Professional Documents
Culture Documents
PART-A
CARRIAGE OF MATERIALS
NOTE: Part of Km beyond 1Km will be treated as under :
1.499=1.00 Km; 1.500 Km = 2.00 Km.
1 Carriage of Earth, Sand, Lime, Cum 14.7 2.4 36.3 43 2.7 53.8 2.3 65.3 2.1 86.3 1.9
Morrum, Manure or Sludge etc.
including loading and unloading
complete with a lead of
2 Carriage of Building Rubbish Cum 16 2.7 40.3 48.3 2.7 59.1 2.4 71.1 2.1 92.1 1.9
Stone Metal, Grit and Ballast etc.
including loading and unloading
complete with a lead of
3 Stone for masonry work and Cum 16.8 3 43.8 54.6 3.4 68.2 2.75 81.95 2.7 108.95 2.1
soiling
4 Excavated work Cum 19 3.3 48.7 58.8 3.7 73.6 3 88.6 3 118.6 2.4
5 Bricks 1000 30.5 6.1 85.4 91.3 6.1 115.7 6.1 146.2 4.8 194.2 3.95
Nos.
6 Brick Tiles 1000 24.2 4.2 62 67.2 4.8 86.4 4.8 110.4 4.2 152.4 2.75
Nos.
7 Cement, Stone Blocks, Pipes and MT 19 1.5 32.5 38.9 2.1 47.3 2.4 59.3 1.9 78.3 1.5
other heavy materials
8 Steal, Tar, Bitumen and Steam MT 22 2.1 40.9 48.3 2.7 59.1 2.75 72.85 2.1 93.85 1.5
Coal
9 Empty Bitumen Drums 10 8.4 1.2 19.2 24.2 1 28.2 1.2 34.2 1 44.2 1
Nos.
10 carriage with care PreCast cement concrete blocks like Dand & kerbs etc. weighting
10.1 Up to 50 Kg. Each - - - 3.3 0.25 4.3 0.25 5.55 0.1 6.5 0.1
10.2 51 to 70 Kg. Each - - - 4.9 0.3 6.1 0.25 7.35 0.1 8.35 0.1
10.3 71 to 100 Kg. Each - - - 6 0.4 7.6 0.25 8.85 0.1 9.85 0.1
11.1 Dia 300 mm Meter - - 14.7 17.6 0.4 19.2 0.25 20.45 0.1 21.45 0.1
11.2 Dia 600 mm Meter - - 38.8 40.9 1 44.9 0.9 49.4 0.65 55.9 0.4
11.3 Dia 900 mm Meter - - 96.6 102.9 1.9 110.5 1.6 118.5 1.3 131.5 0.9
11.4 Dia 1200 mm Meter - - 120 133.4 2.4 143 1.9 152.5 1.3 165.5 1
CHAPTER : ROAD MATERIALS & THEIR CARRIAGE
R-1
Item No. Item Description Unit Rate (Rs.) Rate (Rs.) %
2009 2008 VARIATION
PART - A CARRIAGE OF MATERIALS
12 Carriage of Bitumen mixed material from Hot Mix Plant
in Tipper to Paver Finisher
12.1 For the first km. (rate is included in the respective item).
4.1.2.2 Pre-stressed/ reinforced cement concrete grade M-20 Cum 329.00 312.00 5.45
& above
4.2 Brick/ tile work
4.2.1 In lime mortar Cum 91.00 85.00 7.06
4.2.2 In cement mortar Cum 116.00 108.00 7.41
4.2.3 In mud mortar Cum 80.00 76.00 5.26
4.3 Stone masonry
4.3.1 Rubble stone masonry in lime mortar Cum 94.00 94.00 0.00
4.3.2 Rubble stone masonry in cement mortar Cum 116.00 108.00 7.41
4.3.3 Rubble stone masonry in mud mortar Cum 91.00 85.00 7.06
4.3.4 Dry rubble masonry Cum 85.00 80.00 6.25
4.4 Stone pitching/ dry stone spells. Cum 80.00 76.00 5.26
4.5 Dry brick pitching or brick soling Cum 80.00 73.00 9.59
4.6 Wood work wrought framed and fixed in frames of Cum 217.00 205.00 5.85
Trusses up to a height of 5 m above plinth level.
4.7 Steel work in all types of sections up to a height of 5
m above plinth level excluding cutting of rivet.
4.7.1 Including dismembering Tonne 553.00 515.00 7.38
4.7.2 Excluding dismembering Tonne 413.00 377.00 9.55
4.7.3 Extra over item No. 4.7.1 and 4.7.2 for cutting rivets Each 4.00 4.00 0.00
7 Dismantling guard rails by manual means and Meter 28.00 26.00 7.69
disposal of dismantled material with all lifts and up to
a lead of 1000 meters, stacking serviceable materials
and unserviceable materials separately as per
MoRTH specification clause 202.
8 Dismantling kerb stone by manual means and Meter 6.00 6.00 0.00
disposal of dismantled material with all lift and up to a
lead of 1000 meter as per MoRTH specification
clause 202.
9 Dismantling Kerb stone channel by manual means Meter 9.00 9.00 0.00
and disposal of dismantled material with all lifts and
up to a lead of 1000 meter as per MoRTH
specification clause 202.
10 Dismantling of Kilometer stone including cutting of
earth, foundation and disposal of dismantled material
with all lifts and lead up to 1000 m and back filling of
pit as per MoRTH specification clause 202.
12 Dismantling of CI water pipe line 600 mm dia Meter 50.00 47.00 6.38
including disposal with all lift and lead up to 1000
meters and stacking of serviceable material and
unserviceable material separately under supervision
of concerned department but excluding earth
excavation and dismantling of masonry works as per
MoRTH specification clause 202.
11
13 Removal of cement concrete pipe of sewer gutter Meter 64.00 60.00 6.67
1500 mm dia under the supervision of concerned
department including disposal with all lifts and up to a
lead of 1000 meters and stacking of serviceable and
unserviceable material separately but excluding earth
excavation and dismantling of masonry works as per
MoRTH specification clause 202.
4 Box cutting/Trenching the Sub Grade to proper slope, 100Sqm 49.00 41.00 19.51
camber and removing inequalities including removing
deleterious stuff and depositing on the road side
slopes (cutting of earth shall be paid separately in the
respective item on the basis of classification of the
excavation done by the Engineer (MoRTH
specification clause 301 to 305)
5 Compensation for earth, taken from private land with Cum 10.00 5.00 100.00
all lead and lift (Land to be arranged by private
negotiations by the contractor) [MoRTH Specification:
Clause 301 to 305].
13
7.2 BY MANUAL MEANS: When lying of earth in layers is Cum 18.00 15.00 20.00
done from stockpiles including breaking of clods and
dressing with all lead and lift but excluding rolling and
watering.
7.3 BY MECHANICAL MEANS, using Motor Grader, from Cum 18.00 15.00 20.00
earth in stock piles with all lead and lift but excluding
rolling and watering.
8 Extra for watering the earth to bring the earth up to Cum 8.00 7.00 14.29
required O.M.C excluding rolling
9 Extra for rolling to specification with the use of Cum 13.00 11.00 18.18
Vibratory roller when earth is at suitable moisture
content with desired field density not less than 95% of
maximum dry density (Modified Heavy Proctor test),
excluding watering.
10 Extra for rolling to specification with the use of Cum 17.00 14.00 21.43
Vibratory roller when earth is at suitable moisture
content with desired field density not less than 100%
of maximum dry density (Modified Heavy Proctor
test).excluding watering.
11 Extra for rolling to specification with Power Roller, 8- Cum 7.00 6.00 16.67
10 tonne when earth is at suitable moisture content
with dry field density not less than 95 % of maximum
dry density (Ordinary Procter test).excluding watering.
12 Extra for rolling to specification with Power Roller, 8- Cum 8.00 7.00 14.29
10 tonne when earth is at suitable moisture content
with dry field density not less than 100 % of maximum
dry density (Ordinary Procter test).excluding watering.
15.1 Ordinary Soil (80% of item No.R3-8.1) Cum 66.00 55.00 20.00
15.2 Hard Soil (pick work) (80% of item No. R3-8.2). Cum 95.00 79.00 20.25
15.3 Blasting work
15.3.1 Soft Rock (80% of item No.R3-8.3.1). Cum 196.00 163.00 20.25
15.3.2 Hard Rock (80% of item No.R3-8.3.2) Cum 246.00 205.00 20.00
15.4 Chiseling/Wedging out of rock (where blasting of
prohibited).
15.4.1 Soft Rock (80% of item No.R3-8.4.1) Cum 551.00 459.00 20.04
15.4.2 Hard Rock (80% of item No.R3-8.4.2). Cum 870.00 725.00 20.00
16 Construction of embankment with approved material Cum 168.00 131.00 28.24
obtained from borrow pits with all lifts and leads,
transporting to site, spreading, grading to required
slope and compacting by vibratory roller 8-10 Tonne
to meet requirement of Table 300-2 including cost of
compensation for earth taken from private land with
lead up to 1 Km as per MoRTH specification Clause
No. 305.
18 Construction of sub grade and earthen shoulders with Cum 182.00 152.00 19.74
approved material obtained from borrow pits with all
lifts and leads, transporting to site, spreading, grading
to require slope and compacted by vibratory roller 8-
10 Tonne to meet requirement of Table 300-2 as per
MoRTH specification Clause No. 305.
15
21 Stripping, storing of top soil by road side at 15 m Cum 97.00 81.00 19.75
internal and reapplication on embankment slopes, cut
slopes and other areas in localities where the
available embankment material is not conducive to
plant growth as per MoRTH specifications Clause No.
305.
22 Silt clearance of drains, channels and canals with lift Cum 38.00 32.00 18.75
1.5 Meter. And lead up to 50 Meter.
23 Filling of available excavated earth (excluding rock) in Cum 13.00 11.00 18.18
trenches, plinth sides of foundation etc. in layers not
exceeding 20 cm depth consolidating each deposited
layer by ramming and watering including lead up to
50 Meter. And lift up to 1.5 Meter.
2.1 For grading-I with CBR value not less than 30. To Cum 496.00 390.00 27.18
attain 100% proctor density.
2.2 For grading-II with CBR value not less than 25. To Cum 486.00 384.00 26.56
attain 100% proctor density.
2.3 For grading-III with CBR value not less than 20.to Cum 481.00 383.00 25.59
attain 100% proctor density.
3 Providing laying spreading and compacting
specified graded sand, gravel as per Table 400-
1,400-2 or any other course material as per design
mix, as per CBR in sub base course including
premixing the material at OMC in wet mix plant,
carriage of mixed material spreading in uniform
layers with motor grader F.E loader on a prepared
base and compacting with vibratory roller to
achieve desired density (as per I.S.2720) including
all material, labor, machinery, lighting guarding,
barricading and maintenance of diversion
complete.[MoRTH specification : Clause 401]. By
mechanical means with lead up to 1 km
6.1 Grading of material for sub-base course Cum 689.00 626.00 10.06
6.2 Grading of material for base course Cum 689.00 626.00 10.06
CHAPTER GRANULAR SUB BASE
: R-4
Item No. Item Description Unit Rate Rate (Rs.) %
(Rs.) 2008 VARIATIO
2009 N
7 Construction of sub-base using lime- Fly ash Cum 314.00 285.00 10.18
admixture with granular soil, free from organic
matter/ deleterious material or clayey silts and low
plasticity clays having PI between 5 and 20 and
liquid limit less than 25 and commercial dry lime
(slacked)
BASE COURSE
4.1 Add extra to item No. 4 for 1 Kg / 10 Sqm emulsion Sqm 2.00
5 Providing and applying tack coat on the prepared Sqm 8.00
surface, with bitumen emulsion as per IS : 8887 &
manufacturer’s specifications @ 2 kg /10sqm. With a
self propelled or towed bitumen pressure sprayer
equipped for spraying the material uniformly at specified
rates and temperatures as per MoRTH specification
Clause 503 & 112 ( Including cleaning of bituminous
road surface )
5.1 Add extra to item No. 5 for 1Kg / 10 Sqm emulsion Sqm 2.00
6 Providing and laying bituminous macadam on prepared
surface with specified graded crushed aggregate as per
table 500-4, grading-1for base / binder course including
loading of aggregates with Front end loader and
heating and mixing of stone aggregate and bitumen
(including cost of anti-stripping compound wherever
required) in hot mix plant transporting the mixed
material in tipper and laying mixed material with sensor
paver finisher to the required level and grade rolling by
power roller & vibratory compactor to achieve the
desired density (approved by the department )excluding
cost of primer/tack coat [MoRTH Specification : Clause
504 & 112] with lead of mix 1 Km.
7.1 50 mm thick. - Bitumen grade 60/70 @ 5 Kg. Per sqm Sqm 242.00
7.2 75 mm thick. - Bitumen grade 60/70 @ 6.8 Kg. Per sqm Sqm 326.00
13.1 19 mm nominal chipping size @ 0.015 cum per sqm & Sqm 58.00
Bitumen @ 1.2 Kg per sqm
13.2 13 mm nominal chipping size @ 0.01 cum per sqm & Sqm 48.00
Bitumen @ 1.0 Kg per sqm
13.3 10 mm nominal chipping size @ 0.008 cum per sqm & Sqm 39.00
Bitumen @ 0.9 Kg per sqm
14 Providing and laying open graded premix carpet 20mm
thick (compacted) on prepared surface in a single
course as wearing course composed of specified
graded crushed aggregates as per Table 500-23,
heating bituminous binder @ 14.6 Kg/10 Sqm.(60/70
grade) and aggregates in Hot Mix Plant (including cost
of anti-stripping compound , wherever required),
transporting the mixed material with tipper and laying
with paver finisher to the required level and grade,
rolling with power roller, 8-10 tonne but excluding cost of
tack and seal coat with lead for mix of material 1 Km.
[MoRTH Specification : Clause 511 & 112]
14.1.1 a) In Hot Mix Plant 40-60 TPH, including loading of Sqm 82.00
aggregates with Front end loader bitumen 60/70 grade
14.1.2 b) In Hot Mix Plant 40-60 TPH, including loading of Sqm. 85.00
aggregates with Front end loader bitumen crumb rubber
modified bitumen- CRMB 60
14.2.1 a) In mini Hot Mix Plant 6-10 TPH bitumen 60/70 grade Sqm 76.00
14.2.2 b) In mini Hot Mix Plant 6-10 TPH crumb rubber Sqm. 78.00
modified bitumen- CRMB 60
15 Providing and laying20mm thick Mix Seal Surfacing on a
prepared surface in a single course composed of
specified graded crushed aggregates as per table (500-
26) premixed with bituminous binder (including cost of
anti-stripping compound , wherever required) with lead
of mixed material up to 1 Km. [MoRTH Specification:
Clause 512 & 112) In a hot mix plant 40-60 TPH with
Front end loader, laying with paver finisher transporting
the mixed material by tipper and rolling with power roller
8-10 tonne to achieve density approved by the
department, but excluding cost of tack coat.
15.1 a) Type "A" (22 Kg. binder per 10 Sqm) bitumen 60/70 Sqm 110.00
grade
15.2 b) Type "A" (22 Kg. Binder per 10 Sqm) crumb rubber Sqm 114.00
modified bitumen- CRMB 60
15.3 a) Type "B" (19 Kg. Binder per 10 Sqm) bitumen 60/70 Sqm 113.00
grade
15.4 b) Type "B" (19 Kg. Binder per 10 Sqm) crumb rubber Sqm 116.00
modified bitumen- CRMB 60
16 Providing and laying seal coat for sealing the voids in a Sqm 45.00
bituminous surface laid to the specified levels, grade
and cross fall, including cleaning and rolling with a
smooth wheeled roller 8 - 10 tonne capacity finished to
required level and grades, complete as per MoRTH
specification clause 513 Type A - comprising of 11.2
mm to 2.36 mm size aggregate @ 0.09 Cum per 10
Sqm and bitumen binder @ 9.8 Kg / 10 sqm complete.
17 Providing and applying premix seal coat type "B" Sqm 33.00
comprising of thin application of fine aggregate (0.06
cum per 10 sqm) premix with 6.8 Kgs. Per 10 sqm
bitumen binder (Grade 60/70) (including cost of anti-
stripping compound wherever required) In mini hot mix
plant 6-10 TPH and laying with mechanical paver and
rolling with power roller 8-10 tonne including all lead of
mix material ( MoRTH Specifications Clause 513)
25.1 Crack width below 6mm using modified binder (PMB - Sqm 45.00
40) @ 9Kg. Per 10 Sqm crushed stone aggregate 0.11
Cum per 10 Sqm.
25.2 Crack width 6mm to 9mm using modified binder (PMB - Sqm 54.00
40) @ 11 Kg. Per 10 Sqm crushed stone aggregate
0.12 Cum per 10 Sqm.
25.3 Crack width above 9mm using modified binder (PMB - Sqm 72.00
40) @ 15 Kg. Per 10 Sqm crushed stone aggregate
0.12 Cum per 10 Sqm.
26 Providing and laying of premix of crushed stone
aggregates (as per Table 500 - 40) and emulsion
binder, mixed in a batch type cold mixing plant, laid over
prepared surface, by hydrostatic paver finisher with
sensor control, rolled with a pneumatic tyred roller
initially and finished with a smooth steel wheel roller , all
as per Clause 519.3
26.1 75 mm thickness comprising 40mm nominal size Cum 4500.00
aggregate and emulsion @ 45 Ltr. Per tonne
26.2 40 mm thickness comprising 14 mm nominal size Cum 6349.00
aggregate and emulsion @ 70 Ltr. Per tonne
26.3 25 mm thickness comprising 6 mm nominal size Cum 7416.00
aggregate and emulsion @ 85 Ltr. Per tonne
27 Spraying of bitumen over cleaned dry surface of Sqm 9.00
crushed cement concrete base at the rate of 25 Kg per
10 Sqm by a bitumen pressure distributor, spreading of
key aggregates at the rate of 0.13 cum per 10 sqm by a
mechanical gritter and rolling the surface as per Clause
506.3.8
28 Cost of bitumen to be added / subtracted when it varies
from job mix formula adopted in any of the above items.
NOTE:
Deduct the amount of cleaning in item no 4 & 5 if same
is not provided as per item no 1 & 2
CHAP TRAFFIC AND TRANSPORTATION
TER :
R-7
Item Item Description Unit Rate (Rs.) Rate (Rs.) %
No. 2009 2008 VARIATION
1 Supplying and fixing pre cast R.C.C. stones (M-15 mix) using
one percent steel reinforcement, including finishing in cement
sand mortar 1:3, earthwork, cement concrete 1:4:8 engraving
letters and numerals, painting with enamel paint etc. complete
as per IRC standard design.
1.1 Km. Stone for NH, SH & MDR ( size 35 x110x25 cm) Each 860.00 860.00 0.00
1.2 5th Km. Stone ( size 50 x152x25 cm) Each 1426.00 1426.00 0.00
1.3 200 Meter stone ( size 15 x10x65 cm) Each 248.00 248.00 0.00
1.4 Boundary stone ( size 15cm dia at top & 20 cm dia at bottom & Each 207.00 207.00 0.00
90 cm high )
1.5 Guide stone ( size 20 x15x120 cm) Each 357.00 357.00 0.00
2 S & F cut stone including earthwork, cement concrete 1:4:8
engraving letters and numerals, as per IRC standard design:
2.1 Km. Stone for NH, SH & MDR ( size 35 x110x25 cm) Each 1026.00 1026.00 0.00
2.2 5th Km. Stone ( size 50 x152.5x25 cm) Each 1553.00 1553.00 0.00
2.3 200 Meter stone ( size 15 x15x90 cm) Each 371.00 371.00 0.00
2.4 Boundary stone ( size 15x15x90cm) Each 378.00 378.00 0.00
2.5 Guide stone ( size 20 x15x120 cm) Each 475.00 475.00 0.00
3a S & F cement concrete pre cast Kerb or Dand up to 60 cm
length over 20 mm thick base of cement mortar1:4 including
jointing earth work, pointing & jointing with cement mortar 1:4 of
size
3.1 10 x 15 cm Mtr. 8 8
3.2 15 x 15 cm Mtr. 8 8
3.3 20 x 20 cm Mtr. 9 9
3.4 20 x 25 cm Mtr. 9 9
3.5 (20 x 25)/2 x 30 cm Mtr. 12 12
3.6 (20.5 x 25)/2 x 30 cm Mtr. 12 12
CHAP TRAFFIC AND TRANSPORTATION
TER :
R-7
Item Item Description Unit Rate (Rs.) Rate (Rs.) %
No. 2009 2008 VARIATION
4.1 Km Stone for NH, SH & ODR Each 238.00 238.00 0.00
4.2 5th Km Stone Each 352.00 352.00 0.00
4.3 200 Meter Stone Each 94.00 94.00 0.00
4.4 Boundary/Guide Stone Each 94.00 94.00 0.00
5 Labour charges for casting of cement concrete Kerb or Dand
including finishing and curing of size:
5.1 10 X 15 cm, 15 X 15 cm and 15 X 20 cm Mtr 15.00 15.00 0.00
5.2 25 X 25 (22.5+25)/2X30 and (20+25)/2X30 cm Mtr 18.00 18.00 0.00
6 Supply of mandatory / regulatory reflective sign board fixed on
3 meter long Angle Iron of size 65x65x6 mm complete as per
IRC-67-1977 made of 2 mm thick M.S. sheet stove enameled
paint and reflective symbol. Comp. in all respect duly post
painted in alternate band of Black/White synthetic enamel paint
& hold fast at bottom
9 Supplying cautionary / warning sign board 90 cm equilateral Each 4235.00 4235.00 0.00
triangle made out of 2.0 mm thick aluminum sheet riveted on a
frame of 40X40X3mm angle Iron, face to be fully covered by
white / blue high intensity grade retro reflective sheeting with
Red/white symbol, cut out or screen printed background with
epoxy paint complete confirming to MoRTH specifications
(1995) Cl. 801 with angle iron post 65 x 65 x 6 mm. Comp. in all
respect duly post painted in alternate band of Black/White
synthetic enamel paint & hold fast at bottom
12 Installation of sign board having the post like mandatory Each 192.00 192.00 0.00
cautionary & informatory board includes excavation, cement
concrete 1:5:10 (30X30X60) cm and transportation complete.
13 Supplying route Marker reflective sign boards consisting of Each 880.00 880.00 0.00
shield marked on M.S. flat 14 gauge of size 60 x 45 cm and
definition plate of 30 x 25 cm, 14 gauge, fixed on mild steel
posts of Angle Iron of 65X65X6mm – 3mtr.long for NH/SH:
Comp. inall respect duly post painted in alternate band of
Black/White synthetic enamel paint & hold fast at bottom
14 Supply of flood gauge (water Gauge) as per I.R.C. 67 standard Each 825.00 825.00 0.00
200 cm long fixed on angle iron posts 50x50x6 mm, 2.6 M.
long.
15 Fixing of flood gauge (water Gauge) in cement concrete M-15 Each 230.00 230.00 0.00
mix size 30x30x60 cm. complete including transportation
excavation etc. complete
16 Supplying of Cat’s Eye made of aluminium alloy size Each 154.00 154.00 0.00
75x100x22 mm having 21 biconvex lenses embedded in
circular disc of ABS plastic on each side.
CHAP TRAFFIC AND TRANSPORTATION
TER :
R-7
Item Item Description Unit Rate (Rs.) Rate (Rs.) %
No. 2009 2008 VARIATION
17 Supply of Traffic Cone made out of 1.25 mm thick MS. Sheet, Each 990.00 990.00 0.00
height 1 meter having upper dia, 8 cm, and lower dia.30 cm.
with base plate of size 40x40 cm two hooks are to be provided
for linking M.S. steel chain 12 mm dia, whole body is processed
in orange stoving enamel paint and one reflective band of 200
mm on it, complete in all respect with one chain 3 M long with
each cone.
18 Supplying of men at work sign board (folding type) made of Each 924.00 924.00 0.00
1.25 mm thick M.S. sheet size 900x900x900 mm painted in
white stove enameled paint and reflective machine cut sheet
Men’s emblem and letter MEN AT WORK in red colours and
additional attachment of size 150x900 mm plate for gang
number and name with white stoving enameled back ground
both plates are fixed on a folding stand of M.S. (heavy) steel
tube of size 13.2 mm outer dia as per IS-1239 (part-I) 1979 duly
painted in grey colour and both the plates are painted on back
side in grey enamel paint.
19 Supply of ‘L’ type Bollard made out of 1.25 mm thick M.S. sheet Each 1100.00 1100.00 0.00
height 134 cm, welded in circular type ring section having upper
dia 15 cm. and lower dia 21 cm with another attachment of
15x15 cm circular section with 15 cm. face plate and hold fast
at bottom, whole body is processed in white stoving enamel
and red reflective 3 hands, each of 7.5 cm end one reflective
sheet of 15 cm. dia provided to it complete in all respect.
20 Supply of Swiss Type Bollard made out of 1.25 mm thick M.S. Each 1265.00 1265.00 0.00
sheet, total height 135 cm, the lower portion is made in tapered
circular section having upper dia 15 cm and lower dia 20 cm
with attachment of one mandatory plate 7 mm thick & fixed with
the help of 7 cm long, 30mm dia chrome plated M.S. tube this
part is fixed on the body with another attachment of a cap 30x7
cm. whole body is processed in black stoving enamel and
mandatory plate in Azure blue, with one compulsory keep left
arrow with 10mm border reflective strip each of 7.5 cm on body
complete in all respect.
CHAP TRAFFIC AND TRANSPORTATION
TER :
R-7
Item Item Description Unit Rate (Rs.) Rate (Rs.) %
No. 2009 2008 VARIATION
21 Supply of Retro-reflective sign boards size 1800x1200 mm Each 24200.00 24200.00 0.00
made out of 2 mm thick aluminium sheet duly framed with 40
mm M.S. black tube (Medium Class) as per IS-1239 (Part-I)
1979 with Inner support of M.S. flat 12x3 mm whole structure is
fixed with two supports each side 75 mm long and 40 mm M.S.
black tube on two posts of 60 mm dia M.S. black tube (Medium
class) as per 1239 (Part-I ) 1979 2.03 meter long each and also
provision of hold fasts of M.S. bars 12 mm and 25 cm long two
on each post. The sheet has to be stove enameled or epoxy
painting one side and other side Green/ blue retro-reflective
high intensity with White Retro reflective sheet. The letters and
numerals have to be made as per IRC 30-1968 and the board
shall be conformed to the MoRTH specification (1995 edition
clause 801). Post and outer frame of board to be painted with
black and white strips of synthetic enamel paint with black and
white strips.
22 Supply of Hazard Marker made out of 2 mm thick M.S. sheet Each 440.00 440.00 0.00
size 300x300x3 mm framed with angle iron 25x25x3 mm and
fixed on channel posts 75x40x6 mm and hold fast at bottom
whole body is painted in white stoving enamel and 6 Nos., 5 cm
dia reflective sheet on white reflective background with
additional border of 1.25 cm all around it.
23 Supply of Swiss type of Hazard marker, made out of 2 mm thick Each 605.00 605.00 0.00
M.S. sheet size of box is 15x15 cm with hold fast at bottom, the
body is painted in orange stoving enamel paint with white/high
intensity grade micro-prismatic type sheeting, on all four side.
24 P & F Delineator with 30 cm. outer dia RCC Hume pipe NP-2 Each 347.00 347.00 0.00
(As per IS-458/ 1971 ) pipe 1.0 M. Long 40 cm embedded in
cement concrete (1:2:4) block of size 50x50x40 cm. including
excavation up to 40 cm depth. The inside of pipe shall be filled
with C.C. (1:2:4) stone grit max size 20 mm or less up to the
top with semi circular humping. The pipes shall be painted
white/black with enamel paint with red dots two Nos. on each
side
26 Supply of Chevron sign of size 75x60 cm made out of Each 3300.00 3300.00 0.00
alluminium sheet 2 mm thick with fixing provision on M.S. angle
iron post 50x50x6 mm 3 M long screwed with stainless steel
nut bolts of 8 M dia, plate is covered by high intensity grade
yellow retro-reflective sheeting and black screen printed arrow
on Retro Reflective Sheet, complete in all respect. Comp. in all
respect duly post painted in alternate band of Black/White
synthetic enamel paint & hold fast at bottom
30 Providing and fixing 1.2 metres high GI barbed wire fencing P.Rmt 155.00 155.00 0.00
with 1.8 m angle iron posts 40 mm x 40 mm x 6 mm placed
every 3 metres center to center founded in M-15 graded
cement concrete 30cm.x30cm.x60cm, 0.6 metre below ground
level, every 15th post, last but one end post and corner post
shall be strutted on both sides and end post on one side only
and provided with 9 horizontal lines and 2 diagonals interwoven
with horizontal wires, fixed with GI staples, turn buckles etc.
complete as per MoRTH specification Clause 807.
CHAP TRAFFIC AND TRANSPORTATION
TER :
R-7
Item Item Description Unit Rate (Rs.) Rate (Rs.) %
No. 2009 2008 VARIATION
31 Providing and fixing 1.8 metre high GI barbed wire fencing with P.Rmt 283.00 283.00 0.00
2.4 m angle iron posts 50 mm x 50 mm x 6 mm placed every 3
metre center to center founded in M-15 grade cement concrete
30cm.x30cm.x60cm, 0.6 metre below ground level, every 15th
post, last but one end post and corner post shall be strutted on
both sides and end post on one side only and provided with12
horizontal lines and 2 diagonals interwoven with horizontal
wires, fixed with GI staples, turn buckles etc. complete as per
MoRTH specification Clause 807.
32 Providing 1.20 metre high fencing with angle iron posts 50 mm P.Rmt 409.00 409.00 0.00
x 50 mm x 6 mm at 3 metre center to center with 0.40 metre
embedded in M-15 grade cement concrete, corner, end and
every 10th post to be strutted, provided with welded steel wire
fabric of 75 mm x 50 mm mesh and fixed to iron posts by flat
iron 50 x 5 mm and bolts etc. complete in all respects. Welded
steel wire fabric 75x50mm mesh @ 4 Kg./Sqm 4x30x1.2+5
percent wastage.
33 Providing, fixing and erecting 50 mm dia tubular steel pipe P.Rmt 752.00 752.00 0.00
railing as per IS 1239 in 3 rows duly painted on medium weight
steel channels (ISMC series) 100 mm x 50 mm x 1.2 metre
high above ground, 2 mm centre to centre, complete as per
approved drawings as per MoRTH specification Cl. 808.
34 Providing, fixing and erecting 50 mm dia painted tubular steel P.Rmt 439.00 439.00 0.00
pipe as per IS 1239 railing in 3 rows on precast M-20 grade
RCC vertical posts 1.8 metre high (1.2 m above GL) with 3
holes 50 mm dia for pipe, fixed 2 metre centre to centre,
complete as per approved drawing as per MoRTH specification
clause 808.
35 Provision of reinforced cement concrete crash barrier at the P.Rmt 1685.00 1685.00 0.00
edges of the road, approaches to bridge structures and
medians, constructed with M-20 grade concrete with HYSD
reinforcement conforming to IRC: 21 and dowel bars 25 mm dia
, 450 mm long at expansion joints filled with pre-moulded
asphalt filler board, keyed to the structure on which it is built
and installed as per design given in the enclosure to MoRTH
Circular No. RW/ NH- 33022/ 1/ 94-DO III dated 24th June
1994 as per dimensions in the approved drawing and at
locations directed by the Engineer , all as specified as per
MoRTH specification Cl. 809.
CHAP TRAFFIC AND TRANSPORTATION
TER :
R-7
Item Item Description Unit Rate (Rs.) Rate (Rs.) %
No. 2009 2008 VARIATION
36 Providing and erecting a "W" metal beam crash barrier P.Rmt 1689.00 1689.00 0.00
comprising of 3 mm thick corrugated sheet metal beam rail, 70
cm above road/ ground level, fixed on CRC rolled channel
vertical post, 150 x 75 x 5 mm spaced 2 mm centre to centre,
1.8 m high, 1.1 m below ground / road level, all steel parts and
fitments to be galvanized by hot dip process, all fittings to
conform to IS: 1367 and IS: 1364 , metal beam rail to be fixed
on the vertical post with a spacer of channel section 150 x 75 x
5 mm, 330 mm long complete as per MoRTH specification
Clause 810.
37 Providing and erecting a "Thrie" metal beam crash barrier P.Rmt 2633.00 2633.00 0.00
comprising of 3 mm thick corrugated sheet metal beam rail, 85
Cm above road/ ground level, fixed on ISMC series channel
vertical post, 150 x 75 x 5 mm spaced 2 m centre- to- centre, 2
m high with 1.15 m below ground level , all steel parts and
fitments to be galvanized by hot dip process, all fittings to
conform to IS: 1367 and IS: 1364 , metal beam rail to be fixed
on the vertical post with a space of channel section 150 x 75 x
5 mm , 546 mm long complete as per Clause 810.
38 Providing and erecting a wire rope safety barrier with vertical P.Rmt 1242.00 1242.00 0.00
posts of medium weight RS joist (ISMB series) 100 mm x 75
mm (11.50 Kg/ m) 1.50 m long 0.85 m above ground and 0.65
m below ground level, split at the bottom for better grip,
embedded in M-15 grade cement concrete 450 x 450 x 450 mm
, 1.50 m centre to centre and with 4 horizontal steel wire rope
40 mm dia and anchored at terminal posts 15 m apart. Terminal
post to be embedded in M-15 grade cement concrete
foundation 2400 x 450 x 900 mm (depth), strengthened by a
strut of RS joist 100 x 75 mm, 2 m long at 450 inclination and a
tie 100 x 8 mm, 1.50 m long at the bottom, all embedded in
foundation concrete as per approved design and drawing, rate
excluding excavation and cement concrete.
39 Providing and erecting anti- glare screen with rectangular vanes P.Rmt 532.00 532.00 0.00
of size 750 x 500 mm made from MS sheet , 3 mm thick and
fixed on MS angle 50 x 50 x 6 mm at an angle of 450 to the
direction of flow of traffic, 1.5 m center to center , top edge of
the screen 1.75 m above ground level, vertical post firmly
embedded in M-15 cement concrete foundation 0.60 m below
ground level , applying 2 coats of paint on exposed faces , all
complete as per approved design and drawings.
CHAP TRAFFIC AND TRANSPORTATION
TER :
R-7
Item Item Description Unit Rate (Rs.) Rate (Rs.) %
No. 2009 2008 VARIATION
40.1 Single row for one utility service P.Rmt 565.00 565.00 0.00
40.2 Double row for two utility services P.Rmt 1037.00 1037.00 0.00
40.3 Three row for three utility services P.Rmt 1588.00 1588.00 0.00
41 Installation of a steel portable barricade with horizontal rail 300 Each 1850.00 1850.00 0.00
mm wide, 2.5 m in length fitted on a "A" frame made with 45 x
45 x 5 mm angle iron section, 1.5 m in height, horizontal rail
painted (2 coats) with yellow and white strips , 150 mm in width
at an angle of 450 , 'A' frame painted with 2 coats of yellow
paint, complete as per IRC: SP:55-2001.
42 Construction of a permanent type barricade made of steel Each 3067.00 3067.00 0.00
components, 1.5 m high from road level, fitted with 3 horizontal
rails 200 mm wide and 4 m long on 50 x 50 x 5 mm angle iron
vertical support , painted with yellow and white strips, 150 mm
in width at an angle of 450 , complete as per IRC:SP:55-2001.
43 Construction of a permanent type barricade made of wooden Each 5840.00 5840.00 0.00
components, 1.5 m high from road level, fitted with 3 horizontal
planks 200 mm wide and 3.66 m long on 100 x 100 mm
wooden vertical post, painted with yellow and white strips, 150
mm in width at an angle of 450, complete as per IRC :SP:55-
2001.
44 Construction of a permanent type barricade made with brick Each 4983.00 4983.00 0.00
work in mud mortar, 1.5 m high , 4 m long. 600 mm thick,
plastered with cement mortar 1:6, painted with yellow and white
strips.
46 Provision of metal drum/ empty bitumen drum Delinator, 300 Each 237.00 237.00 0.00
mm in diameter, 800 mm high, filled with earth for stability,
painted in circumferential strips of alternate black and white 100
mm wide fitted with reflectors 3 Nos of 7.5 cm dia, all as per
IRC: SP: 55-2001.
46 Positioning of a smart flagman with a yellow vest and a yellow Each 122.00 122.00 0.00
cap and a red flag 600 x 600 mm securely fastended to a staff
1 m in length for guiding the traffic.
CHAP TRAFFIC AND TRANSPORTATION
TER :
R-7
Item Item Description Unit Rate (Rs.) Rate (Rs.) %
No. 2009 2008 VARIATION
47 Fabrication & assembling of over head gantary & cantilever P.Kg 57.00 57.00 0.00
type structure as per drawing & design including steel work in
built up tubular trusses , cutting / hoisting, bolting & fixing in
position & applying coat of red oxide paint including special
type of nut, bolts( Bolt up to 750 mm ) and washers complete &
finishing with grey enamel paint .
48 Supply of High Intensity retro reflecting Type IV sign plate P.Sqm 7508.00 7508.00 0.00
made out of 2.0 mm thick aluminium sheet face to be fully
covered with blue / green high intensity grade retro reflective
sheet and logo/ matters, boarder made of with similar type of
white sheeting after etching treatment of aluminium sheet , the
back side is to be painted with epoxy grey paint. The plate is to
be fixed on 40x40x5 mm angle iron frame with help of
aluminium rivets.
49.1 Providing and fixing of Precast concrete interlocking blocks of P.Sqm 295.00 295.00
60mm thick manufactured from fully computerized automatic
stationery hydraulic vibro pressed machine & full computerized
automatic batching plant of class A-I as per BS: 6717-2001.
The C.C. interlocking paving blocks be laid on average 50mm
thick bed of coarse sand and the joint is to be filled with fine
sand. Laying procedure on compacted sub base as defined.
The work includes earth work in cutting of B/T road, cutting of
WBM road and disposal of unserviceable material with all leads
& lifts and stacking of serviceable material complete job is to be
executed as per the instructions of Engineer-in-charge. The
rates to be inclusive of all lead, lifts & taxes General
specification of Blocks:
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
(B) PAINTING WORK #DIV/0!
#DIV/0!
Unit Labour Complete Labour Complete
#DIV/0!
Old Work New Work Old New
#DIV/0!
(Two (Three Work Work
#DIV/0!
Coats) Coats) (Two (Three
Coats) #DIV/0!
Coats)
#DIV/0!
1 Painting with superior grade
#DIV/0!
enamel paint of approved quality to
give an even shade including #DIV/0!
writing, littering, figuring etc. #DIV/0!
complete as per IRC standards of: #DIV/0!
3 Stripping excess soil from the shoulder surface including Sqm 7.00 7.00 0.00
disposal of excess earth side slopes to achieve the
approved level and compacting with plate compactor up
to 75mm average depth complete as per MoRTH
specification clause 3003.
4 Filling pot-holes and patch repairs with open-graded Sqm 86.00 90.00 -4.44
premix surfacing, 20 mm with removal of all failed
material, trimming of completed excavation to provide
firm vertical faces, cleaning of surface, painting of tack
coat on the sides and base of excavation as per Clause
503, back filling the pot holes with hot bituminous
material as per clause 511 using 60/70 grade bitumen
mixed in hot mix plant 40-60 TPH capacity and carriage
with all lead, compacting with 8-10 tonne smooth wheel
roller, trimming & finishing the surface to form a smooth
continuous surface, all as per MoRTH specification
Clause 3004.2
5 Filling pot-holes and patch repairs with bituminous Sqm 227.00 240 -5.42
concrete, 40 mm with removal of all failed material,
trimming of completed excavation to provide firm vertical
faces, cleaning of surface, painting of tack coat on the
sides and base of excavation as per Clause 503 back
filling the pot holes with hot bituminous material using
60/70 grade bitumen @ 5% of total mix & mixed in hot
mix plant 40-60 TPH capacity and carriage with all leads
as per clause 509, compacting with smooth wheel roller
8-10 tonne, trimming & finishing the surface to form a
smooth continuous surface, all as per MoRTH
specification Clause 3004.2
6 Filling of crack using slow- curing bitumen emulsion and R.Mtr. 3.00 2.00 50.00
applying crusher dust in cracks complete as per MoRTH
specification clause 3004.3.3
CHAPTER MAINTENANCE OF ROADS
: R-8
Item Description Unit Rate (Rs.) Rate (Rs.) %
2009 2008 VARIATI
ON
7 Applying crusher dust to areas of road where bleeding of Sqm 0.50 0.50 0.00
excess bitumen has occurred as per MoRTH
specification Clause 3004.4.
8 Removal of existing sealant and re-sealing of R.Mtr. 82.00 82.00 0.00
contraction, longitudinal or expansion joints in concrete
pavement with fresh sealant material hot poured
rubberized bitumen or cold polysulphide type as per
Clause 602.2.8 with appropriate type of primer complete
as per MoRTH specification Clause 3005.2..
9 Removal of earth from the choked hill side drain and Cum 12.00 12.00 0.00
disposing it on the valley side manually complete as per
MoRTH specification Clause 3000.
10 Clearance of landslides in soil and ordinary rock by a Cum 42.00 42.00 0.00
bull- dozer D 80 A-12 , 180 HP and disposal of the same
on the valley side as per MoRTH specification Clause
3000.
11 Clearing of landslide in hard rock requiring blasting for 50 Cum 74.00 74.00 0.00
percent of the boulders and disposal of the same on the
valley side as per MoRTH specification Clause 3000.
12 Labour charges for patching W.B.M. using crushed / Cum 99.00 99.00 0.00
broken aggregates including preparation of pot hole
scarifying and reshaping to the required grade and
camber as per the standard specifications, spreading of
material consolidation with 8-10 tonne power roller,
spreading and consolidation of binding material including
cost of fuel and lubricants and hire charges of T & P
16 Labour charges for digging out of sludge humps on black Sqm 12.00 12.00 0.00
topped surface including removal & disposing of the
dismantled material aside up to 50 Mtr. lead.
17 Dismantling/Digging out entire road wearing coat of Sqm 200.00 200.00 0.00
bituminous surface including removal of dismantled
material aside up to 50 Mtr. lead.
18 Cutting of black topped surface up to 30mm depth for Sqm 10.00 10.00 0.00
fixing of Kerb/Dand stones/Medians including cleaning of
surface laying bed mortar & removal of dismantled
material with all lead & traffic diversion arrangements
complete
19 Digging out entire WVM surface including sorting out Cum 47.00 47.00 0.00
serviceable material its stacking & removal of rubbish up
to 50 Mtr. lead.
20 Cutting WBM road and soling up to 1.5 Mtr. depth for Sqm 251.00 251.00 0.00
laying pipe line etc. & making good to original condition
complete.
CHAPTER MAINTENANCE OF ROADS
: R-8
Item Description Unit Rate (Rs.) Rate (Rs.) %
2009 2008 VARIATI
ON
21 Providing and laying built up spray grout patching 75mm Sqm 222.00 195.00 13.85
thick in two layers (each layer consisting of spreading
aggregate (crusher broken) @0.50 cum per 10 Sqm area
as per MoRTH specifications, laying first layer after
application of tack coat @ 3.75 Kg per 10 Sqm (including
cost of tack coat) rolling with 8-10 tonne power road
roller application of first spray of binder @ 15 Kg/10 Sqm
spreading & rolling of second layer of course aggregate
with 8-10 tonne power road roller application spray of
binder @ 15 Kg/10 Sqm and laying key aggregate on the
top of second layer & rolling with 8-10 tonne power road
roller including heating & spraying of binder, cleaning of
the area of patch, pot holes, cut to regular shape with
vertical sides, removing all loose & disintegrated material
including cost of coarse aggregate Key aggregate rolling
& hire charges of machinery T&P fuel bitumen etc.
complete.
22 Cutting black topped surface up to 1.5 Mtr. depth Sqm 266.00 266.00 0.00
including all layers of crust for laying pipe line etc. &
making good to original condition (excluding cost of
Bitumen)
23 -----do----- For paver finished surface Sqm 303.00 303.00 0.00
24 Cutting black topped surface up to 0.5 Mtr. depth Sqm 254.00 254.00 0.00
including all layers of crust for laying pipe line etc. for
house connection & making good the with premixed
chips (excluding cost of Bitumen).
25 Cutting WBM surface up to 0.5 Mtr. depth including all Sqm 218.00 218.00 0.00
layers of crust for laying pipe line etc. for house
connection & making good to original condition.
26 Labour charges for removal of up heaved bitumen #DIV/0!
surface on semi-dense carpeted road surface good to
original condition
26.1 Up to 3 cm height Sqm 13.00 13.00 0.00
26.2 Above 3 to 5 cm height Sqm 15.00 15.00 0.00
26.3 Above 5 to 8 cm height Sqm 20.00 20.00 0.00
26.4 Above 8 cm height Sqm 22.00 22.00 0.00
27 Dressing of berms including digging of earth up to 10 cm Sqm 0.65 0.65 0.00
depth
28 Dismantling tile work in floors and roofs laid in cement Sqm 5.80 5.80 0.00
mortar including stacking of serviceable material and
disposal of unserviceable material within 50 Mtr. lead.
CHAPTER MAINTENANCE OF ROADS
: R-8
Item Description Unit Rate (Rs.) Rate (Rs.) %
2009 2008 VARIATI
ON
29 Providing and fixing steel gate grating and grills made of Kg 55.00 55.00 0.00
angles, tees, square bars or other flats black pipe with
hold fast and fittings complete as per design and drawing
including cutting welding and fabrication with priming
coat of red oxide.
30 Providing stone slab covering over drains including filling Sqm 281.00 281.00 0.00
of joints in cement sand mortar 1:3 with 35mm thick
cement concrete flooring 1:2:4 mix complete with good
finish with stone slab 60 to 75mm thick average.
CHAPTER : HORTICULTURE
R-9
Item No. Item Description Unit Rate (Rs.)
2009
5 Rough dressing the trenched ground including breaking 100 Sqm 15.50
of clouds.
6 Uprooting weeds from the trenched area after 10 to 15 100Sqm 177.00
days of its flooding with water including disposal of
uprooted vegetation.
7 Fine dressing the ground 100 Sqm 44.00
8 Spreading of sludge farm-yard manure or/and good earth Cum 7.00
in required thickness (cost of sludge, farm-yard manure
or/and good earth to be paid for separately).
9 Mixing earth and sludge or farm-yard manure in Cum 4.50
proportion specified or as directed.
10 Grassing with 'Doob' grass including watering and
maintenance of the lawn for 30 days or more till the
grass forms a thick lawn free from weeds and fit for
moving including supplying good earth if needed.
10.1 In rows 15 cm apart in either direction. 100 Sqm 204.00
10.2 In rows 7.5 cm apart in either direction. 100 Sqm 275.00
10.3 In rows 5 cm apart in either direction. 100 Sqm 352.00
11 Uprooting rank vegetation and weeds by digging the 100 Sqm 880.00
area to a depth of 60cm.removing all weeds and other
growth with roots by forking repeatedly, breaking clods,
rough dressing, flooding with water, uprooting fresh
growth after 10 to 15 days and then fine dressing for
planting new grass, including disposal of all rubbish with
all leads and lifts.
CHAPTER : HORTICULTURE
R-9
Item No. Item Description Unit Rate (Rs.)
2009
17 Turfing lawn with fine grassing including ploughing, 100 Sqm 704.00
dressing including breaking of clods, removal of rubbish,
dressing and supplying and spreading of farm yard
manure at rate 0.60 cum per 100 Sqm.
18 Maintenance of lawns with fine grassing for the first year 100 Sqm 3520.00
including watering etc.
19 Planting permanent hedges including digging of trenches 100 8085.00
60cm wide and 45cm deep refilling the excavated earth Meters
mixed with farm yard manure supplied at the rate of 4.65
cum per 100 meters and supplying and planting hedge
plants at 30 cm apart.
20 Maintaining the hedges for the first two years including
watering etc. complete.
20.1 For first year Meters 42.00
20.2 For second year Meters 35.00
21 Digging holes in all kinds of soil and refilling the same
with the excavated earth mixed with well decayed farm
yard manure (cost of well decayed farm yard manure to
be paid separately).
21.1 Hole 1.2 mm dia and 1.2m deep One hole 24.00
21.2 Hole 0.6 m dia and 0.6 m deep Each 11.00
CHAPTER : HORTICULTURE
R-9
Item No. Item Description Unit Rate (Rs.)
2009
24 Half brick circular tree guard in second class bricks, Each 374.00
internal dia 1.25 meters, and Ht. 1.2 meter above ground
and 0.2 meters below ground, bottom two course laid dry
and top three courses in cement mortar 1:6 (1 Cement, 6
Sand) and the intermediate courses being in dry honey
comb masonry, as per design, complete.
25 Edging with 2nd class bricks laid dry length wise Meter 9.00
including excavation refilling, consolidating with and
packing and spreading nearby, the surplus earth within
lead of 50 meters.
CHAPTER : HORTICULTURE
R-9
Item No. Item Description Unit Rate (Rs.)
2009
26 Making tree guard 53 cm dia and 1.3 m high as per Each 166.00
design from empty bitumen drums(supplied by the
department at stock issue rate) including providing and
fixing 2 nos. M.S sheet rings 50 x 0.5 mm with rivets,
complete in all respects.
27 Making tree guard 53cm dia and 2 m high as per design Each 297.00
from empty bitumen drums (supplied by the department
at stock issue rate) including providing and fixing four
legs 40 cm long of 30 x 3 mm M.S. Flat riveted to tree
guard and providing and fixing 2 nos. M.S. sheet rings 50
x 0.5 mm with rivets complete in all respects.
28 Providing and fixing Wrought iron and Mild steel welded Quintal 3355.00
work (using flats, square bars, tees and channel grills,
grating) frames, gates and tree guards of any size and
design etc. including cost of screens and welding rods or
bolts and nuts, complete, fixed in position but without the
cost of excavation and concrete for fixing which will be
paid separately.
29 1.2 meters high fencing with 1.65 meters posts placed at Meter 14.50
every 2.5 to 3 meters apart embedded in cement
concrete blocks and every tenth post to be strutted,
provided with 4 horizontal lines of G.I. barbed wire,
weighing 9.34 Kg per 100 meters (minimum) and fixed
wit G.I. staples, ties to 6mm bar with binding wire or by
providing cut, including drilling holes in the post,
complete( excluding the cost of the post, earthwork and
concrete which is payable extra in the respective item).
CHAPTE CULVERTS
R : R-10
Item No. Item Description Unit Rate (Rs.) Rate (Rs.) %
2009 2008 VARIATI
ON
1.1 Cement concrete 1:4:8 mix crushed stone aggregates 40mm Cum 2086 1896.00 10.02
nominal size.
1.2 Cement concrete 1:4:8 mix hand broken stone aggregates Cum 1791 1628.00 10.01
40mm nominal size.
1.3 Cement concrete 1:3:6 mix crushed stone aggregates 20mm Cum 2497 2270.00 10.00
nominal size.
1.4 Cement concrete 1:3:6 mix with stone aggregate 40mm Cum 2423 2203.00 9.99
crusher broken.
2 Providing and laying Plain cement concrete M15 mix with Cum 2793 2576.00 8.42
stone aggregate 20mm nominal size mechanically mixed and
vibrated, in foundation up to a depth of 1.50 below Ground
level and or 1.50 meters above ground/bed level.
3 Providing and laying Plain cement concrete M15 mix with Cum 2998 2725.00 10.02
stone aggregate20mm nominal size mechanically mixed and
vibrated, in superstructure up to 4 meter above 1.5 meter level
from Bed/Ground level.[MoRTH Specification: Clause
1000/1700]
4 Cum 3390 3703.00 -8.45
Providing and laying RCC M25 mix with stone aggregate
20mm (nominal size) mechanically mixed and vibrated for
RCC work in slab in superstructure up to 4 meter above 1.5
meter level from Bed/ Ground level, excluding steel
reinforcement but including centering and shuttering laid in
position.[MoRTH Specification : Clause 1000/1700]
5 Providing and laying Reinforced cement concrete M20 mix Cum 3119 3104.00 0.48
with stone aggregate 20mm nominal size mechanically mixed
and vibrated for bed plates excluding steel reinforcement but
including centering and shuttering, laid in position .[MoRTH
Specification : Clause 1000/700]
7 Providing and laying First class brick masonry (min.10.5 MPa) Cum 2449 2365.00 3.55
in cement mortar 1:3 up to a depth of 1.50 meters below
ground and above 1.50m from Bed/ground level. [MoRTH
Specification : Clause 1000/1300]
8 Extra for brick works in superstructure up to a height 4 meters Cum 55.00 55.00 0.00
or part thereof above 1.5 meter level from Bed/Ground level
[MoRTH specification: Clause 1000/1300].
9 Providing and laying Brick-on-edge flooring with 1st class Sqm 165.00 165.00 0.00
bricks (min.10.5 Mpa) including cement slurry in cement sand
mortar 1:4 at all levels.[MoRTH Specification : Clause
1000/1300]
10 Providing and laying Coursed / Random Rubble stone Cum 2272 2130.00 6.67
masonry in cement sand mortar 1:3, in foundation up to a
depth of 1.50 meters and also 1.50 meters above Ground
/Bed level [MoRTH Specification : Clause 1000/1400]
11 Extra for coursed/Random rubble stone masonry in Cum 80.00 80.00 0.00
superstructure up to a height of 4 meters or part thereof above
1.50 meters from Ground /Bed level [MoRTH Specification :
Clause 1000/1400]
12 Providing Cement pointing 1:3 deep grooved (cut or weather) Sqm 31.00 31.00 0.00
on brick / stone and tile work at all levels.[MoRTH
Specification : Clause 1000/1300]
13 Providing Cement pointing 1:3, flush on Brick-on-edge floor at Sqm 32.00 32.00 0.00
all levels.[MoRTH Specification: Clause 1000/1300]
14 Providing Cement plaster 12mm thick in cement mortar (1:3) Sqm 63.00 63.00 0.00
at all levels [MoRTH Specification: Clause:1000/1300]
18.1 Good local sand free from earth [MoRTH Specification : Cum 444.00 327.00 35.78
Section 2100]
18.2 Selected granular material in filling [MoRTH Specification Cum 454.00 336.00 35.12
Clause :1500]
18.3 Filter media behind abutment, wing and return wall [MoRTH Cum 444.00 327.00 35.78
Specification :Clause : 2504]
19 Making and filling expansion joints, with bitumen filler Meter/cm 1.00 1.00 0.00
(Bitumen 40 percent, asbestos 5 percent and sand 55 percent depth
) 12mm wide at any level. [MoRTH Specification : Clause :
2100]
21 Reinforced cement concrete M30 mix with stone aggregate Cum 3970 3757.00 5.67
20mm nominal size mechanically mixed and vibrated for
reinforced concrete work in superstructure at any level
excluding steel reinforcement but including centering and
shuttering laid in position [MoRTH Specification : Clause
1000/1700]
22.1 M-25 grade mix 1:1:2 ( 1 cement : 1 sand : 2 graded stone Cum 3608 3174.00 13.67
aggregate)
22.2 M-20 grade mix 1:1.5:3 ( 1 cement : 1.5 sand : 3 graded stone Cum 3439 2889.00 19.04
aggregate).
23 Providing and fixing precast cement concrete coping 1:2:4 Sqm 156.00 142.00 9.86
mix, 50mm thick complete as per specifications
23.1 Providing and laying cement concrete coping 1:2:4 mix, 50mm Sqm 142.00 129.00 10.08
thick complete as per specifications
24 Pointing of stone masonry in cement mortar (1:3) raised & cut Sqm 46.00 42.00 9.52
pointing.
25 Plaster on new surface with cement mortar (1:3) including Sqm 85.00 77.00 10.39
racking of joint etc. complete fine finished 20mm thick.
26 Plaster on new surface with cement mortar (1:4) including Sqm 64.00 58.00 10.34
racking of joint etc. complete fine finished 20mm thick.
0.00 #DIV/0!
6.1 Coursed Rubble Masonry (first sort) Cum 2730.00 2271.00 20.21
6.2 Random Rubble Masonry (coursed/un-coursed). Cum 2272.00 2130.00 6.67
7 Structural cement concrete (Design Mix) in open
foundations, with form work, at any level.
Cement concrete for plain/reinforced concrete in open
foundation as per drawing and technical specification.
[MoRTH Specification : Section 1700(N)&1500(N)].
Using Batching Plant,Transit Mixture, and Concrete
Pump.
7.1 P.C.C.M-15 grade Cum 2793.00 2576.00 8.42
7.2 P.C.C.M-20 grade Cum 3095.00 2889.00 7.13
7.3 P.C.C.M-25 grade Cum 3378.00 3075.00 9.85
7.4 P.C.C.M-30 grade Cum 3401.00 3096.00 9.85
7.5 R.C.C.M-20 grade Cum 3119.00 2934.00 6.31
7.6 R.C.C.M-25 grade Cum 3406.00 3121.00 9.13
7.7 R.C.C.M-30 grade Cum 3415.00 3132.00 9.04
7.8 R.C.C.M-35 grade Cum 3478.00 3197.00 8.79
7.9 R.C.C.M-40 grade Cum 3473.00 3273.00 6.11
8 Providing and laying cutting edge of mild steel for well Tonne 51283.00 69585.00 -26.30
foundation at designed level complete as per drawing
technical specification :[MoRTH Specification : Section :
1200(N) & 1900(N)]
9 Plain/reinforced Cement concrete for well foundations at
designed level, complete with form work, as per drawing
and technical specification. Using Batching Plant, Transit
Mixture, and Concrete Pump.
Structural Concrete (Design mix) in well foundations
[MoRTH Specification: 1200(N), 1500(N),1700(N)]
9.1 Well Curb , including formwork etc.
9.1.1 R.C.C M-20 grade Cum 3389.00 3268.00 3.70
9.1.2 R.C.C.M-25 grade Cum 3846.00 3727.00 3.19
9.1.3 R.C.C.M-35 grade Cum 3965.00 3848.00 3.04
CHAPTER FOUNDATIONS
R11
Item No. Item Description Unit Rate (Rs.) Rate (Rs.) %
2009 2008 VARIATIO
N
9.2 Well steining, including formwork etc.
9.2.1 P.C.C.M-15 Grade Cum 2955.00 2725.00 8.44
9.2.2 P.C.C.M-20 Grade Cum 3274.00 2996.00 9.28
9.2.3 R.C.C.M-20 Grade Cum 3107.00 3268.00 -4.93
9.2.4 P.C.C.M-25 Grade Cum 3391.00 3261.00 3.99
9.2.5 R.C.C.M-25 Grade Cum 3526.00 3280.00 7.50
9.2.6 P.C.C.M-30 Grade Cum 3421.00 3292.00 3.92
9.2.7 R.C.C M-30 Grade Cum 3438.00 3329.00 3.27
9.2.8 R.C.C M-35 Grade Cum 3635.00 3527.00 3.06
9.2.9 R.C.C M-40 Grade Cum 3681.00 3573.00 3.02
9.3 Bottom plug, including forming sump, protective
bounds, chiseling etc.
9.3.1 P.C.C.M-20 grade Cum 3145.00 3040.00 3.45
9.3.2 P.C.C.M-25 grade Cum 3311.00 3208.00 3.21
9.3.3 P.C.C.M-30 grade Cum 3345.00 3242.00 3.18
9.3.4 P.C.C.M-35 grade Cum 3417.00 3314.00 3.11
9.4 Intermediate plug, include extra protective works and
dewatering etc.
9.4.1 P.C.C.M-20 grade Cum 3014.00 2915.00 3.40
9.4.2 P.C.C.M-25 grade Cum 3174.00 3075.00 3.22
9.4.3 P.C.C.M-30 grade Cum 3205.00 3107.00 3.15
9.5 Top plug in Plain Cement Concrete, including extra
protective works and dewatering etc.
9.5.1 P.C.C.M-15 grade Cum 2686.00 2477.00 8.44
9.5.2 P.C.C.M-20 grade Cum 2977.00 2779.00 7.12
9.5.3 P.C.C.M-25 grade Cum 3083.00 2886.00 6.83
9.5.4 P.C.C.M-30 grade Cum 3110.00 2992.00 3.94
9.6 Well cap
9.6.1 R.C.C.M-20 grade Cum 2904.00 2800.00 3.71
9.6.2 R.C.C.M-25 grade Cum 3224.00 3122.00 3.27
9.6.3 R.C.C.M-30 grade Cum 3233.00 3131.00 3.26
9.6.4 R.C.C.M-35 grade Cum 3298.00 3197.00 3.16
9.6.5 R.C.C.M-40 grade Cum 3473.00 3372.00 3.00
10 Sinking of well, true and vertical, through all types of soil
and rock (other than pneumatic method of sinking),
complete as per drawing and technical specification.
[MoRTH Specification : 1200(N)]
10.1 Well of 6m external diameter
10.1.1 In Sandy soil)
10.1.1.1 Depth from 0-3 meters from cutting edge level. Meter 2841.00 2787.00 1.94
10.1.1.2 Beyond 3m up to 10m.depth, Meter 4150.00 4083.00 1.64
10.1.1.3 Beyond 10m up to 20m depth : Add 5% for every Meter 5% 5%
additional meter depth of sinking over the rate of sinking
for the previous meter. 0.00
10.1.1.4 Beyond 20m up to 30m depth: Add 7.5% for every Meter 7.50% 7.50%
additional meter depth of sinking over the rate of sinking
for the previous meter 0.00
CHAPTER FOUNDATIONS
R11
Item No. Item Description Unit Rate (Rs.) Rate (Rs.) %
2009 2008 VARIATIO
N
10.1.1.5 Beyond 30m up to 40m depth: Add 10% for every Meter 10% 10%
additional meter depth of sinking over the rate of sinking
for the previous meter 0.00
10.1.1.6 Kent ledge(supports, loading arrangement, labour etc.) Meter 20% 20%
0.00
10.1.1.7 Add for dewatering if required
10.1.1.7.1 Depth up to 3m Meter 5% 5% 0.00
10.1.1.7.2 Depth 3 to10m Meter 5% 5% 0.00
10.1.1.7.3 Depth above 10m Meter 5% 5% 0.00
10.1.2 In Clayey soil.(Well of 6m. External diameter)
10.1.2.1 Depth from 0-3 meters from cutting edge level. Meter 4147.00 4086.00 1.49
10.1.2.2 Beyond 3m up to 10m.depth, Meter 8960.00 8837.00 1.39
10.1.2.3 Beyond 10m up to 20m depth : Add 5% for every Meter 5% 5%
additional meter depth of sinking over the rate of sinking
for the previous meter. 0.00
10.1.2.4 Beyond 20m up to 30m depth: Add 7.5% for every Meter 7.50% 7.50%
additional meter depth of sinking over the rate of sinking
for the previous meter 0.00
10.1.2.5 Beyond 30m up to 40m depth: Add 10% for every Meter 10% 10%
additional meter depth of sinking over the rate of sinking
for the previous meter 0.00
10.1.2.6 Kent ledge(supports, loading arrangement, labour etc.) Meter 20% 20%
0.00
10.1.2.7 Add for dewatering if required
10.1.2.7.1 Depth up to 3m Meter 5% 5% 0.00
10.1.2.7.2 Depth 3 to10m Meter 5% 5% 0.00
10.1.2.7.3 Depth above 10m Meter 5% 5% 0.00
10.1.3 In Soft rock. .(Well of 6m. External diameter)
10.1.3.1 Depth from 0-3 meters from cutting edge level. Meter 9993.00 9438.00 5.88
10.1.3.2 Beyond 3m up to 10m depth : Add 5.00% for every Meter 5.00% 5.00%
additional meter depth of sinking over the rate of sinking
for the previous meter. 0.00
10.1.3.3 Beyond 10m up to 20m depth : Add 7.5% for every Meter 7.50% 7.50%
additional meter depth of sinking over the rate of sinking
for the previous meter. 0.00
10.1.3.4 Beyond 20m up to 30m depth: Add 10.00% for every Meter 10.00% 10.00%
additional meter depth of sinking over the rate of sinking
for the previous meter 0.00
10.1.3.5 Beyond 30m up to 40m depth: Add 12.50% for every Meter 12.50% 12.50%
additional meter depth of sinking over the rate of sinking
for the previous meter 0.00
10.1.3.6 Kent ledge(supports, loading arrangement, labour etc.) Meter 20% 20%
0.00
10.1.3.7 Add for dewatering if required
10.1.3.7.1 Depth up to 3m Meter 5% 5% 0.00
10.1.3.7.2 Depth 3 to10m Meter 5% 5% 0.00
10.1.3.7.3 Depth above 10m Meter 5% 5% 0.00
10.1.4 In Hard Rock.(Well of 6m. External diameter)
CHAPTER FOUNDATIONS
R11
Item No. Item Description Unit Rate (Rs.) Rate (Rs.) %
2009 2008 VARIATIO
N
10.1.4.1 Depth from 0-3 meters from cutting edge level. Meter 11612.00 11500.00 0.97
10.1.4.2 Beyond 3m up to 10m depth : Add 5.00% for every Meter 5.00% 5.00%
additional meter depth of sinking over the rate of sinking
for the previous meter. 0.00
10.1.4.3 Beyond 10m up to 20m depth : Add 7.5% for every Meter 7.50% 7.50%
additional meter depth of sinking over the rate of sinking
for the previous meter. 0.00
10.1.4.4 Beyond 20m up to 30m depth: Add 10.00% for every Meter 10.00% 10.00%
additional meter depth of sinking over the rate of sinking
for the previous meter 0.00
10.1.4.5 Beyond 30m up to 40m depth: Add 12.50% for every Meter 12.50% 12.50%
additional meter depth of sinking over the rate of sinking
for the previous meter 0.00
10.1.4.6 Kent ledge(supports, loading arrangement, labour etc.) Meter 20% 20%
0.00
10.1.4.7 Add for dewatering if required
10.1.4.7.1 Depth up to 3m Meter 5% 5% 0.00
10.1.4.7.2 Depth 3 to10m Meter 5% 5% 0.00
10.1.4.7.3 Depth above 10m Meter 5% 5% 0.00
10.2 Well of 7m external diameter
10.2.1 In Sandy soil) . (Well of 7m. External diameter)
10.2.1.1 Depth from 0-3 meters from cutting edge level. Meter 4413.00 4346.00 1.54
10.2.1.2 Beyond 3m up to 10m.depth, Meter 6058.00 5977.00 1.36
10.2.1.3 Beyond 10m up to 20m depth : Add 5% for every Meter 5% 5%
additional meter depth of sinking over the rate of sinking
for the previous meter. 0.00
10.2.1.4 Beyond 20m up to 30m depth: Add 7.5% for every Meter 7.50% 7.50%
additional meter depth of sinking over the rate of sinking
for the previous meter 0.00
10.2.1.5 Beyond 30m up to 40m depth: Add 10% for every Meter 10% 10%
additional meter depth of sinking over the rate of sinking
for the previous meter 0.00
10.2.1.6 Kent ledge(supports, loading arrangement, labour etc.) Meter 20% 20%
0.00
10.2.1.7 Add for dewatering if required
10.2.1.7.1 Depth up to 3m Meter 5% 5% 0.00
10.2.1.7.2 Depth 3 to10m Meter 5% 5% 0.00
10.2.1.7.3 Depth above 10m Meter 5% 5% 0.00
10.2.2 In Clayey soil.(Well of 7m. External diameter)
10.2.2.1 Depth from 0-3 meters from cutting edge level. Meter 6058 5977.00 1.36
10.2.2.2 Beyond 3m up to 10m.depth, Meter 8800 8691.00 1.25
10.2.2.3 Beyond 10m up to 20m depth : Add 5% for every Meter 5% 5%
additional meter depth of sinking over the rate of sinking
for the previous meter. 0.00
10.2.2.4 Beyond 20m up to 30m depth: Add 7.5% for every Meter 7.50% 7.50%
additional meter depth of sinking over the rate of sinking
for the previous meter 0.00
CHAPTER FOUNDATIONS
R11
Item No. Item Description Unit Rate (Rs.) Rate (Rs.) %
2009 2008 VARIATIO
N
10.2.2.5 Beyond 30m up to 40m depth: Add 10% for every Meter 10% 10%
additional meter depth of sinking over the rate of sinking
for the previous meter 0.00
10.2.2.6 Kent ledge(supports, loading arrangement, labour etc.) Meter 20% 20%
0.00
10.2.2.7 Add for dewatering if required
10.2.2.7.1 Depth up to 3m Meter 5% 5% 0.00
10.2.2.7.2 Depth 3 to10m Meter 5% 5% 0.00
10.2.2.7.3 Depth above 10m Meter 5% 5% 0.00
10.2.3 In Soft rock. .(Well of 7m. External diameter)
10.2.3.1 Depth from 0-3 meters from cutting edge level. Meter 9277.00 9500.00 -2.35
10.2.3.2 Beyond 3m up to 10m depth : Add 5.00% for every Meter 5.00% 5.00%
additional meter depth of sinking over the rate of sinking
for the previous meter. 0.00
10.2.3.3 Beyond 10m up to 20m depth : Add 7.5% for every Meter 7.50% 7.50%
additional meter depth of sinking over the rate of sinking
for the previous meter. 0.00
10.2.3.4 Beyond 20m up to 30m depth: Add 10.00% for every Meter 10.00% 10.00%
additional meter depth of sinking over the rate of sinking
for the previous meter 0.00
10.2.3.5 Beyond 30m up to 40m depth: Add 12.50% for every Meter 12.50% 12.50%
additional meter depth of sinking over the rate of sinking
for the previous meter 0.00
10.2.3.6 Kent ledge(supports, loading arrangement, labour etc.) Meter 20% 20%
0.00
10.2.3.7 Add for dewatering if required
10.2.3.7.1 Depth up to 3m Meter 5% 5% 0.00
10.2.3.7.2 Depth 3 to10m Meter 5% 5% 0.00
10.2.3.7.3 Depth above 10m Meter 5% 5% 0.00
10.2.4 In Hard Rock.(Well of 7m. External diameter)
10.2.4.1 Depth from 0-3 meters from cutting edge level. Meter 12966.00 12655.00 2.46
10.2.4.2 Beyond 3m up to 10m depth : Add 5.00% for every Meter 5.00% 5.00%
additional meter depth of sinking over the rate of sinking
for the previous meter. 0.00
10.2.4.3 Beyond 10m up to 20m depth : Add 7.5% for every Meter 7.50% 7.50%
additional meter depth of sinking over the rate of sinking
for the previous meter. 0.00
10.2.4.4 Beyond 20m up to 30m depth: Add 10.00% for every Meter 10.00% 10.00%
additional meter depth of sinking over the rate of sinking
for the previous meter 0.00
10.2.4.5 Beyond 30m up to 40m depth: Add 12.50% for every Meter 12.50% 12.50%
additional meter depth of sinking over the rate of sinking
for the previous meter 0.00
10.2.4.6 Kent ledge(supports, loading arrangement, labour etc.) Meter 20% 20%
0.00
10.2.4.7 Add for dewatering if required
10.2.4.7.1 Depth up to 3m Meter 5% 5% 0.00
10.2.4.7.2 Depth 3 to10m Meter 5% 5% 0.00
CHAPTER FOUNDATIONS
R11
Item No. Item Description Unit Rate (Rs.) Rate (Rs.) %
2009 2008 VARIATIO
N
10.2.4.7.3 Depth above 10m Meter 5% 5% 0.00
10.3 Well of 8m external diameter
10.3.1 In Sandy soil)
10.3.1.1 Depth from 0-3 meters from cutting edge level. Meter 5460.00 5378.00 1.52
10.3.1.2 Beyond 3m up to 10m.depth, Meter 6776.00 7000.00 -3.20
10.3.1.3 Beyond 10m up to 20m depth : Add 5% for every Meter 5% 5%
additional meter depth of sinking over the rate of sinking
for the previous meter. 0.00
10.3.1.4 Beyond 20m up to 30m depth: Add 7.5% for every Meter 7.50% 7.50%
additional meter depth of sinking over the rate of sinking
for the previous meter 0.00
10.3.1.5 Beyond 30m up to 40m depth: Add 10% for every Meter 10% 10%
additional meter depth of sinking over the rate of sinking
for the previous meter 0.00
10.3.1.6 Kent ledge(supports, loading arrangement, labour etc.) Meter 20% 20%
0.00
10.3.1.7 Add for dewatering if required
10.3.1.7.1 Depth up to 3m Meter 5% 5% 0.00
10.3.1.7.2 Depth 3 to10m Meter 5% 5% 0.00
10.3.1.7.3 Depth above 10m Meter 5% 5% 0.00
10.3.2 In Clayey soil.(Well of 8m. External diameter)
10.3.2.1 Depth from 0-3 meters from cutting edge level. Meter 7403.00 8250.00 -10.27
10.3.2.2 Beyond 3m up to 10m.depth, Meter 9396.00 10450.00 -10.09
10.3.2.3 Beyond 10m up to 20m depth : Add 5% for every Meter 5% 5%
additional meter depth of sinking over the rate of sinking
for the previous meter. 0.00
10.3.2.4 Beyond 20m up to 30m depth: Add 7.5% for every Meter 7.50% 7.50%
additional meter depth of sinking over the rate of sinking
for the previous meter 0.00
10.3.2.5 Beyond 30m up to 40m depth: Add 10% for every Meter 10% 10%
additional meter depth of sinking over the rate of sinking
for the previous meter 0.00
10.3.2.6 Kent ledge(supports, loading arrangement, labour etc.) Meter 20% 20%
0.00
10.3.2.7 Add for dewatering if required
10.3.2.7.1 Depth up to 3m Meter 5% 5% 0.00
10.3.2.7.2 Depth 3 to10m Meter 5% 5% 0.00
10.3.2.7.3 Depth above 10m Meter 5% 5% 0.00
10.3.3 In Soft rock. .(Well of 8m. External diameter)
10.3.3.1 Depth from 0-3 meters from cutting edge level. Meter 10308.00 11000.00 -6.29
10.3.3.2 Beyond 3m up to 10m depth : Add 5.00% for every Meter 5.00% 5.00%
additional meter depth of sinking over the rate of sinking
for the previous meter. 0.00
10.3.3.3 Beyond 10m up to 20m depth : Add 7.5% for every Meter 7.50% 7.50%
additional meter depth of sinking over the rate of sinking
for the previous meter. 0.00
CHAPTER FOUNDATIONS
R11
Item No. Item Description Unit Rate (Rs.) Rate (Rs.) %
2009 2008 VARIATIO
N
10.3.3.4 Beyond 20m up to 30m depth: Add 10.00% for every Meter 10.00% 10.00%
additional meter depth of sinking over the rate of sinking
for the previous meter 0.00
10.3.3.5 Beyond 30m up to 40m depth: Add 12.50% for every Meter 12.50% 12.50%
additional meter depth of sinking over the rate of sinking
for the previous meter 0.00
10.3.3.6 Kent ledge(supports, loading arrangement, labour etc.) Meter 20% 20%
0.00
10.3.3.7 Add for dewatering if required
10.3.3.7.1 Depth up to 3m Meter 5% 5% 0.00
10.3.3.7.2 Depth 3 to10m Meter 5% 5% 0.00
10.3.3.7.3 Depth above 10m Meter 5% 5% 0.00
10.3.4 In Hard Rock.(Well of 8m. External diameter)
10.3.4.1 Depth from 0-3 meters from cutting edge level. Meter 12750.00 14300.00 -10.84
10.3.4.2 Beyond 3m up to 10m depth : Add 5.00% for every Meter 5.00% 5.00%
additional meter depth of sinking over the rate of sinking
for the previous meter. 0.00
10.3.4.3 Beyond 10m up to 20m depth : Add 7.5% for every Meter 7.50% 7.50%
additional meter depth of sinking over the rate of sinking
for the previous meter. 0.00
10.3.4.4 Beyond 20m up to 30m depth: Add 10.00% for every Meter 10.00% 10.00%
additional meter depth of sinking over the rate of sinking
for the previous meter 0.00
10.3.4.5 Beyond 30m up to 40m depth: Add 12.50% for every Meter 12.50% 12.50%
additional meter depth of sinking over the rate of sinking
for the previous meter 0.00
10.3.4.6 Kent ledge(supports, loading arrangement, labour etc.) Meter 20% 20%
0.00
10.3.4.7 Add for dewatering if required
10.3.4.7.1 Depth up to 3m Meter 5% 5% 0.00
10.3.4.7.2 Depth 3 to10m Meter 5% 5% 0.00
10.3.4.7.3 Depth above 10m Meter 5% 5% 0.00
10.4 Well of 9m external diameter
10.4.1 In Sandy soil)
10.4.1.1 Depth from 0-3 meters from cutting edge level. Meter 5498.00 5410.00 1.63
10.4.1.2 Beyond 3m up to 10m.depth, Meter 7451.00 7341.00 1.50
10.4.1.3 Beyond 10m up to 20m depth : Add 5% for every Meter 5% 5%
additional meter depth of sinking over the rate of sinking
for the previous meter. 0.00
10.4.1.4 Beyond 20m up to 30m depth: Add 7.5% for every Meter 7.50% 7.50%
additional meter depth of sinking over the rate of sinking
for the previous meter 0.00
10.4.1.5 Beyond 30m up to 40m depth: Add 10% for every Meter 10% 10%
additional meter depth of sinking over the rate of sinking
for the previous meter 0.00
10.4.1.6 Kent ledge(supports, loading arrangement, labour etc.) Meter 20% 20%
0.00
10.4.1.7 Add for dewatering if required
CHAPTER FOUNDATIONS
R11
Item No. Item Description Unit Rate (Rs.) Rate (Rs.) %
2009 2008 VARIATIO
N
10.4.1.7.1 Depth up to 3m Meter 5% 5% 0.00
10.4.1.7.2 Depth 3 to10m Meter 5% 5% 0.00
10.4.1.7.3 Depth above 10m Meter 5% 5% 0.00
10.4.2 In Clayey soil.(Well of 9m. External diameter)
10.4.2.1 Depth from 0-3 meters from cutting edge level. Meter 7775.00 8687.00 -10.50
10.4.2.2 Beyond 3m up to 10m.depth, Meter 10155.00 11282.00 -9.99
10.4.2.3 Beyond 10m up to 20m depth : Add 5% for every Meter 5% 5%
additional meter depth of sinking over the rate of sinking
for the previous meter. 0.00
10.4.2.4 Beyond 20m up to 30m depth: Add 7.5% for every Meter 7.50% 7.50%
additional meter depth of sinking over the rate of sinking
for the previous meter 0.00
10.4.2.5 Beyond 30m up to 40m depth: Add 10% for every Meter 10% 10%
additional meter depth of sinking over the rate of sinking
for the previous meter 0.00
10.4.2.6 Kent ledge(supports, loading arrangement, labour etc.) Meter 20% 20%
0.00
10.4.2.7 Add for dewatering if required
10.4.2.7.1 Depth up to 3m Meter 5% 5% 0.00
10.4.2.7.2 Depth 3 to10m Meter 5% 5% 0.00
10.4.2.7.3 Depth above 10m Meter 5% 5% 0.00
10.4.3 In Soft rock. .(Well of 9m. External diameter)
10.4.3.1 Depth from 0-3 meters from cutting edge level. Meter 13242.00 12829.00 3.22
10.4.3.2 Beyond 3m up to 10m depth : Add 5.00% for every Meter 5.00% 5.00%
additional meter depth of sinking over the rate of sinking
for the previous meter. 0.00
10.4.3.3 Beyond 10m up to 20m depth : Add 7.5% for every Meter 7.50% 7.50%
additional meter depth of sinking over the rate of sinking
for the previous meter. 0.00
10.4.3.4 Beyond 20m up to 30m depth: Add 10.00% for every Meter 10.00% 10.00%
additional meter depth of sinking over the rate of sinking
for the previous meter 0.00
10.4.3.5 Beyond 30m up to 40m depth: Add 12.50% for every Meter 12.50% 12.50%
additional meter depth of sinking over the rate of sinking
for the previous meter 0.00
10.4.3.6 Kent ledge(supports, loading arrangement, labour etc.) Meter 20% 20%
0.00
10.4.3.7 Add for dewatering if required
10.4.3.7.1 Depth up to 3m Meter 5% 5% 0.00
10.4.3.7.2 Depth 3 to10m Meter 5% 5% 0.00
10.4.3.7.3 Depth above 10m Meter 5% 5% 0.00
10.4.4 In Hard Rock.(Well of 9m. External diameter)
10.4.4.1 Depth from 0-3 meters from cutting edge level. Meter 14846.00 14475.00 2.56
10.4.4.2 Beyond 3m up to 10m depth : Add 5.00% for every Meter 5.00% 5.00%
additional meter depth of sinking over the rate of sinking
for the previous meter. 0.00
CHAPTER FOUNDATIONS
R11
Item No. Item Description Unit Rate (Rs.) Rate (Rs.) %
2009 2008 VARIATIO
N
10.4.4.3 Beyond 10m up to 20m depth : Add 7.5% for every Meter 7.50% 7.50%
additional meter depth of sinking over the rate of sinking
for the previous meter. 0.00
10.4.4.4 Beyond 20m up to 30m depth: Add 10.00% for every Meter 10.00% 10.00%
additional meter depth of sinking over the rate of sinking
for the previous meter 0.00
10.4.4.5 Beyond 30m up to 40m depth: Add 12.50% for every Meter 12.50% 12.50%
additional meter depth of sinking over the rate of sinking
for the previous meter 0.00
10.4.4.6 Kent ledge(supports, loading arrangement, labour etc.) Meter 20% 20%
0.00
10.4.4.7 Add for dewatering if required
10.4.4.7.1 Depth up to 3m Meter 5% 5% 0.00
10.4.4.7.2 Depth 3 to10m Meter 5% 5% 0.00
10.4.4.7.3 Depth above 10m Meter 5% 5% 0.00
10.5 Well of 10m external diameter
10.5.1 In Sandy soil)
10.5.1.1 Depth from 0-3 meters from cutting edge level. Meter 6734.00 6639.00 1.43
10.5.1.2 Beyond 3m up to 10m.depth, Meter 7827.00 7710.00 1.52
10.5.1.3 Beyond 10m up to 20m depth : Add 5% for every Meter 5% 5%
additional meter depth of sinking over the rate of sinking
for the previous meter. 0.00
10.5.1.4 Beyond 20m up to 30m depth: Add 7.5% for every Meter 7.50% 7.50%
additional meter depth of sinking over the rate of sinking
for the previous meter 0.00
10.5.1.5 Beyond 30m up to 40m depth: Add 10% for every Meter 10% 10%
additional meter depth of sinking over the rate of sinking
for the previous meter 0.00
10.5.1.6 Kent ledge(supports, loading arrangement, labour etc.) Meter 20% 20%
0.00
10.5.1.7 Add for dewatering if required
10.5.1.7.1 Depth up to 3m Meter 5% 5% 0.00
10.5.1.7.2 Depth 3 to10m Meter 5% 5% 0.00
10.5.1.7.3 Depth above 10m Meter 5% 5% 0.00
10.5.2 In Clayey soil.(Well of 10m. External diameter)
10.5.2.1 Depth from 0-3 meters from cutting edge level. Meter 8364.00 9464.00 -11.62
10.5.2.2 Beyond 3m up to 10m.depth, Meter 9789.00 12290.00 -20.35
10.5.2.3 Beyond 10m up to 20m depth : Add 5% for every Meter 5% 5%
additional meter depth of sinking over the rate of sinking
for the previous meter. 0.00
10.5.2.4 Beyond 20m up to 30m depth: Add 7.5% for every Meter 7.50% 7.50%
additional meter depth of sinking over the rate of sinking
for the previous meter 0.00
10.5.2.5 Beyond 30m up to 40m depth: Add 10% for every Meter 10% 10%
additional meter depth of sinking over the rate of sinking
for the previous meter 0.00
10.5.2.6 Kent ledge(supports, loading arrangement, labour etc.) Meter 20% 20%
0.00
CHAPTER FOUNDATIONS
R11
Item No. Item Description Unit Rate (Rs.) Rate (Rs.) %
2009 2008 VARIATIO
N
10.5.2.7 Add for dewatering if required
10.5.2.7.1 Depth up to 3m Meter 5% 5% 0.00
10.5.2.7.2 Depth 3 to10m Meter 5% 5% 0.00
10.5.2.7.3 Depth above 10m Meter 5% 5% 0.00
10.5.3 In Soft rock. .(Well of 10m. External diameter)
10.5.3.1 Depth from 0-3 meters from cutting edge level. Meter 13555.00 13126.00 3.27
10.5.3.2 Beyond 3m up to 10m depth : Add 5.00% for every Meter 5.00% 5.00%
additional meter depth of sinking over the rate of sinking
for the previous meter. 0.00
10.5.3.3 Beyond 10m up to 20m depth : Add 7.5% for every Meter 7.50% 7.50%
additional meter depth of sinking over the rate of sinking
for the previous meter. 0.00
10.5.3.4 Beyond 20m up to 30m depth: Add 10.00% for every Meter 10.00% 10.00%
additional meter depth of sinking over the rate of sinking
for the previous meter 0.00
10.5.3.5 Beyond 30m up to 40m depth: Add 12.50% for every Meter 12.50% 12.50% 0.00
additional meter depth of sinking over the rate of sinking
for the previous meter
10.5.3.6 Kent ledge(supports, loading arrangement, labour etc.) Meter 20% 20% 0.00
9 Supplying fitting and fixing in position true to line and Tonne 384.00 384.00
level Sliding Plate Bearing with PTFE surface sliding on Capacity
stainless steel complete including all accessories as per
drawing and technical specification and BS:5400,
Section 9.1 &9.2 (for PTFE) [MoRTH Specification
Section 2000 (N)
10 Supplying fitting and fixing in position true to line and Cm3 0.80 0.80
level, Elastromeric Bearing confirming to IRC: 83 (Part II-
Section IX) complete including all accessories as per
drawing and technical specification.[MoRTH
Specification Section 2000(N)]
11 Supplying fitting and fixing in position true to line and Tonne 490.00 490.00
level, POT-PTFE Bearing suitable for biaxial movement Capacity
as per drawing and BS:5400 Sections 9.1 & 9.2 [MoRTH
Specification Section 2000(N)]
12 Supplying fitting and fixing in position true to line and Tonne 384.00 384.00
level, Sliding Plate Bearing with stainless steel plate Capacity
sliding on stainless steel plate with mild steel matrix
[MoRTH Specification : Section 2000(N)]
13 Providing A.C pipe Weep holes 100mm dia in Meter 44.00 40.00
Masonry/Plain Concrete/.Reinforced Concrete abutment,
wing wall/return wall complete as per drawing and
technical specification.[MoRTH Specification Clause
2205]
14 Providing A.C pipe Weep holes 150mm dia in Meter 66.00 60.00
Masonry/Plain Concrete/.Reinforced Concrete abutment,
wing wall/return wall complete as per drawing and
technical specification.[MoRTH Specification Clause
2205]
15 Providing and laying Expansion Joint complete as per
drawing and technical specification
15.1 With 20mm thick Galvanized mild steel plate.[MoRTH Meter 1071.00 974.00
Specification : Section 2100(N), 2600(N)]
15.2 Providing & fixing 2 mm thick corrugated copper plate in Meter 1675.00
expansion joint complete as per drawing & Technical
Specification.
15.4 Providing & fixing 20 mm thick compressible fibre board Meter 131.00 524.00
in expansion joint complete as per drawing & Technical
Specification.
15.5 Providing & Fixing in position 20mm thick moldedulded Meter 80.00 263.00
joint filler in expansion joint complete.
15.6 Providing and filling joint sealing compound -Coarse Meter per 10.00 10.00
sand with bitumen (6% by weight) Cms
depth
CHAPTER SUB STRUCTURE
: R-12
16.1 Providing and laying of compression seal joint consisting Meter 2078.00
of steel armoured nosing at two edges of the joint gap
suitably anchored to the deck concrete and a preformed
chloroprene elastomer or closed cell foam joint sealer
compressed and fixed into the jo
16.2 Providing and laying of a strip seal expansion joint Meter 8908.00
catering to maximum horizontal movement upto 70 mm,
complete as per approved drawings and standard
specifications to be installed by the
manufacturer/supplier or their authorised representative
ensuring
16.3 Modular Strip / Box Seal Joint
Providing and laying of a modular strip Box seal Meter 8485.00
expansion joint including anchorage catering to a
horizontal movement beyond 70 mm and upto 140mm,
complete as per approved drawings and standard
specifications to be installed by the
manufacturer/supplier
16.4 Modular Strip / Box Seal Joint
Providing and laying of a modular strip box seal Meter 9699.00
expansion joint catering to a horizontal movement
beyond 140mm and upto 210mm, complete as per
approved drawings and standard specifications to be
installed by the manufacturer/supplier or their authorised
%
VARIATI
ON
4.14
2.54
7.22
5.26
6.52
6.90
8.44
0.00
0.00
7.10
0.00
0.00
3.99
3.99
4.00
3.92
3.93
3.93
3.70
3.70
%
VARIATI
ON
3.70
3.19
3.20
-3.91
-0.98
-0.87
-0.97
3.06
3.05
3.04
0.00
0.00
0.00
2.92
9.52
-22.77
-31.53
-20.00
-28.29
%
VARIATI
ON
0.00
0.00
0.00
0.00
10.00
10.00
9.96
-75.00
-69.58
0.00
%
VARIATI
ON
0.02
CHAPTER SUPERSTRUCTURE
: R-13
Item No. Item Description Unit Rate (Rs.) Rate (Rs.)
2009 2008
3 Providing and laying High tensile steel wires/strands at Tonne 93153.00 103877.00
any level including all accessories for stressing, stressing
operations and grouting complete as per drawing and
technical specification.[MoRTH Specification 1800(N)]
8 PCC M-15 grade leveling course below approach slab Cum 2495.00 2477.00
complete as per drawing and MoRTH specifications
clause 14.10.
9 Reinforced cement concrete approach slab including
reinforcement and formwork complete as per drawing
and MoRTH specifications section 1500, 1600, 1700,
2704.
9.1 M 30 grade Cum 5371.00 5086.00
9.2 M 35 grade Cum 5454.00 5169.00
9.3 M 40 grade Cum 5537.00 5252.00
10 P&F on culverts/ bridges deck rain water spouts made of Each 1048.00 391.00
cast iron as per MoRTH specification complete
%
VARIATIO
N
-0.19
-0.15
-0.17
-0.15
-0.17
-0.17
-0.20
-0.21
-0.18
-0.21
-0.18
-0.20
-0.19
-0.18
-0.20
-0.18
-0.20
-0.20
-0.22
-0.21
-0.20
-2.73
-0.20
-0.19
-0.21
-0.20
%
VARIATIO
N
-0.22
-0.21
-0.18
-0.19
-0.18
-0.19
-0.21
-0.20
-0.19
-0.18
-0.20
-0.22
-0.21
-0.21
-0.22
-0.19
-0.20
-0.21
-0.23
-0.21
-0.22
-0.22
-0.22
-0.22
-21.95
%
VARIATIO
N
-10.32
-13.13
-13.06
-12.78
-12.78
-18.43
-18.21
-26.96
0.73
5.60
5.51
5.43
168.03
CHAPTER RIVER TRAINING AND PROTECTION WORK
: R-14
3.2 With Cement Concrete block M15 grade, complete with Cum 2647.00 2628.00 0.72
form work etc. [MoRTH Specification: Clause:
2504,1700]
4 Providing and laying Flooring Rubble stone/ C.C M15
block over bedding complete as per drawing and
technical specification. [MoRTH Specification: Clause
2505,1700]
4.1 Rubble stone laid in cement mortar 1:3 Cum 2439.00 2381.00 2.44
4.2 Cement concrete block in M15 grade including form work Cum 2518.00 2460.00 2.36
4.3 If cement concrete (M15) bedding is provided Cum 3486.00 3076.00 13.33
5 Supply of wire crates in required size made of hot dipped sqm 220.00 200.00 10.00
G I wire 4 mm dia having mesh of 10 cm X10 cm surface
area
6 Labour Charges --
6.1 For dumping of boulders / stones including hand packing Cum 199.00 181.00 9.94
where necessary
6.2 For stone pitching for slopes Cum 199.00 181.00 9.94
6.3 For dry stone masonry for toe walls Cum 199.00 181.00 9.94
6.4 For laying boulders in bed Cum 103.00 94.00 9.57
6.5 For filling wire crates made of 5mm dia G I wire by stone Cum 259.00 235.00 10.21
in specified position at site including 5 mm dia G I wire
for binding complete in all respect .
CHAPTER RIVER TRAINING AND PROTECTION WORK
: R-14
7 Providing and construction of a gabian structure for Cum 1758.00 1598.00 10.01
retaining earth with segments of wire crates of size 7 m x
3 m x 0.6 m each divided into 1.5 m compartments by
cross netting, made from 4 mm galvanized steel wire @
32 Kg per 10 Sqm having minimum tensile strength of
300 Mpa conforming to IS: 280 and galvanizing coating
conforming to IS : 4826 , woven into mesh with double
twist, mesh size not exceeding 100 x 100 mm , filled with
boulders with least dimension of 200 mm , all loose ends
to be tied with 4 mm galvanized steel wire complete as
per MoRTH specification clause 2503.3
8 Providing and constructing gabian structures for erosion Cum 3357.00 3052.00 9.99
control, river training works and protection works with
wire crates of size 2 m x 1 m x 0.3 m each divided into 1
m compartments by cross netting, made from 4 mm
galvanized steel wire @ 32 Kg per 10 Sqm having
minimum tensile strength of 300 Mpa conforming to IS :
280 and galvanizing coating conforming to IS: 4826 ,
woven into mesh with double twist, mesh size not
exceeding 100 mm x 100 mm filled with boulders with
least dimension of 200 mm, all loose ends to be securely
tied with 4 mm galvanized steel wire complete as per
MoRTH specification clause 2503.3
CHAPTER REPAIR & REHABILITATION
: R-15
Item No. Item Description Unit Rate (Rs.) Rate (Rs.)
2009 2008
12 Providing and laying strip seal expansion joint catering to Mtr 9798.00 8907.00
maximum horizontal movement up to 70mm complete as
per approved drawing and IRC specifications including
acceptance testing as specified to be installed under
supervision of a specialist manufacturer (MoRTH Sp."
2600) including arrangement of traffic during
replacement of joint.
15 Providing and filling joint filler compound confirming to Rmt 12.00 11.00
IS: 1834 for each 25mm width & 25mm depth
%
VARIATI
ON
10.00
10.04
10.34
9.78
10.26
10.67
10.00
10.67
10.00
10.34
9.38
10.67
10.00
%
VARIATI
ON
10.00
10.00
10.12
10.00
9.09
Chapter Description Unit Labour Including Including Including
Code for cost of M- cost of M- cost of M-
fixing 10 Mix 15 Mix 20 Mix
only Dand / Dand / Kerb Dand/Kerb
Kerb Complete Complete
Complete
3.1 10 x 15 cm Mtr. 8 55 58 63
3.2 15 x 15 cm Mtr. 8 75 89 95
3.3 20 x 20 cm Mtr. 9 120 159 169
3.4 20 x 25 cm Mtr. 9 150 196 211
3.5 (20 x 25)/2 x 30 Mtr. 12 200 265 285
cm
3.6 (20.5 x 25)/2 x Mtr. 12 220 270 289