Professional Documents
Culture Documents
MAINTENANCE SER
PROJECT : PEMBANGUNAN KAMPUS TETAP UTHM BATU PAHAT JOHOR BANGUNAN Location :
PERPUSTAKAAN DAN DEWAN KULIAH
Service -2 Check outgoing fixed contacts and tightness of its connection joints
No Work Steps Check Box Remarks
Inspect the engagement point in the outgoing
1
fixed contact for any pitting
Check whether the backelite housing is cracked or
2
not
Clean the surface of the cu-contact and apply thin
3
film of neutral grease
Check the tighness of the power cable/busbar
4
connections to these contacts
4
Check insulation resistance of busbars and record
Comment :
Name : Name :
Main-Contractor : PHARSB-ECSB JV Client : UTHM
Date : Date :
LOW VOLTAGE P
MAINTENANCE SER
PROJECT : PEMBANGUNAN KAMPUS TETAP UTHM BATU PAHAT JOHOR BANGUNAN Location :
PERPUSTAKAAN DAN DEWAN KULIAH
2
Check power terminal wire connection tightness
Visual check of power contacts after removing arc
3
chute (moving and fixed)
2
Check power terminal wire connection tightness
Check mechanical working of the resetting
3 arrangement with reset chord and button and
record detail of any defect
Check working of 'pressed to test button' is ok or
4
not.
5 Check the continuity of the auxiliary contact
Comment :
Name : Name :
Main-Contractor : PHARSB-ECSB JV Client : UTHM
Date : Date :
LOW VOLTAGE P
MAINTENANCE SER
PROJECT : PEMBANGUNAN KAMPUS TETAP UTHM BATU PAHAT JOHOR BANGUNAN Location :
PERPUSTAKAAN DAN DEWAN KULIAH
Comment :
Name : Name :
Main-Contractor : PHARSB-ECSB JV Client : UTHM
Date : Date :
LOW VOLTAGE POWER SYSTEM
MAINTENANCE SERVICES REPORT
Location :
Client Technician:
Tool Required :
cleaner,screw driver,spannar
set,torch,vacum cleaner,soft
brush
Tool Required :
cleaner,screw driver,spannar
set,vacum cleaner
Tool Required :
cleaner,screw driver,spannar
set,vacum cleaner
AL-PM-LVS001-LVB
LOW VOLTAGE POWER SYSTEM
MAINTENANCE SERVICES REPORT
Location :
Client Technician:
Tool Required :
cleaner,screw driver,spannar
set,torch
Tool Required :
cleaner,screw driver,spannar
set,vacum cleaner
Tool Required :
cleaner,screw driver,spannar
set,vacum cleaner,continuity
tester
AL-PM-LVS001-LVB
LOW VOLTAGE POWER SYSTEM
MAINTENANCE SERVICES REPORT
Location :
Client Technician:
Tool Required :
cleaner,screw driver,spannar
set,torch,continuity tester
Tool Required :
cleaner,screw driver,spannar
set,vacum cleaner
AL-PM-LVS001-LVB
LOW VOLTAGE P
MAINTENANCE SER
PROJECT : PEMBANGUNAN KAMPUS TETAP UTHM BATU PAHAT JOHOR BANGUNAN Location :
PERPUSTAKAAN DAN DEWAN KULIAH
Date :
Clean the MCCB with dry cloth and vacum cleaner
Check all accessible live parts screened with
2
insulating plate or earthed metal.
Check tightness of connecting bolt of Live,Neutral
3
and earth buses.
Check on-off operation and continuity of auxiliary
4
contacts
Check insulation resistance measured between
5
phases/neutral/earth and record
2
Check power terminal wire connection tightness
Check mechanical working of the resetting
3 arrangement with reset chord and button and
record details in case of any defect
Check working of 'pressed to test button' is o.k or
4
not
5 Check the continuity of the auxiliary contact
Visual check of all cable protection incoming and
6
outgoing
Comment :
Name : Name :
Main-Contractor : PHARSB-ECSB JV Client : UTHM
Date : Date :
LOW VOLTAGE POWER SYSTEM
MAINTENANCE SERVICES REPORT
Location :
Tool Required :
cleaner,vacum cleaner,screw
driver,spannar set,test
pen,continuity
tester,insulation tester,
Tool Required :
cleaner,vacum cleaner,screw
driver,spannar set,test
pen,continuity
tester,insulation tester,
AL-PM-LVS002-SSBDB