SEPTEMBER 2010
ATTENDANCE
Agenda
Opening prayer
Communication from the Chair
Progress reports from all the teams for the project
Concluding remarks and way forward
The chair gave the status for the funds that were released for the first quarter of the first
year of the project with the aim of building a prototype of two seater electric car. He
confirmed that all the money that had been budgeted for the first quarter was deposited
in the respective accounts and the procurement of all the required equipment was
ongoing.
The chair encouraged the team to look at the development of this first prototype was
key in establishing this technology in our country. He gave an example of a city in
Switzerland which banned the used of automobiles that burn fossil fuels and thus
encouraged the team to be inspired by such successes elsewhere.
The GRAs were yet to sign the Terms of Reference and receive the appointment letters.
He concluded by saying the technical meeting shall be held every Monday at 12pm and
urged the team to make preparation for the meeting before hand. He also said that with
time, there would other external personnel to come and attend the meetings
Mechanical Team
The team reported on the work done so far which was mainly modifying the chassis
design to incorporate the motor and gearbox at the front.
Comments
Electrical Team
Comments
The team was told to make clear reference points for the designs it is carrying out
The team was asked about the powertrain but the team could not do more work
on the powertrain without the simulation software in place
The team reported on the development of the OS for the micro controllers
Comments
The team was asked to give clear references as well that it was using as a guide for the
development of the systems
Design Team
The team had been given a task of developing the logo for the prototype which it
presented to the project team and the logo was approved.
The team also had been given a task to design the design lab and come up with
architectural drawings for the lab which it had done partly
Comments
The team was asked to finalize the logo which was approved
The team was told to design the lab to only utilize the space within the building
without any extensions or any alterations of the old building structure
He urged the team to work closely together since this was the first multidiscipline
program project