You are on page 1of 6

August 5, 2010

Thursday, 8:00AM – 6:00PM


- Visiting and observing the cooling towers (Systems 1, 2, 3 and 4), chiller unit, air-cooled
condensers, and exhaust outlets at the RP-Galleria Roof deck.

August 6, 2010
Friday, 7:00AM – 6:00AM
- Observing the tenant’s Air-conditioning System (Team Pacquiao)
- Lecture of Heat Load Calculations and Sprinkler Construction by Engr. Phyllip James Cajigal.
- Lecture by Engr. Roberto Lozada about sewage treatment plant and engines (diesel and
gasoline).
- Visiting the Fire Pump Station and cleaning its control panel board at Basement 1.

August 9, 2010
Monday, 6:50AM – 6:00PM
- Visiting the Generator Set at the Basement 1.
- Lecture of Diesel Engine fuel line by Engineering Director Roberto Lozada.
- Double-check the Mechanical and Fire Protection Layout under the Working drawings and
the Design drawings.

August 10, 2010


Tuesday, 7:00AM – 5:00PM
- Estimation of Air ducting system from an As-Built Plan.
- Inspect the AHU (Air Handling Unit) of a tenant located at the 3rd level, RP-Galleria.
- Observed how Air Balancing is performed using a digital anemometer (velometer).

August 11, 2010


Wednesday, 7:00AM – 5:00PM
- Estimation of a Ducting System.
- Visiting two tenants during their store construction and Inspecting if they have followed the
RLC (Robinsons Land Corporation) Standards.
- Lecture by Engr. Roberto Lozada on Diesel engine, Fire pump, and Air Handling Units.
- Visiting the Fire Pump Station at the Basement 1 (Operations and Maintenance Department).

August 12, 2010


Thursday, 6:50AM – 5:00PM
- Lecture by Engr. Roberto Lozada on designing a Fire Pump Station together with its
Capacity.
- Visiting the Fire Pump Station at the Basement 1 to check the Pressure Regulator Valve.
- Visiting the AHU (Air Handling Unit) of a tenant located at the 3rd level, RP-Galleria.
- Noting some Comments and Guidelines on the Design blueprint drawings.

August 13, 2010


Friday, 6:40AM – 6:30PM
- Monitoring the tenant’s on-going construction specifically to the Sprinkler and Air-conditioning
system.
- Checking and noting some Guidelines for Mechanical (Air-conditioning) and Fire protection
Layout under the Design drawings and Working Drawings.

August 16, 2010


Monday, 7:00AM – 6:30PM
- Double-checking of Mechanical (Air-conditioning) and Fire protection Layout of some
Tenants for their submitted Design drawings and Working Drawings.

August 17, 2010


Tuesday, 6:40AM – 5:00PM
- Arranging and Double-checking some office Documents/Files.
- Lecture by Engr. Roberto Lozada on Power Factor and Capacitor Banking.
- Making an Evaluation of Contractor’s bid through Microsoft Spread Sheet.
- Heat Load Calculation for DR Recovery Facility (Cybergate Cebu).

August 18, 2010


Wednesday, 7:00AM – 5:00PM
- Lecture by Engr. Roberto Lozada about Heat Load Calculations regarding the DR Recovery
Site at Cybergate Cebu.
- Estimation of Ductworks for the proposed industrial Building at Sto. Tomas, Batangas.

August 20, 2010


Friday, 6:40AM – 6:30PM
- Discussion by Engr. Roberto Lozada on proposition for the automation of Moving walks
(Walkalator).
- Tabulation of Air-conditioning units used in the proposed industrial Building at Sto. Tomas,
Batangas.
- Monitoring of provision of two Tenants at Level 3, RP-Galleria.
- Lecture conducted by Engr. Roberto Lozada about the Ozone Depletion Process.

August 23, 2010


Monday, 6:50AM – 6:30PM
- Inspection for the opening of a tenant (Karimadon) at Level 3, RP-Galleria.
- Billing of Pipe works for muffler extension of Generator set at Robinsons General Santos
(100% payment recommendation for release).

August 24, 2010


Tuesday, 6:50AM – 6:00PM
- Re-estimation of in-house evaluation for proposed project of 5-toner FCU capacity of a tenant
(Comic Odyssey).
- Lecture conducted by Engr. Roberto Lozada about the different standards used in Chillers.
- Inspection of ACCU (Air Cooled Condensing Units).

August 25, 2010


Wednesday, 6:50AM – 5:00PM
- Encoding of files/ typing job for EQR (Engineering Quote Request) and In-House Estimation;
Photo Copying of Documents; Canvassing of a FCU (Fan Coil Unit) price via phone land line.

August 26, 2010


Thursday, 6:50AM – 6:30PM
- Discussion lead by Engr. Roberto Lozada on how an ACCU (Air Cooled Condensing Unit) will
distribute its capacity evenly to the different lessees with different time of operation.
- Inspecting the Mechanical As-built plan, mainly on the diffusers of tenant (Wizz Mind), at
Level 3, RP-Galleria.

August 27, 2010


Friday, 6:40AM – 6:30PM
- Designing of New Exhaust Duct for Installation; Filing of Mechanical and Fire protection
Blueprints.

August 31, 2010


Tuesday, 6:50AM – 5:00PM
- Checking and noting some Guidelines for Mechanical (Air-conditioning & gas Installation) and
Fire protection Layout under the Design drawings and As-Built Drawings.

September 1, 2010
Wednesday, 6:50AM – 5:00PM
- Checking and noting Mechanical (Gas Installation) blueprints under the Design drawings.
- Monitoring the provision of a lessee (TGI Fridays) at Level 2 – East Wing, RP-Galleria.

September 2, 2010
Thursday, 7:00AM – 6:00PM
- Checking and noting some Guidelines for Mechanical (Air-conditioning) and Fire protection
Layout under the Design drawings and Working Drawings; Filing of Blueprint/ drawings.

September 3, 2010
Friday, 7:22AM – 6:48PM
- Room Temperature Monitoring at all RLC Administrative Office using a Digital Psychrometer.
- Inspection of Tenant (Tuna Davao Grill), if they have complied in their As-Built Plan.
- Checking for Mechanical (Air-conditioning) and Fire protection Blueprints under the Design
drawings and Working Drawings.

September 6, 2010
Monday, 6:45AM – 6:20PM
- Doing some Office works such as Filing, Stamping, Receiving, and Typing.
- Practice AutoCAD Drawing.

September 7, 2010
Tuesday, 6:52AM – 5:05PM
- Inspection for the Provision of a tenant (Alcatel) at level 1.
- Heat Load Calculation for tenant (Hip Culture) at level 3.

September 8, 2010
Wednesday, 7:46AM – 5:06PM
- Visiting and observing the Systems of Cooling Towers, Chillers, Chilled Water Pump, and
Condensed Water Pump on the Roof deck.

September 9, 2010
Thursday, 6:42AM – 6:45PM
- Making a Technical-Bid Evaluation and an In-House Estimation; Doing such other office
works.

September 13, 2010


Monday, 6:39AM – 6:55PM
- Measuring the floor area of Sun Cellular at Level 4, West Wing for Heat Load Calculation.
- Discussion lead by Engr. Roberto Lozada about the Time of Use of loads such as Lighting
and Motors, in RP-General Santos.
- Inspection of the AHU (Air Handling Unit) no.’s 06, 07, 89, and 47 for the proposed repair.

September 14, 2010


Tuesday, 6:51AM – 5:13PM
- Encoding the Computed Heat Load Calculation for Sun Cellular located at Level 4, West
Wing.
- Discussion lead by Engr. Roberto Lozada about the Engineering Values.
- Doing some office works such as AutoCAD Drawing.

September 15, 2010


Wednesday, 6:54AM – 5:10PM
- Revision of Drawings for the Proposed Rectification of Exhaust Ducting at RP-Dasmariňas.

September 16, 2010


Thursday, 6:49AM – 6:07PM
- Checking and noting some Guidelines for Mechanical (Air-conditioning) and Fire Protection
layout under the Design drawings and Working Drawings.

September 17, 2010


Friday, 6:40AM – 5:10PM
- Checking of Fire Protection and Mechanical layout under the Design drawings for approval.
- Inspection of Tenant (What A Girl Wants) based on its As-Built Plan, located at Level 3.
- Checking the Provision of a tenant (Ducts Unlimited) located at Sports Loop, Level 3.

September 20, 2010


Monday, 6:53AM – 6:18PM
- Checking and noting some Guidelines for tenant’s Mechanical (Air-conditioning) and Fire
Protection layout under the Design drawings and Working Drawings.

September 21, 2010


Tuesday, 6:44AM – 6:41PM
- Visiting and observing the STP (Sewage Treatment Plant) of RP-Galleria.
- Checking of Fire Protection and Mechanical (Air-conditioning) layout under the Working
Drawings.

September 22, 2010


Wednesday, 7:13AM – 5:13PM
- Canvassing for the price of an Exhaust Fan (wall mounted, approximately ± 14” x 14” panel).
- Lecture lead by Engr. Roberto Lozada on renovation of a Generator Set.
- Monitoring the provision of two lessees located at Level 2 and 3 respectively.
- Visiting the STP (Sewage Treatment Plant) of RP-Galleria.

September 23, 2010


Thursday, 6:43AM – 6:30PM
- Inspecting the provision of a lessee (Saizen) located at Level 3.
- Inspection the mechanical scopes and works of two tenants (Metro Dental and The Athlete’s
Foot) before store opening, located at Level 3.
- Checking the Fire Protection and Mechanical As-built Plan of Converse store (beside The
Athlete’s Foot store).
September 24, 2010
Friday, 7:02AM – 6:33PM
- Visiting the Operations and Maintenance Engineering Department to observe how the Chiller
System works.
- Re-checking the FCU’s (Fan Coil Unit) and AHU’s (Air Handling Unit) capacity of tenant
(Saizen) for provision.
- Checking the Fire Protection and Mechanical blueprints under the Design and Working
Drawings.

September 27, 2010


Monday, 6:45AM – 5:04PM
- Visiting the Operations and Maintenance Engineering Department at basement 1 to observe
and take some photos of the Chiller System and the Generator Sets.
- Record Keeping of plan and layout Designs for CPPD.

September 28, 2010


Tuesday, 6:46AM – 6:00PM
- Inspection of A-Built Plan of Tenant (TGI Friday’s) located at Level 2 for the compliance to the
Mechanical (Air-conditioning) and Fire Protection Works.
- Heat load computation and Canvassing for the price of the Calculated capacity of a Window
type A/C unit.

September 29, 2010


Wednesday, 6:48AM – 5:10PM
- Lecture conducted by Engr. Roberto Lozada about the demand to operate the Generator set
and Chiller at the same time with regards in saving the cost of electricity.
- Checking and noting some Guidelines for tenant’s Mechanical (Air-conditioning) and Fire
Protection, Working Drawings.

September 30, 2010


Thursday, 6:47AM – 6:19PM
- Discussion lead by Engr. Roberto Lozada about the problem in Robinsons place Metroeast in
having a low power factor.
- Doing office works such as Filing, Record keeping, and stamping of Blueprints.

October 1, 2010
Friday, 7:00AM – 6:54PM
- Discussion lead by Engr. Roberto Lozada concerning the proper installation of capacitors for
circuits having motor loads, and also the new relocation of RP-Galleria’s Generator Set Water
Tank.
- Inspecting the tenant’s site (Mrs. Pixels), in compliance to their As-Built Plan.
- Gathering of data such as Dry bulb and Wet bulb Temperature, and Air Volume Displacement
at the AHU (Air Handling Unit) no. 47, for repair purposes.
October 4, 2010
Monday, 6:47AM – 6:32PM
- Re-checking the Mechanical As-built Layout at the tenant’s site (Mrs. Pixels) to verify the
location of Ductworks and FCU (Fan Coil Unit) capacity.
- Inspecting the tenant’s (Al Terra) site for its Fire Protection As-Built Layout, located at Sports
loop, level 3.
- Visit the Cooling Tower Systems to take some photos.

October 5, 2010
Tuesday, 6:56AM – 6:00PM
- Discussion lead by Engr. Roberto Lozada on the updates regarding the problem at RP-
Metroeast, and also the problem in RP-Ilocos on Water Treatment especially in its Total
Dissolved Solids of final effluent.

October 6, 2010
Wednesday, 6:47AM – 5:30PM
- Lecture conducted by Engr. Roberto Lozada on problem at RP-Manila about its STP
(Sewage Treatment Plant) that releases foul odor.
- Inspection of provision of a kiosk tenant (Lowe Pro) located at My Domain, Level 1, for its Fire
Protection and Mechanical (A/C) concern.