Span Roof
XONG YING
(Jiuyuan Construction Design Ltd. Co., Beijing, PRC, 100031)
Institute of Building and Construction, PRC. She has undertaken designing work
and fabricating management on steel structure for over 15 years. She has designed
Center, Century Hall of Renmin University of China and so on. Design and
Calculation of Steel Structures has being used widely .She is one of authors on the
Shuangling Wen
book. She received Master degree of Engineering from Xi'an University of
Architecture & Technology in 1989. She is Class A Registered Structural Engineer from 1999.
ABSTRACT
A roof garden is a round shape with diameter of 42.2m and with the total loads of 20kN/m2. After
comprehensive comparison, decision was made to use steel cross-grid beam structure of large span which the
section was H shape being welded. The paper has introduced the comparison of steel structure proposals, support
The roof area of roof garden of a science and technology center is 1,400 m2 (see photo 1:bird view of roof
garden), in the center is a square shape swimming pool surrounded by flowers, grass, bushes, and also stone
tables and seats are arranged for people to rest, recreation and barbecue. The space under the roof is a large
conference center for international seminars, equipped with simultaneous interpretation room. The structure span
of roof garden is 36.8m, the normal value of permanent loads is
STRUCTURE PROPOSAL
Construction Requirement
Photo 1, Bird View of Roof Garden Since the center part of the roof garden is a swimming pool, so, the
surroundings. Roof is structurally slopping method. First, the support structure design of roof panel was to begin
the slop at upper surface, and the same thickness insulation layer and waterproof layer was laid on the 150mm
thick reinforced concrete slab, which did not only avoiding the heavy loads caused by normal roof insulation slop
structure, and also meeting the basic requirement of heat insulation, drainage and waterproof. Furthermore, both
the roof structure height and loads bearing capacity had been improved, the allowable clear height under the roof
» Ä
ì Íý Á
Öù
Fig. 1, Steel Structure Plane Arrangement Fig.2, Vertical Section Drawing of Steel Beam
Proposals Comparison
The larger space structure under the roof garden was reinforced concrete frame, the reinforced concrete column
position is shown in Fig. 1. The roof is polygon (nearly as a round shape), which is suitable for the arrangement
of space structure system. Considering the facts of heavy loads on roof, larger impact from earthquake, the
requirement of construction functions and clear space, two proposals of steel cross-grid girder structure with
Steel cross-grid beam structure normally has been used for large space concrete structure, but, steel cross-grid
beam structure with solid-section girder has been hardly used for large span roof. In China, the first steel
cross-grid girder structure with solid-section beam of large span under heavy load was used in the lobby roof
garden of Building B, Beijing Xiyuan Hotel. Its structure span is 28m×28m, the internal distance between beams
is 4m, steel beam cross section is H1800×450×20×30. The preliminary proposal of this project was 36.8m span,
double directions orthogonal, steel cross-grid beam structure with H welded solid-section girder. Calculation
results had shown that if the steel used was grade Q345, height of steel beam was 2.2m, pre-arching measure was
taken for the large span beam during construction, both its structure strength and deformation met the demands
of application.
At present, most of the large span space structure still is space network structure, the advantage is lower steel
consumption and easy passing through the pipeline facilities, but, when the span is larger, it takes up more space.
Calculation indicated that when space truss was applied, the height of central line of upper and lower chords
required 3.0m; meanwhile, the joint ball required more than 0.8m in diameter. The roof panel support beams of
space frame upper chord were H300×300×10×6, unfortunately, the space height of steel structure under
concrete panel was as high as 4.7m, which was too large and exceeded the construction allowable space
requirement.
Table 1 shows the comparison calculations and analysis on these two proposals. These two proposals had
similar steel consumptions. Since steel cross-grid beam structure with solid-section girder could meet the
requirement of construction space and also had the properties of quick and easy construction, so, at last, the steel
cross-grid beam structure with variable cross-section H girder hade been applied (Cross- Section see Fig. 2).
Roof garden was supported on reinforced concrete frame, which was un-equilateral octagon, top 800mm
concrete ring beam was supported on 12 reinforced concrete columns, the plane position of columns was shown
in Fig. 1.
Loads
Considering comprehensively the function requirement of roof garden and garden design proposal, the loads
selection and effective combination were done according to “Load Code for the Design Structure” (GBJ 9-87)
and “Code for Seismic Design of Building” (GBJ 11-89). Standard value of roof loads were:
A, Standard value of permanent loads: 20kN/m2, including the weight of concrete slab, covering soil of roof,
pebbles, swimming pool, ventilation ducts, water supply and heating pipes and structures.
There were three kinds of loads combination had been considered in this project:
B, 1.2 permanent loads + 1.4 active loads for half roof span and
Proposal
Cross-grid beam structure Space truss
Property
Beam: Q345 B.F. Member: Q345 B.F.
Steel
Truss: Q235 B.F. Roof Support Beam: Q235 B.F.
300mm (central line distance
Height of main loads support structure 2400 mm
between upper and lower chords)
Member: φ325×16
Max. cross-section member H2400×500×30×18
Ball: φ1200×60
Max. height of space taken by structure
2400mm 4650mm
(support beam under roof panel included)
Slab support beam No. H300X300X10X6
Vertical deformation 133mm 135mm
2
Steel consumption 200kg/m 192kg/m2
Small holes can made, Pipes can pass through the space
Structure space application
cannot directly use between members
Height requirement of Height requirement of 2.6m can
Construction requirement
2.4m can be met not be met
Construction Schedule Site erection is quick Site erection is slow
Structure Arrangement
Steel structure plane arrangement for roof garden is shown in Fig. 1. Maximum structure span was 36.8mm;
internal distances between beams were 4.5m or 4.9m. Steel beams inside the square area of 19.2m×19.2m in the
center part of roof (shadow area in Fig. 1) are equal cross-section girders. The height of roof beam middle parts
was 2.4m; height of support base was 2.2m, which meeting the requirement of 2.2m clear height of construction.
Beams were become variable cross-section members, and rest of the beams were equal cross-section; its cross
section was symmetrical along the longitudinal. Fig. 2 shows the half beam cross-section.
Structure Calculation
A, Steel beam support base was ideal splice connection, turning around the main axis of steel beam
B, Main load bearing steel beams of roof structure were all double direction continuous beams, the
connection between main load bearing steel beams and the end of two ring beams outside (LL) was hinge joint.
SAP93 finite element program was used in the calculation. After the space calculation model was established,
based on the Grade Q345B steel and the different loads to calculate out the internal force and deformation of
structures. According to the result analysis, the vertical seismic combination (1.2 permanent loads + 1.3 vertical
seismic loads) played the key role, which showed that for heavy load roof structure, the working condition of
vertical seismic effect should be considered carefully (since the γRE value was 1.0 in this case). After repeatedly
calculation and optimization, the largest steel beam cross-section at last was H(2200 – 2400) ×500×18×30 (see
Fig. 2). Under the permanent loads effect, the maximum deflection of steel beam was 118.4mm; under the basic
combination effect controlled by permanent load effect, the maximum deflection of steel beam was 130.1mm.
Considering the center part of garden proposal was a 6.4m×6.4m square and 600mm deep swimming pool,
actual loads could not reach the calculation value, and also the maximum vertical deformation of beams could
not reach the calculation value, the design arching value could be less than the deflection brought by permanent
Structure Connection
A, Support
cross-section, there was no lateral displacement outside the plane. 60mm thick single side arc supporting panel
was selected, 4 pieces of M36 anchor bolts were installed, and pressure springs were added on the upper of
anchor bolts to allow the support having little turning and linear displacement, so that to guarantee the supporting
loads property of large span steel beams caused by deflection and temperature stress impact. The joints structure
To guarantee the beam to beam rigid connection in the double direction of H shape steel beam structure
proposal, the assembly joints were put at the position far away from the intersection (1500mm or 500 from the
axis intersection) by the design, which making the assembly position as the moment connection joints with beam.
The joints were connected by bolt and weld structure method, that is, welding the wing edge, and bolts
connecting the web plate (see Fig. 4). The high strength bolts connection of web plate benefited the construction,
and also could guarantee erection precision. The fully melted welding on wing edge could guarantee the
continuity of upper and lower edge plates. Beam and web plate assembly structure applied the double plates
connection form. According to precise calculation, high strength bolts could resist part of the bending moment,
so that, the last decision was to use 120 sets of M24 high strength bolts for the maximum bolts on beam and web
plate assembly.
CONCLUSION
Steel Structure members were fabricated precisely based on the design drawings, and during the installation of
high strength bolts, no hole-enlarged phenomenon was found. The erection of 280 tons steel structure took only
20 days, the construction was quick. Excellent quality standard has been rewarded in the project acceptance.