FLAT OWNER


(SIGN & DATE) (SIGN & DATE)

PASSENGER LIFT CL – 45

Check List :

1. Lift pit and lift shaft size as per lift manufacturers specifications and the
work order.
2. Waterproofing to the lift pit and top of the machine room slab.
3. Size of the shaft, size of the all door openings, floor levels and height of
machine room as per manufacturers requirements.
4. Cleaning of lift pit, ducts and shafts.

- 52 -
5. All material produced is as per the specifications. (Refer work order)
6. Angels and channels in the lift shaft / duct.
7. Fixing of template.
8. Scaffolding is made in the lift shaft is steardy and approved by the lift
erector.
9. Electrical cabling and light points in shaft as per manufacturer’s
requirement.
10. All the door frames (except ground floor) are fixed in the plumb line fixed
by the erector.
11. Rope hole in the bottom slab of machine room and pockets are made in
the side walls for clamping of angles.
12. Grouting of brackets and check rigidity.
13. Whitewash in the lift shaft.
14. For the machine room
a) I.P.S. flooring
b) Ventilation and Exhaust fan.
c) Shutter fixing
d) Painting of machine room.
e) Provide electrical points as per manufacturers requirement.
15. Angles (rails) fixing and roping.
16. Machine of the lift is fixed with proper bolting, grouting, and anti vibration
pads are fixed below it.
17. Flooring in the landing is done as per levels fixed previously and slope of
the flooring is away from the lift.
18. Button box holes are marked and made properly.
19. Ensure three phase meter exclusively for lift.
20. Ensure the safety arrangement as
a) Ladder for pit.
b) Weld mesh guard to the motor.
c) Weld mesh guard to the window to avoid entry of the birds.
d) All safety indicators working properly.
e) Effectiveness of electrical switches.
f) Emergency key operations.
g) Instruction plates for the usefulness of the passengers guidance.
h) Earthing done properly.
21. Ensure while the trial run of the lift that there are no jerks and sudden
stops, floor levels matching to lift level at all floors.
22. Ensure about the guarantee period and certification from P.W.D.
23. Instructions for users from manufacturer should be displayed inside lift
cabin.

- 53 -
24. Maintenances :
a) Ensure local agency for A.M.C. with full address, telephone numbers of
contractor and engineer.
b) Frequency of Maintenance.
c) Lubrication of wire ropes and guide rails.
d) Levels of machine oil.
e) Greasing to the motor.
f) Cleaning of all the equipment.
g) Adjustment in electrical circuits, leading gate locks, lift car switches etc.
h) Inspection of hoist way switches.

Records : Lift manufacturers name, address, telephone numbers.

Site representative attending the job.

Lift erection period lift handling over date.

Lift inspection report.

FIRE FIGHTING SYSTEM CL – 46

Check List :

1. The capacity of U.G.W.T. and O.H.W.T. with provision in that for fire
fighting storage.
2. Other requirement as per municipal authorities in provisional N.O.C.
3. Authorized agency for fire fighting installation work.
4. Quality of material supplied by the contractor refers work order.

- 54 -
5. Civil work like excavation, making holes to the bricks, wall, concrete and
refinishing of the same is done properly as per the requirements of
working agency.
6. Scaffolding fixed in such a way that no work in fire fighting is disturbed.
7. Testing done before inspection by Municipal authorities.
8. All G.I. / M.S. pipe line for straightness, level plumb, etc for perfect ness.
9. G.I. / M.S. line painted in red colour.
10. Check all required electrical connections are provided and are in working
condition.
11. Check that all fire extinguishers are working and installed at proper
location.
12. Fire hydrant located is easily accessible.

ROAD WORK CL – 47

Check List :
A) GENERAL :
1. Approved cross-section for road work.
2. Demarcation of road on the layout plan and type of road to be provided.
Distinguish roads, ramps, open parking areas, paving etc.
3. Preparation of longitudinal and cross-section of the existing ground level
with respect to TBM
4. Decide the layers in foundation (subgrade) and base course and wearing
surface thickness ( for bituminous road 2” and for concrete road min 4” )
5. Decide the formation level with respect to plinth of buildings and
approach road.
6. Balancing of cutting and filling area.
7. Decide the longitudinal slope, camber, super elevation etc.

B) SUB GRADE :
1. Initial ground level.
2. Excavated final ground level.
3. Murrum filling in layers and rolling by 8 to 10 ton roller.
4. Record final sub grade levels.

- 55 -
C) BASE COURSE : By Soling
1. Record initial levels laid.
2. Ensure the pipes are laid for cross-drain, electrical, drainage, water line
and any other service line.
3. Soling with stone laid on their edges and chips filled in voids properly of
minimum 9” thickness.
4. Width of soling 1’00” more than the width of road.
5. Rolling of the road by 8 to 10 ton roller.
6. Record final formation levels.
7. Soling and WBM should be completed minimum 2 months before for
concrete roads.

D) BITUMINOUS ROAD (ON BASE COURSE) :


1. Record initial levels.
2. Spreading the grit as per specification.
3. Proper slope, gradient, camber.
4. Decide grouting pattern (semi grout, full grout) and weight of bitumen per
square meter area.
5. Ensure spreading of grit when bitumen is hot. Ensure the compaction by
roling.
6. Final levels.
E) TACK COAT, CARPET AND SEAL COAT (ON BASE COURSE) :
1. Record initial levels.
2. Decide weight of bitumen / sq.m. to be used.
3. Mixing of 20 mm & 12 mm metal with bitumen.
4. Spreading the mixture in uniform thickness.
5. Rolling when mix is hot.
6. Same procedure is to be adopted for seal coat (metal size smaller ¼”)
7. Record final level.

F) CONCRETE ROAD (ON BASE COURSE) :


1. Initial level about base course.
2. Drawings showing layout of slabs panels, expansion joints, construction
joints.
3. Proper cleaning.
4. Channel thickness to match concrete thickness.
5. Grade of concrete / mix design.
6. Concreting in alternate bays. Area of each bay not to exceed 36 sq.meter.
7. Filler for expansion joints.

- 56 -
8. Needle vibrator and screed vibrator.
9. Mechanical trovelling and vacuum dewatering.
10. Broom finish.
11. Curing by ponding for minimum 10 days.
12. Filling bitumen 25 mm thick and deep in joints
13. Provision for speed breakers.

G) PAVING BLOCKS :
1. Approved drawings.
2. Levels to be decided.
3. Pattern of fixing to be decided.
4. Block fixed in proper line, level and pattern.

H) STORM WATER SYSTEM :


1. Approved drawings.
2. Ensure that the storm water drain is not connected to sewage line in any
case.
3. Ensure that no turbulence is created at junctions.
4. Periodic cleaning / Pre monsoon precautions.

Records : Consumption Statement

LANDSCAPE WORKS CL – 48

Check List :

1. Latest approved layout of total landscape works from landscape


consultant and parent architect.

- 57 -
2. For location and size of building and structures as Club House, Swimming
Pool, Tennis Court, Garden, Library Hall, Gymnasium, Other Games,
Children’s Park, Entrance Gate, Open Parking Place, Plantation refer to
approved detail drawings of landscape of landscape consultants and RCC
3. Civil construction works to be completed with reference to other check
list of construction activities.
4. Work order for specialized equipment along with, manufacturer’s
specification, catalogues.
5. Work order for horticulture contractor, his scope of work, schedule of
completion.
6. Arrangement for cutting, developing, manufacturing and watering of
plants, lawns, and shrubs area.
7. Maintainace contracts for swimming pools water purification plants play
game equipment, gymnasium equipment etc.

Records : Consumption Statement

CLEANING OF WATER TANK CL - 49

Check List :

1. Empty the water tank before starting any work.


2. Arrange scraping by wire brush on the internal wall surface of the tank.
3. Spray the liquid, bleaching with water by jet gun.
4. Clean the entire tank surface by using water twice and then ensure there
is no wash water inside.
5. Ensure there is no foreign particle inside the tank and then clear the tank
for use.
6. Ensure that the person who is cleaning the tank uses the rubber gloss
during the cleaning.
7. Enter the details of work done along with date and time in the water tank
cleaning register.
8. A.M.C. may be given to approved agency.

Records : Water tank cleaning register.

CLEANING OF DRAIN LINE CL - 50

- 58 -
Check List :

1. Ensure that the person who is cleaning the drainage line uses the rubber
gloss, mask & helmet.
2. Chamber to chamber cleaning by using steel rod.
3. Ensure that the chamber should be cleaned by wire brush & hand broom.
4. Clean the entire tank surface by using water twice and then ensure there
is no wash water inside.
5. Ensure that this procedure follows quarterly every year.
6. A.M.C. may be given to approved agency.

Records : Drain Line Cleaning register.

COLLECTION AND DISPOSAL OF


DRY GARBAGE / WET GARBAGE CL - 51

Check List :

1. For 100 kg wet garbage per day (approximately half kg / family / day),
construct 7 bins of size 8’ x 4’ x 2’6” (plastering is optional) over ground
level along suitable part of the compound wall.
2. Bins should be marked “Monday, Tuesday,…..” for efficient disposal.
3. Spread broken piece of bricks evenly at bottom of bins.
4. On the layer of bricks spread coconut fiber, dry leaves.
5. Instruct every flat owner to collect wet and dry garbage in separate bags
or buckets.
6. Ensure that the person is appointed for collecting wastage from every
house.
7. Ensure that the person collects wet and dry garbage separately.
8. Spread wet garbage inside bin (of respective day)
9. Sprinkle rock-dust on it.
10. On these layers sprinkle vermi ++ Biosanitizer (Biosanitizer is an enzyme
used to process biodegradable waste in simple and efficient manner).
11. Cover it with thin layer of garden waste.
12. Sprinkle ‘Sujala Biosanitizer’ water with a watering can evenly over entire
bins. (Packet of ‘Sujala Biosanitizer’ to be left in watering can
permanently)
13. Repeat the process in the next bin for next day.

- 59 -
14. Spread the waste wet in every day in the respective bin only, but every
day sprinkle ‘Sujala Biosanitizer’ water in all bins.
15. Ensure that the dry wastage is separate like paper and plastic for recycling
and remaining garbage dump into the PMC separate dust bin for dry
garbage.
16. Ensure that the PMC container comes and collects all the wastage and
dump into the depot everyday.
17. A.M.C. may be given to approved agency.

Records : Waste Collecting Register.

LIFT MAINTENANCE CL – 52

Check List :

1. Ensure the annual maintenance contract is done.


2. Ensure that the quarterly servicing is done for each lift.
3. Ensure that the inspection of lift machine like (oil, breaks, setting & etc) is
done time to time.

Records : Lift Maintenance Register.

WORKING AND MAINTENANCE


OF FIRE FIGHTING EQUIPMENTS CL –53

Check List :

1. Ensure that OHWT capacity 10,000 liters serve for fire fighting.

- 60 -
2. Ensure that UGWT capacity 50,000 liters serve for fire fighting if
applicable.
3. Ensure that 4” dia pipeline for each building in each one main valve & NRV
at OHWT & 3 HP with back up pump is connected to the line. Hydrant
valve with lugs for every floor to attach delivery hose & branch pipe fire
alarm system with control panel pill box & siren at ground floor.
4. Ensure that the oiling to lungs assembly, Female coupling hydrant
Spindles, Gate Valves Spindle & pump checking for inner gaskets of
hydrant valve & coupling.
5. Ensure that the Portable extinguisher for each building servicing fire
extinguisher quarterly done and yearly refilling and demonstration before
refilling.
6. Ensure that Fire Drill System is done quarterly.

Records : Fire Fighting Maintenance Register.

CLANING SWIMMING POOL CL – 54

Check List :

1. Ensure display of instructions for use to maintain hygienic condition of


swimming pool.
2. Ensure that the water sample is tested by test kit from pool for Ph &
Chlorine content. Ph = 7.6 > 7.2 & Chlorine = 2.00 > 1.5
3. Ensure that the materials for cleaning swimming pool are
Chlorine = TCC Granules, Alum = Normal – Powder or Cub’s,
Hypo (liquid chlorine) = 12 %, Cooper Sulphate = Granules.
4. Ensure that the brushing is done to bottom of pool and all impurities are
collected to deep end of pool.
5. Ensure that the trolley pump section is done & outlet is connected to
overflow trap which goes to filtration plant & all impurities are collected
in filtration plant & clean water goes to pool.
6. Ensure that the back wash is done to filtration plant & filter is cleaned.
7. Ensure that the Risen of filter is done.
Dose for cleaning : Chlorine = 250 gm per day, Alum = 1.5 to 2.0 kg per
four day, Hypo = 7 lit. Per day, C.S. = 1 kg per 15 days.

- 61 -
Records : Swimming Pool Cleaning Register.

SAFETY MEASURES AT SITE CL – 55

A) Following type of accidents may occur at site.


i. Falling down, Slipping from height.
ii. Falling of material from top.
iii. Fire
iv. Structural Collapse.
v. Electrical Shocks.
vi. Any other injuries.

B) Why accidents occur ?


i. No use of Safety tools i.e. Helmets, Safety Belts, Safety Shoes, Hand
Glows, Goggles, Safety Nets, etc
ii. Not following of safety instructions.
iii. Electricity misuse.
iv. Negligence & Ignorance in following general safety rules

C) First Aid
i. First Aid kit should be readily available.
ii. Administration of First-Aid.
iii. Information to ambulance.
iv. Shifting to nearby hospital.
v. Information to corporate office.
vi. Information to other concerned agency.
vii. Police, Fire Brigade etc

- 62 -
D) Following Corrective/Preventive Actions should be initiated by Project
In-Charge
i. Proper training for all
ii. Contractor’s / Supplier have to be properly educated about safety.
iii. Mock-Drills to be regularly conducted.
iv. E.P.R. team to be alert at all times.
v. Role of Security Supervisor is to make people use safety tools.
vi. All are informed about the importance of safety and basic safety safe
practices.
vii. Contractor’s / Supplier’s are educated about importance of safety.
viii. Fire-Fighting equipments should be available at site and should be
regularly checked.
ix. Electrical overloading or unauthorized connections should be avoided.
x. Avoid working in night time.

RAIN WATER HARVESTING CL - 56

Due to unlimited use, sub-soil water level decreased. Due to building, roads,
footpaths and concreting deposition of rain water to subsoil water is reduced.
To reinstate this water bank rain water harvesting is absolutely necessary. This
can be done by

a) Percolation Pit Method :


Constructed in the open space at required intervals
Size : 1 m x 1 m x 1.5 m
Filled with broken bricks / pebbles.
Suitable for sandy sub-soil area.
One unit for 250 sq.ft. area (approximately)

- 63 -
b) Bore Well Method :
Roof top rain. Water may also be diverted to a bore well.
A settlement / filter tank of required size to be provided.
Overflow water may be diverted to a percolation pit nearby.
Recharge through bore well is less effective than open wells.
Defunct bore wells may also be used.

c) Open Well Method :


Rain water from the terrace is diverted to the existing open well using PVC
pipes through a filter chamber.
The minimum size of filter chamber is 2’ x 2’ x 2’ filled with broken bricks
in the bottom and sand on the top.
The chamber may be covered with RCC slab

d) Recharge Well Method (Shallow / Small) :


Meant for large areas with heavy run-off

- 64 -
Size : 3’00” diameter with 5’0” – 10’0” depth.
Constructed with Brick / Concrete rings.
Side walls must be perforated.
Bottom (1’0”) is filled with brickbats.
Covered with RCC slab / manhole.
Suitable for sandy sub-soil area.

Note :
1. For area with clay / hard formations recharge wells with
diameter (5’0”) / depth (10’0” – 15’0”) has to be constructed.
2. Run-off water diverted through a filter media preferably.
3. One wall is sufficient for areas with one ground extent.
4. Rainwater from the open spaces may be diverted through mall
trenches.

e) Recharge trench with bore method :


Along the recharge trench boreholes has to be drilled.
Borehole interval, 10’0” – 15’0”
Suitable for clay area.

- 65 -
Notes :
1. Above structures are meant for area with large catchments like
Apartments / Big Complexes.
2. RCC slab cover is optional.
3. Top (1’00”) portion may be filled with sand.

f) Recharge Trench Method :


Similar to recharge pit but longitudinal in shape.
Size : 0.5 – 1.0 m wide / 1.0 – 1.5 m depth.
Length may vary from 1.0 m – 5.0 m
Filled with broken bricks / pebbles.
Suitable for sandy sub-soil area.

g) Percolation Pit with Bore Method :


A borehole is to be drilled at the bottom of the percolation pit.

- 66 -
Bore hole size 150 – 300 mm diameter with 10’0” -15’0” depth. (approx.)
Filled with broken bricks / pebbles.
Suitable for clay area.
Note :
1. Above structures are meant for
area with small catchments like
individual houses.
2. RCC slab cover is optional.
3. Top (1’00”) portion may be filled
with sand.

HANDLING, STORAGE AND PRESERVATION

A) For Cement, Lime, Sanla :


1. 6” raised platform.
2. Water tight compartment with minimum ventilation.
3. First in first out should be followed.
4. Date of receipt to be displayed to avoid storage beyond one month.
5. Maximum 10 bags should be stored in each stack.
6. Separate stock for each brand stock position and tables.

B) For Steel :
1. To be stacked on concrete block in different diameter stacks, diameter
wise stock and labels.
2. Steel yard should have proper Access / Space for Vehicles, Fitters
movement.

C) For Sand, Metal, Dust, Grit, Bricks, Concrete Blocks :


1. All above material should be stacked separately with avoiding direct
contact with soil.
2. Should be stacked systematically for easy use and minimizes wastage.

D) For Door Frames and Shutters :


1. Store in water tight compartment and lockable arrangement with firm
and leveled platform.
2. Stack the material in different sizes and not more than 10 nos in each
stack

- 67 -
3. Wooden door frames shall be applied Black Japan on top and side and
primer for inside surface.
4. Door Frame should be stacked in vertical manner and shutter in horizontal
manner.
5. Stock position, Size wise, Labels.

E) For Door Fittings, C.P. Fittings, Sanitary ware, Plumbing Material :


1. Store in Lockable arrangement and free from dampness.
2. Fittings should be store in racks in cupboards.
3. To avoid accidental breakages store in separate places.

F) For Rolling Shutter, Aluminum Window, MS Grill, MS Window, Wooden


Panels :
1. Store in water tight components with lockable arrangement.
2. Stack in such a manner to avoid bends, scratches and breakages.
3. Material wise labels
G) For Flooring Material :
1. Should be stacked on leveled floor with locking arrangement and free
from dampness.
2. Store separately, Quality Wise, Colour wise, Size wise
3. Store position and labels.

Note : All rejected materials should be kept separately with identification


tags.

Records :

1. All material inward and outward registers.


2. Identification marks as per each consignment.
3. Physical stock verification at every month end

SAMPLING PLAN
Sr. Materi Frequen Samplin Reference Remarks
N al cy g Plan / Criteria
o.
1 Cemen Every 01 bag For all Instructions
t truck for every criteria’s for use of
load 100 specific brand

- 68 -
bags. given in of cement to
Random field test. be obtained
selection Format from purchase
MT-01 dept..
2 Tor- For each 03 nos of For all If fields test
steel delivery 1 m criteria’s results are not
& every length given in satisfactory
dia of cut piece field test. send the
steel, if for each Format samples for
wt of dia of MT-02 Laboratory
each dia steel test with the
is 500 kg received. approval of
purchase
department
3 Bindin Every 01 For all ----
g Wire Delivery bundle criteria’s
given in
field test.
Format
MT-03
4 Bricks Every 03 bricks For all If supplier and
truck for every criteria’s source is same
load 1000 nos given in for more than
random field test. one truck load
selection Format in a single day,
MT–8 then sampling
from one truck
load is
enough.
5 Sand Every Sample For all If supplier and
truck from criteria’s source is same
load central given in for more than
part of field test. one truck load
the Format in a single day,
truck. MT-04 then sampling
Random from one truck
selection load is
enough.

- 69 -
6 Stone Every Sample For all If supplier &
Metal truck from criteria’s source is same
load central given in for more than
part of field test. one truck load
truck Format in a single day,
MT-05 then sampling
from one truck
load is
enough.
7 Sanla Every 01 bag For all If supplier &
delivery for every criteria’s source is same
50 bags. given in for more than
Random field test. one truck load
selection Format in a single day,
MT-09 then sampling
from one truck
load is
enough.
Sr Materi Frequen Samplin Reference Remarks
. al cy g Plan / Criteria
N
o.
8 Cerami Every 05 tiles For all As per sample
c / delivery from criteria’s approved by
Glazed / 2 each given in Purchase
Tiles boxes Random field test Department
for each selection Format
150 . MT-19
boxes
for each
brand &
for each
size.
9 Kota / Every Each For all As per sample
Kadapp Delivery Piece criteria’s approved by
a/ given in Purchase
Tandur field test. Department
/ Format
Granite MT-20
/

- 70 -
Marble
1 Mosaic Every 05 tiles For all As per sample
0 Tiles & Delivery from criteria’s approved by
Cheque every given in Purchase
red 100 field test. Department
Tiles numbers Format
. MT-18
Random
selection
.
1 M.S. Every Each As ----
1 Door Delivery Frame specified
Frame in work
order &
criteria’s
given in
field test.
1 Timber Every Each For all ----
2 / Wood Delivery member criteria’s
given in
field test.
Format
MT-21
1 Flush Every Each For each ----
3 Doors Delivery Shutter criteria
given in
field test
Format
MT-07
1 Rolling Every Each As ----
4 Shutter Delivery Shutter specified
in work
order&
criteria’s
in field
test
Format
MT-12
1 Alumin Every One As As per sample
5 um flat and piece of specified approval by

- 71 -
windo commo each in work purchase
ws & n area sectionorder & department.
doors used, criteria’s
including
given in
glass &field test.
gasket Format
MT-13
RECEIVING, INSPECTION AND TESTING :
CEMENT FT - 01

Sr. Field Test Details Required Result


No.
1 Grade and Brand 33 / 43 / 53 Grade as indented of
approved brand.
2 FRESHNESS TEST
a) Manufacturing date from Printed Week, Month and Year
the date of manufacture. Older
than 90 days should not be
used. No lump should be present.
b) Lump Test
3 FINENESS TEST
a) Feeling the fineness after Should feel silky
rubbing in the fingures.
b) When hand immersed in the Should feel hot / warm.
bag
4 FLOATING TEST Should float on water before sinking
5 TYPE OF BAG Jute / Polythene / Paper Bag
6 HANDLING & STORAGE a) Should be stacked / stored on
raised platform
b) Flooring should be damp proof
c) First in first out should be
followed.
d) Max 10 bags should be stored in
each stack
e) Receipt date of cement should be
displayed.
f) Period of storage : Ensure use
within 3 months avoid storage more
than 2 months.

- 72 -
RECEIVING, INSPECTION AND TESTING :
STEEL FT -02

Sr. Field Test Details Required Results


No.
1. TYPE OF STEEL
a) Tor Steel As indented
b) Mild Steel Tor/CTD/Round bars, J round
bars, TMT
2 COLOUR Steel Gray
3 WEIGHT PER METER LENGTH Criteria for Acceptance
a) 6 mm diameter bar
b) 8 mm diameter bar
c) 10 mm diameter bar Weight = 2% tolerance
d) 12 mm diameter bar
e) 16 mm diameter bar
f) 20 mm diameter bar
4 RUSTING SHOULD NOT BE FOUND
5 DIAMETER AS PER INDENT
6 BENDING TEST FOR HARDNESS IF IT SHOULD BEND SMOOTHLY &
FELT NECESSARY SHOULD NOT DEVELOP ANY
CRACK WHILE BENDING

RECEIVING, INSPECTION AND TESTING :


BINDING WIRE FT – 03

Sr. Field Test Details Required Results


No.
1 GUAGE OF WIRE AS INDENTED
(NORMAL GUAGE 17 S.W.G.)
2 BENDING TEST FOR HARDNESS SHOULD BE SOFT FOR TWISTING

- 73 -
RECEIVING, INSPECTION AND TESTING :
SAND (FINE AGRREGATE) FT – 04

Sr. Field Test Details Required Results


No.
1 SILT CONTENT IT SHOULD NOT BE MORE THAN 7%
BY VOLUME
2 TYPE OF SAND COARSE OR FINE
3 ORGANIC IMPURITIES SHOULD BE WITHIN LIMITS &
SHOULD BE IDENTIFIED BY
VISUALISATION (SUCH AS MIXED
QUALITY OF SHELU/SHINGLE &
OTHERS)
4 STORAGE HANDLING 1) AREA TO BE MARKED FOR
STORING TO ENABLE TRACEABILITY
AFTER CONSUMPTION
2) DIRECT CONTACT OF MATERIALS
WITH SOIL AVOIDED.
3) STORED FOR EASY ACCESS FOR
CONSUMPTION.

RECEIVING, INSPECTION AND TESTING :


STONE METAL ( COARSE AGGREGATE ) FT – 05

Sr. Field Test Details Required Result


No.
1 SHAPE ANGULAGE NOT FLACKY, HARD
2 SIZE AS PER INDENT
3 QUALITY OF STONE BLACKISH / GREY AND HARD
4 STORAGE HANDLING 1) AREA TO BE MARKED FOR
STORING TO ENABLE
TRACEABILITY AFTER
CONSUMPTION.
2) DIRECT CONTACT OF
MATERIALS WITH SOIL AVOIDED

- 74 -
3) STORED FOR EASY ACCESS FOR
CONSUMPTION.

RECEIVING, INSPECTION & TESTING :


MURRUM FT – 06

Sr. Field Test Details Required Result


No.
1 QUALITY IT SHOULD NOT GET MUDDY
2 SIZE SHOULD BE ACCEPTABLE
3 HARDNESS PARTICLE SHOULD BE HARD
ENOUGH

RECEIVING, INSPECTION & TESTING :


FLUSH DOOR FT – 07

Sr. Field Test Details Required Result


No.
1 TYPE SOLID CORE / BOILING WATER-
PROOF
2 BONDING MATERIAL PHENOL BONDED
3 DEFECTS FREE FROM BEND, TWISTING &
WARPING
4 EDGES SHOULD BE SHARP, STRAIGHT AND
NO DAMAGES IN TOP LAYER
5 STIRAGE AND HANDLING 1) FLOOR TO BE DAMP PROOF
2) SHOULD BE PLACED
HORIZONTALLY
3) ROOF SHOULD BE LEAK PROOF
4) STORED IN LOCKABLE
ARRANGEMENT

- 75 -
RECEIVING, INSPECTION & TESTING :
BRICKS FT – 08

Sr. Field Test Details Required Result


No.
1 COLOUR REDDISH AND UNIFORM
2 SIZE & MARK AS PER REQUIREMENT
1) ORDINARY BRICK 225 X 100 X 80 MM TOLERANCE
2) THOKLA / GATTU BRICK 5MM
225 X 150 X 100 MM TOLERANCE
5MM
3 FROG SHOULD NOT BE LESS THAN 1 CM &
SHOULD NOT BE MORE THAN 2 CM
4 WATER ABSORPTION SHOULD BE BETWEEN 25 % TO 30 % BT
WEIGHT
5 SOUNDNESS SHOULD GIVE CLEAR METTALIC
SOUND
6 OVERBURNT BRICKS SHOULD NOT BE MORE THAN 5 %
7 BROKEN BRICKS SHOULD NOT BE MORE THAN 5 %
8 STRENGHT SHOULD NOT BREAK WHEN THROWN
TO THEIR FLAT FACE FROM A HEIGHT
OF 60 CM (24”)
9 STORAGE & HANDLING 1) AREA TO BE MARKED FOR EASY
TRACEABILITY AFTER CONSUMPTION
2) BRICKS SHOULD NOT BE THROWN
3) STACKED FOR EASY COUNTING
4) GROUND TO BE FAIRLY LEVELLED
5) STACKING SHALL BE DONE IN SUCH
A PLACE WHERE DEBRIS, SCRAP,
THROWN FROM THE BUILDING DOES
NOT FALL ON THE STACK.

RECEIVING, INSPECTION & TESTING :


INSTANT SANLA FT – 09

Sr. Field Test Results Required Results


No.

- 76 -
1 COLOUR EVEN & UNIFORM (PINKISH OR
WHITE), BRAND AS PER ORDER
2 STRENGTH IT SHOULD HARDEN WITHIN 12
HOURS AFTER APPLICATION ON
WALLS.
3 CONSISTENCY IT SHOULD BE CONSISTENT & CAN
BE JUDGE BY VISUAL
OBSERVATION.
4 FRESHNESS NO LUMPS SHOULD BE OBSERVED
5 WEIGHT OF BAG AS PER ORDER
6 STORAGE / HANDLING 1) SHOULD BE STORED ON RAISED
PLATFORM
2) ROOFS & FLOORING SHOULD BE
WATERPROOF
3) STACKED IN LOCKABLE
ARRANGEMENT

RECEIVING, INSPECTION & TESTING :


M.S. WINDOWS FT – 10

Sr. Field Test Results Required Results


No.
1 A) CHECK FOR SECTION TRADE MARK EMBOSSED ON SECTION
AT EVERY LENGTH @ 12 / 18 METER.
AHEMDABAD SECTION’S STANDARD
B) WEIGHT OF SECTION WEIGHTS
2 ACCESSRIES PROVIDED AS PER ORDER
3 CHECK WINDOW FOR BOTH DIAGONALS SHOULD BE SAME &
DIAGONAL SIZE / PLUMB CORRECT.
4 CHECK RED OXIDE & RED OXIDE SHOULD BE UNIFORM
WELDING OVERALL OVER WELD PORTION TO BE GRINDED.
FINISHING QUALITY
5 OPENING OF SHUTTERS / AS PER ORDER
LOUVERS
6 LOCKING SYSTEM TOWER AS PER ORDER
BOLTS
7 HINGES BOX TYPE, SMOOTH WORKING
8 STORAGE / HANDLING 1) STACKED AT AN ANGLE TO THE
WALL

- 77 -
2) FLOOR & ROOF TO BE LEAK PROOF
TO AVOID RUSTING
3) TO BE LOCKED WITH M.S. CHAIN
4) STAYS AND HANDLES TO BE STORED
SEPERATELY.

RECEIVING, INSPECTION & TESTING :


GLASS FIXING FT - 11

Sr. Field Test Details Required Results


No.
1 CHECK OVERALL SIZE, AS PER ORDER
THICKNESS & TYPE OF GLASS
2 CHECK FOR WAVYNESS, SHOULD BE FREE FROM ALL DEFECTS
CRACKS, CAVITY
3 CHECK FOR STRAIGHTNESS & SHOULD BE PERFECT
RIGHT ANGLES
4 SCRATCHES NO SCRATCHES
5 CHECK FOR OVERALL FIXING SHOULD BE RIGID AND WELL PACKED
WORK ALLROUND
6 CHECK FOR PUTTI / GLAZING AS PER ORDER / UNIFORM FIXING OF
CLIP CLIP AT REQUIRED SPACING
7 TOLERANCE FOR THICKNESS =1%
BETWEEN 4 MM TO 7 MM
THICK GLASS SHEET

RECEIVING, INSPECTION & TESTING :


ROLLING SHUTTERS FT – 12

Sr. Field Test Details Required Results


No.

- 78 -
1 TYPE OF SHUTTER PULL AND PUSH TYPE / GEAR TYPE
2 GUAGE OF BOTTOM LOCK PLATE & AS PER ORDER
LOCKING ARRANGEMENT
3 TYPE OF SECTION USED FOR LATHS 18/20 GUAGE OR SHOULD BE AS
WITH GUAGE PER ORDER.
4 CHECK SHUTTER LATHS IN 30 CMS 4 TO 4 ½ NUMBERS
LENGTHS
5 TOP COVER IN ONE PIECE WITH IN ONE PIECE OF 20/22 GUAGE
CENTRALLY SUPPORTED PLATE &
ITS GUAGE
6 BALL BEARING & SPRING CHECK FOR SMOOTH OPERATION
7 M.S. PIPE SHAFT DIAMETER MINIMUM 40 MM
8 BRACKET PLATES & GUIDE RAIL AS PER ORDER
9 STOPPER ON EACH SIDE AS PER ORDER
10 HANDLE 2 NOS RIVETTED OR AS PER
ORDER
11 HOLD FAST AT EQUAL DISTANCE 30 CM IN LENGTH & 3 NOS ON
EACH SIDE OR AS PER ORDER
12 RED OXIDE UNIFORM ON COAT
13 EXTRA LOCIKING ARRANGEMENT 1 NO IN CENTER AS PER ORDER
14 OVERALL FINISHNG / FIXING SHOULD BE GOOD LOCKING
OPERATION
15 GREASING FOR SPRINGS AND SUFFICIENT FOR EASY AND
GUIDE SMOOTH OPERATION

RECEIVING, INSPECTION & TESTING :


ALUMINUM WINDOWS FT – 13

Sr. Field Test Details Required Result


No.
1 SIZE AS PER DRAWING / INDENT
2 DIAGONAL AND PLUMB SHOULD BE PERFECT
3 SECTION / ACCESSORIES USED AS PER ORDER
FOR TRACK, SHUTTER, INTER
LOCKING ETC
4 ASSEMBLY SHOULD BE PROPER WITH SCREW

- 79 -
5 CHECK FOR ACCESSORY AS PER ORDER
POSITION & RUBBER / PVC
PACKING FOR GLASS
6 CHECK FOR QUALITY OF GLASS AS PER ORDER
7 ANNODISING / COLOUR OF AS PER ORDER
POWDER COATING
8 MAKE ALUNIMUM SECTION AS PER ORDER
USED
9 SLIDING OF GLASS PANELS ON ROLLERS & SMOOTH
10 SCRATCHES / BENDS / CRACKS IF FREE FROM ALL DEFECTS
ANY
11 PROVISION OF FLY PROOF AS PER ORDER
SHUTTER
12 PROVISION OF DRAIN HOLES IN ENSURE NO STAGNATION OF
WINDOW BOTTOM CHANNEL WATER
13 STORAGE / HANDLING 1) STACKED PROPERLY
2) FREE FRO DAMPNESS &
LEAKAGES
3) STORE IN LOCKABLE AREA
4) IN COUNTABLE POSITION

RECEIVING, INSPECTION & TESTING :


PLUMBING G.I. PIPES & FITTINGS FT – 14

Sr. Field Test Details Required Results


No.
1 CLASS SEE COLOUR BAND FOR B OR C CLASS
– REFER ORDER
2 DEFECTS FREE FROM ANY CRACKS
3 LENGTH & SIZE STANDARD LENGTH & DIA.
4 PIPE DIA. & WEIGHT AS PER CLASS OF PIPE
5 PIPE FITTINGS ALL ISI MARKS
6 STORAGE & HANDLING G.I. PIPES :
1) STORED IN STEEL RACK DIAWISE /
CLASSWISE
2) THREADED ENDS OF GI PIPES TO BE
PROPERLY PROTECTED.
3) TO BE STACKED IN COUNTABLE
POSITION
G.I. PIPES FITTINGS :

- 80 -
STORED IN WOODEN RACKS.
(PIGEON HOLE TYPE DIAMETERWISE,
PROPERLY CLASSIFIED LIKE ELBOW,
TEE, ETC)
RECEIVING, INSPECTION & TESTING :
PLUMBING C.I PIPES & FITTINGS FT – 15

Sr. Field Test Details Required Results


No.
1 CLASS SEE IS 1230-1979 MARK FOR RW PIPE
& IS 1729-1979 MARK FOR SOIL PIPE.
2 DEFECTS FROM INSIDE PIN HOLES / ROUGH SURFACE
3 PIPE FITTINGS VERY SMOOTH SURFACE FROM INSIDE
/ CHECK MATCHING WITH PIPES.
4 LENGTH & SIZE REFER ORDER STANDARD LENGTHS & DIA.
5 STORAGE & HANDLING STORED IN STACKS HORIZONTALLY,
DIAWISE SEPERATELY ON WOODEN
MEMBERS.
RECEIVING, INSPECTION & TESTING :
PLUMBING PVC PIPES & FITTING FT – 16

Sr. Field Test Details Required Results


No.
1 CLASS MEDIUM (FOR PRESSURE 4 KG PER
SQ.M.)
HEAVY (FOR PRESSURE 6 KG PER
SQ.M.)
2 DEFECTS SHOULD BE FREE FROM CRACKS,
BEND, PIN HOLES
3 PIPE FITTINGS VERY SMOOTH SURFACE FROM
INSIDE.
NO BUR FROM INSIDE.
CHECK JOINTING SYSTEM FOR USING
LUBRICANT, RUBBER RING &
SOLUTION.
4 LENGTH & SIZE STANDARD LENGTHS & DIA
REFER ORDER
5 STORAGE & HANDLING STORED IN PIGEON HOLE RACKS,
DIAWISE, HORIZONTALLY WITH TAGS

- 81 -
FITTINGS, LUBRICANTS, RUBBER RINGS
/ SOLUTION VERY CAREFULLY
RECEIVING, INSPECTION & TESTING :
HUME PIPES FT – 17

Sr. Field Test Results Required Results


No.
1 LENGTH & SIZE LENGTH & DIA AS PER ORDER
2 TYPE SPIGGOT END / COLLERED
JOINT AS PER ORDER
3 CLASS PRESSURE P1 / P2 ETC OR NON
PRESSURE NP2 CLASS FOR
CLASS PIPES GRAVITY FLOW WE USE NP2
4 DEFECTS SHAPE – NOT EXACTLY
CIRCULAR NO RINGING SOUND
WHEN STUCK WITH LIGHT
HAMMER CHECK DAMAGED
ENDS & HOLES ON SURFACE.
5 STORAGE & HANDLING DIAWISE SEPERATELY ON
WOODEN SLEEPERS
HORIZONTALLY.
AVOID ENDS ABUTTING EACH
OTHER.

RECEIVING, INSPECTION & TESTING :


MOSAIC TILES FT – 18

Sr. Field Test Result Required Result


No.
1 SIZE 25 CM X 25 CM (10” x 10”) 20
MM THK.
30 CM X 30 CM (12” x 12”) 25
MM THK.
2 COLOUR GRAY / WHITE
3 NO. OF CHIPS & ITS 0 TO 5 NOS SIZE OF CHIPS OR
PROPORTION AS PER ORDER.
4 DIAGONAL OF TILE BOTH DIAGONAL SHOULD BE
PERFECT
5 TOP LAYER THICKNESS NOT LESS THAN 6 MM

- 82 -
6 WATER ABSORPTION LESS THAN 10 %
7 TOP SURFACE & SHOULD BE SMOOTH WITH
SHARPNESS OF EDGES SHARP EDGES
8 CRACKS, CAVITIES IN THE SHOULD BE FREE FROM ALL
TILE DEFECTS
9 STORAGE / HANDLING 1) STORED AGAINST THE WALL
AT ANGLE.
2) LOT WISE STORING IS
MAINTAINED
3) TO BE STACKED IN COVERED
AREA & NOT EXPOSED TO SUN
4) STACKED PERIOD SHALL BE
MINIMUM
5) ARRANGED COLOURWISE
6) FLOOR SHALL BE FREE FROM
DAMPNESS

RECEIVING, INSPECTION & TESTING :


CERAMIC / GLAZED TILES FT – 19

Sr. Field Test Details Required Results


No.
1 SIZE, COLOUR, QUALITY AS PER ORDER
2 DIAGONAL OF TILE BOTH DIAGONAL SHOULD BE PERFECT
3 EDGES / RIGHT ANGLES SHOULD BE CORRECT & PERFECT
4 EVENESS OF TOP LAYER SHOULD BE SMOOTH & EVEN
5 STRAIGHTNESS OF TILES SHOULD BE STRAIGHT
6 CRACKS / CAVITIES, HOLES TOP LAYER SHOULD BE FREE FROM
ANY DEFECTS
7 CORNERS SHOULD BE STRAIGHT & NOT
BRACKEN
8 THICKNESS NOT LESS THAN 5 MM
9 TOP FINISHING & GLAZE UNIFORM & GOOD
10 STORAGE / HANDLING 1) STACKING DONE LOTWISE,
COLOURWISE & SIZE WISE
2) FLOOR TO BE IN LEVEL

- 83 -
3) 1ST / PREMIUM & 2ND /
COMMERCIAL QUALITY SHALL BE
STACKED SEPERATELY.
4) STORED WITH LOCKING
ARRANGEMENTS
5) FLOOR SHALL BE FREE FROM
DAMPNESS

RECEIVING, INSPECTION & TESTING :


GRANITE/MARBLE/KOTAH/TANDOOR STONES FT – 20

Sr. Field Test Results Required Results


No.
1 SIZE, COLOUR, QUALITY SHOULD BE UNIFORM
COLOUR, SIZE AS PER ORDER,
SOUND & TOUGH
2 CHECK FOR POLISHING ONE FACE SHOULD BE
QUALITY & CUTTING POLISHED WITH FOUR SIDE
MACHINE CUT, REFER ORDER
3 EDGES / DIAGONAL EDGES SHOULD BE STRAIGHT
& AT RIGHT ANGLES TO EACH
OTHER & DIAGONAL SHOULD
BE PERFECT
4 PERFORMANCE OF TOP SHOULD BE FREE FROM
LAYER CRACKS
5 STAIGHTNESS OF TILES SHOULD BE STRAIGHT
6 THICKNESS UNIFORM THICKNESS AS PER
ORDER
7 STORAGE / HANDLING 1) FLOOR TO BE IN LEVEL
2) LOTWISE VERTICAL
STACKING TO BE DONE.

RECEIVING, INSPECTION & TESTING :


WOOD/TIMBER/PLYWOOD/BLOCK BOARD/LAMINATE FT–21

- 84 -
Sr. Field Test Details Required Results
No.
1 TYPE OF WOOD REFER ORDER
2 WETNESS & SEASONING
AIR DRY & SEASINED WOOD
3 TEXTURE UNIFORM
4 FREE FROM SPOTS SAPWOOD / OPEN SHAKES
SPONGY HOLLOW CRACKS
5 AREA OF KNOTS OF SHOULD NOT BE MORE THAN
SURFACE AREA 15 %
6 GRAINS PARALLEL & NATURAL

RECEIVING, INSPECTION & TESTING :


SHINGLE FT – 22

Sr. Field Test Results Required Results


No.
1 SIZE OF PARTICLES 100 % PASSING THROUGH 20
MM SIEVE
PASSING THROUGH 10 MM
SHOULD BE MORE THAN 80 %
PASSING THROUGH 4.75 MM
SHOULD NOT BE MORE THAN 30
%
PASSING THROUGH 2.36 MM
SHOULD NOT BE MORE THAN 10
%
2 IMPURITIES SHOULD NOT CONTAIN MUD
LUMPS CALCIUM, SHELLS
3 STORAGE SEPARATE CLEAN AREA
AVOID DIRECT CONTACT WITH
SOIL

RECEIVING, INSPECTION & TESTING :

- 85 -
STONE DUST FT – 23

Sr. Field Test Details Required Results


No.
1 SIZE OF PARTICLES PASSING THROUGH 4.75 MM & 2.36
MM SIEVE – 100 %
PASSING THROUGH 600 MICRON NOT
MORE THAN 60 %
PASSING THROUGH 150 MICRON NOT
MORE THAN 20 %
2 IMPURITIES SHOULD NOT CONTAIN FLACKY
PARTICLES
3 STORAGE SEPARATE CLEAN AREA.
AVOID DIRECT CONTACT WITH SOIL

RECEIVING, INSPECTION & TESTING :


CRUSHED SAND FT – 24

Sr. Field Test Details Required Results


No.
1 SIZE OF PARTICLES STANDARD GRADATION PASSING
THROUGH 150 MICRON NOT MORE
THAN 20 %
PASSING THROUGH 75 MICRON NOT
MORE THAN 15 %
2 IMPURITIES SHOULD NOT CONTAIN FLACKY
PARTICLES
3 STORAGE SEPARATE CLEAN AREA.
AVOID DIRECT CONTACT WITH SOIL

RECEIVING, INSPECTION & TESTING :


FLY ASH FT – 25

Sr. Field Test Details Required Results


No.

- 86 -
1 SIZE AND PARTICLES PASSING THROUGH 75 MICRON 90 %
RETAINED ON 75 MICRON NOT MORE
THAN 10 %
2 IMPURITIES SOURCE FROM STAGE 4 OR ABOVE
FROM THERMAL PLANT
3 STORAGE SEPERATE CLEAN AREA
AVOID DIRECT CONTACT WITH SOIL.

RECEIVING, INSPECTION AND TESTING :


FLY ASH BRICKS FT – 26

Sr. Field Test Details Required Result


No.
1 COLOUR UNIFORM
2 SIZE & MARK AS PER REQUIREMENT
1) ORDINARY BRICK 230 X 100 X 80 MM TOLERANCE
5MM
2) THOKLA / GATTU BRICK 230 X 150 X 100 MM TOLERANCE
5MM
3 FROG SHOULD NOT BE LESS THAN 1 CM &
SHOULD NOT BE MORE THAN 2 CM
4 WATER ABSORPTION SHOULD BE BETWEEN 15 % TO 20 % BT
WEIGHT
5 BROKEN BRICKS SHOULD NOT BE MORE THAN 1-2 %
6 STRENGHT SHOULD NOT BREAK WHEN THROWN
TO THEIR FLAT FACE FROM A HEIGHT
OF 60 CM (24”)
ABOUT 12.5 N / MM2 AT 28 DAYS.
7 STORAGE & HANDLING 1) AREA TO BE MARKED FOR EASY
TRACEABILITY AFTER CONSUMPTION
2) BRICKS SHOULD NOT BE THROWN
3) STACKED FOR EASY COUNTING
4) GROUND TO BE FAIRLY LEVELLED.
5) STACKING SHALL BE DONE IN SUCH
A PLACE WHERE DEBRIS, SCRAP,

- 87 -
THROWN FROM THE BUILDING DOES
NOT FALL ON THE STACK.

RECEIVING, INSPECTION AND TESTING :


CITADEL BLOCKS FT – 27

Sr. Field Test Details Required Result


No.
1 COLOUR GREYISH WHITE
2 SIZE & MARK AS PER REQUIREMENT
625 X 250 X 100 -300 MM
(25 MM INCREMENT)
TOLERANCE +/- 1.5 MM
3 FROG NOT REQUIRED
4 BROKEN BRICKS SHOULD NOT BE MORE THAN 1-2 %
5 STRENGTH SHOULD NOT BREAK WHEN THROWN
TO THEIR FLAT FACE FROM A HEIGHT
OF 60 CM (24”)
ABOUT 35.0-40.0 KG / CM2
6 STORAGE & HANDLING 1) AREA TO BE MARKED FOR EASY
TRACEABILITY AFTER CONSUMPTION
2) GROUND TO BE PERFECTLY
LEVELLED.
3) STACKING SHALL BE DONE IN SUCH
A PLACE WHERE DEBRIS, SCRAP,
THROWN FROM THE BUILDING DOES
NOT FALL ON THE STACK.
4) SHOULD BE PROTECTED AGAINST
RAIN FALL / SNOW FALL.

RECEIVING, INSPECTION AND TESTING :


CPVC PIPES FT - 28

Sr. Field Test Details Required Result


No.

- 88 -
1 SIZE DIAMETER OF PIPES & FITTINGS
AS PER ORDER.
2 DEFECTS SHOULD BE FREE FROM
CRACKS, BEND, PIN HOLES
3 PIPE FITTINGS SHOULD BE SMOOTH FROM
INSIDE.
CHECK FOR JOINING SYSTEM
AND JOINING MATERIAL
RECEIVED
4 STORAGE & HANDLING SHOULD BE STORED IN A RACK,
DIAMETER-WISE.
FITTINGS TO BE STORED
DIAMETERWISE AND TYPEWISE
SEPEARTELY.
ALL MATERIALS TO BE
PROPERLY TAGGED.

RECEIVING, INSPECTION AND TESTING :


R.C.C. DOOR FRAMES MT – 29

Sr. Field Test Details Required Result


No.
1 APPEARANCE ON UNPACKING NO CRACKS
SHOULD BE FOUND AND ALL
EDGES INTACT.
ALSO CHECK NUT BOLTS FOR
HOLD FAST FIXING.
2 SIZE AND SHAPE WIDTH AND HEIGHT OF DOOR
FRAME AS PER ORDER.
CROSS SECTION AS PER ORDER
ON ASSEMBLY ALL SIDES
SHOULD BE AT RIGHT ANGLES
TO EACH OTHER.

- 89 -
3 FIXING ARRANGEMENT ARRANGEMENT FOR FIXING
HINGES, HOLDFAST AND
LOCKING ARRANGMENTS FOR
ALL DOOR FITTINGS AS PER
REQUIREMENTS
4 STORAGE / HANDLING TO BE STORED CAREFULLY ON
LEVELLED GROUND, SEPERATE
AS PER SIZE.
TO BE STORED WITH LOCKING
ARRANGEMENT

DUROCRETE MIX DESIGN MANUAL

What is Mix Design ?


Like any structural member concrete needs to be designed for strength and
workability. Mix design consists of determining relative quantities of cement
sand, metal, water to achieve the desired strength & workability.

Advantages of Mix Design


1. Mix design aims to achieve good quality concrete at site economically,
quality concrete means.
Better Strength
Better Durability
Dens & Homogeneous Concrete
2. Economy in Cement Consumption :
It is possible to save upto 15 % of cement for M20 grade of concrete with
the help of concrete mix design. Savings in cement consumption increases
with the grade of concrete. Lower cement content also results in lower
heat of hydration & reduces shrinkage cracks.

Design Variables in Mix Design :


A. Water Cement Ratio
B. Cement Content
C. Proportion of Fine & Coarse aggregate.
D. Use of Admixtures.

Water Cement Ratio

- 90 -
Water cement ratio (W/C ratio) is the single most important factor governing
the strength of concrete. Strength of concrete depends upon W/C ratio rather
than the cement content. Higher the water cement ratio lower is the strength
of concrete. As a thumb rule every 1 % increases in quantity of water added
reduces the strength of concrete by 5 %. A water cement ratio of only 0.38 is
required for complete hydration of cement. Water added for workability over &
above this water cement ratio of 0.38 evaporates leaving cavities in the
concrete. They reduces the strength and durability of concrete. Hence it is very
important to control the water cement ratioon site.

Cement Content
Cement is the core material in concrete which acts as a binding agent and
imparts strength to the concrete. From durability considerations cement
content should not be reduced below 290 kgs / m3 considering moderate
conditions of exposure. IS 456 recommends higher cement contents for more
severe conditions of exposure of weathering agents to the concrete. It is not
necessary that higher cement content would result in higher strength. Higher
cement content helps us in getting the desired workability at a lower water
cement ratio.

Gradation of Aggregates : Are two types


A. Coarse aggregates (Metal) : These are particles retained on standard IS
4.75 mm sieve.
B. Fine Aggregate (Metal) : These are particles passing through IS 4.75 mm
sieve.

Proportion of fine aggregate to coarse aggregate is decided with the help of the
gradation curves.
The coarse aggregate of 20 mm & 10 mm are generally used for concreting. 20
mm coarse aggregate is defined as the one, which passes through 20 mm sieve
and is retained on 10 mm sieve. While 10 mm metal should pass the 10 mm IS
sieve and should be retained on 4.75 mm sieve. Some common problems to
metal available in Pune are as follows :
1. The metal has considerable proportion of over-size aggregates varying
from 20 mm to 40 mm size.
Generally when the sand is fine, smaller proportion of it is enough to get a
cohesive mix, while coarser the sand, greater has to be its proportion in the
concrete.

- 91 -
Excess sand increases the water requirement of concrete & reduces the
strength, while under – sandy mix results in segregation and honey combed
concrete.
Generally sand available in Pune is very coarse (FM > 3.2) and needs to be
blended with fine particles (like stone dust) to get a cohesive mix.

Use of Admixtures
Now a day’s admixtures are rightly considered as a fourth ingredient of concrete.
Use of plasticizers is essential to control the water cement ratio on site.
Plasticizers help us in increasing the workability of concrete at lower water
cement ratio. Hence we can achieve much higher strength at the same cement
content. Use of plasticizers is economical as the cost incurred on them is less
than the cost of cement saved. This is made possible by mix design.

IMPLEMENTATION OF MIX DESIGN ON SITE


Items necessary on site for Mix Design.
1. Set of 12 cube moulds.
2. A slump cone, tamping rod, and a scale.
3. Weighing balance of 5 kg with accuracy of 2 gms.
4. Spring balance of 50 kgs
5. Buckets of known capability for addition of water preferably 5 to 7 liters
in capacity
6. 250 ml measuring cylinder.
7. Forms of various sizes.

Capacity in Liters Nos L B H Size (in cms)


35 1 40 * 25 * 35
30 1 40 * 25 * 30
25 2 40 * 25 * 25
20 1 40 * 25 * 20
15 1 40 * 25 * 15
10 2 40 * 25 * 10

B. Measuring pan & Stove for heating the sand.

3. IMPORTANT FOR IMPLEMENTATION OF MIX DESIGN

- 92 -
1. Cement brands to be used should be standardized in advance.
2. Make regular corrections on the proportions of mix design for
a) Moisture in sand
b) Absorption by metal
c) Bulk density of sand
d) Changes in fineness of sand
3. Regularly check the weight of cement bags.
4. The water cement ratio on the site should be strictly controlled. The water
cement ratio can be controlled by maintaining the slump as per the design
specifications.
5. The slump readings should be taken after every 25 bags of concreting. The
slump readings should be specially taken for the batches from which cube
casting is done.
6. Cement bags to be used should not be older than one month. Cement
used should not have lumps and should give a cool feel on hand.
7. Extremely coarse sand or silty sand should not be used.

Note :If any of the above conditions are not satisfied a trial mix should be
conducted at laboratory to determine fresh proportions.

4. STANDARD CORRECTIONS FOR IMPLEMENTING MIX DESIGN

3.1 Corrections for surface moisture in sand.


Sand contains some fraction of water as surface moisture. This moisture
affects he water cement ratio of concrete. Water cement ratio takes into
account the total water available for hydration of cement.

Water cement ratio = (water added per batch + Surface moisture in sand
– absorption of coarse aggregate) / 50

Finding surface moisture of sand


Take 500 gms of sand & hat it in tray gently till sand is dry and starts
flowing freely. Surface dry sand is weighed again to find the loss in weight.
Surface Moisture = W / (500 - w)

Note : It is important not to over heat the sand

- 93 -
To get a rough estimate of surface moisture following thumb rule may be
used when sand is not extremely wet.

Moisture in Sand Bulkage


Medium Sand Coarse Sand
1% 8% 6%
2% 16 % 12 %
3% 22 % 15 %
4% 27 % 17 %
5% 29 % 18 %

Water to be added per batch = (water cement ratio * 50) – Surface


moisture * wt. of sand per batch
If moisture content = 4 %
Wt of sand = 135 kgs
Water-cement ratio = 0.55
Water to be added per batch = 0.55 * 50 – 4 % * 135
= 27.5 – 5.4
= 22.11 liters
Weight of sand per batch should be increased correspondingly by wt. of
surface moisture in sand e.g. 5.4 kgs
Moisture content in sand will vary from day to day and also with different
lots of sand. It is therefore very important to make corrections for
moisture in sand to maintain w/c ratio. If slump on site is kept under
control, the water cement ratio is automatically controlled.
FINDING AGGREGATE ABSORPTION :
For any mix design, the coarse aggregate is considered to be in saturated
surface dry condition. Whereas the metal on sites is often in bone dry
condition (especially in summers). This dry aggregate often absorbs the
water added in concrete & reduces the workability of concrete.
Correction for surface absorption is necessary to maintain the water
cement ratio. A correction of 1 % to 2 % of coarse aggregate may be made

- 94 -
in case of bone dry condition of aggregate. For example if the aggregate
absorption is 2 % and water and total weight of aggregates is 180 kgs then
Aggregate absorption = 0.02 * 180
= 3.6 liters.
Hence quantity of water added (from previous example) = 22.1 + 3.6
= 25.7

CORRECTION FOR BULK DENSITY :


Every mix design is always done considering weights of different
ingredients. In case volume batching is done on site, the weights of
aggregates need to be converted into volumes. This is done with the help
of bulk densities of aggregates.
Bulk density = weight of material in kgs
-----------------------------
volume in liters
Bulk density can be measured on site by filling a standard 35 liters pharma
with aggregate & weighing the aggregate filled in the form.
e.g. wt. of sand in 35 liters pharma = 58 kgs
Bulk density = 58 / 35 = 1.66 kgs / liters.
Volume of sand per batch = wt. of aggregate per batch
------------------------------
Bulk density

VOLUME BATCHING
For example, if weight of sand per batch = 135 kgs.
Volume of sand = 135 / 1.66 = 81.3 liters, say 80 liters.
Hence use 2 forms of 25 liters & one form of 30 liters. Bulk density of sand
changes with bulkage. Hence correction for bulk density of sand should
be made every day.
Bulk density of metal is between 1.4 kg / lit to 1.5 kg / lit whereas bulk
density of sand varies with bulkage and usually lies between 1.6 to 1.8 kg
/ lit.

CORRECTION FOR BULKAGE :


This is done in case of volume batching of concrete. When sand is moist it
bulks i.e. it occupies greater volume. Hence, less weight of sand is taken
in the given volume. In other words, the bulk density of sand changes. If
correction of bulk density is done. Otherwise, volume of sand needs to be
increased in proportion of bulkage.

- 95 -
Measuring bulkage on site
Take 100 mls of sand in 250 ml. Baker and add water so as to completely
submerge the sand. Shake the beaker well and keep it steady for some
time. Note the level to which it settles.
Bulkage % = Original Level - New Level * 100
------------------------------------------
New Level

CHECK THE SILT CONTENT :


Excessive silt in sand affects the bond between cement and sand. This
reduces the strength of concrete. This problem is quite severe during
monsoon.
Measuring silt content on site.
Take 50 ml of water in 250 ml beaker and add some salt to it. Add sand to
it till 100 ml mark is reached. Again add water up to 150 ml. Stir the sand
well to wash it in salt water. Keep the beaker still for 3 hours. Observe the
thickness of silt layer.
Silt content = Height of Silt Layer (ml) * 100
------------------------------------
Height of Sand
Sand with silt content greater than 7 % calculated by above method
should not be used for concreting.

CORRECTIONS FOR CHANGES IN GRADATION OF SAND :


Sand shows lot of variation on sites because of changes in source of
supply. The fineness module of sand in Pune varies from 3.2 to 3.8. The IS
specifies a limit of 2.2 (fine sand) to 33.2 (coarse sand) for fine aggregate.
This means that sand available in Pune is extremely coarse. This is partly
because of absence of fines in the sand and 10 % to 15 % is retained on
4.75 mm sieve as chal or shingle present in the sand. Hence, in case of
extremely coarse sand, use of stone dust up to liters is recommended. If
sand available on site is coarser than the one used for mix design,
following correction may be made.

A. WEIGHT BATCHING
i. Increase in the weight of sand up to 15 kgs and reduce the weight of
metal by equal quantity. Total weight of aggregate going per batch
should remain constant.
ii. If the mix does not improve with above correction, replace up to 15

- 96 -
kgs of sand by dust in the weights mentioned in the design.

B. VOLUME BATCHING
i. Increase the volume of sand by 10 liters and reduce volume of metal
by 10 lit.
ii. If the mix does not improve with above correction replace 10 liters of
sand in mix design proportion by 10 lits of dust.

Following precautions should be taken when stone dust is to use.

 Stone dust should not be too fine or powdery ( FM should be


between 2.0 to 2.5 )
 It should be used used in limited quantity as mentioned above
unless, higher quantity is recommended by the laboratory.
 Strict control on water cement ratio should be kept. Stone dust
reduces the workability; hence the water cement ratio is likely to
increase. The slump may be maintained 2 cms below the value
given in the mix design.

Note : If above corrections in the proportion do not yield satisfactory mix,


fresh trial should be conducted at the laboratory for a revised mix design.

DUROCRETE
Engineering Services Pvt. Ltd.
1160 / 5, Shivaji Nagar, Gharpure Colony, Pune – 411 005
Telefax - 25520456, 25534335
Date : 29 Jan. 2005
MIX DESIGN SHEET
Name :
Purpose of Experiment : Mix design for M15 grade of concrete
Site :
Brand of Cement : Ultratech 43 Grade.

PROPOSED MIX PROPORTIONS :

CEMENT FLY ASH CRUSHED 20 MM WATER ADMIXTURES


SAND

- 97 -
By Wt. 50 9 183 224 33.04 ---- ml
(Kg)
Wt. in 255 45 869 1151 174.90 ---- ml
Kg / m3

Water Cement Ratio = 0.56 Total Cementetious Material 300 kg/m3


Cement Used = Ultratech 43 Grade (W-47, M-11, Y-04)
Fly Ash used = Pozzocem 63 TM
* Slump not to exceed 50 mm
Observations of Laboratory Trial :
Plastic Density = 2547 kg / m3
Compaction factor = 0.94
Average 28 days Compressive strength = 27.39 N/mm2

* Corrections for moisture content in sand & aggregate absorption in


metal should be made on water / cement ratio (Refer our mix design
manual)
* Any change in material like cement, plasticizer, sand or aggregate
would require re-validation of design.
* The volumetric proportion are rounded of to nearest 5 liters,
however, in case of volume batching, weight to volume conversion should
be done on the basis of Dry Loose Bulk Density of ingredients actually
found out at site.
* The above mix design requires certain control practices on site to
ensure results.

Target Mean Strength = fck N / mm2 + (K x Std. Deviation)


K = Himsworth Constant which is 1.65 for 5 % results to fall below the
characteristic strength.
Standard Deviation Assumed = 3.5 N / mm2 (As per IS 456 – 2000 )
Table 8, Clause 9.2.4.2
Target Mean Strength = 15.00 + 1.65 x 3.5 = 20.78 N/mm2

DUROCRETE
Engineering Services Pvt. Ltd.
1160 / 5, Shivaji Nagar, Gharpure Colony, Pune – 411 005
Telefax - 25520456, 25534335

- 98 -
Date : 22 Oct. 2004
MIX DESIGN SHEET
Name :
Purpose of Experiment : Mix design for M20 grade of concrete
Site :
Brand of Cement : Vasavadatta 43 Grade

PROPOSED MIX PROPORTIONS :

CEMENT FLY ASH CRUSHED 20 MM WATER ADMIXTURES


SAND
By Wt. 50 12 164 217 33.00 ---- ml
(Kg)
Wt. in 265 65 869 1151 174.90 ---- ml
3
Kg / m

Water Cement Ratio = 0.53 Total Cementetious Material 330 kg/m3


Cement Used = Vasavadatta 43 Grade
Fly Ash used = Super Pozz
* Slump not to exceed 45 mm
Observations of Laboratory Trial :
Plastic Density = 2525 kg / m3
Compaction factor = 0.97
Average 7 days Compressive Strength = 20.03 N/mm2
Average 28 days Compressive strength = 32.28 N/mm2
* Corrections for moisture content in sand & aggregate absorption in
metal should be made on water / cement ratio (Refer our mix design
manual)
* Any change in material like cement, plasticizer, sand or aggregate
would require re-validation of design.
* The volumetric proportion are rounded of to nearest 5 liters,
however, in case of volume batching, weight to volume conversion should
be done on the basis of Dry Loose Bulk Density of ingredients actually
found out at site.
* The above mix design requires certain control practices on site to
ensure results.

Target Mean Strength = fck N / mm2 + (K x Std. Deviation)


K = Himsworth Constant which is 1.65 for 5 % results to fall below the
characteristic strength.

- 99 -
Standard Deviation Assumed = 4 N / mm2 (As per IS 456 – 2000 )
Table 8, Clause 9.2.4.2
Target Mean Strength = 20.00 + 1.65 x 4 = 26.60 N/mm2

DUROCRETE
Engineering Services Pvt. Ltd.
1160 / 5, Shivaji Nagar, Gharpure Colony, Pune – 411 005
Telefax - 25520456, 25534335
Date : 22 Oct. 2004
MIX DESIGN SHEET
Name :
Purpose of Experiment : Mix design for M25 grade of concrete
Site :
Brand of Cement : Vasavadatta 43 Grade

PROPOSED MIX PROPORTIONS :

CEMEN FLY CRUSHE 10 20 WAT ADMIXT


T ASH D SAND MM MM ER URE
By Wt. 50 12 140 34 168 30.41 ---- ml
(Kg)
Wt. in 290 70 813 198 971 176.4 ----- ml
Kg / 0
m3

Water Cement Ratio = 0.49 Total Cementetious Material 360 kg/m3


Cement Used = Vasavadatta 43 Grade
Fly Ash used = Super Pozz
* Slump not to exceed 50 mm
Observations of Laboratory Trial :
Plastic Density = 2519 kg / m3
Compaction factor = 0.97
Average 7 days Compressive Strength = 21.31 N/mm2
Average 28 days Compressive strength = 32.01 N/mm2

* Corrections for moisture content in sand & aggregate absorption in


metal should be made on water / cement ratio (Refer our mix design
manual)

- 100 -
* Any change in material like cement, plasticizer, sand or aggregate
would require re-validation of design.
* The volumetric proportion are rounded of to nearest 5 liters,
however, in case of volume batching, weight to volume conversion should
be done on the basis of Dry Loose Bulk Density of ingredients actually
found out at site.
* The above mix design requires certain control practices on site to
ensure results.

Target Mean Strength = fck N / mm2 + (K x Std. Deviation)


K = Himsworth Constant which is 1.65 for 5 % results to fall below the
characteristic strength.
Standard Deviation Assumed = 4.0 N / mm2 (As per IS 456 – 2000 )
Table 8, Clause 9.2.4.2
Target Mean Strength = 25.00 + 1.65 x 4.0 = 31.60 N/mm2

DUROCRETE
Engineering Services Pvt. Ltd.
1160 / 5, Shivaji Nagar, Gharpure Colony, Pune – 411 005
Telefax - 25520456, 25534335
Date : 15 Sept. 2006
MIX DESIGN SHEET
Name :
Purpose of Experiment : Mix design for M30 grade of concrete
Site :
Brand of Cement : Coromandal 43 Grade

PROPOSED MIX PROPORTIONS :


CEMENT FLY CRUSHED 20 WATER ADMIXTURES
ASH SAND mm

- 101 -
By 50 08 100 178 24.94 ---- ml
Wt.
(Kg)
Wt. 355 60 708 1259 178.45 ---- ml
in
Kg /
m3
Water Cement Ratio = 0.42 Total Cementetious Material 415 kg/m3
Cement Used = Coromandal 43 Grade (W-27, M-07, Y-06)
Fly Ash used = Star Ash
* Slump not to exceed 70 mm
Observations of Laboratory Trial :
Plastic Density = 2561 kg / m3Compaction factor = 0.91
Average 7 days Compressive strength = 28.08 N / mm2
Average 28 days Compressive strength = 40.55 N / mm2
* Corrections for moisture content in sand & aggregate absorption in
metal should be made on water / cement ratio (Refer our mix design
manual)
* Any change in material like cement, plasticizer, sand or aggregate
would require re-validation of design.
* The above mix design requires certain control practices on site to
ensure results.
* Given mix proportions will be confirmed on achieving satisfactory
28 day’s compressive strength at our laboratory.
* You are requested to take a site trial and give us a feedback, which
will enable us to give you the corrections in the mix, before your actual
casting.
Target Mean Strength = fck N / mm2 + (K x Std. Deviation)
K = Himsworth Constant which is 1.65 for 5 % results to fall below the
characteristic strength.
Standard Deviation Assumed = 4.0 N / mm2 (As per IS 456 – 2000 )
Table 8, Clause 9.2.4.2
Target Mean Strength = 25.00 + 1.65 x 4.0 = 31.60 N/mm2

- 102 -
DUROCRETE
Engineering Services Pvt. Ltd.
1160 / 5, Shivaji Nagar, Gharpure Colony, Pune – 411 005
Telefax - 25520456, 25534335

MIX DESIGN SHEET


Name :
Purpose of Experiment : Mix design for M35 grade of concrete
Site :
Brand of Cement : Vasavadatta 43 Grade

PROPOSED MIX PROPORTIONS :

CEMENT CRUSHED SAND 20 MM WATER ADMIXTURES


By Wt. 50 84 137 20.00 400 ml
(Kg)
Wt. in 430 724 1182 172.00 3440 ml
3
Kg / m

Water Cement Ratio = 0.40


Cement Used = Vasavadatta 43 Grade
Fly Ash used = Super Pozz
Admixture Used = Dr. Fixit Pidiproof LW

* Slump not to exceed 50 mm


Observations of Laboratory Trial :
Plastic Density = 2508 kg / m3
Compaction Factor = 0.92
* Corrections for moisture content in sand & aggregate absorption in
metal should be made on water / cement ratio (Refer our mix design
manual)
* Any change in material like cement, plasticizer, sand or aggregate
would require re-validation of design.
* The above mix design requires certain control practices on site to
ensure results.

- 103 -
* Given mix proportions will be confirmed on achieving satisfactory
28 day’s compressive strength at our laboratory.
* You are requested to take a site trial and give us a feedback, which
will enable us to give you the corrections in the mix, before your actual
casting.
* The above mix proportions are based on 3 day’s compressive
strength achieved at our laboratory = 24.37 N /mm2
Crushed Sand
Moisture Content = 4.56 %
Loose Bulk Density = 1.29 kg / lit (for conversion to volumetric)
Water Absorption = 3.37 %
Specific Gravity = 2.500
Sieve Sizes Wt. Wt. Cumu. Wt. Cumu.
Retained Retained % Retained % Passing %
(gm)
10 mm 3 0.30 0.30 99.70
4.75 mm 19 1.90 2.20 97.80
2.36 mm 233 23.30 25.50 74.50
1.18 mm 200 20.00 45.50 54.50
600 191 19.10 64.60 35.40
micron
300 100 10.00 74.60 25.40
micron
150 85 8.50 83.10 16.90
micron
75 micron 100 10.00 93.10 6.90
Pan 69 6.90 100.00 0.00
Total 1000
F.M. = 2.958

20 mm Metal
Specific Gravity = 2.872
Water Absorption = 1.21 %
Flakiness Index = 21.05 %
Loose Bulk Density = 1.44 kg / lit (for conversion to volumetric)
Sieve Wt. (gm) Wt. Cumu. Cumu. IS
Size Retained Retained Wt. Passing Passing
% Retain % % % Limits
40 mm 0 0.00 0.00 100.00 100
25 mm 0 0.00 0.00 100.00 ----

- 104 -
20 mm 290 14.50 14.50 85.00 85 to
100
16 mm 806 40.30 54.80 45.20 ----
12.5 689 34.45 89.25 10.75 ----
mm
10 mm 191 9.55 98.80 1.20 0 to 20
Pan 24 1.20 100.00 0.00 ----
Total 2000

- 105 -
- 106 -
- 107 -
EQUIVALENT UNITS / CONVERSION TABLES
A) LINEAR MEASUREMENTS :
Sr. No. Unit Equivalent Unit
1 1 Kilometer 1000 Meter
2 1 Kilometer 0.62 Miles
3 1 Meter 100 Centimeters
4 1 Meter 3.28 Feet
5 1 Meter 1.093 Yards
6 1 Centimeter 10 Millimeter
7 1 Centimeter 0.393 Inch

- 108 -
8 1 Mile 8.00 Furlong
9 1 Furlong 220 Yards
10 1 Yard 3 Feet
11 1Mile 5280 Feet
B) WEIGHT MEASUREMENTS :
Sr. No. Unit Equivalent Unit
1 1 Tonne 1000 Kilogram
2 1 Kilogram 1000 Grams
3 1 Kilogram 2.205 Pounds
4 1 Quintal 100 Kilogram
5 1 Gram 0.086 Tola
6 1 Ounce 28.35 Grams
C) AREA MEASUREMENTS :
Sr. No. Unit Equivalent Unit
1 1 Sq. Kilometer 106 Sq. Meter
2 1 Sq. Kilometer 0.386 Sq. Miles
3 1 Sq. Meter 10000 Sq. Centimeter
4 1 Sq. Meter 10.76 Sq. Ft.
5 1 Acre 40 Guntha
6 1 Guntha 1089 Sq.Ft.
7 1 Acre 43560 Sq.Ft.
8 1 Acre 4047 Sq. Meter
9 1 Hector 100 Are
10 1 Are 100 Sq. Meters
11 1 Hector 10000 sq. Meters
12 1 Hector 2047 Acre
13 1 Brass 100 Sq.Ft.
14 1 Brass 9.29 Sq. Meter
15 1 Acre 4840 Sq. Yards
D) VOLUME MEASUREMENTS :

Sr. No. Unit Equivalent Unit


1 1 Cu. Meter 106 Cu. Centimeter
2 1 Cu. Meter 35.28 Cu. Ft.
3 1 Cu. Meter 220.14 Gallon
4 1 Cu. Meter 1000 Liters
5 1 Cu. Feet 6.24 Gallon
6 1 Gallon 4.546 Liters
7 1 Cu. Feet 28.315 Liters

- 109 -
8 1 Brass 100 Cu. Ft.
9 1 Brass 2.83 Cu. Meter

WEIGHT’S OF MATERIALS

Sr. No.Material Weight Kg. / cum


1 Cement 1440
2 Steel 7850
3 Sand a) Dry 1600
b) River 1840
4 Stone (Basalt) 2850 to 2960
5 Water 1000
6 PCC 2240
7 RCC (2 % steel) 2420
8 Bricks 1600 to 1920
9 Brick Masonry 1920
10 Soil 1760
11 Cement Concrete Blocks 1800
(Solid)
12 Cement Mortar 2080
13 Lime Mortar 1760
14 Lime 640
15 Glass 2530
16 Teak Wood 670 to 830
17 Sal Wood 990
18 Marble Stone 2620
19 Granite Stone 2460 to 2800
20 Cuddappah 2720
21 A.C. Sheet (Corrugated) 16 kg / sqm
22 Bitumen 1040
USEFUL NOTES ON CEMENT

1 Ton of Portland Cement = 20 bags


1 cu.ft. of Portland Cement weights 90.94 lbs. when loosely filled.

Average weight of 1:2:4 concrete :


1) Coke bricks aggregate 100 lbs per cu.ft.
2) Clinker aggregate 110 lbs per cu.ft.
3) Brick aggregate 125 lbs per cu.ft.
4) Ballast aggregate 145 lbs per cu.ft.

- 110 -
Average weight of 1:2:4 reinforced concrete is 150 lbs per cu.ft.

1 cu.ft. of loose Portland Cement paste will make about :


4.1 cu.ft. of concrete mixed 1:2:4
5.1 cu.ft. of concrete mixed 1:2.5:5
5.8 cu.ft. of concrete mixed 1:3:6
7.5 cu.ft. of concrete mixed 1:4:8
1 cu.ft. of loose Portland Cement neat as cement paste will cover 9.5 sq.ft. 1”
thk.

1 cu.ft. of 1 loose Portland Cement with 1 part of sand will cover 16.8 sq.ft. 1”
thick
1 cu.ft. of 1 loose Portland Cement with 2 part of sand will cover 29 sq.ft. 1” thk.
1 cu.ft. of 1 loose Portland Cement with 3 part of sand will cover 35.7 sq.ft. 1”
thick

1 cu.ft. of loose Portland Cement with 6 parts of sand will lay about 410 bricks
with 3/8” joints and 527 bricks with 1/4” joints

STANDARD MATERIAL CONSUMPTION CONSTANTS ON BUILT-UP AREA


BASIS

Sr. Material Item of Work Quantity / Quantity /


No. Sq.M. Sq.Ft.
1 Cement For RCC work 1.94 bags 0.18 bag
For Masonry Work 0.43 bags 0.04 bag
For Plaster Work 1.18 bags 0.11 bag
For Other Work 0.32 bags 0.03 bag
Total 3.87 bags 0.38 bag
2 Steel For RCC work 24.25 kg 2.25 kg
3 Sand For RCC work 0.21 cum 0.70 cft
For Masonry work 0.05 cum 0.16 cft
For Internal Plaster 0.23 cum 0.75 cft
For External Plaster 0.15 cum 0.50 cft
For Tiling 0.04 cum 0.13 cft
For Water-Proofing 0.03 cum 0.09 cft
For Others 0.01 cum 0.02 cft

- 111 -
Total 0.72 cum 2.35 cft
4 Metal For RCC work 0.27 cum 0.90 cft
5 Rubble For Plinth Soling 0.06 cum 0.20 cft
6 Murrum For Plinth Filling 0.23 cum 0.75 cft
7 Bricks 6” For Ext. Wall (6” 43 nos 04 nos
(Thokla) thk.) 32 nos 03 nos
For Int. Wall (6” 75 nos 07 nos
thk.)
Total
8 Sunla For Internal 0.27 bag 0.025 bag
Plastering
9 Flooring For all rooms and 0.75 sqm 0.75 sq.ft
Tiles balcony/terrace
flooring
10 Skirting For all rooms and 0.25 rm 0.25 rft
balcony/terrace
flooring
11 Bath/Toilet For Flooring 0.05 sqm 0.05 sq.ft.
Dado 0.20 sqm 0.20 sq.ft.
12 Kitchen ---- 0.04 rm 0.012 rft
Platform
13 Parking Parking Area 0.15 sqm 0.15 sq.ft.
Flooring
14 Staircase For Risers 0.014 sqm 0.014
stone For Trades 0.028 sqm sq.ft.
flooring For Landings 0.022 sqm 0.028
Total 0.084 sqm sq.ft.
0.022
sq.ft.
0.084
sq.ft.
Sr. Material Item of Work Quantity / Quantity /
No. Sq.M. Sq.Ft.
15 Brick bats For Water-Proofing 0.03 cum 0.10 cft
16 Door ---- 0.09 nos 0.0085 nos
Frames
17 Door ---- 0.14 sqm 0.14 sq.ft
Shutters
18 Concrete For Staircase 0.03 sqm 0.03 sq.ft
Grills

- 112 -
CONSTRUCTION MATERIALS WASTAGE : PLANNING NORMS

SR. NO. TYPE OF MATERIALS PLANNED WASTAGE


1 Cement 2%
2 Sand 10 %
3 Aggregate 5%
4 Concrete Structural 2%
5 Concrete Blinding (Lean) 10 %
6 Reinforced Steel Bars 3%
7 Reinforced Steel Mesh 10 %
8 PVC Sheeting 15 %
9 Timbering in Trenches 5%
10 Stone Masonry 5%
11 Marble Lining 20 %
12 Wood for Door Frame 5 to 7.5 %
13 Wood for Shutters 10 %
14 Wood for Flooring / Walling 5 to 10 %
15 Sheet Roofing 2%
16 Tile Roofing 5%
17 Floor Tiling 2 to 5 %
18 Wall Tiling 3%
19 Pigments 5%
20 Paints 5%

PERCENTAGE BREAK-UP FOR DIFFERENT CONSTRUCTION ACTIVITIES


(RESIDENTIAL) :

Activity Percentage Cost Break-Up


(Material + Labour)
Work up to Plinth (Excl. 2 %
RCC)
RCC 28 %
Masonry and Plaster 21 %
Aluminum Windows 4%

- 113 -
Door Frames and 5%
Shutters
Railing 1%
Water Proofing 3%
Flooring and Tiling 15 %
Painting 3%
Lift 4%
Fire Fighting 1%
Entrance Lobby and 1%
General
Plumbing / Sanitation 5%
Electrical Work 7%
TOTAL 100 %

Activity Percentage Cost Break-Up


(Material)
Cement 14 %
Sand 11 %
Metal 3%
Steel 12 %
Bricks 4%
Tiles 17 %
Doors and Windows 10 %
Plumbing and Sanitation 6 %
Electrical Work 12 %
Painting 6%
Other Miscellaneous 5%
TOTAL 100 %

Activity Percentage Cost Break-Up


(Labour)
RCC 37 %

- 114 -
Brick work and Plaster 21 %
POP 7%
Tiling 12 %
Plumbing and Sanitation 3%
Doors 1%
Water Proofing 3%
Painting 8%
Electrical 8%
TOTAL 100 %

Note : For general Residential Building,

Material cost = 76 %
Labour Cost = 24 %

Cost Break-Up for RCC :


Steel = 56 %
Concrete = 44 %

Cost Break-Up for Masonary & Plaster :


BBM = 15 %
Internal Plaster = 32 %
External Plaster = 21 %
POP = 32 %

Plumbing and Sanitation Break-Up :


G.I. Pipes and Fittings = 26 %
C.I. / PVC = 18 %
Sanitary = 15 %
C.P. Fittings = 41 %

STANDARD MATERIAL CONSUMPTION CONSTANTS

- 115 -
FOR VARIOUS ITEMS
(A) CONCRETE ITEMS : (INCLUDING WASTAGES)
SR. NO. DESCRIPTION UNIT PER CEMENT SAND METAL
1 P.C.C. (1:3:6) 100 cft 12.00 bags 60 cft 85 cft
M10 1 cum 4.24 bags 0.60 cum 0.85 cum
2 P.C.C. (1:2:4) 100 cft 17.00 bags 60 cft 85 cft
M15 1 cum 6.00 bags 0.60 cum 0.85 cum
3 R.C.C. 100 cft 22.00 bags 60 cft 85 cft
(1:1.5:3) M20 1 cum 7.77 bags 0.60 cum 0.85 cum
4 R.C.C. (1:1:2) 100 cft 32.00 bags 60 cft 85 cft
M25 1 cum 11.47 bags 0.60 cum 0.85 cum

(B) MASONARY ITEMS :


S. Descriptio Unit Cemen Sand Rubble Bricks Bricks
N n Per t 23x10x 23x15x
. 7 cm 9 cm
1 U.C.R. 100 4.5 40 cft 125 cft -- --
Masonry cft bags
In C.M. 1 0.4 1.25
1:6 cum 1.6 cum cum
bags
2 23 cm (9”) 100 2.5 20 cft -- 1000 --
B.B. sft bags nos
Masonry 1 0.06 -- --
In C.M. sqm 0.27 cum 110
1:5 bag nos
3 15 cm (6”) 100 1.5 15 cft -- -- 400
B.B. sft bags Nos
Masonry 1 0.05 -- --
In C.M. sqm 0.16 cum 45 Nos
1:5 bag
4 10 cm (4”) 100 1 bags 8 cft -- 475 --
B.B. sft nos
Masonry 1 0.11 0.025 -- --
In C.M. sqm cum cum 50 nos
1:4

- 116 -
(C) PLASTERING ITEMS :
Sr.No.Description Unit Per Cement Sand Neeru
(30 kg bag)
1 NEERU FINISH PLASTER
12.5 MM (1/2” THK.)
a) in C.M.1:4 100 sft 1.5 bags 11.00 cft
0.60 bags
1 sqm 0.60 bags 0.03 cum 0.07 bags
b) in C.M. 1:5 100 sft 1.2 bags 11.00 cft
0.60 bags
1 sqm 0.13 b02ags 0.03 cum 0.07 bags
c) in C.M. 1:6 100 sft 1.00 bag 11.00 cft 0.80
bags
1 sqm 0.11 bags 0.03 cum 0.07 bags
2 NEERU FINISH PLASTER
20 MM (3/4” THK.)
a) in C.M. 1:4 100 sft 2.4 bags 18.00 cft
0.60 bags
1 sqm 0.26 bags 0.06 cum 0.07 bags
b) in C.M. 1:5 100 sft 1.90 bags 18.00 cft 0.60
bags
1 sqm 0.21 bags 0.06 cum 0.07 bags
c) in C.M. 1:6 100 sft 1.6 bags 18.00 cft
0.60 bags
1 sqm 0.17 bags 0.60 cum 0.07 bags
3 SAND FACED PLASTER
SINGLE COAT 15 TO 20 MM THK.
a) in C.M. 1:4 100 sft 2.25 bags 17 cft ---
1 sqm 0.24 bags 0.05 cum ---
b) in C.M. 1:5 100 sft 1.80 bags 17 cft ---
1 sqm 0.19 bags 0.05 cum ---
c) in C.M. 1:6 100 sft 1.50 bags 17 cft ---
1 sqm 0.16 bags 0.05 cum ---
4 SAND FACED PLASTER
DOUBLE COAT 20 TO 25 MM THK
a) in C.M. 1:4 100 sft 3.75 bags 28 cft ---
1 sqm 0.41 bags 0.09 cum ---

- 117 -
b) in C.M. 1:5 100 sft 3.00 bags 28 cft ---
1 sqm 0.32 bags 0.09 cum ---
c) in C.M. 1:6 100 sft 2.50 bags 28 cft ---
1 sqm 0.27 bags 0.09 cum ---

(D) FLOORING & TILING :


Sr. Description Unit Cement Sand Lime Tiles White
No. Per 30 kg Cement
bag
1 Mosaic Tile 100 1.0 bag 16 cft 2.0 As 5 kg
/ Ceramic sft bag Per
Tile Flooring 1 0.11 0.05 0.2 Size 0.55 kg
sqm bag cum bag
2 Mosaic Tile 100 2.0 2 cft -- As 2 kg
/ Ceramic rft bags 0.017 -- Per
Tile Skirting 10 cum Size 0.65 kg
rm 0.65
bag
3 Stone 100 2.0 16 cft -- 43 2 kg
Flooring sft bags nos
40 x 55 cm 1 0.05 -- 0.22 kg
cut sqm 0.22 cum 5
45 x 60 cm bag nos
cut
4 Rough 100 0.75 18 cft 2.0 40 --
Shahabad sft bag bags nos
Stone 1 0.06 0.2 --
Flooring sqm 0.08 cum bag 4
45 x 80 cm bag nos
uncut
40 x 55 cm
cut
5 Chequered 100 1.25 16 cft 2 150 --
Tile Flooring sft bag bags nos
(25 x 25 cm) --

- 118 -
1 0.13 0.05 0.2 16
sqm bag cum bag nos
6 I.P.S. 100 3.5 16 cft -- -- --
Flooring sft bags
1 0.05 -- -- --
sqm 0.38 cum
bag
7 Glazed Tile 100 3.5 -- -- 420 2.0 kg
Dado sft bags nos
( 15 cm x 15 1 -- -- 45 0.22 kg
cm ) sqm 0.38 nos
bag

(E) WATER PROOFING :


Sr. Description Unit Cement Sand Brickbat
No. Per
1 Brickbat Coba 100 sft 6.00 30 cft 30 cft
Water Proofing 1 sqm bags 0.09 0.09 cum
in W.C. / Bath / 0.65 cum
2 Toilet Etc 100 sft bags 30 cft
Brickbat Coba 1 sqm 30 cft 0.09 cum
Water Proofing 4.00 0.09
to Terrace bags cum
0.43
bags

(F) RECOMMENDED CEMENT MORTAR MIXES


Sr. Purpose Cement Fly Natural W/C Remark
No. 43 Ash Sand / Ratio
Grade (Kg) Crushed
(Kg) Sand
(Kg)
1 BBM 50 50 629 0.65 M/C
50 25 472 0.65 Mixing

- 119 -
Hand
Mixing
2 Internal 50 50 550 0.70 M/C
Plaster 50 25 412 0.70 Mixing
Hand
Mixing
3 External 50 50 473 0.65 M/C
Plaster 50 25 355 0.65 Mixing
Hand
Mixing

Notes : 1) Crushed Sand and Natural sand should confirm to RCC


acceptance
criteria
2) Mortar to be used within 45 minutes of addition of water.

WEIGHT PER METER IN KG. FOR ROUND & SQUARE BARS

Size in For Round Bars For Square Bars


Mm Area Weight Length Area Weight Length
2
cm Kg / m (m) / cm2 Kg / m (m) /
Ton Ton
6 0.283 0.222 4510 0.36 0.283 3535
8 0.503 0.395 2532 0.64 0.502 1992
10 0.785 0.617 1621 1.00 0.785 1274
12 1.131 0.888 1125 1.44 1.130 885
14 1.539 1.208 829 1.96 1.539 650
16 2.011 1.578 633 2.56 2.010 498
18 2.545 2.000 500 3.24 2.543 393
20 3.142 2.466 405 4.00 3.140 318
22 3.801 2.980 336 4.84 3.799 263
25 4.909 3.854 200 6.25 4.906 204
28 6.157 4.830 207 7.84 6.154 162
32 8.042 6.313 159 10.24 8.038 124
36 10.179 7.990 125 12.96 10.200 98
40 12.566 9.864 101 16.00 12.560 80
50 19.365 15.410 65 25.00 19.625 51
Notes :
1. For Round Bars

- 120 -
Weight of Steel in Kg./ meter = d2 / 162 (where ‘d’ is diameter of bar in mm)
2. Density of Steel = 7850 kg / meter3
3. Weight of Steel = Density x cross-sectional area of bar (in mm2)
e.g. For 20 mm square bar : Wt. = (7850 x 10-6) x 400 = 3.140 kg / meter

WEIGHT / RUNNING METER OF G.I. PIPES


Diameter Class ‘A’ Class ‘B’ Class ‘C’
(mm) Weight Weight Weight
(Kg) (Kg) (Kg)
15 (1/2”) 1.01 1.28 1.51
20 (3/4”) 1.48 1.65 1.97
25 (1”) 2.10 2.54 3.08
32 (1 ¼”) 2.72 3.27 3.97
40 (1 ½”) 3.40 3.76 4.58
50 (2”) 4.32 5.31 6.38
65 (2 ½”) 6.10 6.81 8.20
80 (3”) 7.20 8.85 10.51
ROLLED STEEL BEAMS
Designation Wt. Sectional Depth Flange Thk. Thk. of
of of Width Web
/m Area Section Flange ‘tw’ mm
2
‘W’ kg ‘a’ cm ‘h’ mm ‘b’ mm ‘tf’
mm
ISJB 150 7.1 9.01 150 50 4.6 3.0
ISJB 175 8.1 10.28 175 50 4.8 3.2
ISJB 200 9.9 12.64 200 60 5.0 3.4
ISJB 225 12.8 16.28 225 80 5.0 3.7
ISLB 75 6.1 7.71 75 50 5.0 3.7
ISLB 100 8.0 0.21 100 50 6.4 4.0
ISLB 125 11.9 5.12 125 75 6.5 4.4
ISLB 150 14.2 18.08 150 80 6.8 4.8
ISLB 175 26.7 21.30 175 90 6.9 5.1
ISLB 200 19.8 25.27 200 100 7.3 5.4
ISLB 225 23.5 29.92 225 100 8.6 5.8
ISLB 250 27.9 35.53 250 125 8.2 6.1
ISLB 275 33.0 42.02 275 140 8.8 6.4
ISLB 300 37.7 48.08 300 150 9.4 6.7
ISLB 325 43.1 24.9 325 165 9.8 7.0
ISLB 350 49.5 63.01 350 165 11.4 7.4

- 121 -
ISLB 400 56.9 72.43 400 165 12.5 8.0
ISLB 450 65.3 83.14 450 170 13.4 8.6
ISLB 500 75.0 95.5 500 180 14.1 9.2
ISLB 550 86.3 109.97 550 190 15.0 9.9
ISLB 600 99.5 126.69 600 210 15.5 10.5
ISMB 100 11.5 14.60 100 75 7.2 4.0
ISMB 125 13.0 16.60 125 75 7.6 4.4
ISMB 150 14.9 19.00 150 80 7.6 4.8
ISMB 175 19.3 24.62 175 90 8.6 5.5
ISMB 200 25.4 32.3 200 100 10.8 5.7
ISMB 225 31.2 39.72 225 110 11.8 6.5
ISMB 250 37.3 47.35 250 125 12.5 6.9
ISMB 300 44.2 56.26 300 140 12.4 7.5
ISMB 350 52.4 66.71 350 140 14.2 8.1
ISMB 400 61.6 78.46 400 140 16.0 8.9
ISMB 450 72.4 92.27 450 150 17.4 9.4
ISMB 500 86.90 110.74 500 180 17.2 10.2
ISMB 550 103.7 132.11 550 190 19.3 11.2
ISMB 600 122.6 156.21 600 210 20.8 12.0
INDIAN STANDARD ROLLED STEEL CHANNELS

Section Thickness Thickness Sectional Weight /


hxb of Flange of Web Area Meter
(mm x Tf (mm) Tw (mm) Sq.Cm. W (kg)
mm)
75 x 40 7.3 4.4 8.67 7.1
100 x 40 7.5 4.7 11.70 9.56
125 x 65 8.1 5.0 16.19 13.1
150 x 75 9.0 5.4 20.88 16.8
175 x 75 10.2 5.7 24.38 19.6
200 x 75 11.4 6.1 28.21 22.3
250 x 80 12.4 6.4 33.01 30.60
300 x 90 13.6 7.6 45.64 36.3
350 x 100 13.5 8.1 53.66 42.7
400 x 100 15.3 8.6 62.93 50.1

INDIAN STANDARD ROLLED STEEL EQUAL ANGLES


DESIGNATION SIZE THICKNESS WEIGHT /
hXb OF FLANGE ‘t’ METER

- 122 -
mm X mm mm ‘w’ (Kg)
ISA 2020 20 x 20 3.0 0.90
4.0 1.1
ISA 2525 25 x 25 3.0 1.1
4.0 1.4
5.0 1.8
ISA 3030 30 x 30 3.0 1.4
4.0 1.8
5.0 2.2
ISA 3535 35 x 35 3.0 1.6
4.0 2.1
5.0 2.6
6.0 3.0
ISA 4040 40 x 40 3.0 1.8
4.0 2.4
5.0 3.0
6.0 3.5
ISA 4545 45 x 45 3.0 2.1
4.0 2.7
5.0 3.4
6.0 4.0
ISA 5050 50 x 50 3.0 2.3
4.0 3.0
5.0 3.8
6.0 4.5
ISA 5555 55 x 55 5.0 4.1
6.0 4.9
8.0 6.4
10.0 7.9
ISA 6060 60 x 60 5.0 4.5
6.0 5.4
8.0 7.0
10.0 8.6
ISA 6565 65 x 65 5.5 4.9
6.0 5.8
8.0 7.7
10.0 9.4
DESIGNATION SIZE THICKNESS WEIGHT /
hXb OF FLANGE METER
mm X mm ‘t’ mm ‘w’ (Kg)

- 123 -
ISA 7070 70 x 70 5.0 5.3
6.0 6.3
8.0 8.3
10.0 10.2
ISA 7575 75 x 75 5.0 5.7
6.0 6.8
8.0 8.9
10.0 11.0
ISA 8080 80 x 80 6.0 7.3
8.0 9.6
10.0 11.8
12.0 14.0
ISA 9090 90 x 90 6.0 8.2
8.0 10.8
10.0 13.4
12.0 15.8
ISA 100100 100 x 100 6.0 9.2
8.0 12.1
10.0 14.9
12.0 17.7
ISA 110110 110 x 110 8.0 13.4
10.0 16.5
12.0 19.6
15.0 24.2
ISA 130130 130 x 130 8.0 15.9
10.0 19.7
12.0 23.4
15.0 28.9
ISA 150150 150 x 150 10.0 22.8
12.0 27.2
15.0 33.6
18.0 39.9
ISA 200200 200 x 200 12.0 36.6
15.0 45.5

DIMENSION AND WEIGHTS OF HOT-ROLLED STEEL FLATS

WIDTH THICKNESS WEIGHT


Mm mm (Kg / Meter)
10.0 3.0 0.236

- 124 -
4.0 0.314
5.0 0.393
6.0 0.471
14.0 3.0 0.330
4.0 0.440
5.0 0.550
6.0 0.659
20.0 3.0 0.471
4.0 0.628
5.0 0.785
6.0 0.942
25.0 3.0 0.589
4.0 0.785
5.0 0.981
6.0 1.18
30.0 3.0 0.707
4.0 0.942
5.0 1.18
6.0 1.41
35.0 3.0 0.824
4.0 1.10
5.0 1.37
6.0 1.65
40.0 3.0 0.942
4.0 1.26
5.0 1.57
6.0 1.88

Weight of MS Flat = 7850 x 10-6 x W x T (Kg / m)


Where, W = width of flat in mm
T = thickness of flat in mm

MS PLATES (PLAIN)
THICKNESS WEIGHT
mm KG / SQ.M.
5.0 39.25
6.0 47.10
8.0 62.8

- 125 -
10.0 78.5
12.0 94.2
14.0 109.9
16.0 125.6
18.0 141.3
20.0 157.00
22.0 172.70
25.0 196.25

MS PLAIN BLACK SHEETS


THICKNESS WEIGHT
mm KG / SQ.M.
0.40 3.14
0.50 3.93
0.63 4.95
0.80 6.30
0.90 7.05
1.0 7.85
1.12 8.80
1.25 9.80
1.40 11.00
1.60 12.60
1.80 14.10
1.90 14.90
2.0 15.70
2.24 17.60
2.50 19.60
2.80 22.00
3.15 24.70
3.55 27.86
4.0 31.40
4.30 33.75
4.65 36.50
STEEL TUBES FOR STRUCTURAL PURPOSE

Nominal Outside Class Thickness Weight


Bore (mm) Dia. (mm) (Kg /
(mm) meter)
15 21.3 Light 2.0 0.962

- 126 -
Medium 2.65 1.22
Heavy 3.25 1.45
20 26.9 Light 2.35 1.42
Medium 2.65 1.58
Heavy 3.25 1.90
25 33.7 Light 2.65 2.04
Medium 3.25 2.46
Heavy 4.05 2.99
32 42.4 Light 2.65 2.61
Medium 3.25 3.15
Heavy 4.05 3.86
40 48.3 Light 2.9 3.27
Medium 3.25 3.61
Heavy 4.05 4.43
50 60.3 Light 1 2.9 4.14
Light 2 3.25 4.57
Medium 3.65 5.1
Heavy 4.5 6.17
65 76.1 Light 3.25 5.84
Medium 3.65 6.53
Heavy 4.50 7.92
80 88.9 Light 3.25 6.86
Medium 4.05 8.48
Heavy 4.85 10.10
90 101.6 Light 3.65 8.82
Medium 4.05 9.75
Heavy 4.85 11.6
100 114.3 Light 3.65 9.97
Medium 4.50 12.1
Heavy 5.40 14.5
110 127.0 Light 4.50 13.6
Medium 4.85 14.6
Heavy 5.40 16.2

BARBED WIRE 2 PLY

Gauge of Gauge of Gap Approx. Approx.


Ply Barbs between Wt. Length in
two Barbs Kg. / meter 25 Kg.

- 127 -
bundle
(m)
12 12 75 mm (3”) 0.166 151
14 14 75 mm (3”) 0.083 300
12 14 100 mm 0.119 210
(4”)
12.5 12 75 mm (3”) 0.135 185
12.5 14 75 mm (3”) 0.119 210

GAUGE CONVERSION TO MM

Gauge no. Diameter in mm


08 4.064
10 3.251
12 2.642
14 2.032
16 1.626
18 1.219
20 0.914
24 0.559
26 0.457

LIST OF IMPORTANT I.S. CODES : (Available at H.O. for reference)

I.S. CODE TITLE


269-1989 Ordinary and Low Heat Portland Cement
383-1970 Coarse and Fine Aggregate from Natural
Sources for Concrete
432-1982 (Part D) Mild Steel and Medium Tensile Steel bars
455-1989 Portland Slag Cement
456-2000 Code of Practice for Plain and Reinforced
Concrete
516-1959 Methods of Test for Strength of Concrete
800-1984 Code of Practice for Structural Steel in
General Building Constructions
875-1987 Loading code
(Part I, II, III, IV, V)
1077-1992 Common Burnt Clay Building Bricks

- 128 -
1199-1959 Method of Sampling and Analysis of
Concrete
1200 Method of Measurement of Building and
(Part I to XXVIII) Civil Engineering Works.
1489-1991 (Part I & Portland Pozzolana Cement
II)
1542-1992 Sand for Plaster
1597-1992 (Part I & Code of Practice for Construction of Stone
II) Masonry
1786-1985 High Strength Deformed Steel bars &
Wires for Concrete Reinforcement
1893-2002 (Part I) Design of Earthquake Structures
2065-1983 Code of Practice for Water Supply in
Building
2116-1980 Sand for Masonry Mortars
2386-1963 Method of Test for Aggregates for
(Part I to VIII) Concrete
2470-1985 (Part I & Code of Practice for Septic Tanks
II)
2502-1963 Code of Practice for Bending and Fixing of
bars for Concrete Reinforcement
2751-1979 Code of Practice for Welding of Mild Steel
bars used for Reinforcement Cement
Concrete Construction
2911 (Part I to IV) Code of Practice for Design and
Construction of Pile and Pile Foundations
3370 (Part I to IV) Liquid Retaining Structures
3414-1968 Expansion Joints
3696 (Part I & II) Safety Code for Scaffolds and Ladders
3764-1992 Safety Code for Excavation work
I.S. CODE TITLE
3812-1981 Fly Ash for use as Pozzolana and
Admixture
4082-1996 Storage of Materials
4326-1993 Ductile Design for Earthquake Structures
4925-1968 Battening of Concrete
4926-2003 Ready Mixture Concrete
6313 (Part I to III) Anti-termite Measure in Building
7969-1975 Safety Code for Storage and Handling of
Building Materials

- 129 -
8041-1990 Rapid Hardening Portland Cement
8112-1989 43 Grade Ordinary Portland Cement
9103-1999 Admixtures
11817-1986 Construction Joints
12089-1987 Ground Granulated Blast Furnace Slag
12269-1987 53 Grade Ordinary Portland Cement
13311-1992 (Part I Non-Destructive Testing
& II)
13920-1993 Ductile Design for Earthquake Structures
14687-1999 Formwork Design and Detailing

LIST OF ARCHITECT’S & CONSULTANT’S WITH PHONE NUMBERS

LIST OF ARCHITECTS :

- 130 -
Architect Office Mobile Fax No. E-mail ID
No. No.
Ar. Peshave, 2613773 --- --- cpeshave@vsnl
Pune 1 .net
Ar. 2433046 --- --- dasn@eth.net
Dasnurkar, 1 dasan@vsnl.ne
Pune /2/3 t
dasnurkar@et
h.net
Space 2635623 --- 2634263 spaceds@vsnl.
Designers 4 / 1 com
Syndicate 2636384
Ar. Zubair 1
Sheikh, Pune
Ar. Pradeep --- 93710122 --- pradeepgupte
Gupte, Pune 54 @hotmail.com
Ar. Vishwas 2567549 98224755 --- vishwasgopalb
Bhat, Pune 9 89 hat@hotmail.c
2567548 om
4
Creative 3230163 98223072 --- sanjaygiri@hot
Designs 2 99 mail.com
Ar. Sanjay
Giri, Pune
Deshpande 2553218 --- 2553218 jagaddish_des
Dixit Asso. 2 2 hpande@rediff
Ar. Jagdish mail.com
Deshpande,
Pune
Creative --- 98901196 --- sanjaygiri@hot
Designs 22 mail.com
Ar. Pramod
Deshpande
Pune
Ar. Subhash 3294120 98230893 4004410 ssapvt.1001@y
Shah, Pune 0/1 52 5 ahoo.co.uk
ssapune@vsnl.
net

- 131 -
Ar. Ashok 2577239 --- ---
Patil, 9
Mumbai
Ankur Asso. 2443020 --- 2443020 ankurassociate
Ar. Prakash 9 / 10 9 s@yahoo.com
Kulkarni, ankurassociate
Pune s@hotmail.co
m
Ar. Milind 2553114 98222686 2553114 jagaddish_des
Dixit, Pune 1 07 1 hpande@rediff
mail.com
Ar. Sudhir 2542522 98220233 2542522 theaid@vsnl.n
Deshpande, 4 41 4 et
Pune
Ar. Sunil 2613006 --- 2613006 sunil_vartak@
Vartak, Pune 8 8 hotmail.com
2611119
5
Sandeep 5620611 98220683 2445456 hardikarsande
Hardikar & 7 98 0 ep@vsnl.net
Asso 2445156 93712363
Ar. Sandip 0 98
Hardikar,
Pune
Ar. Anil 2633382 --- 2633382 aranka@vsnl.n
Ranka, Pune 0 / 1 0 et

Design 2565885 --- 2563085 design_system


Systems Ar. 1 1 s407@yahoo.c
Pankaj om
Sanghavi,
Pune
Ar. Dilip Kale, 2447886 --- 2447886 archdgk@yaho
Pune 9 9 o.co.in

Savli 2432190 98220359 2433696 savliarchitects


Architects 8 73 4 @gmail.com

- 132 -
Ar.
Hingmere,
Pune
Dandekar & 2546892 --- 6400100 dandekar.assoc
Associates 3 2 iates@gmail.co
Ar. Sapre- m
Dandekar, rsapre@vsnl.co
Pune m

Atul 2703313 98222681 2703313 ---


Dharwadkar 7 90 7`
& Associates
Ar. Atul
Dharwatkar,
Pune
Infinity 2420911 98901225 2420911 id_infinity11@
Ar. Ajinkya 0 11 0 rediffmail.com
Dhumal, Idajinky11@re
Pune diffmail.com
Skyline 3040401 98201989 2494486 lakshmigoveka
Architects 0 / 11 04 8 r@yahoo.com
Ar. L. skyline.architec
Govekar, ts@gmail.com
Mumbai

Ethique ethiquepune@
Ar. Sanjeev 98202312 hotmail.com
Mehta, Pune 2433380 85 ethique@hotm
Mumbai 3 2500597 ail.com
2500453 8
3
P.G. Patki 2204701 98205093 2204701 pgpatki@vsnl.c
Architects P. 4 09 4 om
Ltd pgpatki@gmail
Ar. P.G.Patki, .com
Mumbai

- 133 -
Ar. Reza 2643941 --- --- ---
Kabul, 5
Mumbai 2643014
6
Ar.Padalikar, 222940 98230389 222940 pnpadali@yah
Alibaugh 72 oo.com
98220810
03
LANDSCAPE ARCHITECTS :
Vikas & 2545070 98220122 2545070 vikasbhosekar
Nilima 0 04 2 @yahoo.co.in
Bhosekar, bhosekar@vsnl
Ar. Vikas .com
Bhosekar,
Pune

LIST OF R.C.C. CONSULTANTS :

RCC Office Mobile Fax No. E-mail ID


Consultant No. No.
G.A. Bhilare 2445271 98221929 2445270 gabcpl@rediff
Consultants 1 03 0 mail.com
Pvt. Ltd. 2445272 gabcpl@yahoo
7 .com
Hansal 2567556 98900468 2567556 hansal@hansal
Parikh & 2 67 4 parikh.com
Asso, Pune
Arun 2446680 98220332 2446680 nykochak@vsn
Gokhale & 2 63 2 l.net
Associates, erang@sancha
Pune rnet.in
Y. S. Sane 2433839 98220131 2433339 saneasso@ph2
Asso., Pune 1 13 4 .vsnl.net.in
2433639 A.N. gramo.s@yssa.
2 Watwe in

- 134 -
LIST OF PLUMBING CONSULTANTS :

Plumbing Office Mobile Fax No. E-mail ID


Consultant No. No.
Apex 5629995 94220860 --- apexconstro@
Construction 9 76 yahoo.com
s, Pune
G. Sagari
Plumbing 2446363 98901979 --- AMITKEN@IIT.
Consultants 0 44 EDU
Shri.
A.Kendale

Unity 2546887 98220589 2546887 ucphnp@vsnl.


Consultant, 8 80 8 net
Pune 2546778
Shri. Pathak 8
Shree 2543344 98221867 2543344 watersgs@vsnl
Gurudeo 5 63 5 .net
Services,
Pune,
Prof. R. V.
Saraf

LIST OF ELECTRICAL CONSULTANT :

Electrical Office Mobile Fax No. E-mail ID


Consultant Phone No.
No.
Mandar 2422362 94220017 2422453 vidyutsallagar
Khadilkar, 9 76 4 @yahoo.co.in
Pune 2422453 vidyutsallagar
4 @hotmail.com
Hemant 2611174 98221466 2611174 ---
Vartak, Pune 6 61 6
Shivani 2543721 98221963 --- shivanielecprol
Electrolines 2 72 ines@vsnl.net
Nikhil Gore,
Pune

- 135 -
Dhananjay 2566252 98220631 2566252 concept_aircon
Sinnarkar 0 99 0 @vsnl.com
(AHU), Pune

LIST OF FIRE-FIGHTING CONSULTANT :

Fire-Fighting Office Mobile Fax No. E-mail ID


Consultant Phone No.
No.
Sujay Fire 2426331 94230010 2426331 jayesh@sujayfi
Jayesh 0 51 0 re.com
Phulpajar,Pu
ne
Sumeet 2538017 98224953 2538017 sumeetenterpr
Enterprises, 0 57 0 ises@vsnl.net
Mohan 2538019
Jadhav, Pune 9

LIST OF ENVIRONMENTAL CONSULTANT :

Environment Office Mobile Fax No. E-mail ID


al Phone No.
Consultant No.
Horizon 2433054 98220502 2433913 hespl@vsnl.co
Environment 8 88 6 m
al Services P. 98220511
Ltd. Pune 28
Oasis 2444274 98220099 2444274 oasisenv@vsnl.
Environment 4 23 4 com
al
Consultants,
Pune
Radient 2433801 98225585 2433380 vgphadnis@ya
Energy 3 02 7 hoo.com
Systems Pvt. 2433485 akshayurja@vs
Ltd 9 nl.net
Shri. Phadnis

- 136 -
For WTP & 2432001
STP 0

- 137 -
IMPORTANT TELEPHONE NUMBERS

POLICE STATIONS 100


Head Quarter 25533382
FarasKhana 24452250
Khadak 24476422
Samarth 26135491
Swargate 24260350
Sahakarnagar 24228113
VishrambaghWada 24457750
Deccan 25675005
Kothrud 25447427
Chaturshringi 25645335
Lashkar 26361250
Vanowadi 26870881
Bundgarden 26123825
Yerawda 26684456
Khadaki 25818659
Bhosari 27124728
Pimpri 27742218
Nigdi 27655088
Vishrantwadi 26692590

FIRE BRIGADE 101


Central Fire Brigade Station 26351707
Pune Station 26122545
Yerwada 26696400
Aundh 25883098
Yerandawane 25468373
Budhwar Peth 24458950
Hadapsar 26870207
Pimpri 27473333
Bhosari 27120090

AMBULANCE 101
Sai Ambulance 24215208 / 24215308
Nandadeep 25533496 / 25536519
Rugnaseva 24217672
Kolumbus 25531146 / 25532630
Pune Medical Foundation’s (Ruby Hall) 26123391

- 138 -
Deendayal Memorial Hospital 25652497
HOSPITALS
K.E.M. Hospital 26125600 / 26125601
Ruby Hall Clinic 26123391
Jahangir Hospital & Medical Center 26122551 / 26122552
Kulkarni Endo-surgery Institute 25448554
Poona Hospital 24331707
Krishna General Hospital 25460625 / 6 / 7
Joshi Hospital 25676861 / 25672563
Bharati Hospital 24375182
Seventh Day Adventist 24261926
Mission Hospital 24261619
Deendayal Memorial Hospital 25652497 / 25651613
Lokmanya Hospital 27456496 / 7 / 8
Inlax & Budhrani Hospital 26129080 / 82
Doctor Ambedkar Cantonment 26350530
Sasoon General Hospital 26128000
Hardikar Hospital 25535326 / 27
Aditya Birla Memorial Hospital 30717777 / 30717500 / 1 / 2

BLOOD BANKS
Ruby Hall Clinic 26136318
Achrya Aanadrishiji Blood Bank 24337627
Indian Serological Institute 24335244
Indian Red Cross 26120950
Navjeevan 24480341
Lokmanya Hospital 27459222
Inlax & Budhrani Hospital 26129080 / 82
Sasoon General Hospital 26128000 (Ext. 364)

DAY-NIGHT CHEMISTS
Poona Medical Foundation 26123391 (Ext. 263)
(Ruby Hall Clinic) (Ext. 346)
K.E.M. Medical Stores 26133176 / 5600 (Ext. 370)
Krishna Medical stores 25448934
Poona Hospital Medical Stores 24338768 / 24331076 (Ext. 215)
Deendayal Memoriyal Hospital 25652497 / 25651613

- 139 -
- 140 -