August 6, 2010
Friday, 7:00AM – 6:00AM
- Observing the tenant’s Air-conditioning System (Team Pacquiao)
- Lecture of Heat Load Calculations and Sprinkler Construction by Engr. Phyllip James Cajigal.
- Lecture by Engr. Roberto Lozada about sewage treatment plant and engines (diesel and
gasoline).
- Visiting the Fire Pump Station and cleaning its control panel board at Basement 1.
August 9, 2010
Monday, 6:50AM – 6:00PM
- Visiting the Generator Set at the Basement 1.
- Lecture of Diesel Engine fuel line by Engineering Director Roberto Lozada.
- Double-check the Mechanical and Fire Protection Layout under the Working drawings and
the Design drawings.
September 1, 2010
Wednesday, 6:50AM – 5:00PM
- Checking and noting Mechanical (Gas Installation) blueprints under the Design drawings.
- Monitoring the provision of a lessee (TGI Fridays) at Level 2 – East Wing, RP-Galleria.
September 2, 2010
Thursday, 7:00AM – 6:00PM
- Checking and noting some Guidelines for Mechanical (Air-conditioning) and Fire protection
Layout under the Design drawings and Working Drawings; Filing of Blueprint/ drawings.
September 3, 2010
Friday, 7:22AM – 6:48PM
- Room Temperature Monitoring at all RLC Administrative Office using a Digital Psychrometer.
- Inspection of Tenant (Tuna Davao Grill), if they have complied in their As-Built Plan.
- Checking for Mechanical (Air-conditioning) and Fire protection Blueprints under the Design
drawings and Working Drawings.
September 6, 2010
Monday, 6:45AM – 6:20PM
- Doing some Office works such as Filing, Stamping, Receiving, and Typing.
- Practice AutoCAD Drawing.
September 7, 2010
Tuesday, 6:52AM – 5:05PM
- Inspection for the Provision of a tenant (Alcatel) at level 1.
- Heat Load Calculation for tenant (Hip Culture) at level 3.
September 8, 2010
Wednesday, 7:46AM – 5:06PM
- Visiting and observing the Systems of Cooling Towers, Chillers, Chilled Water Pump, and
Condensed Water Pump on the Roof deck.
September 9, 2010
Thursday, 6:42AM – 6:45PM
- Making a Technical-Bid Evaluation and an In-House Estimation; Doing such other office
works.
October 1, 2010
Friday, 7:00AM – 6:54PM
- Discussion lead by Engr. Roberto Lozada concerning the proper installation of capacitors for
circuits having motor loads, and also the new relocation of RP-Galleria’s Generator Set Water
Tank.
- Inspecting the tenant’s site (Mrs. Pixels), in compliance to their As-Built Plan.
- Gathering of data such as Dry bulb and Wet bulb Temperature, and Air Volume Displacement
at the AHU (Air Handling Unit) no. 47, for repair purposes.
October 4, 2010
Monday, 6:47AM – 6:32PM
- Re-checking the Mechanical As-built Layout at the tenant’s site (Mrs. Pixels) to verify the
location of Ductworks and FCU (Fan Coil Unit) capacity.
- Inspecting the tenant’s (Al Terra) site for its Fire Protection As-Built Layout, located at Sports
loop, level 3.
- Visit the Cooling Tower Systems to take some photos.
October 5, 2010
Tuesday, 6:56AM – 6:00PM
- Discussion lead by Engr. Roberto Lozada on the updates regarding the problem at RP-
Metroeast, and also the problem in RP-Ilocos on Water Treatment especially in its Total
Dissolved Solids of final effluent.
October 6, 2010
Wednesday, 6:47AM – 5:30PM
- Lecture conducted by Engr. Roberto Lozada on problem at RP-Manila about its STP
(Sewage Treatment Plant) that releases foul odor.
- Inspection of provision of a kiosk tenant (Lowe Pro) located at My Domain, Level 1, for its Fire
Protection and Mechanical (A/C) concern.