Core Activities of CPRI
 Research & Development
 Product & technology development
Upgrading industry products
Consultancy
Testing & certification
CPRI NETWORK

1992
Regional Testing
Laboratory GUWA
Ghaziabad 1993 HATI
1960 Thermal Research
Switchgear Testing Centre
and Development Bhopal
Station KOLKA
TA
Nagpur

Hyderabad 1993
UHV Research Laboratory
1960 Bangalore
Central Research and 1993
Testing Laboratory & Head
Quarters Energy Research Centre
Thiruvananthapuram
OBJECTIVES OF THE INSTITUTE

•Serve as nodal centre for applied research in


Electric Power engineering
•Function as an independent authority for
Testing & Certification of Power Equipment
•Assist utilities / industries in product
development
VISION
TO BE THE GLOBAL LEADER in R&D, Testing & Consultancy in
Electric Power through frontier research & on the cutting edge
technologies

MISSION
To carry out applied research & provide quality services for ACHIEVING
RELIABILITY AND ECONOMY IN POWER SYSTEMS through excellent
facilities, commitment & best practices, ensuring self-sustenance

VALUE
WE VALUE CUSTOMER SATISFACTION by sharing out knowledge and
caring for their needs, maintaining total transparency in our operations

ATTITUDE
TOGETHER WE STRIVE TO LEARN MORE & SERVE THE SOCIETY
BETTER with an open mind and futuristic outlook, always willing to
accept new challenges.
CPRI has excellent facilities for Research,
testing & certification in areas of

 High Voltage  Transmission


Tower Testing up to 800 kV
 Insulation Transmission Line
Accessories
Insulating Material
Power Cables
 Domestic Appliances
Power Capacitors  Materials Technology
Liquid Dielectrics Coal, Environmental,
Fly ash products,
 Short Circuit Materials Characterization

Switchgear  Seismic Qualification


 Power Systems
Real Time Digital Simulation
HVDC Simulator
OTHER SERVICES

 Energy Audits, Enhancement of TPS


performance
 Diagnostic & RLA studies on TPS
 Coal-blending, Environment Impact &
Audit studies
 Dynamic studies on EHV AC & HVDC
Power Systems
 Studies on Energy efficiency & non
conventional energy applications.
OTHER SERVICES

 Waste utilization of Power plants - value


added products

 Diagnostic measurements & PD on


Generator and HV Motor Windings

 High Voltage Performance studies

 Reduction of RoW/ spatial requirements


and cost of Transmission systems

 Third party inspection services


GROWTH IN REVENUE EARNINGS OF
CPRI
40 36 36.5
30.7
35 28.1
30 24.7 25.8
25
20 REVENUE IN
15 CRORES
10
5
0
1999- 2000- 2001- 2002- 2003- 2004-
00 01 02 03 04 05

EACH YEAR THE INSTITUTE SERVICES MORE THAN 2000 ORGANISATIONS IN


THE AREAS OF TESTING & CONSULTANCY
GROWTH IN FE EARNINGS
ENHANCEMENT OF CPRI BRAND EQUITY IN THE COUNTRIES OF
AFRICA, MIDDLE EAST, SOUTH EAST ASIA & SAARC COUNTRIES
HAS LED TO TESTING & CONSULTANCY ASSSIGNMENTS FROM
THIS REGION
300,000

YEAR FE 250,000

200,000

1997- 1998 US$ 17,000 150,000

100,000
1998-1999 US$ 61,000
50,000
2004-2005 US$ 248,000 0
1997-98 1998-99 2004-05

OVER 50 FOREIGN CLIENTS SERVICED DURING 2004-2005


CPRI Performance for 2004-05
Performance Weightage Targets for Performance Grade Performance
Parameters points on 2004-05 (2004-05) score
scale of 100

Revenue Earnings 40 35.80 36.15* Very Good 39.29


(Rs crores)

Research Papers-International 10 25 25 Very Good 8.33

National 5 50 40 Good 3.33

Research Projects completed 15 12 18 Excellent 15.00

Continuing Education
Programmes/Seminars/ 5 15 18 Excellent 5.00
Conferences/Training
Programs

Filing of PATENTS/ 10 6 5 Good 7.14


Technology Transfer

Capital Fund Utilisation (%) 10 100 70* Good 7.00

Invited Talks/Lectures 5 45 64 Excellent 5.00


Overall Excellent 90.09
Note: * The figures shown are provisional
ACCREDITATION OF CPRI

• CPRI laboratories Accredited as per


International Standard ISO / IEC
17025 norms by NABL

• CPRI laboratories Approved by


Bureau of Indian Standards
TRACEABILITY OF CPRI
ACCREDITATION
CPRI ACCREDITATION BY
INTERNATIONAL BODIES
• CPRI Laboratories Accredited by ASTA
BEAB,UK for Testing LV/MV equipment
• CPRI Certification approved by utilities in Saudi
Arabia, Bahrain, Oman, Egypt, UAE, Malaysia,
Bangladesh & Sri Lanka etc
• CPRI laboratories Approved by
Underwriters Laboratories’ (UL), USA for
testing of Capacitors, Cables, Fans, Wiring
materials, Relays, Motors which help
Manufacturers’ to export to USA & other North
American markets
Contd…..
• CPRI laboratories approved by Canadian
Standards Association (CSA) for testing of
Fans, Wiring materials, Relays, Motors which
help Manufacturers’ to export to USA & other
North American markets
• CPRI laboratories are approved under
IECEE-CB scheme.
• CPRI has been conferred full membership of
STL
CREDENTIALS
300 Research Projects successfully
completed
50 know how developed
Over 40 Major Consultancy Assignments
accomplished
25 Technologies Commercialised
Contd….

Over 30 MoU’s with reputed national /


international bodies for joint cooperation
in areas of Research & Consultancy
Over 45 awards received for best
Research Paper Presentations, Best
Young Engineer award etc
CPRI also conferred Best Research
Laboratory by NEFIN Engineers
Foundation in the year 2000.
CREDENTIALS
Presentation of 1900 Research
Papers in National/ International
Seminars/Conferences
14 Patents obtained
- Currently 16 Patent
Applications are under progress
400 Technical Reports brought out
Achievements
Patents : 14+ 16

Awards : 45

Technology
Transfer : more than 30
MAJOR TEST & RESEARCH
FACILITIES
UNIQUE 1500MVA SHORT CIRCUIT TESTING
FACILITIES, STDS, BHOPAL
POLLUTION LABORATORY, UHVRL HYDERABAD
1600 kV, 6A POWER FREQUENCY TRANSFORMER,
UHVRL, HYDERABAD
TEST FACILITY FOR
ELECTRONIC AND
ELECTROMECHANICAL
SHORT TIMEENERGY METERS INGRESS
OVER CURRENT PROTECTION

VIBRATION EMI / EMC


TESTING TEST FACILITY
REAL TIME DIGITAL SIMULATOR
IN ASSOCIATION
SEISMIC QUALIFICATION
WITH
BHEL
Materials Technology
Division

• Remaining life
assessment
• Failure Analysis
• Coal Combustion
• Structural Integrity
• Fly ash utilization

C B A
FOCUS AREA FOR CONSULTANCY

DIAGNOSTIC TESTING OF POWER PLANT


ELECTRICAL EQUIPMENT
* Fully equipped with field testing facilities
* Mobile field testing laboratory

* Special task groups of engineers & scientists


COLLABORATIVE WORK

# CPRI intends to work jointly with


the Power Stations and Utilities in the
following areas:

* On-Line monitoring of PDs on


selected numbers of generator units
and power transformers

* On-Line monitoring of Tan delta in HV


Bushings, CTs & CVTs
* Evolve criteria or bench marks for assessing
extent of deterioration or ageing

* Functional/Performance evaluation and


accelerated ageing studies on power apparatus
insulation systems in the Lab.

* Insulation diagnosis of power transformers


& power cables by HV dielectric spectroscopy

* Advanced PD Technique for detecting &


locating discharge sites in power cables
Research & Development
projects in CPRI
Research Contingency

• Exclusive to CPRI
• Collaborative projects

RSOP and Sponsored


Research Contingency
Projects
Funded by MOP under Plan scheme for
inhouse research in CPRI

Research as main objective


Product / process development
Augmentation of Research and Test facility
New test method/improvement in standards/New
diagnostic methods
Research Scheme On Power
Projects
Projects funded under Research
Scheme on Power by MOP to state
Utilities, Academicia ,Research Centres
etc
Responsible for Co-ordination: CPRI
Total No. of ongoing projects : 24
No of projects studied by CPRI : 1
Total no of organizations : 16
Brief of ongoing Research
Projects
Ongoing Research Contingency
Projects
Title of the Project Start Close Outlay
m y m y Rs.in lakhs

Pollution research on Metal Oxide 07/02 06/05 38.60


surge arresters
Assessment of life Expectancy of 07/02 03/05 22.40
Polymer Insulators
Automation in relay testing facility for 04/01 12/04 41.50
thermal and mechanical durability test

Performance evaluation of 9/03 2/05 45.0


communication technologies for
automatic remote meter reading.
Field testing of single phase prepaid 9/03 03/05 7.00
energy meter
Ongoing Research
Contingency Projects
Investigation of use of hollow 1/03 03/05 5.00
structural mild steel sections for 220
kV D/C transmission line towers
Studies on thermoplastic elastomers 07/02 06/05 32.60
for halogen free, fire retardant low
smoke cable compounds
New Dielectric liquids from non- 1/03 12/04 9.00
conventional / nonedible seeds
Development of Polymeric insulating
material for outdoor insulator 9/03 8/05 45.00
applications
Remaining life assessment of
transformers by large scale survey of
furanic compounds and correlation 9/03 8/05 25.00
with dissolved gas analysis [DGA] &
Degree of polymerization [DP]
Ongoing Research
Contingency Projects
Development of Advanced Non
Destructive Evaluation (NDT) Methods for 07/02 06/05 35.30
Assessment of High Temperature
Damage Mechanisms in Critical
Components of Thermal Power plants
Surface deposition & composite 07/02 12/04 3.80
impregnation techniques using complex
carbides for enhanced wear life of
components
Synthesis of nanomaterials – An 1/03 12/04 15.30
exploratory venture into an extraordinary
frontier in material science

Charging Tendency in large power 07/02 03/05 2.00


Transformer
Investigations on PD activity in model 07/02 12/04 12.40
transformers to validate field data
Ongoing Research
Contingency Projects

Insulation diagnosis by high 10/03 9/06 48.00


voltage spectroscopy
Power quality monitoring and 07/02 12/05 32.00
analysis in distribution system
Evaluation of electrical endurance 01/04 06/05 28.00
capability of medium voltage circuit
breakers
Pilot project on distribution system
07/02 03/05 22.00
planning for hamlet in Kerala
Flaw characterization by Ultrasonic 07/02 06/05 27.60
Time of flight Diffraction (TOFD)
Ongoing Research
Contingency Projects
Steam audit – new approach to improve 07/02 12/04 6.00
heat rate of Thermal Power Station
Damage Assessment in Boiler Tubes, 07/02 12/04 7.00
Drum and headers
Performance evaluation and life
improvement of boiler tube components 9/03 8/06 20.50
through plasma surface coating
Corona performance of bundle 04/00 12/04 26.50
conductors measured in corona cage
Frequency response analysis of high 07/02 06/05 25.60
voltage power transformers
Assessment of Transformer oils for 10/02 12/04 23.50
Additive, Degradation products for oil
status & remaining life.
Ongoing Research
Contingency Projects

Characterization of new imported 01/04 06/05 2.70


low viscosity transformer oil base
stocks presently being used in
power transformers
Design, fabrication and development
of drop out type expulsion fuse 01/04 12/05 2.00
phase II
Estimation and analysis of radiated
electromagnetic of switchgears,
01/04 12/05 35.00
power equipment with augmented
test facility for EMI measurement
Ongoing RSOP Projects in
CPRI
Title of the Project Start Close Outlay
m y m y Rs.in lakhs
Study of effects of electrical fast transients, 03/02 03/05 16.94
electromagnetic and magnetic field on static
energy meters and other electronic gadgets
Creation of grid disturbance database 10/02 12/04 10.00
Performance evaluation of LT capacitors under 03/02 03/05 25.00
Tansients
Acoustic emission technique for online 03/02 03/05 24.00
condition monitoring of power transformers

10/02 03/05 8.25


Design and development of 2500 MVA Master
circuit breaker components
Performance assessment of
electromechanically coupled systems by non- 9/03 8/06 30.00
contact heat loss measurement
IMPORTANT R&D PROJECTS COMPLETED

Study on the behaviour of grounding grids under


power frequency, impulse and DC currents
Feasibility study for enhancing the power
transfer capability on NHVDC experimental line
Vibration studies on transmission lines
Development and evaluation of low smoke
power cables
Ageing studies of insulators under DC voltages
Development of pollution test method using dust
chamber
Electroless nickel plating for engineering
applications
IMPORTANT R&D PROJECTS COMPLETED (contd..)

Development of new capacitor dielectric from


rape-seed oil
Development of microprocessor based Trivector
meter, powerline harmonic analyser and cable fault
locator

Microprocessor based single-phase energy meter


Microprocessor based card-operated single phase
energy meter
Automatic power factor controller
Negative sequence Quantiser
IMPORTANT R&D PROJECTS COMPLETED (contd..)

 Updraft multi-fuel biomass Gasifier


 Software packages for power transmission &
distribution system
 Electronic ballast for tubelights
 Flyash based bricks/ tiles

 Low-cost electrostatic voltage divider

 High strength brick using flyash/ activated bottom


ash
IMPORTANT R&D PROJECTS COMPLETED (contd..)

 High efficiency uninterruptible power supply system

 Electric field meter & ion current meter to measure


electrostatic field under transmission lines and sub-
stations

 Digital modeling of HRC fuses for improving designs

 PC based third harmonic injection test

 Development of Epoxy Novolak resin for Insulators

 Development of low inductive resistive divider for


measurement of steep front impulses

 Menu based software for Distribution system planning


IMPORTANT R&D PROJECTS COMPLETED (contd..)

 Fire ball simulator for improving boiler efficiency

 Harmonic filters for distribution systems

 Design of high accuracy & cost effective energy


meters

 Design of FACTS controller (TCSC) for transmission


systems

 Design of Tower foundation using micropiles

 Relay co-ordination package

 Development of field model of 6-R Damper


HIGHLIGHTS OF COMPLETED
PROJECTS
Title:
Establishment of performance Assurance structural
integrity aspects in Alumina based porcelain Insulators

Outcome:
Studies have been carried out to investigate the structural
integrity aspects as well as performance of porcelain
insulator samples with varying defects and without
Defects.
Important findings are:
 %  - Al2O3 &  - quartz are critical parameters
rather than the total Alumina and silica content.

 New test method is developed for determination of %


 - Al2O3 using XRD

 Corundum phase of Alumina – restricts propagation


of cracks. Optimum % of Alumina is found to be
35.0%. Higher % imparts brittleness due to glassy
matrix.
 Microstructural manifestations – including controlled
mullitic distribution, compositional homogeneity,
porosity play supporting role
Title:
Development of Data acquisition Software for 8 channel
High speed Digital Storage Oscilloscope

Outcome:
Data acquisition software developed to integrate 8 channel
storage oscilloscope to acquire data during short circuit
testing. The work facilitated automation of the test facility
thereby reducing time taken for conducting the tests
Title: Advanced Technique to study the influence of residual
stress on the structural integrity of the plant components
OUTCOME

 Improved by over coming existing limitations on the


diffraction angle measurement.

 Software has been developed to over come earlier


limitations. This has helped in improving the analytical
capacity of the facility

 Improved facility has been utilized effectively by


organizations like M/s ISRO, M/s HAL, M/s Chemhood
Industries etc.
Title: Synthesis, characterization and use of Nitrogen
hector cycles for curing flame retardent properties of
halogenated & non-halogenated systems
OUTCOME
• Several compositions with Ligands and Nitrogen hetro
cycles have been prepared and characterized for FRLS
properties.
• Influence of the heterocycles on the electrical properties
of the cured epoxy resin system at elevated temperature
studied.
• Concentraqtion of heterocycles of the resin system has
been standardized using DSC cure studies.
Title: A Mobile facility for field Evaluation of Accuracy of
Current Transformers and Losses of distribution Transformers.
OUTCOME
 On-site requirements of various clients can be attended to
quickly.
 Saves the cost and hassles of transport of equipment to be
tested.Tests would be faster and cheaper for the clients and can
be done while in service at site..
 The facility can be used as stand-by for laboratory use.
 The mobile set up motivates regular appraisal of DTs and CTs
which in turn results in reduction of failure rates & increase in
their operational efficiency.
 Additional revenue of about Rs. 10 lakhs estimated.
 Facilities have been used extensively in the field testing at RTDS,
Raichur, APTRANSCO, M/s Ogdan Balaji Services, Muduai etc.
Title: Design & Development of interrupting Chamber.

OUTCOME

Development indigenous technology for the


chamber.

Become self sufficient.

Saving on foreign exchange and down time of


procurement.
Title: Design and fabrication of non contact type travel
recorders for analysis of circuit breaker characteristics

OUTCOME
•The aim of the Project is to develop suitable non contact type
travel recording system for recording of contact travel
characteristics of different ratings of circuit breakers.

•Laser based sensors are identified for recording of contact


travel characteristics for medium voltage circuit breakers.

•Ultrasonic sensors are identified for recording of contact travel


characteristics of HV and EHV circuit breakers. Suitable
measuring systems like fibre optic transmitter receiver
identified
TITLE: Improvements in measuring system for
Lightning impulse tests at lower test
voltages

OUTCOME

Design and development of 500 kV Voltage


Divider used for testing distribution / power
transformers up to 33 kV rating, line traps,
reactors, voltage transformers etc.
Major Consultancy Assignments
Joint
Name
Collaborator
Insulation coordination studies for
400kV GIS planned by Tehri Hydro BHEL & IISc
Development Corporation

Power evacuation study of captive


power plant for Usha Martin Ltd., BHEL
Calcutta
Power evacuation studies for MPEB
ABB
system

Design, development & fabrication of DSIR & GK


12 kV load break switch Electricals
MAJOR CONSULTANCY ASSIGNMENTS (contd…)

Joint
Name Collaborator

Line upgradation of existing 110 kV to


132 kV line - Kanakavalli and Kudal at EMC Steelal
MSEB

Line uprating of existing KSEB


66 kV line
Line upgradation of existing Goa ElecDept.
33 kV to 110kV line
ESTIMATION OF TECHNICAL LOSSES
APERC
IN AP POWER SYSTEM
MAJOR CONSULTANCY ASSIGNMENTS (contd…)

Name

SYSTEM STUDIES FOR NEW


MANGALORE PORT TRUST

ESTIMATION OF TECHNICAL LOSS


IN DISTRIBUTION SYSTEM FOR
KERC

POWER SWING STUDIES FOR


WREB SYSTEM

FLICKER STUDIES FOR USHA


MARTIN INDUSTRIES
MAJOR CONSULTANCY ASSIGNMENTS (contd…)
Joint
Name Collaborator
ESTABLISHMENT OF CENTRE FOR
ASH UTILIZATION AND INEP/KPCL
ENVIRONMENTAL CONSERVATION
TECHNO ECONOMIC STUDIES ON KPCL / MMTC
COAL BLENDING

RDSO
FAILURE ANALYSIS OF INSULATORS

CFRI
PILOT SCALE COAL COMBUSTION
FACILITY
AUGMENTATION & MODERNISATION ROURKELA
OF RAURKELA STEEL PLANT STEEL PLANT
Services under APDRP
• Appointed Advisor cum Consultant
under APDRP for 3 Southern States
• Karnataka, Kerala, Andhra Pradesh
• Pioneering work done for total of 9
circles in the three states
WORK DONE BY CPRI UNDER APDRP
• RECONDUCTORING OF 11kV LINES
• R&M OF DISTRIBUTION TRANSFORMER
• SPECIFICATIONS FOR NEW 11kV LINES
• SPECIFICATIONS FOR NEW DOUBLE POLE STRUCTURE
• FEEDER METERING
• ADDITION OF NEW SUBSTATION AND POWER & DISTRIBUTION
TRANSFOMERS

EFFORTS HAVE MATERIALISED IN


1. IMPROVEMENT OF VOLTAGE & REDUCTION OF LINE LOSS WITH
HVDS BY 13.16%
2. VOLTAGE IMPROVEMENT BY 20%
3. IMPROVEMENT IN METERING EFFICIENCY
4. REDUCTION OF DTR FAILURE
5. INCREASE IN REVENUE COLLECTION BY Rs 0.63 Paise Per kWhr
Consultancy Services offered in the area of Electric Power
Transmission and Distribution using Digital Simulation
•Power Swing phenomena in Western Region System and suggestion
for remedial measures to avoid cascade tripping of 400 kV
transmission lines on power swing for WREB

•Power Evacuation Studies for MPEB System

•Insulation Coordination Studies for Gas Insulated System for Tehri


Hydro Development Corporation, Rishikes

•Power Swing Blocking Study in Northern Region System for NREB,


New Delhi

•Installation of Static VAR Compensators in MPEB - EMTP studies

•Failure Analysis of Generator Transformer at Chamera HPP of


NHPC, Faridabad

•Failure Analysis of 400 kV Circuit Breaker at 400kV Khamam


substation for Power Grid Corporation of India
•Simulation of EMTP files for Dynamic Testing of Relays for ABB,
Bangalore

•Design of SVC at 110 kV Ponda substation of Goa

•Relevance and requirement of shunt reactors at 400kV Panipat


and Bhiwani substations in BBMB system.

•Generator Transformer failure analysis at Salal Hydro Power


Station, Salal, Jammu, for NHPC.

•Analysis of Technical Losses of Distribution System of major


Towns viz. (i) Davangere, (ii) Hubli & (iii) Dharwar of Karnataka

•Estimation of Technical Losses in AP TRANSCO system.


•Estimation of Technical and commercial losses in SPDCL system-
Ongoing major work

•Estimation of Losses in Transmission and Sub-transmission system


of Maharashtra State Network. – Work recently awarded by
MERC, Mumbai
Consultancy Services offered using HVDC Simulator

•Dynamic Performance Study of Control & Protection


System for National HVDC Projects Stage II, BHEL

•Factory System Testing of Control & Protection System


for National HVDC Project Stage II, BHEL

•Additional studies on NHVDC Stage II Control System for


BHEL, N. Delhi & Bangalore

•Dynamic Performance Study and Factory System Testing


of Control & Protection System for National HVDC Project
Stage I, BHEL
CONSULTANCY SERVICES OFFERED USING GROUNDING
STUDIES

•Ground mat design for Switchyard of 132 kV Tintibi


Substation, Bhutan

•Ground mat design for Gas Insulated Substation at Al Ain


Substation, Abu Dhabi

•Measurement of soil resistivity & design of Earthing System for


1000 MW, Tehri Hydro Power Project of THDC, Tehri (U.P.)

• Measurement of soil resistivity & design of Impulse & Power


frequency Earthing Systems for High Voltage Laboratory of M/s
Kirloskar Power Projects Ltd, Pune

•Ground mat design of various Hydro Electric projects for KPCL


•Ground mat design for Yelahanka Diesel Generating Station of
KEB

•Ground mat design of Raichur Thermal Power Station of KPCL


•Ground mat design for the Switch yard of Grasim Industries
•Measurement of ground resistance & soil resistivity for
NPC, Kaiga

•Measurement of soil resistivity & design of ground mat for


Khadra Dam Power House of KPCL

•Measurement of soil resistivity & design of ground system


for 33kV s/s at Jindal Vijayanagar Steel Plant, Bellary

•Measurement of soil resistivity & design of ground mat for


WIDIA India Ltd., Bangalore

•Measurement of soil resistivity & earth resistance of CI


earthing system for Kapilansh Dhatu Nigam, Nagpur

•Techno-economic evaluation & Design of concrete encased


grounding system for Kerala State Electricity Board
Consultancy Services offered for Captive Power Generation

•Stability studies for Captive Power Plant for NSK


Engineering Corporation, Pune

•Transient stability and Islanding study for NSK Engg.,


Pune

•Flicker calculation of 25MVA EAF for Usha Alloy & Steel


Division, Jamshedpur

•Power System Planning studies, Coordination of Protection,


Phenomena of Motor Starting, location of 110kV substation
for New Mangalore Port Trust, Mangalore

•Measurement of Earth resistance of 220kV substation of


KEB at Malur

•Check for adequacy of grounding system for Gurunanak Dev


TPs, Bhatinda
•Evaluation of ground resistance of Ashlok Ground
Electrodes, Bangalore

•Mitigation of Neutral Voltages at GE-BEL, Bangalore

•Design of Ground mat for 110kV s/s of KSEB at


Kuttipuram

•Design of harmonic Filter for Usha Beltron, Ranchi

•Measurement & Deisgn of Ground mat for 220kV


Gerusoppa Power Station of KPCL

•Stability studies for Captive generators of J.K.


Cements Works, Rajasthan

•Stability studies for SPIC Petro Chemicals, Madras

•System study for Captive Power Plant of Grasim


Industries, Nagda [MP]
•System studies for Captive Power Plant of Century
Pulp & Paper Plant, Nainital [UP]

•System study of CPP of ONGC, Assam

•Stability studies for Captive Power Generation of


Torrent Pencillin Plant, Gujarat

•Transient stability and Islanding study for NSK


Engg., Pune

•Harmonic study for augmentation existing EAF, for


Usha Martin Industry, Jamshedpur

•Study for proposed synchronization of 25MW CPP


unit with BSEB’s 33kV system for Usha Alloy &
Steel Division, Jamshedpur.