Service -1 Clean the module compartment and vertical busbar


No Work Steps Check Box Remarks
Clean the compartment inside including the
1
vertical bus support
Lift the shutter and check engagement area in the
2
riser for any pitting.
Clean the riser surface and apply thin film of
3
neutral grease at the engagement area
4 Check movement of shutters
5 Clean the tray surface

Service -2 Check outgoing fixed contacts and tightness of its connection joints
No Work Steps Check Box Remarks
Inspect the engagement point in the outgoing
1
fixed contact for any pitting
Check whether the backelite housing is cracked or
2
not
Clean the surface of the cu-contact and apply thin
3
film of neutral grease
Check the tighness of the power cable/busbar
4
connections to these contacts

Service -3 Check tightness of main busbar joint


No Work Steps Check Box Remarks
Tighten the joint of main,neutral and earth buses
1
and check control bus connections

2 tightness and Check all breaker connection joints,


busduct termination and cable lug joints.
3 Check space heater circuit

4
Check insulation resistance of busbars and record

Comment :

Main-Con Representative Client's Representative

Name : Name :
Main-Contractor : PHARSB-ECSB JV Client : UTHM
Date : Date :
LOW VOLTAGE P
MAINTENANCE SER

LOW VOLTAGE SWITCHBOARDS


SERVICES FORM

PROJECT : PEMBANGUNAN KAMPUS TETAP UTHM BATU PAHAT JOHOR   BANGUNAN Location :
PERPUSTAKAAN DAN DEWAN KULIAH

Date: ServiceContractor: Client Technician:

Service -4 Check Switch / MCCB


No Work Steps Check Box Remarks
Check on-off operation and continuity of auxiliary
1
contacts
2 Check tightness of connecting bolt
MCCB gige supply to under voltage coil,trip coil
3
and check operations

4 Check castel locking arrangement if provided


along with door-defect interlocking

Service -5 Check Power contactors


No Work Steps Check Box Remarks
Clean the contactor and its terminal with dry cloth
1
and brush

2
Check power terminal wire connection tightness
Visual check of power contacts after removing arc
3
chute (moving and fixed)

Service -6 Check Relays


No Work Steps Check Box Remarks
Clean the thermal overload relay and its terminals
1
with dry cloth and brush

2
Check power terminal wire connection tightness
Check mechanical working of the resetting
3 arrangement with reset chord and button and
record detail of any defect
Check working of 'pressed to test button' is ok or
4
not.
5 Check the continuity of the auxiliary contact

Comment :

Main-Con Representative Client's Representative

Name : Name :
Main-Contractor : PHARSB-ECSB JV Client : UTHM
Date : Date :
LOW VOLTAGE P
MAINTENANCE SER

LOW VOLTAGE SWITCHBOARDS


SERVICES FORM

PROJECT : PEMBANGUNAN KAMPUS TETAP UTHM BATU PAHAT JOHOR   BANGUNAN Location :
PERPUSTAKAAN DAN DEWAN KULIAH

Date: ServiceContractor: Client Technician:

Service -7 Check Air Circuit Breaker


No Work Steps Check Box Remarks
Clean ACB,its main and auxiliary contacts and its
1
arc-chutes
2 Check breaker contacts pitting
Check manual spring charging operation as well as
3
mechanical on-off operation
Give supply to u.v coil, closing coil, check
4 continuity of power and auxiliary contacts of ACB
during on-off operation of ACB
Check door interlocking,castel locking provided
5
inACB

Service -8 Board cleaning


No Work Steps Check Box Remarks
1 Clean the board inside with vacum cleaner
Clean the board out side with vacum cleaner and
2
dry cloth and thinner
Phisically check all door and covers are properly
3
closed

Comment :

Main-Con Representative Client's Representative

Name : Name :
Main-Contractor : PHARSB-ECSB JV Client : UTHM
Date : Date :
LOW VOLTAGE POWER SYSTEM
MAINTENANCE SERVICES REPORT

Location :

Client Technician:

Materials Required : dry


cloth,grease,

Tool Required :
cleaner,screw driver,spannar
set,torch,vacum cleaner,soft
brush

Materials Required : dry


cloth,soft brush

Tool Required :
cleaner,screw driver,spannar
set,vacum cleaner

Materials Required : dry


cloth,soft brush

Tool Required :
cleaner,screw driver,spannar
set,vacum cleaner

AL-PM-LVS001-LVB
LOW VOLTAGE POWER SYSTEM
MAINTENANCE SERVICES REPORT

Location :

Client Technician:

Materials Required : dry

Tool Required :
cleaner,screw driver,spannar
set,torch

Materials Required : dry


cloth,soft brush

Tool Required :
cleaner,screw driver,spannar
set,vacum cleaner

Materials Required : dry


cloth,soft brush

Tool Required :
cleaner,screw driver,spannar
set,vacum cleaner,continuity
tester

AL-PM-LVS001-LVB
LOW VOLTAGE POWER SYSTEM
MAINTENANCE SERVICES REPORT

Location :

Client Technician:

Materials Required : dry


cloth,soft brush

Tool Required :
cleaner,screw driver,spannar
set,torch,continuity tester

Materials Required : dry


cloth,soft brush

Tool Required :
cleaner,screw driver,spannar
set,vacum cleaner

AL-PM-LVS001-LVB
LOW VOLTAGE P
MAINTENANCE SER

SUB-SWITCH BOARD AND


DISTRIBUTION BOARD SERVICES FORM

PROJECT : PEMBANGUNAN KAMPUS TETAP UTHM BATU PAHAT JOHOR   BANGUNAN Location :
PERPUSTAKAAN DAN DEWAN KULIAH

Service -1 Check and clean MCCB


No Work Steps Check Box Remarks

Date :
Clean the MCCB with dry cloth and vacum cleaner
Check all accessible live parts screened with
2
insulating plate or earthed metal.
Check tightness of connecting bolt of Live,Neutral
3
and earth buses.
Check on-off operation and continuity of auxiliary
4
contacts
Check insulation resistance measured between
5
phases/neutral/earth and record

6 Test shunt trip coil "push button test" and check


operations
Visual check of all cable protection incoming and
7
outgoing

Service -2 Check and clean RCCB/ELCB


No Work Steps Check Box Remarks
Clean the thermal relay and its terminals with dry
1
cloth and brush

2
Check power terminal wire connection tightness
Check mechanical working of the resetting
3 arrangement with reset chord and button and
record details in case of any defect
Check working of 'pressed to test button' is o.k or
4
not
5 Check the continuity of the auxiliary contact
Visual check of all cable protection incoming and
6
outgoing

Comment :

Main-Con Representative Client's Representative

Name : Name :
Main-Contractor : PHARSB-ECSB JV Client : UTHM
Date : Date :
LOW VOLTAGE POWER SYSTEM
MAINTENANCE SERVICES REPORT

Location :

Materials Required : dry


cloth,soft brush

Tool Required :
cleaner,vacum cleaner,screw
driver,spannar set,test
pen,continuity
tester,insulation tester,

Materials Required : dry


cloth,soft brush

Tool Required :
cleaner,vacum cleaner,screw
driver,spannar set,test
pen,continuity
tester,insulation tester,

AL-PM-LVS002-SSBDB

You might also like